The published agenda for the March 25, 2026 meeting contains: "data center". The meeting has passed. The agenda stays here as a permanent public record.
Check the agenda document for the meeting time.
The agenda, word for word
Government public record — the full text of the published document, archived August 13, 2026. Gold highlighting of key terms is ours, not the original’s. Read the original document ↗
1
THE
AREA BOARD OF ZONING APPEALS
OF TIPPECANOE COUNTY
NOTICE OF PUBLIC HEARING
DATE ..................................................................................................... MARCH 25, 2026
TIME................................................................................................................... 6:00 P.M.
PLACE ............................................................................... COUNTY OFFICE BUILDING
20 NORTH 3RD STREET
LAFAYETTE, IN 47901
AGENDA
Links to watch the livestream can be found on the APC website at:
https://www.youtube.com/c/TippecanoeCountyGovernment
I.
APPROVAL OF MINUTES
II.
NEW BUSINESS
III.
PUBLIC HEARING
1. BZA-2223 JHS INVESTMENT GROUP LLC
Petitioner and owner, represented by Kevin J. Riley of RTS Law, requests the
following variances for an existing U-Haul business (SIC 751):
1. To reduce the width and number of plant units of a Type C bufferyard along
the side (south) property line from the required 30’ to 15’ (UZO 4-9-3).
2. To reduce the width and number of plant units of a Type C bufferyard along
the rear (east) property line from the required 30’ to 15’ (UZO 4-9-3).
Vote Results
Variance 1
4-Yes and 0-No
Variance 2
4-Yes and 0-No
The GB-zoned property is Lot 1 of J & J Subdivision, commonly known as 5011
Old US Hwy 231 S, in Wea 20 (NW) 22-4.
2. BZA-2224 1ST SOURCE BANK
Petitioner and owner, represented by Ryan Munden of RTS Law, requests a
variance to reduce the required parking for an existing bank (SIC 60) from the
minimum allowed 60 spaces (per Parking Group 8) to 43 spaces. The ORzoned property is Lot 3 of Part 1 of McClure Park Subdivision, commonly known
as 1215 Potter Drive, Wabash 12 (NE) 23-5 (UZO 4-6-3).
Vote Results
4-Yes and 0-No
IV.
ADMINISTRATIVE MATTERS
Planning Pointer: BZA Bylaws
V.
ADJOURNMENT
NCM | g:\apc\agendas\2026 bza agendas\03 march bza agenda packet items\03 march bza (tentative) agenda.docx | Printed:
March 19, 2026
Tippecanoe County does not discriminate on the basis of race, color, national origin, religion, sex, age, marital status, disability, or
veteran status. If you need a reasonable accommodation, including auxiliary aids or language assistance to participate in a public
meeting or access a County service, please contact the Tippecanoe County ADA/Title VI Coordinator at (765) 423-9215 or by email:
[email protected] at least 48–72 hours before the event. Forms and additional details are available on our website:
Tippecanoe County ADA & Title VI Compliance
2
Per Indiana State Statute, the membership of the Area Board of Zoning Appeals must be
included on all agendas starting July 2025. State Code allows each participating jurisdiction to
determine the length of an appointee’s initial term. Upon re-appointment following the end of
their initial term, an appointee then serves a four-year term. The ABZA membership is as
follows:
President Steve Clevenger, Tippecanoe County appointment, 1/26 thru 12/29 (President thru 12/26)
Vice President Robert Novak, City of Lafayette appointment, 3/26 thru 12/29 (Vice President thru 3/27)
Tim VanderPlaats, Tippecanoe County appointment, 1/26 thru 12/29
Ed Butz, City of Lafayette appointment,1/26 thru 12/29
Brad Hallberg, APC appointment,1/26 thru 12/29
Gary Schroeder, APC appointment, 1/26 thru 12/29
Jennifer Page, City of West Lafayette appointment, 3/26 thru 3/12/27 (3-year term per Mayor)
NCM | g:\apc\agendas\2026 bza agendas\03 march bza agenda packet items\03 march bza (tentative) agenda.docx | Printed:
March 19, 2026
Tippecanoe County does not discriminate on the basis of race, color, national origin, religion, sex, age, marital status, disability, or
veteran status. If you need a reasonable accommodation, including auxiliary aids or language assistance to participate in a public
meeting or access a County service, please contact the Tippecanoe County ADA/Title VI Coordinator at (765) 423-9215 or by email:
[email protected] at least 48–72 hours before the event. Forms and additional details are available on our website:
Tippecanoe County ADA & Title VI Compliance
3
AREA BOARD OF ZONING APPEALS OF TIPPECANOE COUNTY
MINUTES OF A PUBLIC HEARING
DATE ..................................................................................................................................February 25, 2026
TIME ................................................................................................................................................. 6:00 P.M.
PLACE..............................................................................................................COUNTY OFFICE BUILDING
20 N. 3RD STREET
LAFAYETTE, IN 47901
This meeting was held in-person.
MEMBERS PRESENT
MEMBERS ABSENT
STAFF PRESENT
Ed Butz
Robert Novak
(WL) - Vacant
Ryan O’Gara
Steve Clevenger
Gary Schroeder
Nathan McBurnett
Brad Hallberg
Tim VanderPlaats
Eric Burns, Attorney
The Area Board of Zoning Appeals of Tippecanoe County public hearing was held in-person on the 25th
day of February 2026 at 6:00 P.M., pursuant to notice given and agenda posted as provided by law.
Steve Clevenger called the meeting to order. Attorney Eric Burns conducted roll call.
I.
APPROVAL OF MINUTES
Robert Novak moved to approve the minutes from the January 28, 2026 ABZA public hearing as
submitted. Ed Butz seconded. The minutes were approved by a unanimous voice vote.
II.
NEW BUSINESS
Ryan O’Gara, APC staff, stated all three cases were ready to be heard.
III.
PUBLIC HEARING
Robert Novak moved that there be incorporated into the public hearing portion of each application to be
heard and to become part of the evidence, the Unified Zoning Ordinance, the Unified Subdivision
Ordinance, the Comprehensive Plan, the By-laws of the Area Board of Zoning Appeals, the application,
and all documents filed therewith, the staff report and recommendation on the applications to be heard,
and responses from the checkpoint agencies. Ed Butz seconded, and motion carried by unanimous voice
vote.
Steve Clevenger read the meeting procedures.
Robert Novak moved to hear and vote on BZA-2220 WALMART REAL ESTATE BUSINESS TRUST.
BZA-2220 WALMART REAL ESTATE BUSINESS TRUST
Petitioner and owner, represented by Heather Werner of Sign Crafter, Inc., requests the following
variances to install signage for an accessory gasoline service station:
1. To increase the height of a freestanding sign from the maximum allowed 24’ to 30’ (UZO 4-8-6);
2. To increase the area for a freestanding sign from the maximum allowed 100sqft to 152sqft (UZO 48-6);
3. To increase the total sign area on the sign lot from the maximum allowed 240sqft to 686sqft (UZO
4-8-5).
The GB-zoned property is located at the southwest corner of Cumberland Avenue and Sagamore
Parkway West, addressed 2801 Northwestern Avenue, West Lafayette, Wabash 12 (NE) 23-5.
Nathan McBurnett, APC staff, referenced a previous parking variance on this same site from last year.
The site has had some extensive variance activity since it was built in 1994. Some of the proposed
variances apply to the entire property but the only changes will be for the gas station. The entire signage
area, both existing and proposed, was included in the variance request. The northeast corner of the
property is where the gas station is being proposed and has an existing pylon sign. The proposal is to
remove the pylon sign and install a larger sign with digital price readers. The building was previously
4
under the old zoning ordinance that allowed for more signage, but it is now exceeding the signage
allowed under the current zoning ordinance. What the site plan is proposing is about three times larger
than what is currently allowed. Staff recommended denial of all three variance requests. Staff did not
believe that installing the signage would be injurious to the public’s health or safety. This type of signage
was common and the use and value of the area adjacent to the property will not be affected adversely.
There is an 8-10 ft. berm on the property that inhibits visibility. The current freestanding sign sits lower in
the air compared to others on surrounding properties. Strict application of the zoning ordinance will not
result in an unusual or unnecessary hardship and is why staff recommended denial. The signage is not
required for the site to be used as GB or for Walmart to continue functioning.
Steve Clevenger called for the petitioner or the petitioner’s representative to make a presentation.
Heather Werner, Sign Crafters Inc, 1508 Stringtown Road, Evansville, representing the petitioner, said
Walmart is proposing the additional height for the freestanding sign because of visibility. A higher sign is
needed to see the fuel price readers and bring business into the fuel station. The sign would be bigger on
top to match the rest of Walmart’s sign standards. The square footage increase request is to cover the
fuel readers since they have 3’ digits be seen by traffic. It was proposed to move the current sign closer to
the store. The fuel station would have four sets of Walmart letters on the canopy.
Steve Clevenger asked if anyone wished to speak in favor or in opposition of the petition.
Chad Spitznagle, West Lafayette Housing Director, wanted to bring up a couple points and said he had
talked to Walmart a while ago about making the fuel station a second lot to keep frontage on both
Cumberland and US-52. This would have kept them from losing the 240 ft of setback reduction. He had
examined sign permits from 2023, 2019, and 2017 and found it was easier, from a permit perspective, to
have a nice size requirement.
Steve Clevenger asked if the Board had any questions or comments.
Gary Schroeder mentioned how the previous signage was under a different ordinance and asked if those
calculations were available.
Nathan McBurnett did not have the standards from the previous ordinance.
Chad Spitznagle, West Lafayette Housing Director, said he did not have the number from the original
UZO, but he used all the available sign area when Walmart came in for their 2017 permit.
Robert Novak asked if the sign was double-sided and whether square footage was counted for each side.
Nathan McBurnett confirmed that it was not counted for each side when the signs are oriented back-toback.
Robert Novak said it was mentioned that the Walmart sign at the top would be larger.
Nathan McBurnett said it was currently about 36 sq. ft.
Heather Werner, Sign Crafters Inc, 1508 Stringtown Road, Evansville, said she believed it was 3’x12’ and
they were proposing to go to 5’x20’, which comprised the 100 sq. ft. with the additional 52’ being for the
fuel signage portion.
Robert Novak noted that Walmart wanted more square footage for better visibility, but they weren’t willing
to give up the other existing sign. In the past it was suggested by a couple different agencies that the
location of the fuel station be moved to a different part of the lot so that it wasn’t down in the valley. The
extra height on the sign itself is almost self-imposed because they are choosing to place the station in a
bad spot. When Robert Novak had asked a previous Walmart representative whether they would have a
sign package for the station, they said they wouldn’t be including a sign package because it was
5
considered all one property and they would use signage from the original building. Robert Novak asked
how Walmart could justify coming back to ask for more signage.
Heather Werner, Sign Crafters Inc, 1508 Stringtown Road, Evansville, said she was not aware of what
had happened with previous representatives from other companies. She had previously worked with
Chad Spitznagle on the sign package for the building, but not the fuel station.
Robert Novak said Walmart continues to ask for more signage and couldn’t see why they wouldn’t go
ahead and decrease the building signage. By the time the public gets into that lot, they know where they
are going. He found the request unreasonable.
Gary Schroeder agreed that Robert Novak made good points, however the Walmart site is very large, and
you can’t see the sign from far away. He thought Walmart had been modest about their signs and it would
be important to see the gas prices.
Steve Clevenger brought subdividing the property to increase signage.
Robert Novak added that that would cause issues with having enough parking.
Steve Clevenger called for any additional questions or comments. There were none.
Steve Clevenger called for a ballot vote.
Attorney Eric Burns collected the ballots. The Board voted 5-Yes to 1-No, approving variance #1, to
increase the height of a freestanding sign from the maximum allowed 24’ to 30’.
Yes-Vote
Ed Butz
Steve Clevenger
Brad Hallberg
Gary Schroeder
Tim VanderPlaats
No-Vote
Robert Novak
Attorney Eric Burns collected the ballots. The Board voted 5-Yes to 1-No, approving variance #2, to
increase the area for a freestanding sign from the maximum allowed 100sqft to 152sqft.
Yes-Vote
Ed Butz
Steve Clevenger
Brad Hallberg
Gary Schroeder
Tim VanderPlaats
No-Vote
Robert Novak
Attorney Eric Burns collected the ballots. The Board voted 5-Yes to 1-No, approving variance #3, to
increase the total sign area on the sign lot from the maximum allowed 240sqft to 686sqft.
Yes-Vote
Ed Butz
Steve Clevenger
Brad Hallberg
Gary Schroeder
Tim VanderPlaats
No-Vote
Robert Novak
Robert Novak moved to hear and vote on BZA-2221 TOMISH DEVELOPERS, LLC. Ed Butz seconded.
BZA-2221 TOMISH DEVELOPERS, LLC
Petitioner and owner, represented by Ryan Munden of RTS Law, requests the following variances
to allow construction of a multifamily apartment building:
1. To increase the building height from the maximum allowed 14’ measured to the floor of the
uppermost finished story to 24’3/4” (UZO 2-12-11);
2. To reduce the number of parking spaces from the required 13 spaces to 2 spaces (UZO 4-6-4);
3. To decrease the lot width from the minimum required 70’ to 37’4” (UZO 2-12-6);
6
4. To reduce the lot area from the minimum allowed 7,900sqft to 4,863sqft (UZO 2-12-5).
The R4W-zoned property is the south half of Lot 8 of N & E.C. Pierce’s Addition, more commonly
known as 226 South Grant Street, West Lafayette, Wabash 19 (SE) 23-4.
Larry Aukerman, APC staff, said these four variances would be used to construct a six-unit 10-bedroom
multifamily apartment. The existing house was constructed as a single-family house in the 1930s and has
5 units. No records were found that showed when it was converted into a multifamily structure. The city
block contains multiple buildings in the same situation where older homes have been converted into
multifamily structures. The proposal showed pedestrian access off Grant Street and vehicular access
would be off an existing alley. With the proposed unit count and sizes, 13 parking spaces would be
required and only 2 are being proposed with one designated as a handicapped space. The density of the
development would be denser than would be required by right as the site could support 3 type-B units
based on lot size. Staff supported the lot width variance because regardless of use, a variance would be
needed even for a single-family house to be located on it, and the lot width would never change no matter
what is built on it. Staff supported the height variance because an increased building height ordinance is
already in the works. Staff recommended denial on the parking and lot size variances because it was the
site plan design requiring the changes.
Steve Clevenger called for the petitioner or the petitioner’s representative to make a presentation.
Ryan Munden, RTS Law, 250 N Main, Lafayette, representing the petitioner, mentioned that the West
Lafayette City Council unanimously rezoned the property to R4W and during the presentation it was
explained to the council the need for variances. The development was intended as an alternative to the
planned developments (PDs) that West Lafayette typically sees for student housing. He stated that
regarding variance #1 and #3, they concurred with staff’s report and recommendation. With respect to
variance #2 and #4, they concurred with staff’s report regarding ballot items 1 and 2. Regarding ballot
items 3, 4, and 5, the argument was that even though the neighborhood was originally intended for singlefamily homes, the entire neighborhood was zoned for apartments. He quoted staff’s report that, “This part
of West Lafayette has very few remnants of the single-family neighborhood that once was located here.
Today, the original homes have either been replaced with apartment buildings or converted to
apartments… This is clearly a prime location for denser student housing.” He continued that these lots are
sized for single-family homes but there aren’t any single-family homes, so the options are to build
apartments, do a PD, or do a rezone with a handful of variances. A PD project could go much larger and
would likely involve acquiring neighboring properties with the result being more expensive units. West
Lafayette was comfortable with the project as a rezone with variances provided that a density cap
commitment was added and it has been capped at 6 units. The biggest criticism city council has with PDs
is that they are too expensive and not affordable for the average student. The parking ratio is consistent
with what PDs have, and they will have access to off-site parking just around the corner at another
development. Parking is also not as necessary due to the walkability with it being adjacent to campus.
Steve Clevenger asked if anyone wished to speak in favor or in opposition of the petition.
John Burgett, 510 Main Street, Lafayette, wished Eric Burns a belated happy birthday. John has been
practicing law for 63 years and the Burgett family has housed several hundred students over the years.
He wanted the board to consider the vacancies that are happening with property. He was concerned with
the availability of utilities and water given the data center and chip factory going in. With the number of
vacancies happening, density needs to be reconsidered. Parking continues to be a problem with people
parking where they shouldn’t and having to get them towed off.
Steve Clevenger asked for a rebuttal.
Ryan Munden, RTS Law, 250 N Main, Lafayette, commented that the building is at the end of its life and
in need of repairs. The parking ratio is on par with what PDs offer but doing a larger project as an
alternative wouldn’t provide the affordability that is needed.
7
Steve Clevenger asked if the Board had any questions or comments.
Robert Novak clarified where the parking spots, driveway, and utilities were located on the site plan.
Steve Clevenger asked what the area north of the handicapped parking spot was.
Barry Knechtel, KJG Architecture, 527 Sagamore Pkwy West, West Lafayette, said that was the
accessible portion of the parking.
Robert Novak asked if it was sound practice to allow 2 parking spots for 6 units.
Ryan O’Gara said each project is compared to similar projects and ratios can be altered to fit the
situation.
Robert Novak asked if this area was considered high-density with a lot of parking traffic.
Ryan O’Gara said residential densities have increased and this area will be included in the expansion of
the West Lafayette downtown plan. A potential parking solution would be for the city to expand its permit
parking program on streets.
Robert Novak asked if pressure was placed on the neighborhood when residences have visitors or
deliveries that need parking.
Ryan O’Gara said this area has deliberately reduced parking to incentivize walkability. Planned
developments have started to experiment with lowering parking ratios.
Robert Novak said that even if a student renter didn’t have a car, there would be the possibility of visitors
or delivery drivers needed parking.
Ryan O'Gara said the area is being treated as urban core where the car doesn’t necessarily dominate or
is fully accommodated. Visitors will have to meet at the curb, or the city will need to address the potential
problem with a street parking program. These are the sorts of issues that have been raised in the
comprehensive plans for the area for the city to consider. A joint parking authority was even proposed.
Chad Spitznagle, West Lafayette Housing Director, said these issues were discussed at the city council
meeting and the cross-parking agreement with the other property was the deciding factor. The next case
has the same owner which provides parking alternatives.
Steve Clevenger asked if the parking spots would be permitted.
Ryan Munden, RTS Law, 250 N Main, Lafayette, said the spots will be assigned by the unit. If someone
needs the handicapped spot they will have access to it. He noted that apartments with no assigned
parking are not as expensive as apartments with parking.
Steve Clevenger asked if there had been a possibility of obtaining the lot to the north and doing a slightly
larger project.
Ryan Munden, RTS Law, 250 N Main, Lafayette, said buying up additional properties can turn into a
domino effect that ends up as a large project in a PD.
Steve Clevenger mentioned that purchasing the other half lot would have given the project a full lot.
Ryan Munden, RTS Law, 250 N Main, Lafayette, said they are working with the property they have control
over and trying to work with an extremely small lot in a unique situation.
8
Gary Schroeder emphasized that he didn’t want to be a community that doesn’t have any parking. He
typically looks at the number of beds, rather than the number of units for how much parking is needed.
Brad Hallberg asked if the spots in the overflow parking at the other Tomish property would be reserved
for this location.
Ryan Munden, RTS Law, 250 N Main, Lafayette, said parking would be set aside and made available on
the other project if needed.
Brad Hallberg asked if the other project was an apartment complex.
Ryan Munden, RTS Law, 250 N Main, Lafayette, said it is an apartment building that will include garage
spaces.
Brad Hallberg asked about the ratio of beds to parking spaces.
Steve Clevenger mentioned that case would be the next one they hear.
Barry Knechtel, KJG Architecture, 527 Sagamore Pkwy West, West Lafayette, added that the other
project will have 24 beds and 24 spaces.
Steve Clevenger called for any additional questions or comments. There were none.
Steve Clevenger called for a ballot vote.
Attorney Eric Burns collected the ballots. The Board voted 6-Yes to 0-No, approving variance #1, to
increase the building height from the maximum allowed 14’ measured to the floor of the uppermost
finished story to 24’3/4”.
Yes-Vote
Ed Butz
Steve Clevenger
Brad Hallberg
Robert Novak
Gary Schroeder
Tim VanderPlaats
No-Vote
(none)
Attorney Eric Burns collected the ballots. The Board voted 5-Yes to 1-No, approving variance #2, to
reduce the number of parking spaces from the required 13 spaces to 2 spaces.
Yes-Vote
Ed Butz
Steve Clevenger
Brad Hallberg
Gary Schroeder
Tim VanderPlaats
No-Vote
Robert Novak
Attorney Eric Burns collected the ballots. The Board voted 6-Yes to 0-No, approving variance #3, to
decrease the lot width from the minimum required 70’ to 37’4”.
Yes-Vote
Ed Butz
Steve Clevenger
Brad Hallberg
Robert Novak
Gary Schroeder
Tim VanderPlaats
No-Vote
(none)
Attorney Eric Burns collected the ballots. The Board voted 6-Yes to 0-No, approving variance #4, to
reduce the lot area from the minimum allowed 7,900sqft to 4,863sqft.
Yes-Vote
Ed Butz
Steve Clevenger
Brad Hallberg
Robert Novak
Gary Schroeder
Tim VanderPlaats
No-Vote
(none)
9
Robert Novak moved to hear and vote on BZA-2222 TOMISH DEVELOPERS, LLC. Ed Butz seconded.
1.
2.
3.
4.
BZA-2222 TOMISH DEVELOPERS, LLC
Petitioner and owner, represented by Ryan Munden of RTS Law, requests the following variances
to allow construction of a multifamily apartment building:
To increase the building height from the maximum allowed 14’ measured to the floor of the
uppermost finished story to 26’5-9/16” (UZO 2-12-11);
To reduce a rear (north) setback from the minimum allowed 25’ to 8’5” 13’ 5” (revised 1/29/26) (UZO
2-12-8);
To decrease the lot width from the minimum required 70’ to 63’8” (UZO 2- 12-6);
To increase the building coverage ratio from the maximum allowed 40% to 58.4% (UZO 2-12-7).
The R4W-zoned property is Lot 15 of N & E.C. Pierce’s Addition, more commonly known as 230
Harrison St, West Lafayette, Wabash 19 (SE) 23-4.
Ryan O’Gara showed another site not too far away from the first with a 5-unit house that was converted in
1910. The parking standard for type-A units is three spaces per unit, and the site plan shows 24 spaces
provided with covered garages and tandem spaces behind them. Regarding variances 1 and 4, staff did
not find any injurious situations occurring with the public. Regarding variance 1, the height request was
not an issue because of the pending ordinance change. Staff were concerned about the building
separation but acknowledged that it was the purview of the fire department. Use and value will not be
impacted in a negative way on variances 1, 2, and 4. The situation this property is in is common to
properties in the same zoning district and neighborhood. Regarding variances 1, 2, and 4, strict
application of the zoning ordinance would not result in unusual or unnecessary hardship. Development
standards could be shifted to meet the requirements. Hardship is self-imposed on variances 1, 2, and 4.
Granting variance 3 will not be injurious to public health and safety, will not impact adjacent properties in
an adverse manner, and the hardship is warranted. Staff’s recommendation was denial for variance 1, 2,
and 4 and approval for variance 3.
Steve Clevenger called for the petitioner or the petitioner’s representative to make a presentation.
Ryan Munden, RTS Law, Lafayette, representing the petitioner, said this property was in the same
situation as the last in that West Lafayette City Council approved the rezone and was aware of the
variances that would be needed. The same situation also applied where a lot sized for single-family
homes was among apartments and rather than do a more expensive PD, they opted for a smaller rezone
with variances. A density cap commitment was also submitted for this project. The height request is only
12” higher than the new standard would be. Regarding the north rear setback, if the alley were
considered the front of the building, they would only be required to have a 6’ setback. He wasn’t clear why
there was concern with 20’ between structures as the building would be much closer to the neighboring
one if they were dealing with a side setback instead of a rear one. If the concern was fire spreading from
building to building, they could fire rate that side of the building.
Steve Clevenger asked if anyone wished to speak in favor or in opposition of the petition. There were
none.
Steve Clevenger asked if the Board had any questions or comments.
Steve Clevenger noted that regarding the rear setback, there is good distance except for the corner of the
other building. He asked how the tandem parking would work.
Ryan Munden, RTS Law, 250 N Main, Lafayette, said tandem parking is done with roommates so you
coordinate with the person you’re living with to get in and out. It’s not the perfect solution but allows for
more parking.
Robert Novak asked if there was a limitation on the driveway length due to it being an alley.
10
Ryan O’Gara confirmed that there wasn’t a standard for the driveway because it was an alley.
Robert Novak asked about the covered driveway situation.
Ryan Munden, RTS Law, 250 N Main, Lafayette, said the building would be on top of the covered parking
spaces.
Ryan O'Gara said the driveway would extend 6’ from the building wall, would be open to the air, and
would essentially be one long curb that cars couldn’t park on.
Ryan Munden, RTS Law, 250 N Main, Lafayette, confirmed that the 12” height request was due to the
slope of the building.
Steve Clevenger confirmed the peak would be 12” above what the standard would be in the new
ordinance.
Steve Clevenger called for additional comments or questions. There were none.
Steve Clevenger called for a ballot vote.
Attorney Eric Burns collected the ballots. The Board voted 6-Yes to 0-No, approving variance #1, to
increase the building height from the maximum allowed 14’ measured to the floor of the uppermost
finished story to 26’5-9/16”
Yes-Vote
Ed Butz
Steve Clevenger
Brad Hallberg
Robert Novak
Gary Schroeder
Tim VanderPlaats
No-Vote
(none)
Attorney Eric Burns collected the ballots. The Board voted 5-Yes to 1-No, approving variance #2, to
reduce a rear (north) setback from the minimum allowed 25’ to 13’ 5”.
Yes-Vote
Ed Butz
Steve Clevenger
Brad Hallberg
Gary Schroeder
Tim VanderPlaats
No-Vote
Robert Novak
Attorney Eric Burns collected the ballots. The Board voted 6-Yes to 0-No, approving variance #3, to
decrease the lot width from the minimum required 70’ to 63’8”.
Yes-Vote
Ed Butz
Steve Clevenger
Brad Hallberg
Robert Novak
Gary Schroeder
Tim VanderPlaats
No-Vote
(none)
Attorney Eric Burns collected the ballots. The Board voted 6-Yes to 0-No, approving variance #4, to
increase the building coverage ratio from the maximum allowed 40% to 58.4%.
Yes-Vote
Ed Butz
Steve Clevenger
Brad Hallberg
IV.
Robert Novak
Gary Schroeder
Tim VanderPlaats
No-Vote
(none)
ADMINISTRATIVE MATTERS
1. Planning Pointers: The Parking Question: How Much is Enough?
11
Nathan McBurnett presented the planning pointer:
This Board has heard APC staff argue for fewer parking spaces in any number of variances throughout the
years, but what is the right number? Are there situations when the ordinance actually allows fewer spaces?
The answer to the first question is a little more difficult to provide and is largely situational. The second
answer is a resounding “YES!”.
UZO chapter 4-6-11 is titled: “Exclusions, Reductions, and Exceptions”.
There are four ways in which the ordinance currently allows specific uses to provide less parking than what
is required in 4-6-3.
1. In a CB zone, except for hotels, motels, newly constructed residential buildings and places of public
assembly (like a movie theater), the off-street parking spaces specified in the parking table are not
required. If they are provided anyway, they still have to conform to the design standards from 4-615.
2. In NBU zones, any nonresidential use is limited to no more than 60% of the required parking
spaces. An example of reduced parking in this situation is The Pickle on N 10 th and Union. They
would be required to provide 1 space per 100 sq ft of gross floor area in any other zoning district.
With a building footprint of approximately 1700 sq ft, they’d be required to provide 17 parking
spaces. It appears from aerial imagery that they’ve provided 10 spaces, which would meet the 60%
reduction allowance. (image on screen)
3. The third instance when parking standards may be altered is during the planned development
process, where everything, including parking spaces, is negotiated. In these cases, APC works with
the jurisdiction and the developer to ensure the project has that “Goldilocks” number of spaces.
Some recent examples from West Lafayette include the Sullivan at 179 parking spaces for 285
units, or .63 spaces per unit; the Standard at 212 parking spaces for 254 units, or .83 spaces per
unit, and the occupied Rise with 121 parking spaces for 289 units, or .42 spaces per unit.
4. The fourth and final time that on-site parking may be reduced is when an off-site parking agreement
is used. These are allowed for individual permitted uses other than single- and two-family dwellings.
There are specific requirements that must be met for these off-site parking agreements, such as
having part of the parking area within 300’ of the site, so that it will adequately serve the use for
which it is intended. Off-site parking for commercial or industrial uses shall only be within
commercial or industrial zones. There cannot be any off-site parking in a residential zone unless it
serves residential needs only. The off-site parking agreement must be recorded in the Office of the
County Recorder.
As you can see from these examples, there are times when we don’t ask developers to install oodles and
gobs of parking spaces, which invariably get reduced by variance requests.
Robert Novak asked how handicapped parking spaces are calculated apart from regular parking spaces.
Nathan McBurnett said the ratio of ADA spaces is federally mandated and cannot be reduced.
Ryan O’Gara said those standards find their way into the building code which determines how many
spaces will be needed based on the disposition of the project. This is then confirmed by the permitting
office. A project is given a total number of parking spaces, and it will be calculated how many of those
need to be set aside as ADA spaces.
Steve Clevenger said in the previous case that it seemed that a parking space was being taken away if
there wasn’t anyone who was handicapped and needed it.
Ryan O’Gara said if it were a commercial space, the general public must have access to those spaces.
However, for an apartment, if none of the residents need a handicapped space, it can be used as a
regular parking space.
12
Steve Clevenger commented that it would have been nice to hear the last case prior to the second,
because of the parking agreement. Had the second Tomish case been denied, the first Tomish case
couldn’t have relied on parking. He mentioned that he had been talking to Ryan O’Gara about the bylaws
and how the 5-minute speaking limit was accidentally removed from them.
Ryan O’Gara said they are still looking into the bylaws and that the ordinance committee was going to
experiment with a 3-minute limit.
Steve Clevenger agreed they shouldn’t do anything about it for now and see if Area Plan is going to
change the rule.
Ryan O’Gara said APC wasn’t trying to take the change on, but to use it just for a couple of ordinance
committee meetings that might be controversial. Technically the board could determine at every meeting
what the public speaking terms would be.
Gary Schroeder said there was discussion about keeping the limits consistent with the other meeting
bodies. It seems that most people can say what they need to say in 3 minutes, but some may have a
presentation, which can always be granted.
Ed Butz commented that the issue is the people that repeat other’s comments.
Steve Clevenger said they will continue to keep it at 5 minutes since that is listed in the instructions
unless something changes with the other voting bodies.
Steve Clevenger stated unless any member has an objection, the chair will order the findings of each
member casting a vote for the majority decision of the Board to be the collective findings of the Board in
support of the decision of the Board. Hearing none, it was so ordered.
V.
ADJOURNMENT
Robert Novak moved to adjourn. The meeting adjourned at 7:32 PM.
Respectfully submitted,
Danielle Bistline
Recording Secretary
Reviewed by,
Ryan O’Gara
Executive Director
13
BZA-2223
JHS INVESTMENT GROUP LLC
(variances)
STAFF REPORT
March 19, 2026
14
BZA-2223
JHS INVESTMENTS GROUP, LLC
Variance
Staff Report
March 19, 2026
REQUEST MADE, PROPOSED USE, LOCATION:
Petitioner, who is also the property owner, represented by Kevin J. Riley of RTS Law,
requests the following variances for an existing U-Haul truck rental business (SIC 751):
1. To reduce the width and number of plant units of a Type C bufferyard
along the side (south) property line from the required 30’ to 15’ (UZO 4-9-3).
2. To reduce the width and number of plant units of a Type C bufferyard
along the rear (east) property line from the required 30’ to 15’ (UZO 4-9-3).
The GB-zoned property is Lot 1 of J & J Subdivision, commonly known as 5011 Old US
Hwy 231 S, in Wea 20 (NW) 22-4.
AREA ZONING PATTERNS:
This property was rezoned GB, general business, just a few weeks ago from NB,
neighborhood business and R1, single-family residential (Z-3018). This rezone made the
existing U-Haul business, with trucks parked on the former R1-zoned portion of the lot, a
conforming use. A setback variance (BZA-2093), heard and approved by the ABZA in
2023, eliminated the existing commercial building’s noncompliance, namely, a side
setback of 4.3’. The office for the U-Haul business is within the convenience store located
on the former NB-zoned portion of the lot.
Surrounding zones include R1A, across the county road to the north; R1 to the east and
south; A, agricultural zoning to the west across the old highway, with GB zoning to the
northwest.
AREA LAND USE PATTERNS:
A convenience store/U-Haul rental business is located on site. The store has a small,
paved parking lot while the U-Haul trucks are parked on gravel. There is some short
shrubbery found along the southern property line and a new-looking wooden fence is on
the eastern property line. Surrounding uses are all single-family residential except to the
west and northwest where land is farmed. Mayflower Mill elementary school is a short
distance to the northeast, and McCutcheon High School is a short distance to the north.
A health clinic is located a few hundred feet to the northwest.
TRAFFIC AND TRANSPORTATION:
The business fronts on CR 500 S, a rural secondary arterial according to the adopted
ksl | g:\apc\staff reports\bza\2200\bza-2223 jhs investment group, llc.docx | JHS InvestmentS Group, LLC | Variance | March
19, 2026
1
15
Thoroughfare Plan; Old US 231 S which abuts the western property line, is classified as
a rural local street that dead-ends ½ mile to the south. The convenience store has an
informal driveway cut that covers half the width of the lot. There is also a driveway cut to
the east for the U-Haul business. These access points will need to undergo review during
the permitting process. GB zoning requires the parking area on the east side of the lot to
be paved.
ENVIRONMENTAL AND UTILITY CONSIDERATIONS:
Septic and public water serve the site. The UZO requires a Type C, 30’ wide bufferyard
between GB and all residential zones. The variances requested would allow the
installation of half the required plant material in a 15’ wide buffer.
STAFF COMMENTS:
For many years, this lot was divided into two separate properties: a small business on the
western half (zoned NB) and a residence on the eastern half (zoned R1). This house was
demolished around 2019 and now the lot is used as one commercial property with two
business uses. The rezone to GB last month made both halves of the lot conforming.
Because the store building is within the 30’ required bufferyard (except for 4.3’) and is a
long-standing commercial use, no bufferyard is required along the former NB-zoned
western half of the lot.
The bufferyard petitioner is proposing would be a single row of 18 evergreen trees planted
on the southern property line of the eastern lot half where the rental trucks are parked,
and 8 evergreens planted along the eastern fenced property line. The petition includes
information on an evergreen variety called “Arborvitae Emerald Green” which, when
purchased, is between 2 to 3’ tall but obtains a foot in height each year, growing to a
height of 12 to 14’. The UZO requires a buffer be 8’ in height. The Administrative Officer
has approved the suitability of these plantings.
Regarding the ballot items:
1. The Area Plan Commission on March 18, 2026 determined that the variances
requested ARE NOT use variances.
And it is staff’s opinion that:
2. Granting this variance WILL NOT be injurious to the public health, safety, and general
welfare of the community. The lot was recently deemed to be acceptable for general
business zoning by the county commissioners. The absence of half the required
bufferyard on site would not injure the community.
3. Use and value of the area adjacent to the property included in the variance request
WILL NOT be affected in a substantially adverse manner. A well-maintained wooden
fence currently separates the lot from the residence to the east; a small amount of
shrubbery exists along the property line of the truck rental area opposite CR 500. The
single line of evergreens proposed will aid in protecting adjacent residences; two lines
of evergreens are not necessary to achieve this.
ksl | g:\apc\staff reports\bza\2200\bza-2223 jhs investment group, llc.docx | JHS InvestmentS Group, LLC | Variance | March
19, 2026
2
16
4. The terms of the zoning ordinance are being applied to a situation that IS NOT
common to other properties in the same zoning district. Other truck rental businesses
in the GB zone are located on much larger pieces of land. The small size of this halflot area, along with an unusable 30’ bufferyard strip along two property lines, would
make this site uncommonly difficult to use.
5. Strict application of the terms of the zoning ordinance WILL result in an unusual or
unnecessary hardship as defined in the zoning ordinance. A 30’ wide bufferyard on
two sides would make operating a truck rental business on this small piece of land
unnecessarily difficult.
Note: Questions 5a. and 5b. need only be answered if a hardship is found in Question
5 above.
5a. The hardship involved IS NOT self-imposed or solely based on a perceived
reduction of or restriction on economic gain. The hardship is caused by the small size
of the lot and is not self-imposed or based on restrictions to economic gain.
5b. The variance sought DOES provide only the minimum relief needed to alleviate
the hardship. Installing one row of evergreens in a 15’ buffer instead of the required
two rows in a 30’ bufferyard is an adequate compromise.
STAFF RECOMMENDATION:
Approval with the following conditions:
1. The parking area for the rental trucks shall be paved to meet the standards of the
GB zone; and
2. Petitioner must obtain drainage approval from the county surveyor’s office.
ksl | g:\apc\staff reports\bza\2200\bza-2223 jhs investment group, llc.docx | JHS InvestmentS Group, LLC | Variance | March
19, 2026
3
17
18
19
20
BZA-2224
1ST SOURCE BANK
(variance)
STAFF REPORT
March 19, 2026
21
BZA-2224
1ST SOURCE BANK
Variance
Staff Report
March 19, 2026
REQUEST MADE, PROPOSED USE, LOCATION:
Petitioner, represented by attorney Ryan Munden of RTS Law, is requesting a variance to
permit 43 parking spaces instead of the required 60 parking spaces for a proposed bank (SIC
60). 1st Source bank will be demolishing the existing building at the northwest corner of
Yeager Road and Sagamore Parkway West and plans to construct a new 2-story (with
basement) building. The site is commonly known as 1215 Potter Drive, West Lafayette,
Wabash 12 (NE) 23-5.
AREA ZONING PATTERNS:
This OR (office research) zoned area of West Lafayette was originally zoned IR (industrial
Reserve) and then changed to OR with the adoption of the NUZO in 1998. The land to the
north was rezoned from PDNR, Planned Development Non-residential, to NB, Neighborhood
Business, in 2014 (Z-2578). Land directly east and south is zoned GB, General Business;
R3, Multi-family Residential is located to the northeast.
AREA LAND USE PATTERNS:
The site in question contains a vacant building that formerly housed Lafayette Community
Bank. North of the site is an accountant’s office. Land to the south, southeast and east is
used commercially and supports a gas station, florist shop and a hardware store. Multi-family
apartments are located to the northeast across Yeager Road.
TRAFFIC AND TRANSPORTATION:
The site is located at the northwest corner of Yeager Road and Sagamore Parkway. The
Thoroughfare Plan classifies Yeager as an urban primary arterial and Sagamore is classified
as an urban divided primary arterial. The parking standard for a bank is one parking space
per 200 square feet of gross floor area.
ENVIRONMENTAL AND UTILITY CONSIDERATIONS:
Sanitary sewer and water serve the site.
STAFF COMMENTS:
Petitioner is requesting a parking variance to allow 43 parking spaces instead of the minimum
required 60 spaces for a new bank. This parking standard is one parking space per 200
square feet of gross floor area. Petitioner’s proposed bank is two-stories with a full basement,
equating to 11,900 square feet. According to the petition, a sizeable portion of the building
will be occupied by staff offices, meeting rooms, and training spaces. The lobby for the bank
will only occupy a small portion of the building. There will be a maximum of 14 employees
on site at any given time.
JWB | g:\apc\staff reports\bza\2200\bza-2224 1st source bank parking var.docx | 1st Source Bank | Variance | March 19, 2026
1
22
In the 30 years since the NUZO was in the process of being written, there have been
significant changes in the way banking services are conducted. Online banking has become
ubiquitous, leading to less of a need for in-person transactions at a brick and mortar facility.
This societal change has not been addressed in the parking requirements of our current
zoning ordinance.
Regarding the ballot items:
1. The Area Plan Commission at its March 18, 2026 meeting determined that the variance
requested IS NOT a use variance.
And it is staff’s opinion that:
2. Granting this variance WILL NOT be injurious to the public health, safety, and general
welfare of the community. A reduction in parking spaces from 60 to 43 will not have a
negative impact on the safety and welfare of the community. Customer and employee
parking can still be accommodated.
3. Use and value of the area adjacent to the property included in the variance request WILL
NOT be affected in a substantially adverse manner. Providing 43 parking spaces instead
of 60 will not negatively impact adjoining properties since fewer people actually need to
visit their bank then when the UZO was written.
4. The terms of the zoning ordinance are being applied to a situation that IS NOT common
to other properties in the same zoning district. In this instance, the new building will
support more than a customer lobby and will include staff offices, meeting rooms and
training spaces that do not reflect the intention of the parking standard, which was
conceived primarily for in-person traffic.
5. Strict application of the terms of the zoning ordinance WILL result in an unusual or
unnecessary hardship as defined in the zoning ordinance. The zoning ordinance’s
parking standard is causing the hardship. The proposed building will accommodate
training spaces, meeting rooms and staff offices, which is more than a typical bank would
provide.
Note: Questions 5a. and 5b. need only be answered if a hardship is found in Question 5
above.
5a. The hardship involved IS NOT self-imposed or solely based on a perceived reduction
of or restriction on economic gain. The hardship in this situation is being created by the
parking standard, which assumes that most of a bank will be occupied by the public. In
this case, the basement and second floor will only be occupied by employees and not the
general public.
5b. The variance sought DOES provide only the minimum relief needed to alleviate the
hardship because the 43 parking spaces will be adequate for customers and employees.
STAFF RECOMMENDATION:
Approval
JWB | g:\apc\staff reports\bza\2200\bza-2224 1st source bank parking var.docx | 1st Source Bank | Variance | March 19, 2026
2
23
24
25
The government’s own published record — read it yourself, then decide what to do about it.
The facilities, the coverage, and the local record for this community.
Not yet recorded. The record stays open — outcomes are added as minutes and vote results are published.
Provenance
Where this record came from. Every source is listed, permanently.
- Agenda Watch · Aug 13, 2026
Permanent ID DKT-2026-000685 — this record is never deleted.
Record history
Every change to this record, logged as it happened.
- Aug 13, 2026 Filed on the Docket
- Aug 13, 2026 Full document archived — public record
- Sep 18, 2026 Record updated
← The full Docket · every meeting, vote, and action on the permanent record · also in the National Record Index.