On the agenda: Grand Rapids meeting — data center (May 7)
Past ⚠ Agenda Watch Grand Rapids, Michigan · Thursday, May 7, 2026 — 4 months ago
About this record
The published agenda for this May 7 meeting contains: "data center". The meeting has passed; the record and its outcome live here permanently.
Check the agenda document for the meeting time.
The agenda, word for word
Government public record — the full text of the published document, archived August 25, 2026. Gold highlighting of key terms is ours, not the original’s. Read the original document ↗
Kent County Department of Public Works
1045 Wealthy St. SW
Grand Rapids, MI 49504
616.632.7920
reimaginetrash.org
AGENDA
May 7, 2026
8:30 AM
Kent County Department of Public Works
Recycling & Education Center
977 Wealthy St. SW
Grand Rapids, MI 49504
I.
Call to Order
II.
Consent Agenda
A. Approval of the Minutes – April 16, 2026
B. Approval of Monentary Outlays – March 2026
III.
Waste to Energy Facility Operations
A. AMP Sortation Presort Pilot Project – AR
B. WTE FY2025/2026 Q2 Transfer Report
IV.
Accounting & Finance
A. YTD Financial Summary
V.
Director’s Report
A. Food Waste Collection Program Kickoff
B. MACT Update
C. DPW Dashboard
VI.
Public Comment/Miscellaneous
VII.
Adjournment
2026 Board of
Public Works
Dan Burrill, Chair
Stan Stek, Vice Chair
Kris Pachla, Secretary
Stephen Kepley
Greg Madura
Jenn Merchant
Ken Yonker
Darwin Baas, Director
Table of Contents
April 16, 2026 Minutes
2
March 2026 Monetary Outlay
12
AMP Sortation Presort Pilot Project - AR
13
Pilot Term Sheet
14
AMP At A Glance
17
OCC - Plastic Separation Calculations
27
WTE Transfer Report
28
Food Waste Collection Program Kickoff
30
March 2026 Dashboard
36
1
KENT COUNTY BOARD OF PUBLIC WORKS
April 16th, 2026
8:30 AM
Kent County Department of Public Works
Large Conference Room, 2nd Floor
977 Wealthy St. SW
Grand Rapids, MI 49504
MEMBERS PRESENT:
Commissioner Burrill, Yonker, Pachla, Merchant,
Supervisor Madura, Mayor Kepley
MEMBERS ABSENT:
Commissioner Stek
OTHERS PRESENT:
Darwin Baas, Director; Nic VanderVinne, Deputy Director;
Nautika Tyler, Division Financial Supervisor; Katie
McSpaden, Senior Administrative Specialist; Matt
McPherson, Marketing & Communications Manager; Isaac
Thaler, Resource Recovery/Recycling Supervisor; Nathan
Yeomans, Environmental Compliance Manager; Dan Rose,
Solid Waste Operations Manager; Paul Smith, Waste-toEnergy Manager; Emma Dillman, Waste Reduction
Educator; Jonathan Neracher, Household Hazardous Waste
Supervisor; Joe Mannlein, Resource Recovery Specialist;
Jesse Douglas, Vicinity Energy; Ron Mills, Civil Engineer;
Robert Swain, Grand Rapids Public Works; John Van
Tholen, VTA; JerriLynn Osmar; Citizens Climate Lobby
I.
Call to Order
Chair Burrill called the meeting to order at 8:30 a.m.
II.
Consent Agenda
a. Approval of the Minutes – March 5, 2026
b. Approval of Monetary Outlays – February 2026
Motion
It was moved by Supervisor Madura and supported by Mayor Kepley to approve the Consent
Agenda.
Motion carried unanimously.
2
III.
Administration
a. BPW Standing Rules 2026 – AR
The Board of Public Works exercises all the powers, duties and authority as provided
to it by Act 185 of the Public Acts of 1957 (MCLA § 123.731 et seq.), as amended,
and pursuant to the rules, regulations, policies and resolutions of the Kent County
Board of Commissioners.
With changes to board membership adopted by the Kent County Board of
Commissioners that became effective January 1, 2026, Corporate Counsel revised and
updated the BPW Standing Rules last approved in 2014
Motion
It was moved by Mayor Kepley and seconded by Supervisor Madura to approve and adopt the
2026 Standing Rules for the Kent County Board of Public Works
Motion carried unanimously.
•
•
Cleaned up the document, adjusted the layout of the agenda.
Main change is member list updated.
o Removed Road Commissioner and one Commissioner.
o Added the township and city representative.
b. Bond Financing Resolution – AR (attached at end of document)
•
•
•
•
•
Dickinson & Wright is our bond counsel. Drafted language and resolution/payment
schedules. Goes to the Finance Committee on May 5th, full Board of Commissioners on
May 17th.
A proposed resolution went to the Board of Commissioners authorizing the issuance of
the bond series 2026.
o Board determined it is in the best interest of the county to approve the proposed
resolution and recommend its adoption by the Kent County Board of
Commissioners.
Mayor Kepley: recommendation to add a 10-year mark to redo the agreement.
o There is time to adjust before going to the full board.
o Will have a discussion with Jeff Dood from Fiscal Services on if that language is
needed, or if it is a given.
Supervisor Madura: How sure are we to get bond under 6%?
o Jeff Dood works with organizations that issue schedule.
o Rates have not bene volatile as far as known, nothing has been over 4%.
Supervisor Madura: How aggressive will we be to pay off early?
o Future boards will look at budget and decide options.
3
•
o Example being at the Recycling & Education Center, the bond was refinanced and
carried full 20 years.
o Unable to pay off before the 10-year mark. 2036 is the earliest it can be paid fully.
o Kent County has a history of paying debts off early.
Discussions had on enterprise revenue funds and solid waste surcharge.
o Reserve could go towards other projects that are necessary in the future.
c. SafeChem Services Agreement for Barry County – AR
With the cost and limited access of a single household hazardous waste collection
event, Barry County partners with the Kalamazoo County Household Hazardous
Waste Center to provide its residents year-round access to a disposal program
with reimbursement to Kalamazoo County.
Barry County inquired if Kent County DPW could provide a similar program to
better serve northern Barry County residents at the South Kent SafeChem facility.
Under the terms of the FY2026 agreement, Barry County will fund their resident’s
access to the SafeChem Center Program Services up to a maximum amount of
$7,800 for the services under the Agreement. DPW will agree to provide 200
vouchers at $39 each.
Costs charged to Barry County for their residents to use of the SafeChem Center
Program will be based upon the actual number of household equivalents served.
Barry County will be charged a participation fee of $39.00 per household
equivalent, the average cost of a Kent County resident using the program.
Motion
It was moved by Supervisor Madura and seconded by Mayor Kepley to approve a SafeChem
Household Hazardous Waste Disposal Program Agreement with Barry County for FY2026.
Motion carried unanimously.
•
IV.
Mayor Kepley: Do we check ID’s now? Technically, they could drop off now and not
know.
o Some counties flow here. We use the term “live, work, or play” for the program.
Majority of our residents are local.
o By issuing the voucher, we create path to formalize agreement.
o Works well with Kalamazoo County and helps their customers with inquiries.
o Necessary for our program, we had over 11,000 people use the program last year.
Waste to Energy Operations
4
•
•
•
•
•
•
We are in the largest outage at Waste-to-Energy we have had in a while.
o To replace scrubber with unit 2.
o Turbine generator; replacing the DC inverter, doing maintenance on piping
systems, sandblasting, inspecting and replacing parts.
o Done every seven years.
o Turbine is 40 years old now.
o A lot of work is being done right now to stay in compliance. The plan is to meet
not only emission standards but continue to generate electricity once the turbine is
refreshed.
a. 2025 Emissions Data Test Results
Packet includes actual boiler conditions and shows examples of where we have permit
limits for a variety of things.
o Unit 1 operates 86% below allowance for SO2 (Sulfur Dioxide).
Replacement of the scrubber on unit 1 last year saw a reduction in reagents used to treat
the flu gas before it came out of the facility.
o Expect to see improvements when unit 2 is replaced as currently it draws excess
air into the system because of the rust and holes.
b. MACT Ruling
Memo put together with assistance from Madison Consulting regarding Title V Permit.
Final ruling has challenges but is more favorable than draft.
o EPA (Environmental Protection Agency) listened to concerns.
o Can meet emissions with current equipment.
o Net cost is predicted to be $50,000 a year, which will be paperwork and
adjustments internally.
▪ Opposed to the predicted $30M over 10 years if the draft rule went
through.
o There is more risk than award to challenge review.
▪ Opposition could lead to bigger impacts and reworks less in our favor.
o Due to minimal financial impact and ability to meet the ruling, it is recommended
to not challenge.
o Must comply and be ready to meet new stack test requirements based on the final
rule in five years. (State of Michigan (Environment, Great Lakes and Energy)
administers the Title V Permit in their own program).
▪ We are also making those with the new scrubbers being input.
▪ Public Works have already done things to prepare for the changes.
▪ Ready to meet with minimal financial impact.
Supervisor Madura: Is there a way to get operators certified ahead of time?
o Only if you can get operators that are already certified.
5
•
•
V.
•
o Must have 6-months experience in the plant to get certification.
o Interpreted as an impossible task to have all certified before being at the plant,
will check with EPA if this is a reasonable adjustment.
o Jesse Douglas discussed the development program at the plant.
▪ It is a career ladder in Vicinity.
▪ Those in the plant already by the time they are ready to do the testing.
▪ There are some challenges with resignations and retirements.
• This is where the task becomes impossible and agree that it is not
feasible.
Commissioner Pachla requests to be updated before the next board meeting on what the
Waste-to-Energy Association decides on challenges.
o May 11th is the deadline for challenges; meeting being held with the Association
this afternoon to discuss.
Mayor Kepley: regarding destruction efficiency requirement of the control equipment, are
there alternate control to help resolve HCl (Hydrogen Chloride) concentration issue?
o HCl is treated with lime injection process.
o Alternative process is still allowed under MACT ruling.
o Jesse Douglas discussed the emissions from materials that come to the facility. We
can’t control what materials come to the facility. Waste stream is different
between geography and months.
▪ Florida will have different trash than Michigan.
▪ December will see different waste than July.
Accounting & Finance
a. FY2025-FY2026 2nd Q Revenue Comparison
How well are we doing under the new rate structure?
o Outpacing 2025.
o Commodity sales dropped.
o Solid waste surcharge up.
▪ Collecting and remitting was recorded quicker this year.
o Waste to Energy rate balanced to same as North Kent and South Kent.
b. FY2027 Operations Budget (Revised) – AR
DPW administration developed a fiscally conservative FY2027 Operations budget
projecting lower revenues and expenses during a FY2026 transition year to
countywide flow control of municipal solid waste (MSW). The Board of Public
Works adopted the initial FY2027 operations budget at their March 5, 2026
meeting.
6
Using FY2026 January - February revenue actuals, DPW finance staff revised
revenue forecasts with an increase revenue projection of $3,724,400. Operating
expenses remain unchanged and the additional revenue, when realized, we be
allocated to contingency and used for future year operating expenses or capital
improve fund expenditures as approved by the Board.
Motion
It was moved by Commissioner Pachla and seconded by Mayor Kepley to approve the
Department of Public Works 2027 Revised Operations Budget to be submitted to County
Administration.
Motion carried unanimously.
•
Commissioner Pachla: Any more thoughts about using money to reduce tip fees?
o Dollars can be spent.
o Major turbine outage means no generation of electricity. Have a $1M fund to help
soften that loss during outage.
o We also have the Sustainable Business Park and South Kent Transfer Station
infrastructure.
▪ Discussing various funding were lined out could be and will be spent.
▪ The funding is set aside but is part of the cash reserve.
▪ It is tracked and set aside inside that reserve.
c. FY2027 Accrual Budget – AR
Annually the Department of Public Works prepares a Rate Study for its operations. This rate
study is a cash basis income statement, and its primary use is to set disposal rates to cover cash
expenditures including wages, benefits, operating expenses, capital improvements and debt
payments.
The budget submitted to the Controller’s Office is a full accrual basis budget and audited
financial statements are filed on this basis. Therefore, the rate study has adjustments for capital
improvement plan expenditures, principal payments, landfill cell construction reserves and
internal fund contributions.
Annual approval of a full accrual basis budget by the Board of Public Works streamlines and
enables the Board to make any needed budget adjustments instead of bringing these requests to
the Board of Commissioners and recommended by the County Budget Director for DPW
Enterprise Funds.
Motion
7
It was moved by Commissioner Pachla and seconded by Supervisor Madura to approve the
FY2027 Accrual Budget for the Department of Public Works showing revenues of $70,167,502
and expenses of $70,167,502.
Motion carried unanimously.
VI.
•
•
Director’s Report
Kent County Public Works has eight total food waste bins ready.
o Two will be at Recycling Facility, two at the North Kent Transfer Station.
o April 22nd launching the program.
o Commissioner Pachla will share a few words during the launch.
Sustainable Business Park
o Door Township reapproved the Planned Unit Development package.
o Going to their full board next week, April 23rd.
o As residents are worried of the data centers being built, they could be worried
about the characteristics of our facility.
a. City of Grand Rapids Circular Economy Grant – Letter of Support
•
Grant submitted by Grand Rapids Public Works, we drafted a letter of support regarding
food waste collection.
b. DPW Dashboard
VII. Public Comment/Miscellaneous
• No Public Comment.
• Board Miscellaneous:
o Mayor Kepley: Now that flow control is active, has anything changed with the
six-cities? Are they still going to Waste-to-Energy?
▪ This first year we agreed to not direct material to any specific facility. This
year, it remains to be seen.
▪ Manager Paul Smith has noticed a slight increase in material.
▪ Industry loves to tip on concrete.
• North Kent volumes are up 40% this year.
• South Kent is not seeing much of an increase.
▪ Mayor Kepley noted that he would like to see the material direction
resolve sooner than later.
▪ Board strategic review is currently ongoing.
8
•
▪
Waiting for that review to be completed before recommending the
type of technical committee and who needs to sit on it to discuss
these types of concerns and logistics.
Commissioner Pachla: When do we start to direct materials from facilities
and how would a South Kent Transfer Station impact this?
• It was also requested by Commissioner Pachla to have transfer
tonnage included in the data.
• Any decision to move forward with the South Kent Transfer
Station program design will depend on a 2–3-year process.
• Based on the cost of the North Kent Transfer Station, South Kent
would likely be double the size and cost around $25M.
VIII. Adjournment
• Adjourned at 9:28 AM.
9
10
11
KENT COUNTY DEPARTMENT OF PUBLIC WORKS
MONETARY OUTLAY SUMMARY
March 31, 2026
COMPANY
AMOUNT
ADMINISTRATION
$
133,646.06
SOLID WASTE OPERATIONS
$ 1,506,808.03
WASTE-TO-ENERGY OPERATIONS
$ 1,574,180.34
TOTAL MONETARY OUTLAY
$ 3,214,634.43
I certify that these disbursements have been reviewed and recommend that they be paid from the approved
operating/CIP budget.
Nautika Tyler, Division Financial Supervisor
12
MEETING DATE: May 5, 2026
BOARD OF
PUBLIC WORKS
ACTION REQUEST
AGENDA ITEM#: III-A
SUBJECT: AMP ONE Sortation Pilot Project
DIVISION: Waste-to-Energy Facility Operations
PREPARED BY: Darwin J. Baas, Director
ACTION REQUESTED:
To approve and authorize the Director to enter a contract with AMP Robotics Corporation (AMP) to
install an AMP ONE sortation system for a two (2) year pilot at the Kent County Waste-to-Energy
(WTE) Facility.
SUMMARY OF REQUEST:
DPW, AMP and Vicinity Energy have completed a feasibility assessment to install a mixed waste
sortation line at WTE to remove recyclables from inbound loads prior to combustion. Based on the
outcomes of the study, AMP is ready to proceed to a pilot project to install sortation equipment.
The pilot project will include the installation of an AMP ONE sortation system configured to sort up to
two (2) target material categories from inbound municipal solid waste. The focus of the pilot project
is to evaluate the removal efficiency, marketability, and reduction in thermal loading for plastics and
old corrugated cardboard (OCC) prior to combustion.
The feasibility assessment indicates combustion throughput could be increased by up to 30,000 tons
annually with the removal of 5000 tons of OCC and 5000 tons of plastics. As a demonstration pilot
project, AMP will provide the sortation system, including installation and operation, for a period of 24
months and will not charge any processing fees to Kent County.
Corporate Counsel will review and approve the contract as to form with terms to parallel the term
sheet.
SUGGESTED MOTION:
It was moved by Commissioner
and seconded by Commissioner
to approve
and authorize the Director to enter a contract with AMP Robotics Corporation to install an
AMP ONE sortation system for a two (2) year pilot at the Kent County Waste-to-Energy
Facility.
ATTACHMENTS:
AMP Term Sheet
OCC – Plastics Combined Removal Summary
Kent – AMP Presentation
GOVERNING/ADVISORY BOARD APPROVAL DATE:
DEPARTMENT DIRECTOR:
DATE: 04.29.2026
13
CONFIDENTIAL, NON-BINDING TERM SHEET
AMP Robotics Corporation & Kent County, Michigan
For Discussion Purposes Only
April 28, 2026
Purpose: This Non-Binding Term Sheet is only for purposes of discussion of the key business points of an anticipated pilot agreement
(“Agreement”) between AMP and Kenty County (or Kent County’s contractor, Vicinity Energy). Once completed and conceptually agreed
upon, this Term Sheet is intended to serve as a common drafting target to guide the legal representatives of the parties during anticipated
contract negotiations. No agreement shall be effective unless and until mutually agreed to and executed by the parties.
1) AMP ONE Pilot Program & Term
a) AMP will design, build and install an AMP ONE® sortation system (“System”) inside the existing Kent
County Waste-to-Energy (“WTE”) facility located at _____________ (the “Facility”).
b) Following AMP’s completion of installation and testing and the parties obtaining/updating all required
permits and approvals, AMP will operate and maintain the System within the Facility for a period of twentyfour (24) months (the “Pilot Term”). The first nine (9) months of the Pilot Term shall be referred to as the
“Minimum Term”.
c) The System will include the AMP Smart Sortation® Services (the “Services”) described below.
2) AMP Smart Sortation Services
a) AMP will operate and maintain the System with such AMP sortation technology as AMP may designate from
time to time. The System will be designed to be configurable to sort up to two (2) target material categories
from the acceptable inbound municipal solid waste (“MSW”) stream.
b) The System will be able to process up to 25 tons of MSW per hour.
c) Kent County will deliver a minimum of [X] tons per month of acceptable MSW for processing by the System.
Kent County will not deliver more than [Y] tons per month of acceptable MSW for processing by the System.
d) AMP will operate the System for up to one (1) approximately eight (8) hour shift per day, up to five (5) days
per week (excluding holidays and weekends).
e) AMP will not guarantee any Service Level Agreements (SLAs), Key Performance Indicators (KPIs) or other
specific performance metrics during the Pilot Term.
3) Fees, Costs & Responsibilities
a) In consideration of Kent County being an early adopter of AMP ONE technology for use in connection with
WTE, AMP will not charge Kent County a processing fee for the System or its operation and maintenance
during the Pilot Term.
b) Kent County will be responsible for managing, and shall bear full financial responsibility for, the following:
14
i)
Sourcing and delivering the identified amounts of acceptable MSW to the Facility for intake by the
System.
ii) Removing and disposing unacceptable MSW and post-processing residue.
iii) Providing all power and utilities for the System and the Facility.
iv) Providing all equipment and staffing necessary to support all intake operations (depositing MSW into
the System via intake reducer) and offtake operations (see below).
v) Timely obtaining/updating all required permits and consents with respect to the Facility and its
operations.
vi) Addressing any impacts to Kent County contractual rights/obligations with Vicinity Energy and any
other Kent County service providers.
vii) Obtaining any required consents or cooperation from Vicinity Energy, and any other Kent County
service providers, with respect to the System, the Facility and/or the Pilot Program.
viii) Reasonably cooperating with AMP in the performance of AMP’s obligations.
c) AMP will be responsible for managing, and shall bear full financial responsibility for, the following:
i)
Design, building, installation, operation, and maintenance of the System, including associated labor
costs.
ii) Obtaining all required permits and consents with respect to installation of the System.
iii) AMP employees necessary to support operation and maintenance of the System.
iv) Examining and rejecting unacceptable MSW.
v) Reasonably cooperating with Kent County in the performance of Kent County’s obligations.
4) Offtake
a) Title to all materials shall remain solely with Kent County.
b) Kent County is responsible for any and all transportation, further processing, and/or disposal of sorted
material, unsorted material, and all other residue.
5) Licenses, Intellectual Property & Data
a) Kent County will grant AMP a site license within the Facility to install, use, operate, and maintain the System
for the duration of the Pilot Term. Kent County will cause the site to be installation and operation ready in
accordance with all specified, reasonable requirements provided by AMP. AMP will have no obligation to
pay any rent, costs or other fees to Kent County, Vicinity Energy, or any other Kent County service provider
with respect to the Pilot Program or the installation, operation, or maintenance of the System.
b) Kent County will also provide AMP, at no cost to AMP, with all necessary access to the Facility to perform
the contracted for services and operations.
c) As between the parties, AMP exclusively owns and shall retain all intellectual property rights in and to the
System.
d) AMP shall collect and analyze data with respect to all materials that pass through the System (“System
Data”). AMP shall retain ownership of all rights with respect to System Data, including but not limited to
15
the rights to use System Data to test, train, create, improve and enhance its products, services and sorting
algorithms.
e) AMP shall grant Kent County a perpetual, limited license to use and retain System Data for the purpose of
managing their waste stream.
f)
Standard confidentiality provisions shall apply.
6) Conclusion of Pilot Term
a) At any time following the completion of the Minimum Term, Kent County may terminate the Agreement and
the Pilot Term upon thirty (30) days prior written notice to AMP.
b) Following the Pilot Term, the parties may mutually agree to extend the Agreement for one (1) additional
twelve (12) month period (“Extension Term”). Pricing for the use of the System during any such Extension
Term to be discussed by the parties.
c) Following the expiration or termination of the Pilot Term and any Extension Term, AMP will be responsible
for uninstalling and removing the System.
7) Contracting Parties
a) AMP and Kent County to discuss and reach agreement as to whether the Agreement shall be a direct
contract between AMP and Kent County, or a subcontract between AMP and Vicinity Energy. To the extent
Kent County requires AMP to subcontract with Vicinity Energy, the above proposed terms are subject to
change.
16
■
Pioneered AI-driven sortation — over a decade of experience using computer vision and AI to
identify and process materials
■
Scaled global deployment — systems installed in ~⅓ of U.S. MRFs and operating across North
America, Europe, and Japan
■
Next-generation facilities — trailblazing deployment of fully automated sortation facilities for
single-stream and MSW with over a half-decade of proven operational track record
■
Transforming waste infrastructure — redefining how materials are sorted, recovered, and valued
■
Proven and unique leadership team — combining AI/technology expertise with deep waste
management operations experience
17
© 2026 AMP™. Confidential.
AMP PILOT
Pilot Details
●
●
●
From 9 - 24 months in length, 8 hours a day, 5 days a week - up to 25 tons per hour, 50,000 tons per year
Install in existing infrastructure
Neural Network is configurable - Kent/AMP can change targeted items
○ Reduce BTU/lb to increase throughput
○ Target various commodities - Cardboard, Paper, Plastics - generate revenue, prove saleability
○ Can configure many plastic types or a single category like HDPE Natural
○ Emission management - target upstream waste items that have impact downstream emissions
Reduce
Thermal
Loading
www.ampsortation.com
Extend
Landfill
Life
Increase
Circular
Economy
Flexible
Pilot
18
© 2024 AMP ™. Confidential.
Case Study:
Southeastern Public Service Authority
19
www.ampsortation.com
© 2026 AMP™.
Confidential.
© 2024
AMP ™. Confidential.
AMP EXPERIENCE: SPSA
Reducing reliance on landfill and incineration through MSW diversion
Project Details
●
●
●
●
●
SPSA serves 1.2 million residents across 2,500 square miles
After closing its incinerator, SPSA faced tradeoff: landfill dependence vs. alternative processing.
SPSA chose to reduce landfill demand through material recovery and conversion.
AMP’s pilot MSW facility was upgraded in 75 days to process 25 tons per hour.
AMP will convert organic waste into biochar to reduce landfill volume and emissions
20
540,000
100
50%
year contract
tons processed
annually
Jobs created
guaranteed
diversion
20
www.ampsortation.com
© 2024 AMP ™. Confidential.
AMP Technology
21
© 2026 AMP™. Confidential.
22
www.ampsortation.com
© 2024 AMP ™. Confidential.
AMP JETS + AMP VISION
The industry’s most flexible advanced sorting device
■
■
■
www.ampsortation.com
Smarter Sorting, Smoother Operations
The jet autonomously detects issues,
clears jams, and self-improves.
Vision Beyond Optical
AMP Vision detects what NIR can’t
— at a lower cost — ensuring higher
accuracy and adaptability.
Data-Driven Plant Performance
Every sort point delivers actionable
insights, so we continuously optimize
efficiency, uptime, and material recovery.
Single-cut JETS positively
sort recyclables
Residue passes through
to the next JET unit
23
© 2026 AMP™.
Confidential.
© 2024
AMP ™. Confidential.
CHARACTERIZATION DATA
Every load produces real-time data to make
informed improvements with:
▪ Waste characterization
▪ Diversion
▪ Recovery
▪ Mass balances
Reports provide data to help communities
enhance oversight and program
benchmarking
Save money on expensive waste
characterization audits by hand
24
© 2026 AMP™. Confidential.
Background
■
■
■
■
Eight (8) municipalities totalling 1.2 million
residents and generation of approximately
760,000 tons / year of waste.
Nine (9) transfer stations, landfill and closed WTE
facility
Before AMP, landfill would reach capacity by 2060
7% recycling rate
Contract Highlights
■
■
■
■
Twenty (20) year contract for 540,000 tons / year
of MSW
Guaranteed 50% diversion and increase
recycling rate to 20%
Expected diversion of mixed recyclables and
organics
Implementation of all municipalities by 2029
25
www.ampsortation.com
© 2025 AMP ™. Confidential.
Q&A
26
www.ampsortation.com
© 2025 AMP ™. Confidential.
Combined Removal Summary
OCC
OCC Removal (tons)
0
Total Tons (Total Processed including OCC Diverted)
188,055.00
Value of Diversion @$60/ton
Increased MSW Boiler throughput (tons)
Value of Boiler Throughput only @$60/ton
Plastic
Plastic Removal (tons)
0
Total Tons (Total Processed including Plastic Diverted) 188,055.00
Value of Diversion @$60/ton
Increased MSW Boiler throughput (tons)
Value of Boiler Throughput only @$60/ton
Total Combined Values
Total Tons (Total Processed including Diversion)
188,055.00
Value of Diversion @$60/ton
$
Increased MSW Boiler throughput (tons)
Value of Boiler Throughput only @$60/ton
-
$
$
5000
10000
15000
17200
199,995.60
211,936.19
223,876.79
229,130.65
716,435.77 $ 1,432,871.55 $ 2,149,307.32 $ 2,464,539.06
1,940.60
3,881.19
5,821.79
6,675.65
116,435.77 $ 232,871.55 $ 349,307.32 $
400,539.06
5000
10000
15000
31217.13
228,792.48
269,529.97
310,267.45
442,396.46
$ 2,444,248.99 $ 4,888,497.97 $ 7,332,746.96 $ 15,260,487.66
30,737.48
61,474.97
92,212.45
191,907.20
$ 1,844,248.99 $ 3,688,497.97 $ 5,532,746.96 $ 11,514,432.06
220,733.08
$ 3,160,684.76
32,678.08
$ 1,960,684.76
253,411.16
$ 6,321,369.52
65,356.16
$ 3,921,369.52
286,089.24
$ 9,482,054.27
98,034.24
$ 5,882,054.27
386,637.85
$ 17,725,026.72
198,582.85
$ 11,914,971.12
27
2025 WTE Transfer Costs
.
Month
2025 Tonnage 2025 Transfer Costs
Month
January
1,827.12
$31,835.65 January
February
2,897.94
$52,508.15 February
March
6,537.20
$101,708.70 March
Grand Total
11,262.26
$186,052.50 Grand Total
2026 WTE Transfer Costs
2026 Tonnage 2026 Transfer Costs
2,901.69
$46,560.06
5,059.87
$79,697.40
5,690.29
$91,442.28
13,651.85
$217,699.74
28
29
30
31
32
metroKEY Dashboard
33
Access History
34
Bin Information
35
DPW Dashboard - March 2026
REC Commodity Tonnage
CORRUGATED (649)
TIN/SCRAP METAL (90)
MIXED PAPER (976)
Education Center
DAIRY (44)
31 Tours
1,625 Visitors
COLOR (22)
PET (88)
3-7 PLASTICS (60)
GLASS (460)
Aluminum (22)
Year to Date - Tonnage by Site
Waste to Energy
70000
60000
61,681
13,591 tons of
refuse processed
61,487
Generated 8,873
MWh of electricity
50000
40000
250 tons of scrap
metal received
34,856
30000
49 tons of nonferrous metals
recovered
20000
10000
7,882
0
SKL
NKT
WTE
MRF
SwapShop
Incoming
Auto Care
251
119
Home Maintence
228
77
Paints/Stains/Solvents
74
50
Lawn & Garden
Outgoing
253
62
Aerosals
452
249
Cleaners
563
241
Propane Cylinders
15
Personal Care Items
37
130
44
23
27
Misc.
0
100
200
300
400
500
600
36
The government’s own published record — read it yourself, then decide what to do about it.
The facilities, the coverage, and the local record for this community.
Not yet recorded. The record stays open — outcomes are added as minutes and vote results are published.
Provenance
Where this record came from. Every source is listed, permanently.
- Agenda Watch · Aug 25, 2026
Permanent ID DKT-2026-001352 — this record is never deleted.
Record history
Every change to this record, logged as it happened.
- Aug 25, 2026 Filed on the Docket
- Aug 25, 2026 Full document archived — public record
← The full Docket · every meeting, vote, and action on the permanent record · also in the National Record Index.