⚡︎ Independent, reader-supported & ad-free · Follow the megawatts in all 50 states ⚡︎ Support Us
The Docket · Government Meeting · DKT-2026-000634

On the agenda: Portland meeting — Data Center (May 15)

Past  ⚠ Agenda Watch  Portland, Tennessee · Monday, May 15, 2023 — 3 years ago

About this record

The published agenda for this May 15 meeting contains: "Data Center". The meeting has passed; the record and its outcome live here permanently.

WhenMonday, May 15, 2023
Check the agenda document for the meeting time.
WherePortland, Tennessee
Money$ 85.00 was at stake
On the record“Data Center”

The agenda, word for word

Government public record — the full text of the published document, archived August 12, 2026. Gold highlighting of key terms is ours, not the original’s. Read the original document ↗

171 pages · scroll to read
Page 1 of 171

Board of Mayor and Aldermen
City Council Meeting
Portland City Hall
100 South Russell Street
Portland, TN 37148
May 15, 2023
5:00 PM
A. Call To Order
B. Prayer And Pledge
C. Roll Call
D. Approval Of Minutes
Documents:
MINUTES MAY 1 2023.PDF
E. Approval Of Agenda
F. Communications From Council Members
G. Presentation
1. Presentation By Chamber Of Commerce
Presentation of 82nd Annual Middle Tennessee Strawberry Festival Parade Awards.
2. Presentation Of United Way Of Sumner County
Erin L. Birch, Chief Executive Officer of United Way of Sumner County to speak.
H. Public Recognition
Up to five minutes per person and comments must pertain to items that are listed on
the meeting agenda.
I. Public Hearings
1. Retail Liquor Store Certificate Of Compliance
Issue of Certificate of Compliance for Retail Liquor Store to James D. Allen at 210
South Broadway. Speak for or against.
J. Department Reports
Documents:
BUILDING AND CODES APRIL 2023 MONTHLY REPORT.PDF
CITY RECORDER APRIL 2023 MONTHLY REPORT.PDF
COMMUNITY DEVELOPMENT APRIL 2023.PDF

Page 2 of 171

J. Department Reports
Documents:
BUILDING AND CODES APRIL 2023 MONTHLY REPORT.PDF
CITY RECORDER APRIL 2023 MONTHLY REPORT.PDF
COMMUNITY DEVELOPMENT APRIL 2023.PDF
FINANCE MARCH 2023 REPORT.PDF
FIRE DEPARTMENT MONTHLY REPORT APRIL 2023.PDF
PARKS APRIL 2023 MONTHLY REPORTS.PDF
POLICE DEPARTMENT APRIL 2023.PDF
PUBLIC WORKS COUNCIL REPORT FOR MAY 2023 MEETING.PDF
UTILITIES WORK REPORTS FOR APRIL 2023.PDF
K. Alcoholic Beverage Board
Vice Mayor Jody McDowell, Chairman
1. Resolution No. 23-55
A Resolution authorizing a certificate of compliance for James Allen of Portland
Liquors located at 210 South Broadway, Portland, TN, 37148.
Documents:
RES_23-55 PORTLAND LIQUORS CERTIFICATE OF COMPLIANCE.PDF
L. Mayor's Report
M. Community Development
Alderwoman Megann Thompson
N. Finance
Alderwoman Penny Barnes
1. Ordinance No. 23-26
An Ordinance amending the Fund Balance Policy for the City of Portland.
Documents:
ORD 23-26 CITY OF PORTLAND FUND BALANCE POLICY FOR 2023.PDF
2. Resolution No. 23-50
A Resolution amending the Debt Management Policy for the City of Portland.
Documents:
RES 23-50 DEBT MANAGEMENT POLICY 2023.PDF
O. Fire Department
Vice Mayor Jody McDowell; Financed by: General Fund
P. Human Resources
Alderwoman Penny Barnes
Q. Legislative
Mayor Mike Callis
R. Municipal Airport
Alderman Mike Hall; Financed by: Special Revenue Fund
S. Parks & Recreation

Page 3 of 171

Mayor Mike Callis
R. Municipal Airport
Alderman Mike Hall; Financed by: Special Revenue Fund
S. Parks & Recreation
Alderman Brian Woodall; Financed by: General Fund/Special Revenue Fund - Golf
Course
T. Planning & Codes
Alderwoman Megann Thompson; Financed by: General Fund
1. Resolution No. 23-51
A Resolution to enhance the requirements of the Combined Zoning Ordinance for
the City of Portland.
Documents:
RES 23-51 PUD DESIGN REQUIREMENTS 1.PDF
2. Resolution No. 23-52
A Resolution requiring all Multi-Family Zoning to be presented as a Planned Unit
Development.
Documents:
RES 23-52 PUD MULTIFAMILIY REQUIREMENT.PDF
U. Police Department
Alderman Drew Jennings; Financed by: General Fund
V. Public Works
Alderwoman LaToya Holcomb; Financed by: General Fund - Streets, City Mechanic /
Special Revenue Fund - Sanitation, Stormwater
1. Resolution No. 23-53
A Resolution re-adopting the Sumner County Multi -Jurisdictional Hazard Mitigation
Plan.
Documents:
RES 23-53 ADOPTING THE SUMNER COUNTY MULTI JURISDICTIONAL
HAZARD MITIGATION PLAN.PDF
SUMNER HMP 2023 DRAFT PLAN.PDF
2. Resolution No. 23-54
A Resolution to rescind Resolution 21-54 and replace with this Resolution to
authorize CSR Engineering and Klober Engineering Services for professional On-Call
Services for engineering review for Planning Submittals.
Documents:
RES 23-54 AMEND RES 21-54 ON-CALL ENGINEERING REVIEW FOR
PLANNING SUBMITTALS.PDF
RES 23-54 ATTCH 1 2022 CSR ENGINEERING RATE SCHEDULE.PDF
RES 23-54 ATTCH 2 KLOBER ENGINEERING STANDARD RATES.PDF

Page 4 of 171

RES 23-54 AMEND RES 21-54 ON-CALL ENGINEERING REVIEW FOR
PLANNING SUBMITTALS.PDF
RES 23-54 ATTCH 1 2022 CSR ENGINEERING RATE SCHEDULE.PDF
RES 23-54 ATTCH 2 KLOBER ENGINEERING STANDARD RATES.PDF
W. Utility Infrastructure
Alderman Brian Woodall; Financed by; Enterprise Fund - Water Distribution, Water
Plant, Wastewater Collections, Wastewater Plant, Natural Gas Distribution, GIS,
Engineering
1. Ordinance No. 23-27
An Ordinance to enter an agreement with Bratton & Associates to provide
Professional Land Acquisition Services for the City of Portland Oak Hill water system
improvements and 2021 Mason Tank 12-inch connector for water system
improvements.
Documents:
ORD 23-27 AGREEMENT WITH BRATTON ASSOCIATES FOR OAK HILL
AND MASON TANK.PDF
ORD 23-27 ATTACH 1 BRATTON AND ASSOCIATES PROPOSAL.PDF
X. Adjournment

Page 5 of 171

Minutes

Board of Mayor and Aldermen
City of Portland, Tennessee
May 1, 2023
A. Call to Order - Mayor Callis called the meeting to order at 5:03 P.M. at Portland City Hall.
B. Prayer/Pledge –Mayor Mike Callis offered the Invocation and the Pledge of Allegiance.
C. Roll Call Present:
Alderwoman Penny Barnes
Alderman Mike Hall
Alderwoman LaToya Holcomb
Alderman Drew Jennings
Vice Mayor Jody McDowell
Alderwoman Megann Thompson
Alderman Brian Woodall
Mayor Mike Callis
Absent
City Attorney John R. Bradley

Also Present:
Finance Director, City Recorder Rachel Slusser
Assistant City Recorder Tracy Kizer

D. Approval of Minutes from April 17, 2023, Council Meeting. Motion was made by Vice Mayor
McDowell, seconded by Alderwoman Thompson to approve the minutes as presented. Voice vote
indicated approval.
E. Approval of Agenda. Motion was made by Alderman Woodall to amend the Agenda by deferring
Ordinance 23-22, second by Alderman Jennings to approve agenda. Voice vote indicated approval.
F. Communications from Council Members – Alderwoman Thompson announced GNRC will have a
kickoff event for the comprehensive plan on May 23, 2023, from 5 pm to 7 pm at Richland Gym. The
public is invited and encouraged to attend. Farmers Market will be starting on May 11th, Strawberry
Festival week, at Richland Park.
G. Presentation of Recognitions - Police Chief Williams had presentations to Police Officers for
Exemplary Service Awards. Many Officers received recognition for their performance from 2022 and a
total of sixteen Life Saver Awards.
Sherry Ferguson from the Chamber of Commerce talked about the upcoming events related to the
Strawberry Festival.
H. Public Recognition – No one spoke.
I.

Public Hearing – No items

J. Mayor’s Report –
1. Mayor invited everyone to attend the National Day of Prayer at First Baptist Church on May 4th
at 7 am. Grab & go breakfast will be served. On Saturday there will be the High School Senior
rolling parade through town, starting at 10am. Mayor gave an update on Comprehensive TDEC

Page 1 of 4

Page 6 of 171

Grant. Mayor reviewed the handout showing the Water Conservation efforts the City has
achieved by repairs to leaks and other water saving efforts.
K. Community Development – Alderwoman Megann Thompson – No items
L. Finance – Alderwoman Penny Barnes
1. Ordinance No. 23-23 - First Reading - An Ordinance of the City of Portland, Tennessee,
amending Budget Ordinance No. 22-40 for the Fiscal Year beginning July 1, 2022, and ending
June 30, 2023. Motion by Alderwoman Barnes, seconded by Alderman Woodall. Voice vote
indicated approval.
2. Ordinance No. 23-25 - First Reading – An Ordinance of the City of Portland, Tennessee
adopting the Annual Budget and Tax Rate for the Fiscal Year beginning July 1, 2023, and ending
June 30, 2024. Motion by Alderwoman Barnes, seconded by Alderman Woodall. Discussion of
handout from Mayor Callis. After discussion, Alderman Jennings made motion to amend the
budget by changing the COLA to 3% and 80% pay of dependent insurance and hire 3 full time
firefighters on January 1, 2024, if the Safer Grant is not awarded to Portland Fire, Alderwoman
Barnes second the amendment. Voice vote indicated approval of the amendment in the
budget. Voice vote indicated approval of Ordinance No. 23-25.
3. Resolution No. 23-47 - A Resolution pursuant to authority granted by Section 6-54-111 of the
Tennessee Code Annotated and in accordance with Section 0380-3-7-02 of the Official
Compilation Rules and Regulations of the State of Tennessee which authorizes appropriations
for financial aid for Nonprofit Charitable Organizations whose services benefit the general
welfare of the residents of this municipality. Motion to approve by Alderwoman Barnes, second
by Alderman Woodall. Voice vote indicated approval.
M. Fire Department – Vice Mayor Jody McDowell – No items
Financed by: General Fund
N. Human Resources – Alderwoman Penny Barnes – No items
O. Legislative – Mayor Mike Callis
1. Ordinance No. 23-18 - Second Reading - An Ordinance authorizing the City of Portland to enact a
Sensitive Data and Intrusion Policy. Motion made by Vice Mayor McDowell, second by
Alderman Jennings. Voice vote indicated approval.
2. Resolution No. 23-49 – A Resolution to re-appoint two members (Kim Delaney and Drew Jennings) to
the City of Portland’s Audit Committee. Motion was made by Alderman Woodall, second by Alderwoman
Thompson. Voice vote indicated approval.

P. Municipal Airport – Alderman Mike Hall - No items
Financed by: Special Revenue Fund
Q. Parks & Recreation – Alderman Brian Woodall – No items
Financed by: General Fund / Special Revenue Fund – Golf Course
R. Police Department – Alderman Drew Jennings - No items
Financed by: General Fund
S. Planning & Codes – Alderwoman Megann Thompson
Financed by: General Fund
Page 2 of 4

Page 7 of 171

1. Ordinance No. 23-24 - First Reading - An Ordinance to amend the City of Portland, Tennessee
zoning map by rezoning 30.85acres at (780, 782, 784 College Street) (map 034, parcels
072.07,072.09,072.10) from RS-40 (residential) & R-15 (residential) to Plan Unit Development
District (Residential PUD w/base zone R-15 residential) with a Preliminary Master Development
Plan for Ruby Springs. Motion made by Alderwoman Thompson, second by Vice-Mayor
McDowell. Discussion of notification of the public about zone changes. Mayor requested that
when signs are posted, a photo be made of the sign and a copy of every letter sent to residents to
be included in the Ordinance packet. After discussion, Alderman Hall made motion to defer first
reading of Ordinance to May 15th meeting, second by Alderman Woodall. Roll Call vote (In
favor: Alderwoman Barnes, Alderwoman Holcomb, Alderman Hall/Against: Alderman
Jennings, Vice-Mayor McDowell, Alderwoman Thompson, Alderman Woodall) – 3/4. Motion
failed. Motion made to suspend Roberts Rule of Order by Alderwoman Thompson and second
by Vice-Mayor McDowell, all in favor. Discussion with Zack Wilkinson about the development.
The Mayor asked for roll call vote on the original motion of Ordinance 23-24 – first reading.
Roll call vote (In favor: Alderwoman Barnes, Alderwoman Holcomb, Alderman Jennings, ViceMayor McDowell, Alderwoman Thompson, Alderman Woodall /Against: Alderman Hall) - 6/1.
Motion passed.
2. Resolution No. 23-46 - A Resolution to re-appoint one existing member, Jessica Hunter, to the
Portland Municipal Planning Commission. Motion to approve by Alderwoman Thompson,
second by Vice-Mayor McDowell. Voice vote indicated approval.
T. Public Works – Alderwoman LaToya Holcomb
Financed by: General Fund – Streets, City Mechanic / Special Revenue Fund – Sanitation, Stormwater
1. Ordinance No. 23-19 – Second Reading - An ordinance to repeal and replace Ordinance No. 2257 with the following rate structures for Stormwater Land Disturbance Permits and Stormwater
Engineering Plan Review Fees. Motion by Alderwoman Holcomb, seconded by Alderwoman
Thompson. Voice vote indicated approval.
U. Utility Infrastructure – Alderman Brian Woodall
Financed by: Enterprise Fund – Water Distribution, Water Plant, Wastewater Collections,
Wastewater Plant, Natural Gas Distribution, GIS, Engineering
1. Ordinance No. 23-15 –Second Reading – An Ordinance to rescind in its entirety Ordinance 2268 and replace with this Ordinance for water, sewer, and natural gas fee structure. Motion made
by Alderman Woodall, second by Alderwoman Thompson. Voice vote indicated approval.
2. Ordinance 23-20 – Second Reading - An Ordinance to enter a new/existing contract with
Aramark/Martinrea for uniforms and Allied (mats/mops towels) services for the city of Portland.
Motion to accept Alderman Woodall, second by Alderwoman Thompson. Voice vote indicated
approval.
3. Ordinance 23-21 – Second Reading - An Ordinance to rescind in its entirety Resolution 21-105
and incorporate into this ordinance and to extend the contract with the City of Mitchellville to
accept the discharge of sewer from Mitchellville’s collection system. Motion to accept Alderman
Woodall, second by Alderwoman Barnes. Voice vote indicated approval.
4. Resolution No. 23- 48 - A Resolution authorizing the release of a sewer tap for Sudden Service to
connect to the City of Portland’s Sewer Collections System due to the hardship of a failing septic
system. Move to approve by Alderman Woodall, second by Alderwoman Thompson. Voice Vote
indicated approval.

Page 3 of 4

Page 8 of 171

V. Adjournment – Motion to adjourn made by Alderwoman Thompson, second by Alderwoman
Holcomb. Meeting adjourned at 6:20 pm.

_______________________________
Mike Callis, Mayor

________________________________
Tracy Kizer, Assistant City Recorder

Page 4 of 4

Page 9 of 171

Portland Building Codes Department
April 2023 Monthly Report
PERMIT TYPE

No. of Permits

Amount

Use & Occupancy Permits

‐NA‐

$ ‐NA‐

Swimming Pool

1

$ 85.00

Plumbing

8

$ 723.50

Mechanical

16

$ 3,099.86

Stand Alone Building

4

$ 8,538.05

Residential Building

‐NA‐

$ ‐NA‐

Fire Alarm / Fire Suppression

1

$ 19,360.00

Commercial/Industrial

‐NA‐

$ ‐NA‐

Plan Review

8

$ 14,480.87

Demolition

2

$ 120.00

Fire Works

1

$ 1,400.00

Moving
‐NA‐
$ ‐NA‐
______________________________________________________________________________
TOTAL ALL PERMIT FEES
41
$ 47,807.28
PORTLAND IMPACT FEE – PARKS
PORTLAND IMPACT FEE – POLICE
PORTLAND IMPACT FEE – FIRE

$
$
$

‐NA‐
‐NA‐
‐NA‐

TOTAL – PORTLAND IMPACT FEES
$ ‐NA‐
______________________________________________________________________________
SUMNER COUNTY IMPACT FEE
$ ‐NA‐
______________________________________________________________________________
GRAND TOTAL

$ 47,807.28

Page 10 of 171

City of Portland
Office of Recorder
100 South Russell Street
Portland, Tennessee 37148
Phone 615/325-6776 Ext. 245

April 2023 Monthly Report
Number of Council Meetings

2

Number of Work Study Meetings

1

Number of Liability Claims

2

Number of Records Requested

8

April 3rd
5 Council Members present
2 Council Members absent
April 17th
6 Council Members present
1 Council Members absent
April 17th
6 Council Members present
0 Council Members absent

Page 11 of 171

CITY OF PORTLAND, TENNESSEE
OFFICE OF ECONOMIC & COMMUNITY DEVELOPMENT
DENISE GEMINDEN, DIRECTOR
APRIL, 2023

TCAT Portland now provides day and night classes for Welding.
Nursing, Cosmetology and Construction Classes have also been
added to IT, Advanced Manufacturing and Tool and Die Classes.
For More Information Call: 615/325-5575.
• Attended Staff and Council meetings this month as needed.
• Provided intended road closures on parade day to local
industries.
• Attended the Robertson County Economic Development Board
Meeting on April 11th.
• Received approved wording from the TN Historical
Commission for a TN Historical Marker for the Moye -Green
Boarding house corner of downtown.
• Had exchange with our NVR contact, the original spearhead for
the Rockland Project.
• Watched the class on Substance Abuse in the Workplace, took
the test and reported to HR on April 13th.

Director Barry Young opens the show
and Mark Gallant & Shantaia provided
an exciting night of entertainment
Saturday, April 22nd for guests
attending Canadian Entertainer Night
at the Temple. Mark & Shantaia sang
songs that spanned several generations
and were a huge hit with young and old
alike.

100 South Russell Street
Portland, Tennessee 37148
Phone 615.325.6776 Cell 615.881.3404
Fax 615.325.7075
[email protected]

Page 12 of 171

April, 2023

Commemorative Engraved Bricks are available from
the Preservation Foundation.
Please help us pave the Way!
For more information visit our website
templetheatretn.com

DOWNTOWN, DOWNTOWN, DOWNTOWN
The Portland Preservation
Foundation and the Certified
Downtown Committee met on April 6,
2023.

Help Pave the Way
Thank you to the Portland
Community for supporting the
Temple Theatre Restoration Efforts.
All Event Bookings for the Temple Theatre
are managed through Barry Young
615/745-5327.
[email protected]
Event tickets are now available for purchase
online at:
www.templetheatretn.com.

Watch for more shows and movies.
Keep in mind a performance or a
movie at the Temple might be an
option.

It’s been wonderful to see the opening of the
theatre bring so many special people downtown
this month. Your continued support is
appreciated as we work to provide a variety of
shows and movies.
• Provided reference to a potential retail locator to
the state’s economic opportunity zone website.
Reached out to other retail agencies to provide
up to date availability of properties.
• Recommended attendees from the Certified
Downtown Committee for the community
strategic planning meeting for the Sumner
County Three Star Program.
Remember “When you’re alone and life is
making you lonely, you can always go
Downtown”.
~Tony Hatch - 1964

Page 13 of 171

APRIL, 2023

Education = Workforce Development & the Creation of a Skilled
Workforce = Re-investment of Community Wealth

SUSTAINING EXISTING ECONOMIC
DEVELOPMENT

Thanks to Doug Hunter for the aerial photo
of Vaughn Parkway. Visuals are excellent
tools for recruitment.







Gratitude to Nate Heisler and our Planning
Commission Members:
These representatives have a huge responsibility
to make decisions that affect our community
growth. Thanks for your dedication and
futuristic thinking.

Provided ESRI data depicting buying
patterns relative to retail recruitment.
Continued working with TDOT and the
owners of property needed for the ROW for
upgrades to Eubanks Road in April.
Received Dorman’s paperwork &
forwarded for the attorney review prior to
asking the IDB Chairman to sign.
Followed up on a citizens request for retail
outreach to a Quick Service Restaurant.
Provided some options for their
consideration.
Responded to RFIs for prospective industry
as relevant.
Referred a Portland industry request for
additional street lighting to Public Works.
Provided available properties to a
representative of Marcus Millichap.
Received the final results of the
participation in the Regional Wage and
Benefit Survey conducted by MTSU and
MTIDA. Both Sumner and Robertson
County had good participation. Thanks to
this, we will have a good measurement of
our workforce needs for two years.
Reached out to two Industrial Development
Board members to request their continued
service on the board in April.
Responded to communications from CSX
Railroad regarding potential rail sites in
Portland.
Attended the Planning Commission
meeting in April.
Distributed the Title VI Limited English
Proficiency Plan and the link to the Title VI
video to Supervisors in April.

Spending money in Portland, Tennessee brings my money back to me ~
Half of our sales tax dollars support our Sumner County Schools.

Page 14 of 171

April, 2023



City of Portland Office of Economic & Community
Development
Portland Municipal Airport

Portland Municipal Airport
Submitted the Airport Title VI Re-assessment to
TDOT this month.
Notified local school representatives of the opportunity for
student participation in the annual aviation contest. This
year’s contest is Airport Design Challenge. The Airport
Design Challenge (ADC) is an interactive learning and
collaboration opportunity for students in grades K-12. The
FAA Science, Technology, Engineering, and Math Aviation
and Space Education (STEM AVSED) Program organizes
and sponsors this exciting challenge.
Submitted and received Pay Request #1 for the BILS Grant
– property purchase appraisal & environmental work.
Notified Airport Authority members of an upcoming visit
by the commissioner.
Distributed an article from the Utility Contractor Magazine
reporting excellence in the Airport Runway Rehab Project.

.

The jukebox and “Shirley” provide excellent photo props.
www.cityofportlandtn.gov
www.cityofportlandtn.gov

Page 15 of 171

O{fib,e, of LI\P, f i.na,nrz D ireotor
7OO S. Rwd)/Streot?ort1.o.,nA,,

TN 37748

6L 5 -i25 -6776
!

IEI

Ayof l-larclv 37, 2023
f bcaltY ear l^a,y el"aptan/ - 7 5%
Amount
GO Bond 2020
W/S Bond 2020

Unspent Committed Funds
$2.571 .01 7

$3.921 .537
$ I 8.238. 174

s 13.609.420

3t3t/2023

Board Passed
Budget

Taxes & Licenses

7.558.254

8.675.000

87.1%

Planning & Codes

1.480.,162

Intergovemmental
Miscellaneous
Cou rt
Other Revenues
Loan Proceeds - Other Fin Source
Grants & Special Projects

1.549.402
165.961

1.320.450
2.I 76.000
46-850
234.500

I 12.lo/o

143.157

3l 1.500

46.0%

7o of Budget

GENERAL FUND
Revenue

3 I.452

7t.2%
67.1%
7 0.8o/o

11,323,235

0.0%
142.2%
13,04t,800 E6.8%

Ceneral Covernment

1.984.901

2.464.195

80.5%

Administrative & Mayor
Human Resources
Planning & Zoning

236.179
79.123
I 58.550
94.409

332.3 50

7 I .lo/o

108.222

7 3.lo/o

279.91

56.6%

l5l.5l8

62.3o/o

59. | 83

71.3?7
4.009.249
3.394.4 t5
|.282.826

8i.0%

T0TAL

0

394.547

0

277.500

Expense

Codes

Court
Police
I:ire

3.1 98.079

Streets & Highways

871.548

City Garage

8l .827
2 t 3.886
63.764

100. I l8

8t.7%

650.000

32.9%

73_898

86.3o/o

Grants & Special Projects
Srvimming Pool

422.t75

1.765.000

23.9o/o

43.029

51.704

83.z%o

Parks & Recreation
Community Development

871.325

| .073.529

81.2%

79.478

I t9.333

66.6Vo

1.803.533

State Street Aid

Animal Control

TOTAL

7 9 .8o/o

53.1o/o
67 .90h

$10,260,9E9 $15,927.605 61.4',h
1

Page 16 of 171

WATER & SEWER

As of 03/31i2023

Board Passed
Budget

7. of Budget
92.0v,

Revenue
Revenue

8.77 I .681

9.53 6.000

8,771,681

9,536,000 92.0'h

1.r46.166
t.5 I 1.534

1.7 4t.9)2

65.8%

) 1)1 )71

55.5%

Grants & Projects
Sewer Collection

2.676.3 5 8

8.434.000

31.7o/o

1.095,353

) or7 554

54.0o/o

Sewer Plant
Business Office

) ni) 75s

2.690.327

7 6.3o/o

21t.970

,1.10..128

5+.9%

445.817

710.635

60.2Yo

9.169.952

18,797,143 48.8y.

TOTAL
Expense

Water PIant
Water Distribution Svstem

Utility Administration
TOTAL w/ Bond

As of 03/31i23

Board Passed
Budget

7. of Budget

Revenue

S5,9.13J32

S5.452,r107

109.0Y.

Expense

$s,865.188

$5,46,r,022

t07 .3Yo

Revenue

s20,202

s{.000

505.t%

Expense

s2J75

s28.000

8.5%

s809,639
s829.191

s795.000
s r J77,09r

101.8%
60.2.h

Revenue

s 1,075,00s

$1,318,032

81.60i"

Expense

s886,968

$t,271,555

69.8"h

s397.895
s374,957

s{87.600

81.6.h
77 .00h

AIRPORT FU:'iD

DRUG FUND

STORMWATER
Revenue
Expense

SOLID WASTE

GOLF COURSE
Revenue
Expense

Srl86,73J

2

Page 17 of 171

Board Passed
As of 03/31i23

Budget 7o of Budget

IMPACT FEES
Revenue
Parks

I t.254

20.000

56.3V,

Police

t)\ )A)

118.000

106.2o/o

109.273

272,000

1505%

$545,789

$4r0,000

l33.lo/"

2,400
59.983

140,000

1.7%

96,000

Fire

TOTAL
Expense
Parks

0

100,000

62.5%
0.0%

$62,383

s336,000

18.6Vo

DEBT SERVICE. CENERAL FUND
Revenue Transt'er tiom General Fund

s1,007,854

s1,17.1,266

Expense

s95 t.027

s I,17,1.266

85.E%
81.0%

DEBT SERVICE. SPECIAL REVENUE
Revenue Transler from San itation

s98.308

E,xpense

stt3,7{2

s98.3{2
s98.3{2

100.0%
85.2"/"

Revenue

6,1J6,731

5,432,000

tt3.0"h

Expense

6,171,670

7,885,509

78.3y"

Police
F

ire

TOTAI,

GAS

Red*el St u-W,r,CMFO

3

Page 18 of 171

SIAIT SAI.TS TAX
160000

r40000

r

120000

looooo

t

r

.19-20

r 20-21

80o00

.27.22

60000

r 22-23

40000
20000
0

Jul Aut Sep O(t Nov De( Jan Fcb Mar Apr May lun

LOCAT OPTION SALES TAX
400000

t50000

J0qx)0

a

250000
2U0000

.l

r 19.20
.20.21

150000
I

.21 12
a22 2l

100000
50000
0

Jul AuB 5€p O(t Nov De( .,ao Feb Mar Apr May .lun

4

Page 19 of 171

Incident Reports By Incident Type, Summary

311B: 7.43 %
321: 55.43 %
311: 4.00 %
142: 1.14 %
131: 1.14 %
111: 0.57 %
700: 1.71 %
622: 0.57 %
611: 8.00 %
554: 0.57 %
553: 6.86 %
550:
0.57
%
520:
0.57
%
480:
0.57
%
463:
1.14
%
441:
444:
0.57
0.57
%
%
322: 4.00 %324:
412:
352:
0.57
% 0.57 %
3.43
%

111: 0.57 %

444: 0.57 %

131: 1.14 %

463: 1.14 %

142: 1.14 %

480: 0.57 %

311: 4.00 %

520: 0.57 %

311B: 7.43 %

550: 0.57 %

321: 55.43 %

553: 6.86 %

322: 4.00 %

554: 0.57 %

324: 3.43 %

611: 8.00 %

352: 0.57 %

622: 0.57 %

412: 0.57 %

700: 1.71 %

441: 0.57 %

Total Incidents

Percent

111 - Building fire

1

0.57%

131 - Passenger vehicle fire

2

1.14%

142 - Brush or brush-and-grass mixture fire

2

1.14%

311 - Medical assist, assist EMS crew

7

4.00%

311B - Public Assist

13

7.43%

321 - EMS call, excluding vehicle accident with injury

97

55.43%

322 - Motor vehicle accident with injuries

7

4.00%

324 - Motor vehicle accident with no injuries.

6

3.43%

352 - Extrication of victim(s) from vehicle

1

0.57%

412 - Gas leak (natural gas or LPG)

1

0.57%

441 - Heat from short circuit (wiring), defective/worn

1

0.57%

444 - Power line down

1

0.57%

463 - Vehicle accident, general cleanup

2

1.14%

480 - Attempted burning, illegal action, other

1

0.57%

520 - Water problem, other

1

0.57%

550 - Public service assistance, other

1

0.57%

553 - Public service

12

6.86%

Incident Type

May 04, 2023 10:00

Page 1 of 3

Page 20 of 171

Total Incidents

Percent

554 - Assist invalid

1

0.57%

611 - Dispatched & canceled en route

14

8.00%

622 - No incident found on arrival at dispatch address

1

0.57%

700 - False alarm or false call, other

3

1.71%

Incident Type

May 04, 2023 10:00

Total Number of Incidents:

175

Total Number of Incident Types:

21

Page 2 of 3

Page 21 of 171

Incident Type

Total Incidents

Percent

Report Filter Settings
Report File Name: Incident Reports by Incident Type, Summary
Filter Name:

Last Calendar Month

Filter Expression: [AlarmDateTime] is between '4/1/2023 12:00:00 AM' and '4/30/2023 11:59:59 PM'

May 04, 2023 10:00

Page 3 of 3

Page 22 of 171

Monthly Report / April 2023
Jamie White, Parks Director
Tammy Groves, Assistant Parks Director
Trent Stephens, Park Maintenance Crew Leader
Marty Bullington, Golf Course Manager
Civic Clubs
Portland Youth Football League
Portland Soccer Club
Dixie Youth Baseball

Off Season
In Season
In Season

Parks and Recreation Programs and Events
As discussed at the April 17th Council Meeting, The City Swimming Pool will not be open this year.
The Famers Market will be at Richland Park this year on Thursdays in May – August from 3:30 pm to 7:00
pm. The first show of the year will be on Thursday May 11th. Hannah Ladd will be running the Farmers
Market and the Parks Department will be assisting her.
Richland Gym is open for walkers Monday – Friday from 7am to 10am. We are about 90% done with the
HVAC unit project. We still feel comfortable that the system will be up and running by mid‐June.
The Back 9 Disc Course project is underway. We will be adding 9 more holes and this project will also be
improving the hike and bike trail. We have about 2 more months for this project to be completed.
Park Staff is working on the Strawberry Parade City Float. We had some storm damage to the float, but
it will be in the Parade this year.
The Easter Egg Hunt was a huge success. Weather was on our side this year.
The 2nd Annual Strawberry Festival Art Showcase that was at Milo’s in 2022 will be at Richland Gym this
year on Thursday May 11th.
3rd Annual Quilt Show is set for Saturday May 6th in Richland Gym.
Jackie’s Memorial Car Show was set for May 6th on Main Street. This event has been changed to
Saturday May 20th on Main Street.
The Carnival is set to be at Richland Park from Tuesday May 9th – May 13th. The Portland High School
Band Boosters are responsible for the Carnival. Please forward any questions about the Carnival over to
the PHS Band Boosters.
Friday Scrambles will start in May. Please contact the course to make a reservation.

Page 23 of 171

RESOLUTION

City of Portland, Tennessee
No. 23 - 55
A RESOLUTION AUTHORIZING A CERTIFICATE OF COMPLIANCE FOR
JAMES ALLEN OF PORTLAND LIQUORS LOCATED AT 210 SOUTH
BROADWAY, PORTLAND, TN, 37148.
WHEREAS, James Allen has applied to the City of Portland for a Certificate of
Compliance; and
WHEREAS, John Bradley, Attorney for the City of Portland, has reviewed the
application; and
WHEREAS, the City of Portland’s Alcoholic Beverage Board has reviewed the
application and recommended that James Allen of Portland Liquors located at 210 South
Broadway, Portland, TN 37148 receive a Certificate of Compliance; and
NOW, THEREFORE BE IT RESOLVED by the Mayor and Board of
Alderman of the City of Portland, Tennessee that the City of Portland issue James Allen
of Portland Liquors located at 210 South Broadway, Portland, TN 37148 a Certificate of
Compliance; and
BE IT FURTHER RESOLVED that the Resolution shall become effective upon
its passage, the public welfare requiring it.

___________________________________
Mike Callis, Mayor
Approved this_____Day of ___________.

______________________________
Attest: Rachel Slusser, City Recorder

Page 24 of 171

ORDINANCE

City of Portland, Tennessee
No. 23 - 26
AN ORDINANCE AMENDING THE FUND BALANCE POLICY FOR THE CITY OF
PORTLAND
WHEREAS, the City of Portland passed Ordinance 11-16 that established a fund balance policy
to comply the Governmental Accounting and Financial Standards Board (GASB) Statement No. 54, Fund
Balance Reporting and Governmental Fund Balance Definitions; and
WHEREAS, the purpose of a fund balance policy is to establish a key element of financial
stability by settling guidelines for fund balance; and
WHEREAS, it is essential that the City maintain adequate levels of unassigned fund balance to
mitigate financial risk that can occur from unforeseen levels of fluctuations, unanticipated expenditures,
and similar circumstances; and
WHEREAS, the City has reviewed the current policy and has determined that it needs to be
amended to reflect current economic conditions.
NOW, THEREFORE, BE IT RESOLVED by the Mayor and Board of Aldermen of the City of
Portland, Tennessee that Ordinance 11-16 is rescinded, and the attached fund balance policy titled
General Fund, Fund Balance Policy, 2023, be adopted in its entirety and become the official Fund
Balance Policy for General Fund in the City of Portland.
This Ordinance shall take effect from and after its final passage, the public welfare requiring it.

________________________________
Mike Callis, Mayor

______________________________
Attest: Rachel Slusser, City Recorder

Passed First Reading:
Passed Second Reading:

Page 1 of 5
Ordinance # 23‐26

Page 25 of 171

City of Portland, Tennessee
General Fund
Fund Balance Policy 2023
Policy
The following policy has been adopted by the City Council in order to address the implications
of the Governmental Accounting Standards Board (“GASB”) Statement No. 54 Fund Balance
Reporting and Governmental Fund Definitions. The purpose of this policy is to establish a key
element of the financial stability of the City by setting guidelines for fund balance. Unassigned
fund balance is an important measure of economic stability. It is essential that the City maintain
adequate levels of unassigned fund balance to mitigate financial risk that can occur from
unforeseen revenue fluctuations, unanticipated expenditures, and similar circumstances, and to
maintain favorable bond ratings. Also, the fund balance provides cash flow liquidity for the
City’s general operations. Factors for maintaining sufficient fund balance include the ability to:







Maintain covenants of third-party agreements.
Provide funds for enacted Ordinances and Resolutions of the Board of Mayor and
Alderman.
Mitigate State budget actions that may reduce City revenue.
Mitigate economic downturns that the City may face in the future.
Front-fund or complete fund, if necessary, disaster costs or costs associated with
emergencies.
Fund the City’s expenditures and debt service payments during the first few months of
the fiscal year before traditional revenues are realized.
For non-recurring expenses identified as necessary by the Board of Mayor and Aldermen.
Fund one-time capital expenses identified as necessary by the Board of Mayor and
Aldermen.

This policy and the procedure promulgated under it supersede all previous policies regarding the
City’s fund balance and reserve policies.
Fund Balance Classifications
Fund Balance – An accounting distinction is made between the portions of fund equity that are
spendable and non-spendable. These are broken up into five categories:
1) Non-Spendable Fund Balance – Amounts that are not in a spendable form or are
required to be maintained intact. Examples are inventory or permanent funds.
2) Restricted Fund Balance – Amounts that can be spent only for the specific purposes
stipulated by external resource providers either constitutionally or enabling legislations.
Examples include grants and child safety fees.
3) Committed Fund Balance – Amounts that can be used only for the specific purposes
determined by a formal action of the government’s highest level of decision-making

Page 2 of 5
Ordinance # 23‐26

Page 26 of 171

authority. Commitments may be changed or lifted only by the City Legislative Body
taking the same formal action that imposed the constraint originally.
4) Assigned Fund Balance – Amounts that are intended to be used by the government for
specific purposes. Intent can be expressed by the governing body or by an official or
body to which the governing body delegates the authority. In governmental funds other
than general fund, assigned fund balance represents the amount that is not represents the
amount that is not restricted or committed. This indicates that resources in other
governmental funds are, at a minimum, intended to be used for the purpose of that fund.
Assigned funds cannot cause a deficit in unassigned fund balance.
5) Unassigned Fund Balance – Amount is the residual classification of the general fund
and includes all amounts not contained in other classifications. Unassigned amounts are
technically available for any purpose.
Order of Use of Restricted and Unrestricted Funds
When both restricted and unrestricted funds are available for expenditure, it shall be the policy of
the City to use the restricted amounts first as permitted under the law.
When committed, assigned, and unassigned funds are available for expenditure, committed funds
should be spent first, assigned funds second, and unassigned funds last.
Authority to Commit Funds
The City’s governing body has the authority to set aside funds for a specific purpose. Any funds
set aside as Committed Fund Balance requires the passage of an ordinance by a simple majority
vote. The passage of an ordinance must take place prior to June 30th of the applicable fiscal year.
If the actual amount of the commitment is not available by June 30th, the ordinance must state the
process or formula necessary to calculate the actual amount as soon as information is available.
Authority to Assign Funds
The City’s governing body has the authority to set aside funds for the intended use of a specific
purpose. Any funds set aside as Assigned Fund Balance requires the passage of a resolution by a
simple majority vote. The same action is required to change or remove the assignment. Upon
passage of a budget ordinance where assigned fund balance is used to balance the budget, the
Finance Director shall record the amount as “Assigned Fund Balance”.
Minimum Level of Unassigned Fund Balance
Unassigned Fund Balance is the residual Fund Balance in the General Fund. It represents the
resources available for future spending. An appropriate level of unassigned fund balance should
be maintained in the General Fund to cover unexpected expenditures and revenue shortfalls. The
unassigned fund account shall have five subaccounts.
The unassigned fund balance in the General Fund shall have the following subaccounts:

Page 3 of 5
Ordinance # 23‐26

Page 27 of 171

A. Cash Flow Stabilization Subaccount
The Cash Flow Stabilization Subaccount is intended to provide reserves to mitigate the
deficiencies caused by the timing of the cash inflows and cash outflows.
The Cash Flow Stabilization Subaccount shall be set at a minimum of 20% of General
Fund operating budgeted expenditures less any capital outlay and project amounts.
B. Contingency Subaccount
The Contingency Subaccount is intended for unanticipated expenses and revenue
shortfalls impacting programs already approved in conjunction with the current year’s
budget. The Contingency Subaccount shall not be used to fund new programs or positions
added outside of the current year’s budget.
Funds in the Contingency Subaccount may be used towards expenses outside of the
budget only as follows:
1) A change in legislation creating an unfunded mandate.
2) Large, unexpected payroll/retirement payouts.
3) A technical correction in the budget.
4) Unbudgeted project expense overrun.
The Contingency Subaccount shall be set at a minimum of 3% of General Fund operating
budgeted expenditures.
C. Emergency Subaccount
The Emergency Subaccount is intended for unforeseen urgent events. To utilize funds
from the Emergency Subaccount, a finding by the Mayor, with confirmation by the Board
of Aldermen, of “urgent economic necessity” will be required, as well as a determination
that no other viable sources of funds are available. A finding of urgent economic
necessity would be based on a significant event, for example, a natural disaster or
catastrophe.
The Emergency Subaccount shall be set at a minimum of 5% of General Fund operating
budgeted expenditures.
D. Debt Service Subaccount
The Debt Service Subaccount is intended to provide reserve funds for shortfalls in
budgeted revenues intended for general obligation debt service payments or unexpected
and unbudgeted expenditures related to general obligation debt service as well as any
unbudgeted expense related to the service and maintenance of the City’s debt liabilities.
The Debt Service Subaccount shall have a shall be set at a minimum of 3% of General
Fund operating budgeted expenditures.
E. Future Project/Capital Outlay Subaccount
The Future Project/Capital Outlay Subaccount shall be the balance of Unassigned Fund
Balance after the Contingency, Emergency, Cash Flow Stabilization, and Debt Service
Page 4 of 5
Ordinance # 23‐26

Page 28 of 171

Subaccounts are funded. This Subaccount shall be used to fund one-time capital
expenditures. If this subaccount is used to balance the budget, it shall state “Cash used for
Capital Expenditures”.
The Future Project/Capital Outlay Subaccount shall have a minimum balance of at least
$250,000.
Any budget amendment that will result in the unassigned fund subaccounts dropping below the
minimum level, it will require the approval of a majority of the Board of Mayor and Aldermen.
If any subaccount drops below the minimum level amount, the Board of Mayor and Aldermen
shall develop a plan to replenish the fund balance to establish the minimum amount level within
two years.
Fund Balance Policy Adoption
The City’s Fund Balance Policy shall be adopted by Resolution by the Board of Mayor and
Aldermen. The policy shall be reviewed by the approving authority and the same authority must
approve any modifications. It is recommended that the policy be reviewed every year within six
months following budget approval. This policy will be managed and monitored by the Finance
Department and report on the current and projected level of reserve funds in conjunction with the
budget process. If necessary, the Finance Director will present recommendations for any
amendments, deletions, additions, improvements, or clarifications.

Page 5 of 5
Ordinance # 23‐26

Page 29 of 171

RESOLUTION

City of Portland, Tennessee
No. 23 - 50
A RESOLUTION AMENDING THE DEBT MANAGEMENT POLICY FOR THE
CITY OF PORTLAND
WHEREAS, the City of Portland has made a commitment to manage the financial
affairs of the City to minimize risks, avoid conflicts of interest and ensure transparency
while still meeting the capital needs of the City; and
WHEREAS, a Debt Management Policy signals to the public and the rating
agencies that the City is using a disciplined and defined approach to financing capital
needs; and
WHEREAS, the State of Tennessee requires the City to adopt a debt management
policy for accountability and transparency related to the issuance of public debt in
Tennessee; and
WHEREAS, the City of Portland approved by Resolution 22-90 a Debt
Management Policy; and
WHEREAS, the City of Portland has reviewed the current policy and has
determined it needs to be amended in order to continue the commitment of fiscal
responsibility.
NOW, THEREFORE, BE IT RESOLVED by the Mayor and Board of Aldermen
of the City of Portland, Tennessee that Resolution 22-90 is rescinded, and the attached debt
policy titled City of Portland Debt Management Policy, May 15, 2023, be adopted in its
entirety and be the official Debt Management Policy for the City of Portland; and
This Resolution shall take effect from and after its final passage, the public welfare
requiring it.

_____________________________
Mike Callis, Mayor

_________________________
Attest: Rachel Slusser, City Recorder

Approved this ___ day of __________.

Page 1 of 8
Resolution # 23-50

Page 30 of 171

City of Portland, TN
Debt Management Policy
May 15, 2023
Introduction:
The purpose of this debt management policy is to establish a set of parameters by which
debt obligations will be undertaken by the City of Portland, TN. This policy reinforces the
commitment of the City and its officials to manage the financial affairs of the City to
minimize risks, avoid conflicts of interest and ensure transparency while still meeting the
capital needs of the City. A debt management policy signals to the public and the rating
agencies that the City is using a disciplined and defined approach to financing capital
needs and fulfills the requirements of the State of Tennessee regarding the adoption of a
debt management policy.
The goal of this policy is to assist decision makers in planning, issuing, and managing debt
obligations by providing clear directions as to the steps, substance, and outcomes desired.
In addition, greater stability over the long term will be generated using consistent
guidelines in issuing debt.
Definition of Debt:
All obligations of the City to repay, with or without interest, in installments and/or at a
later date, some amount of money utilized for the purchase, construction, or operation of
City resources. This includes but is not limited to notes, bond issues, capital leases, and
loans of any type whether from an outside source such as a bank or from another internal
fund.
Approval of Debt:
Bond anticipation notes, capital outlay notes, grant anticipation notes, and tax and
revenue anticipation notes (including any interfund loans), and certain non‐exempt
financing leases will be submitted to the State of Tennessee Comptroller’s Division of Local
Government Finance and the City Council prior to adoption of the authorizing resolution
for capital outlay notes and prior to issuance or entering into all other notes. A plan for
refunding debt issues will also be submitted to the Comptroller’s Office prior to adoption
of the authorizing resolution by the governing body and issuance.
Transparency:

The City shall comply with legal requirements for notice and for public meetings
related to debt issuance.
All notices shall be posted in the customary and required posting locations,
including as required local newspapers, bulletin boards, and websites.
Page 2 of 8

Resolution # 23-50

Page 31 of 171



All costs (including principal, interest, issuance, continuing, and one‐time) shall be
clearly presented and disclosed to the citizens, City Council, and other stakeholders
in a timely manner.
The terms and life of each debt issue shall be clearly presented and disclosed to
the citizens/members, City Council, and other stakeholders in a timely manner.
A debt service schedule outlining the rate of retirement for the principal amount
shall be clearly presented and disclosed to the citizens/members, City Council, and
other stakeholders in a timely manner.

Role of Debt:

Long‐term debt shall not be used to finance current operations. Long‐term debt
may be used for capital purchases or construction identified through capital
improvement, regional development, transportation, or master process or plan.
Short‐term debt may be used for certain projects and equipment financing as well
as for operational borrowing; however, the City will minimize the use of short‐term
cash flow borrowings by maintaining adequate working capital for enterprise
funds, available cash for governmental funds, and close budget management.
In accordance with Generally Accepted Accounting Principles and state law,
1. The maturity of the underlying debt will not be more than the useful life of
the assets purchased or built with the debt, not to exceed 30 years;
however, an exception may be made with respect to federally sponsored
loans, provided such an exception is consistent with law and accepted
practices.
2. Debt issued for operating expenses must be repaid within the same fiscal
year of issuance or incurrence.

Types and Limits of Debt:


The City will seek to limit total outstanding annual debt service obligations to 40%
of tax assessments and local option tax revenues, excluding overlapping debt,
enterprise debt, and revenue debt.
The limitation on total outstanding debt must be reviewed prior to the issuance of
any new debt.
The City’s total outstanding debt obligation will be monitored and reported to the
City Council annually by the finance director during the budget preparation
process. The finance director shall monitor the maturities and terms and
conditions of all obligations to ensure compliance. Also, the finance director shall
report to the City Council any matter that adversely affects the credit or financial
integrity of the City.
Historically, the City has issued and is authorized to issue General Obligation
bonds, Revenue bonds, TIFs, leases, notes, financing leases and other debt allowed
by law. The City has determined it currently will not issue complex debt
instruments such as swaps or derivatives.
Page 3 of 8

Resolution # 23-50

Page 32 of 171


The City will seek to structure debt with level or declining debt service payments
over the life of each individual bond issue, loan, or other debt obligation.
The City may utilize non‐level debt methods. However, the use of such methods
must be thoroughly discussed in a public meeting and the Mayor and City Council
must determine such use is justified and in the best interest of the city, as well as
submitted to the Comptroller’s Office for approval.
The City may use financing leases (formerly called capital leases) to finance
projects. The City will follow the guidance established by the Comptroller of the
Treasury, Division of Local Government Finance when assessing potential financing
leases. This guidance is pursuant to TCA 9‐24‐101 “Uniformity in Local Government
Lease Financing Act of 2021” and the Division of Local Government Finance’s Debt
Manual.
Bonds backed with a general obligations pledge often have lower interest rates
than revenue bonds. The City may use its General Obligation pledge with revenue
bond issues when the populations served by the revenue bond projects overlap or
significantly are the same as the property tax base of the City. The City Council and
management are committed to maintaining rates and fee structures of revenue
supported debt at levels that will not require a subsidy from the City’s General
Fund.

Use of Variable Rate Debt:

The City recognizes the value of variable rate debt obligations and that cities have
greatly benefitted from the use of variable rate debt in the financing of needed
infrastructure and capital improvements.
However, the City also recognizes there are inherent risks associated with the use
of variable rate debt and will implement steps to mitigate these risks, including:
1. The City will annually include in its budget an interest rate assumption for
any outstanding variable rate debt that takes market fluctuations affecting
the rate of interest into consideration.
2. Prior to entering into any variable rate debt obligation that is backed by
insurance and secured by a liquidity provider, the City Council shall be
informed of the potential affect on rates as well as any additional costs that
might be incurred should the insurance fail.
3. Prior to entering into any variable rate debt obligation that is backed by a
letter of credit provider, the City Council shall be informed of the potential
affect on rates as well as any additional costs that might be incurred should
the letter of credit fail.
4. Prior to entering into any variable rate debt obligation, the City Council will
be informed of any terms, conditions, fees, or other costs associated with
the prepayment of variable rate debt obligations.
5. The City shall consult with persons familiar with the arbitrage rules to
determine applicability, legal responsibility, and potential consequences
associated with any variable rate debt obligation.
Page 4 of 8

Resolution # 23-50

Page 33 of 171

6. The City will avoid over‐reliance on variable rate debt due to the volatility
seen in credit markets.
Use of Derivatives:

The City chooses not to use derivatives or other exotic financial structures in the
management of the City’s debt portfolio.
Prior to any reversal of this provision:
1. A written management report outlining the potential benefits and
consequences of utilizing these structures must be submitted to the City
Council; and
2. The City Council must adopt a specific amendment to this policy concerning
the use of derivatives or interest rate agreements that complies with the
State Funding Board Guidelines.

Bonds ‐ Methods of Sale:

Competitive ‐ In a competitive sale, the City's bonds shall be awarded to the bidder
providing the lowest true interest cost as long as the bid adheres to the
requirements set forth in the official notice of sale.
Negotiated ‐ While the City prefers the use of a competitive process, the City
recognizes some bonds are best sold through negotiation. In a negotiated sale, the
underwriter(s) will be chosen through a Request for Qualification (RFQ) process
and the interest rate and underwriter's fees are negotiated prior to the sale. The
factors to be considered for a negotiated sale include the following:
1. Volatility of market conditions
2. Size of bond sale and credit strength
3. Whether the bonds are issued as variable rate demand obligations

Costs of Debt:


All costs associated with the initial issuance or incurrence of debt, management,
and repayment of debt (including interest, principal, and fees or charges) shall be
disclosed prior to action by the City Council in accordance with the notice
requirements stated above.
In cases of variable interest or non‐specified costs, a detailed explanation of the
assumptions shall be provided along with the complete estimate of total costs
anticipated to be incurred as part of the debt issue.
Costs related to the repayment of debt, including liabilities for future years, shall
be provided in context of the annual budgets from which such payments will be
funded (General Obligations bonds in context of the General Fund, Revenue bonds
in context of the dedicated revenue stream and related expenditures, loans and
notes).

Refinancing Outstanding Debt:
Page 5 of 8
Resolution # 23-50

Page 34 of 171

The City will refund debt when it is in the best financial interest of the City to do so,
and the Finance Director shall have the responsibility to analyze outstanding bond
issues for refunding opportunities. The Comptroller’s Office must review the
refunding plan prior to the decisions being approved by the governing body, and all
plans for current or advance refunding (no longer tax‐exempt) of debt must be in
compliance with state laws and regulations.
The finance director will consider the following issues when analyzing possible
refunding opportunities:
1. Onerous Restrictions – Debt may be refinanced to eliminate onerous or
restrictive covenants contained in existing debt documents, or to take
advantage of changing financial conditions or interest rates.
2. Restructuring for Economic Purposes – The City will refund debt when it is
in the best financial interest of the City to do so. Such refunding may
include restructuring to meet unanticipated revenue expectations, achieve
cost savings, mitigate irregular debt service payments, or to release reserve
funds. Current refunding opportunities may be considered by the finance
director if the refunding generates positive present value savings, and the
finance director must establish a minimum present value savings threshold
for any refinancing.
3. Term of Refunding Issues – The City will refund bonds within the term of
the originally issued debt. However, the finance director may consider
maturity extension, when necessary to achieve a desired outcome,
provided such extension is legally permissible. The finance director may
also consider shortening the term of the originally issued debt to realize
greater savings. The remaining useful life of the financed facility and the
concept of inter‐generational equity should guide this decision.
4. Escrow Structuring – The City shall utilize the least costly securities available
in structuring refunding escrows. Under no circumstances shall an
underwriter, agent or financial advisor sell escrow securities to the City
from its own account.
5. Arbitrage – The City shall consult with persons familiar with the arbitrage
rules to determine applicability, legal responsibility, and potential
consequences associated with any refunding.

Professional Services:
The City shall require all professionals engaged in the process of issuing debt to clearly
disclose all compensation and consideration received related to services provided in the
debt issuance process by both the City and the lender or conduit issuer, if any. This
includes “soft” costs or compensations in lieu of direct payments.

Counsel: The City shall enter into an engagement letter agreement with each
lawyer or law firm representing the City in a debt transaction. No engagement
letter is required for any lawyer who is an employee of the City or lawyer or law
firm which is under a general appointment or contract to serve as counsel to the
Page 6 of 8

Resolution # 23-50

Page 35 of 171

City. The City does not need an engagement letter with counsel not representing
the City, such as underwriters’ counsel.

Financial Advisor: The City shall enter into a written agreement with each person
or firm serving as financial advisor for debt management and transactions.
o Whether in a competitive sale or negotiated sale, the financial advisor shall
not be permitted to bid on, privately place or underwrite an issue for which
they are or have been providing advisory services for the issuance or broker
any other debt transactions for the City
Underwriter: The City shall require the Underwriter to clearly identify itself in
writing as an underwriter and not as a financial advisor from the earliest stages of
its relationship with the City with respect to that issue. The Underwriter must
clarify its primary role as a purchaser of securities in an arm’s‐length commercial
transaction and that it has financial and other interests that differ from those of
the Entity. The Underwriter in a publicly offered, negotiated sale shall be required
to provide pricing information both as to interest rates and to takedown per
maturity to the City Council in advance of the pricing of the debt.

Conflicts:

Professionals involved in a debt transaction hired or compensated by the City shall
be required to disclose to the City existing client and business relationships
between and among the professionals to a transaction (including but not limited to
financial advisor, swap advisor, bond counsel, swap counsel, trustee, paying agent,
liquidity or credit enhancement provider, underwriter, counterparty, and
remarketing agent), as well as conduit issuers, sponsoring organizations and
program administrators. This disclosure shall include that information reasonably
sufficient to allow the City to appreciate the significance of the relationships.

Professionals who become involved in the debt transaction as a result of a bid
submitted in a widely and publicly advertised competitive sale conducted using an
industry standard, electronic bidding platform are not subject to this disclosure.
No disclosure is required that would violate any rule or regulation of professional
conduct.

Continuing Disclosure:
The City will execute a Continuing Disclosure Certificate with each issuance of municipal
bonds, if required by Rule 15c2-12 of the Federal Securities and Exchange Commission
(the “Rule”), under which it will covenant for the benefit of holders and beneficial owners
of the Bonds to provide certain financial information and operating data relating to the City
(the “Annual Report”) and to provide notice of the occurrence of certain enumerated events
(“Material Events”), as required by the Rule. The Annual Report and notices of Material
Page 7 of 8
Resolution # 23-50

Page 36 of 171

Events shall be filed by the City with the Municipal Securities Rulemaking Board
(“MSRB”) at www.emma.msrb.org and with any State Information Depository which may
hereafter be established in Tennessee when required by the Rule. The specific nature of the
information to be contained in the Annual Report or the notices of material events can be
found in the Continuing Disclosure Certificate related to each issuance of Bonds.
To ensure compliance, the City has appointed the Finance Director to be responsible for all
continuing disclosure endeavors. The Finance Director will maintain knowledge of the Rule
through continuing education, including resources such as the Government Finance
Officers website. The Finance Director will review each continuing Disclosure Certificate
and will file each Annual Report when required by such Continuing Disclosure Certificate.
If the Annual Report is not complete because of the unavailability of the annual audit, then
the Annual Report will be timely filed containing an unaudited financial report. Any failure
to timely file an Annual Report will be reported with a notice posted with the MSRB on
www.emma.msrb.org and with any State Information Repository. The Finance Director will
monitor each outstanding bond issue and timely file all material events.
Review of Policy:
The debt policy guidelines outlined herein are only intended to provide general direction
regarding the future use and execution of debt. This policy shall be reviewed at least
annually by the City Council during the annual budget process. Any amendments shall be
considered and approved in the same process as the initial adoption of this Policy, with
opportunity for public input.
Compliance:
The mayor and finance director are responsible for ensuring compliance with this policy.

Page 8 of 8
Resolution # 23-50

Page 37 of 171

RESOLUTION

City of Portland, Tennessee
No. 23 - 51
A RESOLUTION TO ENHANCE THE REQUIREMENTS OF THE COMBINED
ZONING ORDINANCE FOR THE CITY OF PORTLAND
WHEREAS, In an effort to manage growth and preserve the long-term character of the
community the City Council is requiring more developments to be presented as Planned
Unit Developments (PUD); and
WHEREAS, The Combined Zoning Ordinance No. 387 provides guidelines to ensure that
all presented PUDs enhance the community as a whole and fulfills the intended purpose
of the proposed development; and
WHEREAS, The City Council wishes to require that all PUDs containing residential
components include minimum square footage for each residential unit, include a list of
exterior building materials and the minimum percentage of each material to be used per
residential unit, include design elevations that will substantially meet the proposed plan,
along with other such details as: driveways, mailboxes, underground utilities, HOAs, and
amenities; and
WHEREAS, The City Council request that staff and the Planning Commission review the
current Zoning Ordinance to consider automatic requirements when a PUD is to be
presented instead of straight zoning (noting that the City Council already wishes that all
multi-family be presented as a PUD) as well as requiring developers to include design
elements for any PUD approval; and
NOW, THEREFORE BE IT RESOLVED, By the Mayor and City Council that the Combined
Zoning Ordinance be amended to include the necessary criteria for when a Planned Unit
Development is required and that certain design elements are included in any approved
PUD; and
BE IT FURTHER RESOLVED, That this resolution shall become effective upon its passage,
the public welfare requiring it.
___________________________________
Mike Callis, Mayor
Approved this the ____ of ____________.

____________________________
Rachel Slusser, City Recorder

Page 38 of 171

RESOLUTION

City of Portland, Tennessee
No. 23 - 52
A RESOLUTION REQUIRING ALL MULTI-FAMILY ZONING TO BE
PRESENTED AS A PLANNED UNIT DEVELOPMENT
WHEREAS, In an effort to preserve the character and general welfare of the community
the City Council desires that all developments be completed as presented; and
WHEREAS, All rezoning request that wholly or in part contains multi-family such as RM1, NMU, CMU, or RMU will be required to submit a Planned Unit Development (PUD)
plan of the project and the Council may request certain design elements be included in
the plan; and
NOW, THEREFORE BE IT RESOLVED, By the Mayor and City Council that all rezoning
request containing multi-family must be presented as a Planned Unit Development; and
BE IT FURTHER RESOLVED, That this resolution shall become effective upon its passage,
the public welfare requiring it.
___________________________________
Mike Callis, Mayor
Approved this the ____ of ______________.

____________________________
Rachel Slusser, City Recorder

Page 39 of 171

RESOLUTION

City of Portland, Tennessee
No. 23 - 53
A RESOLUTION RE-ADOPTING THE SUMNER
JURISDICTIONAL HAZARD MITIGATION PLAN

COUNTY

MULTI-

WHEREAS, Sumner County recognizes the threat that natural hazards pose to
people and property; and
WHEREAS, undertaking hazard mitigation actions before disasters occur will
reduce the potential for harm to people and property and save taxpayer dollars; and
WHEREAS, an adopted hazard mitigation plan is required as a condition of future
grant funding for mitigation projects; and
WHEREAS, Sumner County participated jointly in the planning process with the
other local units of government within the county of prepare the Multi-Jurisdictional
Hazard Mitigation Plan which can be seen on the Sumner County Website at
www.sumnertn.org.
NOW, THEREFORE BE IT RESOLVED by the Mayor and Board of Aldermen
of the City of Portland, Tennessee re-adopts the Sumner County Multi-Jurisdictional
Hazard Mitigation Plan as an official plan pursuant to the finalized FEMA letter attached
herewith; and
BE IT FURTHER RESOLVED that the Sumner County Emergency Management
Agency will submit on behalf of the participating agencies, the adopted Hazard
Mitigation Plan to the Federal Emergency Management Agency officials for completion
of the requirement.

______________________________
Mike Callis, Mayor

Approved this ____ day of _______.

_________________________________
Attest: Rachel Slusser, City Recorder

Page 40 of 171

Sumner County
Hazard Mitigation Plan
2023 Update

Prepared BY:
Sumner County Hazard Mitigation Planning Committee
Sumner County Emergency Management Agency/Office of Emergency Management

Assistance Provided By:
Tennessee Emergency Management Agency
as part of the Tennessee Mitigation Initiative

Page 41 of 171

Executive Summary
Over the past two decades, hazard mitigation has gained increased national attention due
to the large number of natural disasters that have occurred throughout the U.S. and the
rapid rise in costs associated with those disaster recoveries. It has become apparent that
money spent mitigating potential impacts of a disaster event can result in substantial
savings of life and property. With these benefit-cost ratios extremely advantageous, the
Disaster Mitigation Act of 2000 was developed as U.S. Federal legislation reinforcing the
importance of pre-disaster mitigation planning by calling for local governments to develop
mitigation plans (44 CFR 201).
A local hazard mitigation plan aims to identify the community’s notable risks and specific
vulnerabilities and then to create/implement corresponding mitigation projects to address
those areas of concern. This methodology helps reduce human, environmental, and
economic costs from natural and man-made hazards through the creation of long-term
mitigation initiatives.
The advantages of developing a local hazard mitigation plan are numerous and include
improved post-disaster decision-making, education on mitigation approaches, and an
organizational method for prioritizing mitigation projects. Communities with a mitigation
plan receive larger amounts of Federal and State funding opportunities to be used on
mitigation projects and can receive these funds faster than communities without a plan.
This 2023 update of the Sumner County Hazard Mitigation Plan addresses Building
Resilient Communities and Infrastructure (BRIC), Flood Mitigation Assistance (FMA), and
Hazard Mitigation Grant Program (HMGP) requirements. Each jurisdiction within the county
participated in the preparation of the update, including:
• Sumner County
• Town of Westmoreland
• City of Gallatin
• City of Whitehouse
• City of Goodlettsville
• Sumner County Board of
• City of Hendersonville
Education
• City of Millersville
• Volunteer State Community
• City of Mitchellville
College
• City of Portland
In reference to federal code title 44 CFR 201, the plan is required to be submitted to both
TEMA (State) and FEMA (Federal) for review to be approved. When the plan is deemed
“approval pending adoption” by FEMA (44 CFR 201.6(c)5), each of the participating
jurisdictions will adopt the plan through a local resolution.

2023 Sumner County Hazard Mitigation Plan
2

Page 42 of 171

Table of Contents
Chapter 1. The Planning Process .............................................................................................. 5
1.1 Purpose and Need, Authority and Statement of Problem.................................................................... 5
1.1.1 Purpose and Need................................................................................................................................. 5
1.1.2 Authority .................................................................................................................................................. 5
1.1.3 Statement of Problem........................................................................................................................... 5
1.2 Methodology, Update Process, and Participation Summary ............................................................... 6
1.2.1 Local Government Participation ......................................................................................................... 6
1.2.2 Hazard Mitigation Planning Process .................................................................................................. 9
1.3 Plan Update .................................................................................................................................................. 13
1.3.1 The New Plan ........................................................................................................................................ 13
1.3.2 2017 HMP Strategy Review ................................................................................................................ 13
1.4 Multi-Jurisdictional Special Considerations............................................................................................. 17
1.5 Public Participation ...................................................................................................................................... 17
1.6 County Data Profile ..................................................................................................................................... 18
1.6.2 Resources and Assets ......................................................................................................................... 18
1.6.3 Development and Growth ................................................................................................................. 19
1.6.4 Demographics ...................................................................................................................................... 19
1.6.5 Social Vulnerability ............................................................................................................................... 20
1.6.6 Critical Infrastructure........................................................................................................................... 22
1.7 Resource Capabilities.................................................................................................................................. 22

Chapter 2: Hazard and Risk Assessment .............................................................................. 25
Risk Assessment Overview .......................................................................................................................... 25
2.1 Drought.......................................................................................................................................................... 27
2.2 Earthquakes.................................................................................................................................................. 34
2.3 Flood............................................................................................................................................................... 42
2.4 Severe Weather............................................................................................................................................ 56
2.5 Tornadoes ..................................................................................................................................................... 64

Chapter 3. Mitigation Strategy ............................................................................................... 71
3.1 Mitigation Goals ........................................................................................................................................... 71
3.3 Compliance with NFIP................................................................................................................................. 72
2023 Sumner County Hazard Mitigation Plan
3

Page 43 of 171

3.4 Prioritization Process .................................................................................................................................. 73
3.5 Mitigation Action Plan ................................................................................................................................. 75

Chapter 4. Implementation, Integration, and Maintenance............................................ 82
4.1 Plan Adoption, Implementation, Monitoring, and Evaluation ............................................................ 82
4.1.1 Plan Adoption ....................................................................................................................................... 82
4.1.2 Implementation.................................................................................................................................... 82
4.1 Integration into Local Planning Mechanism........................................................................................... 83
4.2 Monitoring, Evaluating, Updating ............................................................................................................. 83

Appendix A .................................................................................................................................... i
Appendix B .................................................................................................................................. ix
Appendix C............................................................................................................................. xxxiv
Appendix D ................................................................................................................................ xlii

2023 Sumner County Hazard Mitigation Plan
4

Page 44 of 171

CHAPTER 1: THE PLANNING PROCESS

Chapter 1. The Planning Process
1.1 Purpose and Need, Authority and Statement of Problem
1.1.1 Purpose and Need
FEMA defines “hazard mitigation” as any sustained action taken to reduce or eliminate the
long-term risk to life and property from a hazard event. Hazard mitigation planning is the
process through which hazards are identified, likely impacts determined, mitigation goals
set, and appropriate mitigation strategies defined, prioritized, and implemented. The
Hazard Mitigation Plan aims to identify, assess, and mitigate risk to better protect the
people and property of Sumner County from the effects of natural and man-made hazards.
This Plan documents the hazard mitigation planning process and identifies relevant
hazards, vulnerabilities, and strategies the County and incorporated jurisdictions will use to
decrease vulnerability and increase resiliency and sustainability. This Plan demonstrates
the participating communities’ commitment to reducing risks from identified hazards and
serves as a tool to help decision-makers direct mitigation activities and resources.

1.1.2 Authority
This Hazard Mitigation Plan has been adopted by Sumner County and all participating
jurisdictions in accordance with the authority granted to local communities by the State of
Tennessee. This Plan was updated per state and federal rules and regulations governing
local hazard mitigation plans. The Plan shall be reviewed annually and go through a
complete update process every five years to remain eligible for hazard mitigation grants. The
following legislation was used for guidance:

Section 322 of the Robert T. Stafford Disaster Relief and Emergency Assistance Act
(Stafford Act or the Act), 42 U.S.C. 5165, enacted under Section 104 of the Disaster
Mitigation Act of 2000 (DMA 2000) Public Law 106-390 of October 30, 2000, as
implemented at 44 CFR 201.6 and 201.7 dated October 2011.
Tennessee Code Annotated
• T.C.A. 58-2-106(b)(16)
• T.C.A. 58-2-106(b)(1)
• T.C.A. 58-2-103(a)(5)

1.1.3 Statement of Problem
Each year in the United States, natural disasters take the lives of hundreds of people and
injure thousands more. Taxpayers pay billions of dollars annually to help communities,
organizations, businesses, and individuals recover from disasters. Unfortunately, this only
partially reflects the cost of disasters because additional expenses incurred by insurance
companies and non-governmental organizations are not reimbursed by tax dollars. Many
natural disasters are predictable, and much of the damage caused by these events can be
reduced or even eliminated.

2023 Sumner County Hazard Mitigation Plan
5

Page 45 of 171

CHAPTER 1: THE PLANNING PROCESS

The original Sumner County Hazard Mitigation Plan was created and approved by FEMA in
2023. Per federal requirements stated in 44 CFR 201, all local hazard mitigation plans are
required to go through a FEMA approval process every five years to remain eligible for
hazard mitigation grants. This plan will be re-evaluated and updated every five years to
ensure local governments are continuing to assess the hazards and risks within their
communities. This plan update has been prepared to meet requirements set forth by FEMA
and the Tennessee Emergency Management Agency (TEMA) to ensure Sumner County is
eligible for funding and technical assistance from state and federal hazard mitigation
programs. All communities are welcome to address man-made hazards and risks in their
hazard mitigation plan. However, it's important to note that the State and Federal
governments only evaluate and approve based on natural hazards only as per federal code
title 44 CFR 201.

1.2 Methodology, Update Process, and Participation Summary
This Hazard Mitigation Plan was developed under the guidance of a Hazard Mitigation
Planning Committee (HMPC). The Committee included representatives of Sumner County,
Gallatin, Goodlettsville, Hendersonville, Millersville, Mitchellville, Portland, Westmoreland,
White House, Sumner County Board of Education, and Volunteer State Community College.
Information in this plan will help guide and coordinate mitigation activities and decisions
for local land use policy in the future. Proactive mitigation planning will help reduce the
cost of disaster response and recovery to communities and their residents by protecting
critical community facilities, reducing liability exposure, and minimizing overall community
impacts and disruptions. This plan identifies activities that can be undertaken by both the
public and the private sectors to reduce risk to safety, health, and property caused by
natural and man-made hazards.

1.2.1 Local Government Participation
The planning regulations and guidance stress that each local government seeking FEMA
approval of their mitigation plan must participate in the planning effort in the following
ways:



Participate in the process as part of the HMPC;
Detail where within the planning area the risk differs from that facing the entire area;
Identify potential mitigation actions; and
Formally adopt the plan.

For the HMPC, “participation” meant the following:




Providing facilities for meetings;
Attending and participating in the HMPC meetings;
Collecting and providing other requested data (as available);
Identifying mitigation actions for the plan;
Reviewing and providing comments on plan drafts;

2023 Sumner County Hazard Mitigation Plan
6

Page 46 of 171

CHAPTER 1: THE PLANNING PROCESS



Informing the public, local officials, and other interested parties about the planning
process and providing opportunity for them to comment on the plan;
Coordinating, and participating in the public input process; and
Coordinating the formal adoption of the plan by the appropriate governing body.

The HMPC met all the above-stated participation requirements. Sumner County and all its
incorporated jurisdictions (Gallatin, Goodlettsville, Hendersonville, Millersville, Mitchellville,
Portland, Westmoreland, White House, Sumner County Board of Education, Volunteer State
Community College.) participated in the 2023 Plan update, as well as reviewed and
provided timely comments on all draft components of the Plan. A summary of past and
current community participation is shown below in Table 1. All participants were invited to
this committee via email by the County EMA Director. Those who did not originally respond
were reached out to via phone or email by the County EMA Director.
Table 1 Multi-Jurisdictional HMPC Participation
Jurisdiction
Sumner County
City of Gallatin
City of Goodlettsville
City of Hendersonville
City of Millersville
City of Mitchellville
City of Portland
Town of Westmoreland
City of White House
Sumner County Board of Education
Volunteer State Community College

2017 Participation
X
X
X
X
X
X
X
X
X
X
X

2023 Participation
X
X
X
X
X
X
X
X
X
X
X

The HMPC for the 2023 plan update included key community representatives. Table 2
details the HMPC members, meeting dates, associated FEMA Lifeline, and committee
member attendance. FEMA Lifelines are fundamental way for a community to recover,
however, all participants might not be associated with a FEMA Lifeline. If they are not
associated with a FEMA Lifeline, then they will be indicated as not applicable (NA).
The EMA director invited individuals who represented regional and local agencies that have
authority in regulating county/city development, individuals that represent vulnerable
populations, as well as those that are responsible for responding to the identified hazards
of prime concern. These partners include jurisdictional police, fire, public works, and health
departments, community representatives, nonprofit organizations, local floodplain
administration, the county/city school board, elected officials, and electric utility
companies. Induvial from all sectors were invited to attend the HMPC meetings, those that
chose to attend are listed. All committee members provided key information to recognize
and mitigate hazards of prime community concern. A more detailed summary of HMPC
meeting dates, members seeking approval and FEMA lifeline association follows in Table 2.
Meeting sign-in sheets are included in Appendix A.

2023 Sumner County Hazard Mitigation Plan
7

Page 47 of 171

CHAPTER 1: THE PLANNING PROCESS
Table 2 HMPC Members
Name
Lawrence
Daniel Jr.
Mickey
Summers
Brandon
Head
Patrick
McLaughlin
Carla Miller
Jeff Beaman
Paul Allen
Fornes
Ken Weidner
Jennifer
LeFevre
Preston
Dallas
Bill McCord

Title

Organization/
Jurisdiction

3/30/23

Commander

Hendersonville PD

X

Deputy Director

Sumner EMA

X

Fire Chief

Millersville FD

X

Fire Chief

White House FD

X

Admin Asst
Fire Chief

Sumner EMA
Gallatin FD

X
X

Client Executive

Spatialest

X

Director
Chief Information
Offier

Sumner EMA
City of Gallatin

X

GIS Specialist
City Planner

Katie Brown

Safe Schools Dir.

Bill Vahldiek
Kim Norfleet
Steve Jolley
Kenneth
Reeves
Heidi
Summers
Jimie Green
Carlton Cobb
Scott
Woodward

Captain
Grants Coord.

Steven Craig

Sergeant

Greg Miller
John Poss
Jay Austin

Chief
Battalion Chief
Asst. Chief

Sarah Lock

Director

John Isbell
Doyle Farris
Tav
Matthews
Pete Griffin
Autumn
Joanow

Mayor

Dispatcher
Director

District Coord.
Planner

City of Gallatin
City of Gallatin
Sumner County Board of
Education
Gallatin PD
Sumner County
Westmoreland PD
Goodlettsville FD

Meeting Dates
4/4/2023
4/17/2023
X
X

X

X

X
X
X

X

X

X

X
X

X

X

X

X

X
X
X

X
X
X

X

Vol State Community
College
Mitchellville
Portland Public Works
Gallatin FD

X
X
X

X
X

Vol State Community
College
Sumner EMS
Sumner EMS
Sumner EMS
Hendersonville Public
Works
Sumner County
Hartsville Pike CoC
Highland VFD
TEMA
TEMA

X

X
X
X
X
X
X
X
X
X

2023 Sumner County Hazard Mitigation Plan
8

X
X

X

Page 48 of 171

CHAPTER 1: THE PLANNING PROCESS

1.2.2 Hazard Mitigation Planning Process
The 2023 Sumner County Hazard Mitigation Plan was updated following guidance put forth
by FEMA in the Local Mitigation Planning Policy Guide which became effective on April 19,
2023. This guidance emphasized the need for a whole community planning approach to
include representatives from all sectors of the community with an emphasis on the
increased need for vulnerable and underserved population representation. The guidance
also highlighted increased emphasis on risk, vulnerability, and resilience assessments, the
inclusion of high hazard dams, and future weather trends/patterns.
FEMA guidance proposes a structured four-phase approach to completing a Hazard
Mitigation Plan as follows:
1)
2)
3)
4)

Planning Process
Risk Assessment
Mitigation Strategy
Plan Maintenance

Phase I - Planning Process
Organize to Prepare the Plan
The planning process officially began with a meeting held on March 30, 2023 at the Sumner
County EOC. The meeting covered the scope of hazard mitigation, the purpose of planning,
eligible grants, risk assessments and vulnerabilities impacting the community. During the
planning process, the committee communicated through face-to-face meetings, email, and
telephone conversations. The neighboring communities were given an opportunity to be
involved in the planning process with email invitations by the County EMA Director for the
planning committee meetings. The City of White House, which is part of both Sumner
County and Robertson County chose to attend.
Involve the Public
Early discussions established the significance of involving the public. The HMPC agreed to
an approach using established public information mechanisms and resources within the
community. Public involvement activities for this plan update included public notices,
stakeholder and public meetings, and the collection of public and stakeholder comments
on the draft plan. In order to ensure socially vulnerable and underserved populations were
included in organizing efforts the Sumner County EMA director located vulnerable areas
within the county and posted survey and meeting invitations. Due to the nature of the
public meetings, neighboring communities, agencies, utilities, academia, civic organizations,
and other interested parties were given the opportunity to participate.
Public notices were posted between 4/10/2023-4/13/2023 on various social media accounts
and throughout the county inviting members of the public to attend the 4/17/2023 Hazard
Mitigation Planning meeting. Documentation to support outreach efforts such as
community flyers, social media postings, and mapping of vulnerable populations can be
found in Appendix A.

2023 Sumner County Hazard Mitigation Plan
9

Page 49 of 171

CHAPTER 1: THE PLANNING PROCESS

Sign-in sheets from all meetings are included in Appendix A. The meeting date and topics
discussed are summarized below in Table 3. The meeting on April 17th was open to the
public and was announced on social media and through flyers placed at strategic locations.
Two individuals from the public and one representative of a volunteer fire station chose to
attend.
Table 3 Summary of Hazard Mitigation Planning Meetings
Meeting Number
Meeting Topic
Meeting Date
Overview of hazard
mitigation
Hazard Mitigation Planning
Process
Purpose of the HMP
HMA Grant Funding
Area growth and changes
Meeting #1
3/30/2023
Identification of Hazards
Future weather predictions
Assessment of risk,
vulnerabilities, resilience
Review of NFIP
Previous HMP goals
Next Steps
Overview of hazard
mitigation
Hazard Mitigation Planning
Process
Purpose of the HMP
HMA Grant Funding
Area growth and changes
Meeting #2
4/4/2023
Identification of Hazards
Future weather predictions
Assessment of risk,
vulnerabilities, resilience
Review of NFIP
Previous HMP goals
Next Steps
Hazards of Prime Concern
Project
Guidelines/Requirements
Meeting #3
4/17/2023
Project Discussion
Next Steps

Meeting Location

Sumner County EOC

Virtual Meeting
(Zoom Link)

Sumner County EOC

Coordination
Early in the planning process, the committee determined that the risk assessment,
mitigation strategy development, and plan approval would be greatly enhanced by inviting
other local and state partners to participate in the process. The coordination involved
contacting these agencies through email, flyers, in-person and phone conversations. All
groups and agencies were advised on how to become involved in the plan development

2023 Sumner County Hazard Mitigation Plan
10

Page 50 of 171

CHAPTER 1: THE PLANNING PROCESS

process and were solicited asking for their assistance and input. A summary of agencies
and organizations actively involved in the HMPC is as follows:












City of Gallatin
City of White House
City of Millersville
City of Hendersonville
City of Goodlettsville
City of Mitchellville
City of Portland
Town of Westmoreland
Sumner County
Tennessee Emergency
Management Agency
Sumner County Emergency
Management Agency
Hendersonville Police Dept
Gallatin Police Dept












Westmoreland Police Dept
Goodlettsville Fire Dept
Millersville Fire Dept
Gallatin Fire Dept
Highland Volunteer FD
Portland Public Works
Hendersonville Public Works
Sumner County Emergency
Medical Services
Sumner County Board of
Education
Volunteer State Community
College
Spatialest
Hartsville Pike Church of Christ

Coordination with other community planning efforts was also paramount to the success of
this plan. Mitigation planning involves identifying existing policies, tools, and actions that
will reduce a community’s risk and vulnerability to hazards. Sumner County uses a variety
of planning mechanisms such as land development regulations and ordinances to guide
growth and development. Integrating existing planning efforts and mitigation policies and
action strategies into this plan establishes a credible and comprehensive plan that ties into
and supports other community programs.
Table 4 identifies the existing planning mechanisms that were reviewed and how they were
incorporated into the 2023 Hazard Mitigation Plan Update.
Table 4 Planning Mechanism Review
Reviewed?
(Yes/No)

Existing Planning Mechanisms

Method of Use in Hazard Mitigation Plan

State Hazard Mitigation Plan

Yes

Local Emergency Operations Plan
Community Data Profile
Stormwater Ordinance
Building and Zoning Codes and
Ordinances
CDC Social Vulnerability Index
FEMA’s National Risk Index

Yes
Yes
Yes

Land Use Maps

Yes

Critical2TN Infrastructure Database
NOAA Archives
ETSU Geoinformatics & Disaster
Science Lab

Yes
Yes

Identifying hazards, assessing vulnerabilities, and
mitigation strategies
Identify major capabilities
Development trends, capability assessment
Capability assessment, mitigation strategies
Different years of code regulations utilized in
different jurisdictions
Analyze vulnerable population in jurisdictions
Analyze natural hazard risk within each jurisdiction
Assessing vulnerabilities, development trends, and
mitigation strategies
Assessing vulnerabilities, mitigation strategies
Analyze weather data and trends

Yes

Analyze future weather trends and patterns

Yes
Yes
Yes

2023 Sumner County Hazard Mitigation Plan
11

Page 51 of 171

CHAPTER 1: THE PLANNING PROCESS
U.S Census Bureau
Local County Hazard Mitigation Plan
Flood Insurance Rate Maps

Yes
Yes
Yes

Analyze community demographic data and trends
Analyze previous plan for updates
Analyze flood prone areas within the community

These and other documents were reviewed and considered, as appropriate, during the
collection of hazard identification, vulnerability assessment, and capability assessment.
Data from these plans and ordinances were incorporated into the risk assessment and
hazard vulnerability sections of the plan as appropriate. The data was also used in
determining the capability of the community in being able to implement certain mitigation
strategies.
Phase II – Risk Assessment
Identify the Hazard, Assess the Risk and Vulnerabilities
The committee completed a comprehensive effort to identify/update, document, and
profile all hazards that have, or could have, an impact on the community. The committee
also conducted a capability assessment to review and document the planning area’s
current capabilities and gaps. By collecting information about existing government
programs, policies, regulations, ordinances, and emergency plans, the committee could
assess the activities and measures already in place that contribute to mitigating some of
the risks and vulnerabilities identified. A more detailed description of the risk assessment
process and the results are included in Chapter 2 Risk and Vulnerability Assessment.
Phase III – Mitigation Strategy
Set Goals and Review Actions
This meeting facilitated brainstorming and discussion sessions that described the purpose
and process of developing planning goals and objectives, a comprehensive range of
mitigation alternatives, and a method of selecting and defending recommended mitigation
actions using a series of selection criteria. This information is included in Chapter 3
Mitigation Strategy.
Draft an Action Plan
A complete first draft of the plan was prepared based on information and input collected
during the HMPC meetings, and various agencies and individuals were invited to comment
on this draft. Public and agency comments were integrated into the final draft for TEMA
and FEMA Region IV to review and approve, contingent upon final adoption by Sumner
County.
Phase IV – Plan Maintenance
Adopt the Plan
To secure buy-in and officially implement the plan, the plan was reviewed and adopted by
the appropriate governing bodies.
Implement, Evaluate, and Revise the Plan
Implementation and maintenance of the plan is critical to the overall success of hazard
mitigation planning and actions. Chapter 4 Plan Integration and Maintenance discusses
2023 Sumner County Hazard Mitigation Plan
12

Page 52 of 171

CHAPTER 1: THE PLANNING PROCESS

incorporating the plan into existing planning mechanisms and how to address continued
public involvement.

1.3 Plan Update
The 2017 Sumner County Hazard Mitigation Plan contained a hazard identification and risk
assessment for each jurisdiction and a corresponding action list aimed at mitigation risk.
Since that time, progress has been made by both the County and incorporated jurisdictions
on the implementation of the mitigation strategy with 1 completed action and 3 in
progress. The HMPC has met annually over the past five years to monitor, implement, and
update the plan. This chapter includes an overview of the approach to updating the plan
and identifies new analyses and information included in this plan update.

1.3.1 The New Plan
The updated plan involved a comprehensive review and revision of each section of the
2023 plan and included an assessment of the success of the County and the incorporated
jurisdictions in evaluating, monitoring, and implementing the mitigation strategy outlined
in the 2023 plan. Only the information and data still valid from the 2017 plan was carried
forward as applicable in this update. The following requirements were addressed during
this plan update process with consideration of the priorities and goals of the Sumner
County Hazard Mitigation Planning Committee:











Consider changes in vulnerability due to action implementation;
Document success stories where mitigation efforts have proven effective;
Document areas where mitigation actions were not effective;
Document any new hazards that may arise or were previously overlooked;
Document NFIP as related to the county and jurisdictions;
Incorporate new data or studies on hazards and risks;
Incorporate new data related to future climate patterns and trend;
Incorporate new capabilities or changes in capabilities;
Incorporate social vulnerability data and vulnerable population information;
Incorporate growth and development-related changes to inventories; and
Incorporate new action recommendations or changes in action prioritization;
Enhanced public outreach and multi-agency coordination efforts.

1.3.2 2017 HMP Strategy Review
During the 2017 update of the Sumner County Hazard Mitigation Plan, the HMPC identified
12 actions as relevant to the county. Of these 12 actions, 1 has been completed, 3 are in
progress, and 8 have not been started. Actions that had not been pursued were discussed
for relevance to the new plan and were either carried over to the 2023 plan or deleted from
the strategy. 11 of these projects were determined to still be viable and will be carried over
or revised in this plan update. Details and the status of all previous actions are in Table 5.

2023 Sumner County Hazard Mitigation Plan
13

Page 53 of 171

CHAPTER 1: THE PLANNING PROCESS
Table 5 Mitigation Action Progress Summary (2017 Plan)
Current Status

East Camp
Creek,
Gallatin, TN
Continuing
Authorities
Program
Section 205
Feasibility
Cost Share
Agreement

This project involves the
development of alternatives for
reducing flood risk within the East
Camp Creek watershed within
Gallatin, TN

USACE,
Engineering

Gallatin

Public
Information
and Warning

Provide a weather radio as well as
training with the radio to each LMI
residence in Sumner County.
Estimates are based on the 2010
census population of 5,028 LMI
residence in Sumner County; est.
costs are $16/unit x 5,028
residence=$80,448

EMA

County

1

X

X

Est. Cost

All

Priority

City, Public
Works

Local

Study the areas where road
closures are prone due to heavy
rains and make improvements as
necessary

New or
Existing
Infrastr
ucture

X

X

X

M

200K

Both

X

X

X

H

N/A

Existing

H

N/A

Both

M

$80,448

Existing

FMA

Drainage
Study

X

Carry
Forward
or Revise

BRIC1

Gallatin

Delete
Action

Funding Source
HMGP

Public
Works/Engi
neering

Not yet
Started

Location

Identification and improvement of
deficient public drainage
infrastructure systems.

Flooding
Public
Drainage
Infrastructure
Study

In-Progress

Responsibl
e Dept.

Complete

Action Description

Name of
Project

2023 Plan Update

X

X

BRIC previously referred to as PDM in the 2017 Hazard Mitigation Plan
2023 Sumner County Hazard Mitigation Plan
14

X

X

X

Page 54 of 171

CHAPTER 1: THE PLANNING PROCESS
Consider buy out and tear down of
building with recurrent flooding.
Building that experience recurrent
Property
flooding, are located in FEMA flood
Acquisition
zones: South Waters Avenue
between East Bledsoe and East
Winchester Streets
Consider buy out and tear down of
building with recurrent flooding.
Property
Homes that experience recurrent
Acquisition
flooding, are located in FEMA
Flood zones: Merrell Street and
Blade Street
Consider buy out and tear down of
building with recurrent flooding.
Property
One home, located in a FEMA
Acquisition
flood zones, experiences recurrent
flooding: End of Notting Hill Drive
past Pittman Drive
Consider buy out and tear down of
building with recurrent flooding.
Homes that experience recurrent
flooding, are located in FEMA flood
zones: the entire length of Branch
Property
Creek Road and the section of
Acquisition
from the intersection of Branch
Creek and Bradford through to
Red River Road (between two
unnamed tributaries to East
Station Camp Creek)
Severe Storm/ Tornado
Formulate, assemble, and
maintain storm shelter database
Storm Shelter
for City of Gallatin, use during
Database
post-tornado/bad weather
incident to check and free any

City,
Engineering

Gallatin

X

X

X

X

X

L

N/A

Existing

City,
Engineering

Gallatin

X

X

X

X

X

L

N/A

Existing

City,
Engineering

Gallatin

X

X

X

X

X

L

N/A

Existing

City,
Engineering

Gallatin

X

X

X

X

X

L

N/A

Existing

Fire Dept,
IT, GIS

Gallatin

X

X

X

H

5K

Both

2023 Sumner County Hazard Mitigation Plan
15

Page 55 of 171

CHAPTER 1: THE PLANNING PROCESS
persons trapped inside shelters by
rubble.
All
Emergency
Response Fuel

GIS

Public
Information
and Warning

Installation of fuel pumps at public
works facility (powered by a backup generator) to enable city
emergency response during power
outage or fuel shortage.
Identify
business/continuity/disaster
recovery options for critical GIS
services in the event the primary
location of servers become
unavailable
Provide and distribute pamphlets
on how to stay safe in natural,
technological, and human-made
hazards.

Public
Works

Gallatin

City IT

Gallatin

EMA

All

X

X

X

X

2023 Sumner County Hazard Mitigation Plan
16

X

X

X

X

X

M

15K

Both

X

M

N/A

Both

X

L

10K

Existing

Page 56 of 171

CHAPTER 1: THE PLANNING PROCESS

1.4 Multi-Jurisdictional Special Considerations
Hazards Assessment
Most of the natural hazards identified within this plan have an impact on both Sumner
County and the incorporated jurisdictions. Some hazards have a larger impact on the
County rather than the incorporated jurisdictions and vice versa. Impacts of identified
hazards differ the most at the rural and urban interface where flooding can have different
severity levels. Therefore, the flooding section emphasizes the depth, duration, and timing
of severe flooding events. Below is a table that shows whether a hazard will have multijurisdictional impacts.
Table 6 Multi-Jurisdictional Impacts
Hazards

Will the hazard have multi-jurisdictional differences?

Drought

No

Earthquake

No

Flooding

Yes

Severe Weather

Yes

Tornado

Yes

1.5 Public Participation
Public involvement included press releases, public meetings, and a public comment period
on the draft plan. Organizations representing vulnerable and underserved populations
were contacted in an effort to gain further input from populations most at risk during
hazardous events. The formal meetings for this plan are summarized in Table 3 (Section
1.2.2) discussed early in this chapter. The 4/17/2023 HMPC meeting was open to the public;
and two individuals as well as a representative of a volunteer fire department and a
representative of a local church chose to attend.
Public notices were posted between 4/10/2023-4/13/2023 on various social media accounts
and throughout the county inviting members of the public to attend the 4/17/2023 Hazard
Mitigation Planning meeting. Along with the opportunity to attend the public HMPC
meeting, community members were also invited to be a part of the HMP update process by
completing a short survey via QR that was advertised along with the meeting. The survey
was open for three weeks; only 3 individuals participated in the survey opportunity. The
results are detailed below. Over the past five years, the community was kept involved in
the planning process through the implementation of projects in the plan.

2023 Sumner County Hazard Mitigation Plan
17

Page 57 of 171

CHAPTER 1: THE PLANNING PROCESS

Table 7 Public Survey
Are these hazards a risk to your community, yes or no? Why and When
Jurisdiction

Drought

Earthquake

Flood

Severe
Weather

Tornado

Hendersonville

No

No

Yes

Yes

Yes

Gallatin

Yes

No

Yes

Yes

Yes

All

Yes

No

Yes

Yes

Yes

Expanded Narratives
Hendersonville:


“[Flood]has effected before and does when heavy or steady rains occur. Several
areas in town that creates issues with travel and access for First Responders”
“[Severe weather] has increased over the last few years, tornadoes, lightning,
straight line winds and just this year storm winds for over 3 hours”
In reference to tornado risk “Loss of power, access to certain areas hit the hardest,
strain on Public Safety, parks and public works staff and ability to perform their
work”

All:

In reference to how drought risk could affect the community “Farmer/Crop
Production” similar to two years ago (2021)
In reference to how tornadoes could affect the community “Destruction, life safety”
past occurrences to include 03, 06, 08, 09.

1.6 County Data Profile
1.6.2 Resources and Assets
Sumner Regional Medical Center and Tri-Star Hendersonville Medical Center provide 24hour emergency care to residents of the county and are home to 155 beds and 159 beds,
respectively. The unincorporated county also has: 195 volunteer firefighters, 246 full-tiem
firefighters with 28 stations, and 130 full time Law Enforcement officers including the
county sheriff. Sumner County School District facilities the learning of approximately
29,818 students via their system of 49 schools within the county.
Sumner County houses over 35 radio stations, 7 tv networks, and 9 newspapers. The main
phone companies in the area are AT&T, Verizon, Comcast, and Level 3 Communications
(Gallatin). Residents in the county can either obtain internet via AT&T, Comcast, or Level 3
Communications (Gallatin). Communication resources, a vital component of emergency
response and preparedness, is notably lacking in the more rural portions of Sumner

2023 Sumner County Hazard Mitigation Plan
18

Page 58 of 171

CHAPTER 1: THE PLANNING PROCESS

County. Between 2016 and 2020 only 94.7%of households had a computer and only 89.8%
had broadband internet access according to the United States Census Bureau.
Table 8 Roadways
Jurisdiction
Gallatin
Goodlettsville

US Highways
31E
31, 41, 70

Portland

331 E

State Highways
25, 109, 386
45, 109, 155, 174, 254,
255, 840
25, 52, 76, 109

White House
Hendersonville

31W
31E

76, 258
285, 386

Nearest Interstates
I40 & 165 (12miles away)
24, 40, 440, 65, 840
New exit #121 access I24
& I65
I65
I65 (5miles away)

The Cumberland River cuts through the lower middle portion of the county. Other smaller
waterways and creeks intersect through the county and its incorporated jurisdictions as will
be illustrated throughout the flood hazards section. a further analysis of these water
systems will be explored in the hazard flood section as related to their propensity for flood
events.
The nearest international airport to the county seat, Gallatin, is BNA (approx. 31 miles) and
the closest general aviation locations are Music City Executive and John C Tune Airport.
Given the limited public transportation options and the rural environment of Sumner
County, 48% of working individuals endure a commute of more than 30 minutes and 79%
of all working individuals drive alone to work.
Sumner County is governed by an elected County Executive and County Commissioners.
The jurisdictions withing Sumner County are governed by an elected Mayor and
Commissioners/Alderman. There are multiple regulatory committees that are appointed by
both the County Mayor and the Board of Commissioners.

1.6.3 Development and Growth
Like a majority of its counterparts, Sumner County, has been experiencing rapid growth
over the past few years. The population of the county increased between the 2010 and
2020 censuses from 160,645 to 196,281. 12% of the 72,638 Sumner County households
deal with at least 1 severe housing problem (overcrowding, high housing costs, lack of
kitchen facilities, or lack of plumbing facilities). Most of Sumner Counties’ employed
population work within the services industry and the manufacturing industry. Sumner
County is a member of the Joint Economic and Community Development Boards to ensure
and promote economic growth within the county and for its constituents. As stated,
Sumner County has experienced much growth since the last planning period across all
sectors. It was noted by multiple committee members that new subdivisions were being
built with an increasing population throughout the county as well as new industrial areas.

1.6.4 Demographics
Throughout the planning process, Sumner County HMPC remained committed to
recognizing socially vulnerable and underserved populations. In order to maintain this
2023 Sumner County Hazard Mitigation Plan
19

Page 59 of 171

CHAPTER 1: THE PLANNING PROCESS

commitment, the HMPC reached out to key stakeholders as discussed in Section 1.2 and
reviewed the CDC/ATSDR Social Vulnerability Index (SVI). SVI information is located in
Appendix B.
Table 6 below illustrates the population data of the county according to the 2020 U.S
Census. Other important demographics obtained via the U.S Census Bureau and County
Health Rankings (RWJ Foundation) are presented in list form. Of the 196,281 residents living
within Sumner County:







The median household income is $69,878
9.6% live below the national poverty line
27.9% live in rural areas
10% are confronted with food insecurity
12% live with at least 1 of 4 severe housing problems (overcrowding, high housing
costs, lack of kitchen facilities, lack of plumbing facilities)
9.9% of the under 65 years of age population live with a disability
10.4% of the under-65 population do not have health insurance
Population as of 2020 was 370.7 people per square mile

Table 9 Population Data
Demographic
Identified gender

Percentage
Male
Female

49%
51%

Under 5
Under 18
Over 65

5.7%
23.3%
16.4%

Age Group

Race/Ethnicity (one)
White (not Hispanic/Latin)
Asian
Black or African American
American Indian or Alaskan Native
Native Hawaiian or Pacific Islander
Hispanic/Latino

81.8%
1.6%
8.7%
0.4%
0.1%
6.0%

High School Graduate or Higher
Bachelor’s Degree or Higher

90.3%
28.6%

Education

1.6.5 Social Vulnerability
Social vulnerability refers to a community’s capacity to prepare for and respond to the
stress of hazardous events ranging from natural disasters, such as tornadoes or disease
outbreaks, to human-caused threats, such as toxic chemical spills. Social vulnerability
considerations were included in this plan update to identify areas across the planning area
that might be more vulnerable to hazard impacts based on several factors. The County

2023 Sumner County Hazard Mitigation Plan
20

Page 60 of 171

CHAPTER 1: THE PLANNING PROCESS

BEOP will also incorporate this information to improve response efforts in socially
vulnerable neighborhoods.
The Center for Disease Control and Prevention (CDC) has developed a social vulnerability
index (SVI) to measure the resilience of communities when confronted by external stresses
such as natural or human-caused disasters or disease outbreaks. The SVI is broken down
to the census tract level and provides insight into vulnerable populations to assist
emergency planners and public health officials in identifying communities more likely to
require additional support before, during, and after a hazardous event. The SVI index
combines four main themes of vulnerability, which are, in turn, broken down into
subcategories for 16 vulnerability factors. The themes are outlined in the below table and
map.

2023 Sumner County Hazard Mitigation Plan
21

Page 61 of 171

CHAPTER 1: THE PLANNING PROCESS

1.6.6 Critical Infrastructure
Critical Infrastructure are assets in a community that are considered vital to the public’s
health and safety. Due to the sensitivity of these assets in Sumner County and the
incorporated jurisdictions, these assets are restricted for public viewing. However, the data
is viewable to restricted personal on the State of Tennessee’s Critical2TN Database. The
county and incorporated jurisdictions currently have 55 assets identified.

1.7 Resource Capabilities
The committee gathered the following resource capabilities to determine what existing
staff and resources are being used to support mitigation programs.

2023 Sumner County Hazard Mitigation Plan
22

Page 62 of 171

CHAPTER 1: THE PLANNING PROCESS
Table 10 Jurisdictional Mitigation Capabilities

X
X

X

X
X
X
X
X
X

X
X

X

X

X
X
X
X
X
X
X
X
X

X
X
X
X
X
X
X

X
2023 Sumner County Hazard Mitigation Plan
23

X
X
X

X
X
X

X
X
X
X
X

X
X
X
X
X
X

Volunteer State
Comm. College

X
X
X

X

Sumner County
Board of Edu

White House
X
X
X
X
X
X

X
X
X

X
X

X
X
X
X
X
Administrative Capabilities
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
Fiscal Capabilities
X
X
X
X
X

Westmoreland

X

X
X
X
X
X
X

X
X

X
X
X
X
X
X

Portland

Capital improvements project funding
Fees for water, sewer, gas, or electric services
Impact fees for new development

X
X
X
X
X
X

X
X
X
X
X
X

Mitchellville

X
X
X
X
X
X
X

Regulatory Capabilities
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X

Millersville

Grant writer
Public Information Officer
Floodplain Manager
Full Time Fire Service
Law Enforcement
Emergency Manager
GIS Personnel

X
X
X
X
X

Hendersonville

X
X
X
X
X

Goodlettsville

Building Codes
Zoning Codes
Subdivision Ordinance
Stormwater Ordinance
Floodplain Ordinance
Erosion, Sedimentation and Pollution Control
Ordinance
Stormwater Management Program
Site Plan Review Requirements
Capital Improvements Plan
Economic Development Plan
Local Emergency Operations Plan
Flood Insurance Study or Other Engineering
Study for Streams
Repetitive Loss Plan
Elevation Certificates

Gallatin

Sumner County

Mitigation Capabilities

X
X
X
X

X

X
X
X
X

X
X

X
X

X

X
X
X

X

X

X

X
X
X

X

X

Page 63 of 171

CHAPTER 1: THE PLANNING PROCESS
General obligation bonds
Withhold spending in hazard-prone areas

X

X

X

X

2023 Sumner County Hazard Mitigation Plan
24

X
X

X

Page 64 of 171

CHAPTER 1: THE PLANNING PROCESS

Chapter 2: Hazard and Risk Assessment
Risk Assessment Overview
Hazard Mitigation Planning is about developing a strategy to reduce risk in the long term.
An essential part of the process is identifying hazards, risks, impacts and vulnerabilities. In
mitigation planning, “risk” is the potential for damage or loss when a hazard interacts with
an asset. Assets can be people, buildings, infrastructure, the economy, or natural and
cultural resources.
The risk assessment helps communicate vulnerabilities, develop priorities, and inform
decision making. It is the factual basis for the mitigation strategy. The hazards and
associated impacts in the risk assessment should be the hazards and impacts the
mitigation strategy seeks to address. If, for example, the risk assessment shows that the
state will have hurricane damage in a specific area, the mitigation strategy should include
actions to protect state assets and jurisdictions, especially underserved communities, and
socially vulnerable populations, in those areas.

The Sumner County HMPC conducted a hazard identification analysis to determine the
natural and man-made hazards that threaten the County. Existing hazard data from TEMA,
FEMA, the National Oceanic and Atmospheric Administration (NOAA), and other sources
were examined to assess the significance of these hazards to the planning area. Hazard
data from the ETSU Geoinformatics & Disaster Science Lab was also analyzed as related to
the changing weather trends and their significance. Significance was measured in general
terms and focused on key criteria such as frequency and resulting damage, which includes
deaths and injuries, as well as property and economic damage. Any hazard that had two or
more green lifeline categories is considered low risk for damages and therefore, will not be
providing mitigation actions for those specific hazards.
2023 Sumner County Hazard Mitigation Plan
25

Page 65 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

To further focus on the list of identified hazards for this plan update, the HMPC researched
past events that resulted in a federal and/or state emergency or disaster declaration in
Sumner County to identify known hazards. Table 11 presents a list of all major disaster and
emergency declarations that have occurred in Sumner County since 1953, illustrating which
hazards pose the greatest risk to the County.
Table 11 Presidential Disaster Declarations in Sumner County (1953-2023)
Declaration #

Date

Incident Category

Individual
Assistance

Public
Assistance

4637

1/14/2022

Tornadoes, Severe Storm, Straight-line
Winds

X

X

4514

4/2/2020

COVID-19

X

X

3473

3/13/2020

COVID-19

1978

5/9/2011

Severe Storms, Flooding, Tornadoes,
Straight-line Winds

1909

5/4/2010

Severe Storms, Flooding, Tornadoes,
Straight-line Winds

X

X

1745

2/7/2008

Severe Storms, Flooding, Tornadoes,
Straight-line Winds

X

X

1634

4/5/2006

Severe Storms, Tornadoes

X

X

3217

9/5/2005

Hurricane Katrina Evacuation

1464

5/8/2003

Severe Storms, Tornadoes, Flooding

X

X

1441

11/13/2002

Severe Storms, Tornadoes, Flooding

X

X

1275

5/12/1999

Severe Storms, Tornadoes, Flooding

1215

4/20/1998

Severe Storms, Tornadoes, Flooding

1167

3/7/1997

Severe Storms, Flooding

1010

2/28/1994

Ice Storm, Severe Winter Storm, Flash
Flooding

459

3/22/1975

Severe Storms, Flooding

263

7/11/1969

Severe Storms, Flooding

X

X

X

Table 12 documents the hazards of interest to Sumner County and the decision to re-evaluate
or delete them from this plan update. The hazards of concern were altered as necessary to
ensure the Sumner County Hazard Mitigation Plan is in accordance with the Tennessee
Mitigation Strategy.
Table 12 Overview of Updates to Chapter 2: Risk and Vulnerability Assessment
Tennessee 2018
Sumner County 2017
Status
Mitigation Strategy
HMP
Communicable Disease
N/A
Not included
Dam Failure
Dam Failure
Not included
Split into separate
Drought
Drought/Wildfire
hazards
2023 Sumner County Hazard Mitigation Plan
26

Sumner County 2023
HMP Update
N/A
N/A
Drought

Page 66 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT
Earthquakes
Extreme Temperatures
Flooding
Geological Hazard
Hazardous Materials
Release
Infrastructure Incident
Terrorism

Earthquakes
Freezes/Winter Storms
Flooding
N/A

Continued
Not included
Continued
Not included

Earthquakes
N/A
Flooding
N/A

N/A

Not included

N/A

N/A
N/A
Tornadoes/Severe
Storms

Not included
Not included
Split into separate
hazards

N/A
N/A

Severe Weather
(thunderstorms,
lightning, hail)

Tornadoes/Severe
Storms

Split into separate
hazards

Severe Weather
(thunderstorms,
lightning, hail, winter
weather, wind)

Wildfire

Drought/Wildfire

Split into separate
hazards

N/A

Tornadoes

Tornadoes

Summary of changes in the 2023 plan update:


Drought and Wildfires are now categorized as separate hazards; this plan is only to
include drought
Tornadoes and Severe Weather are now categorized as separate hazards and
included in the updated plan.
Freezes/Winter Storms and Dam Failure are no longer included in the plan

The complete list of hazards to be addressed in this 2023 Plan Update include:




Drought
Earthquakes
Flooding
Tornadoes
Severe Weather

2.1 Drought
A. Hazard Overview
Drought is a deficiency in precipitation over an extended period. It is a standard, recurrent
feature of climate that occurs in virtually all climate zones. The duration of droughts varies
widely. In some cases, drought develops relatively quickly and lasts a very short time,
exacerbated by extreme heat and/or wind. There are other cases when drought spans
multiple years or even decades. Studying the paleoclimate record is often helpful in
identifying when long-lasting droughts have occurred. Common types of droughts are
detailed below.
Table 13: Drought Classifications
Type

Details

Meteorological
Drought

Meteorological Drought is based on the degree of dryness (rainfall deficit) and the length
of the dry period.

2023 Sumner County Hazard Mitigation Plan
27

Page 67 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT
Agricultural
Drought
Hydrological
Drought
Socioeconomic
Drought

Agricultural Drought is based on the impacts on agriculture by factors such as rainfall
deficits, soil water deficits, reduced groundwater, or reservoir levels needed for irrigation.
Hydrological Drought is based on the impact of rainfall deficits on the water supply, such
as stream flow, reservoir and lake levels, and groundwater table decline.
Socioeconomic drought is based on the impact of conditions (meteorological, agricultural,
or hydrological drought) on the supply and demand of some economic goods.
Socioeconomic deficiency occurs when the demand for an economic good exceeds the
supply due to a weather-related deficit in the water supply.

The wide variety of disciplines affected by drought, its diverse geographical and temporal
distribution, and the many scales drought operates on make it difficult to develop a
definition to describe drought and an index to measure it. Many quantitative measures of
droughts have been developed in the United States, depending on the discipline affected,
the region being considered, and the particular application. Several indices developed by
Wayne Palmer and the Standardized Precipitation Index help describe the many scales of
drought.
The U.S. Drought Monitor summarizes drought conditions across the United States and
Puerto Rico. Often described as a blend of art and science, the map is updated weekly by
combining a variety of data-based drought indices and indicators and local expert input
into a single composite drought indicator.
The Standardized Precipitation Index (SPI) measures drought, which differs from the
Palmer Drought Index (PDI). Like the PDI, this index is negative for lack and positive for wet
conditions. But the SPI is a probability index that considers only precipitation, while
Palmer's indices are water balance indices that consider water supply (rain), demand
(evapotranspiration), and loss (runoff).
The Palmer Drought Severity Index (PDSI), devised in 1965, was the first drought
indicator to assess moisture status comprehensively. It uses temperature and precipitation
data to calculate water supply and demand, incorporates soil moisture, and is considered
the most effective for unirrigated cropland. It primarily reflects the Perry-term drought and
has been used extensively to initiate drought relief. It is more complex than the SPI and the
Drought Monitor.

B. County Profile
According to the PDSI map shown in Figure 2, Middle Tennessee has a relatively low risk of
drought hazards. However, drought cannot be confined to geographic or political
boundaries, and some areas may experience more severe drought events than what is
shown on the map.

2023 Sumner County Hazard Mitigation Plan
28

Page 68 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

Figure 2 - Palmer Drought Map

Figure 3 - Drought Monitor Time Series (Source: National Drought Mitigation Center)

Figure 3 above illustrates drought conditions within Sumner County between 2000 and
2023. According to the National Drought Mitigation Center, the last Extreme Drought (D4)
period occurred in 2007. D4 (extreme drought) is categorized by browning grass, low lake
levels, municipality water restrictions, and increased water prices. D0 (abnormally dry)
conditions consist of hard ground and declining agriculture ponds and creeks. A table
containing all NOAA-recorded drought events between 2000 - 2023 for Sumner County is
included in Appendix C.
May 2007 through November 2007 – The drought in this period was felt across the
region, the state experienced close to $750 million in crop losses in 2007 largely attributed
to the drought conditions. The City of Portland was unable to meet the water demands of
the residents and had to use water from other utility districts to meet demands. Voluntary
water restrictions were established across jurisdictions. Within the county corn production

2023 Sumner County Hazard Mitigation Plan
29

Page 69 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

was down approximately 50% and forage hay 1/3 during this period having an effect on
normal market prices.

Figure 4 – 2007 Drought Conditions

Probability Future Events – Occasional
The probability of Sumner County and its municipalities experiencing a drought event can
be challenging to quantify but based on the historical record of 16 droughts since 2000; it
can reasonably be assumed that this type of event could occur every few years.

C. Risk Assessment
Sumner County is vulnerable to drought; however, estimated potential losses are
inherently difficult to calculate because drought tends to cause minor damage to the built
environment. Therefore, it is assumed that all buildings and facilities in the planning area
would technically be exposed to the drought hazard; there is no significant vulnerability to
these buildings on a structural level.
Potential drought losses can be calculated in terms of the value of agriculture in the
County, which is perhaps most vulnerable to drought. According to the USDA, the net
income for agriculture is around $2.6 million. Population growth could contribute directly
to this hazard, as more users pull from the available water supply within the region.
Drought can also increase the County’s vulnerability to wildfires. Dry, hot, and windy
2023 Sumner County Hazard Mitigation Plan
30

Commented [AJ1]: Earthquake HAZUS Data

Page 70 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

weather combined with dry vegetation and a spark through human intent, accident, or
lightning can start a wildfire.
The National Risk Index is a dataset and online tool to help illustrate the United States
communities most at risk for natural hazards. It was built and designed by FEMA in close
collaboration with various stakeholders and partners in academia; local, state and federal
government. The Risk Index leverages available source data for natural hazards and
community risk factors to develop a baseline relative risk assessment for each county and
census trace. Some of these community risk factors include social vulnerability which is
determined by the data pulled from the Census preformed every ten years. A higher social
vulnerability score is proportional to a higher risk score.
National Risk Index Score for Drought = very low
Although the National Risk Index is a well-valued tool it fails to properly show the feedback
from the participating jurisdictions. Therefore, all identified hazards were evaluated in
regard to risk in FEMA lifelines per jurisdiction. The scenario that local jurisdictions would
evaluate the conditions off of was a mid-level impact of the identified hazard. The results
are below:
Table 14: Drought Risk based on selected FEMA Lifelines

County
Gallatin
Goodlettsville
Hendersonville
Millersville
Mitchellville

2023 Sumner County Hazard Mitigation Plan
31

Hazardous
Materials

Transportation

Communications

Health & Medical

Food, Water &
Shelter

Safety & Security

Jurisdiction

Energy

FEMA Lifelines

Drought

Page 71 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

Portland
Sumner County
Board of
Education
Volunteer State
Community
College
Westmorland
White House
Jurisdictions did not view the hazard as one of prime concern

Colors indicate lifeline or component conditions:
Red

Significant Impact, Multiple Required Resources

Yellow

Some Impact, Some Outside Resources Required

Green

Little to No Impact, No Outside Resources Required

As shown in the above table, a majority of the Sumner County HMPC chose to rank
droughts as low risk to the community, however, the committee chose to include the
hazard within the plan to better understand the possible impacts if a drought were to
occur. Portland, a more rural jurisdiction, is more susceptible to the negative impacts of a
drought and thus ranked the risk higher and provides a mitigation action to combat said
risk.

D. Land Use and Development
According to the National Drought Mitigation Center, how we use land affects our
vulnerability to drought. In general, land use patterns that maintain the integrity of
watersheds and that have a smaller paved footprint result in greater resilience in the face
of drought. The projected increase in population will possibly result in an increase in
buildings and infrastructure, leading to increased impervious areas. An increase in
population may also put increasing pressure on water and other natural resources,
particularly during periods of drought. Therefore, future development could impact
drought vulnerability in Sumner County.

E. Multi-Jurisdictional Differences
Due to the nature of drought, Sumner County and the incorporated jurisdictions are equally
susceptible to drought conditions.

2023 Sumner County Hazard Mitigation Plan
32

Page 72 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

F. Summary
Sumner County and all incorporated jurisdictions are equally vulnerable to drought. With
historical frequency considered there is a significant chance of this event occurring each
year. Drought can affect people’s health and safety. Examples of drought impacts on society
include anxiety or depression about economic losses, conflicts when there is not enough
water, reduced incomes, fewer recreational activities, higher incidents of heat stroke, and
even loss of human life. Drought conditions can also provide a substantial increase in wildfire
risk. As plants and trees wither and die from a lack of precipitation, increased insect
infestations, and diseases—all associated with drought—they become fuel for wildfires.
Sumner County periods of drought can equate to more wildfires and more intense wildfires,
which affect the economy, the environment, and society in many ways, such as by destroying
neighborhoods, crops, and habitats.

2023 Sumner County Hazard Mitigation Plan
33

Page 73 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

2.2 Earthquakes
A. Hazard Overview
An earthquake results from a sudden release of energy in the Earth’s crust that creates
seismic waves. The energy originates from a subsurface fault. A fault is a fracture or
discontinuity in a volume of rock along tectonic plates. In the most general sense, the word
earthquake describes any event that generates seismic waves. Earthquakes are typically
caused by the rupturing of geological faults. Occasionally, they are also caused by other
events such as volcanic activity, landslides, mine blasts, and nuclear tests. An earthquake's
point of initial rupture is called its focus or hypocenter. The epicenter is the point at ground
level directly above the hypocenter.

B. County Profile
Sumner County is near the major intraplate (within a tectonic plate) seismic zone known as
the New Madrid Seismic Zone. The New Madrid Seismic Zone (NMSZ) is an approximately
120-mile-long fault system that stretches across five states, including Western Tennessee.
Sumner County is near the East Tennessee Seismic Zone (ETSZ) which stretches across
three states. The figure below illustrates the risk level of the NMSZ/ETSZ within the state.

Figure 5 New Madrid Seismic Zone (Source: CUSEC)

According to the USGS Earthquake Database, Sumner County has not experienced
earthquakes in the past 20 years. However, given its proximity to the NMSZ and ETSZ the
committee felt it important to profile due to secondary hazard risk.
2023 Sumner County Hazard Mitigation Plan
34

Page 74 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

The NMSZ is known for producing four of the largest North American earthquakes in
recorded history, all of which would have been felt in Sumner County. This includes the
noted three-month period between December 1811 and February 1812 that had at least
four earthquakes which are understood by scientists to be greater than a M7.0. During this
period, there were dozens of strong earthquakes ranging between M6.0 and M7.5.
Thousands of smaller shocks were documented. Similar to the 1811-12 New Madrid
earthquake sequence which created Reelfoot Lake in Lake County, Tennessee, very large
magnitude earthquake sequences are believed to have occurred in pre-historic times as
well. Paleo-liquefaction and geologic evidence suggests large earthquake sequences
occurred in the New Madrid Seismic Zone in 1450 AD and 900AD.
Based on geologic research on the paleo seismic record of past earthquakes, the USGS
estimates that there is a 7 to 10 percent chance of a New Madrid earthquake the size of
those in 1811-12 occurring in the next 50 years. However, the occurrence of even a
moderate-sized earthquake located in close proximity to urban centers such as Memphis
or St. Louis could be locally devastating. The last magnitude-6 earthquake struck near
Charleston, Missouri, in 1895. The chance of such an earthquake occurring in the New
Madrid region in the next 50 years is 25 to 40 percent.
These probabilities are derived from the USGS National Seismic Hazard Maps, which are
developed from geologic information about faults, evidence of prehistoric earthquakes,
instrumental and historical earthquake catalogs generated by seismic monitoring, and
ground deformation measurements. The National Seismic Hazard Maps are used to
estimate probabilities of large earthquakes and the ground shaking to be expected if those
earthquakes occur.
The Eastern Tennessee Seismic Zone (ETSZ), a zone of small earthquakes stretching from
northeastern Alabama to southwestern Virginia. The ETSZ is the second-most active natural
seismic zone in the central and eastern United States, behind the New Madrid Seismic Zone
in the Mississippi River region that produced the 1811-1812 magnitude 7+ earthquakes. In
historic times, the ETSZ has not produced earthquakes larger than magnitude 4.8, however
scientists believe the ETSZ is capable of generating magnitude 6 or greater. The ETSZ region
is home to several nuclear power plants and hydroelectric dams related to the Tennessee
Valley Authority, along with major population centers such as Knoxville and Chattanooga.
Table 15 Richter Scale Classification (Source: USGS)
Richter Scale for Earthquakes
Magnitudes

Description

Typical Impacts

< 2.0

Micro

Not felt.

2.0-2.9

Slight

Generally, not felt but recorded.

3.0-3.9

Minor

Often felt, but rarely causes damage.

4.0-4.9

Light

Noticeable shaking of indoor items and rattling noises. Significant
damage is likely.

2023 Sumner County Hazard Mitigation Plan
35

Page 75 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

5.0-5.9

Moderate

It can cause major damage to poorly constructed buildings in small
regions. At most slight damage to well-designed buildings.

6.0-6.9

Strong

It can be destructive in areas up to about 100 miles across populated
areas.

7.0-7.9

Major

It can cause serious damage over larger areas.

8.0-8.9

Great

It can cause severe damage in areas several hundred miles across.

9.0-9.9

Epic

They are devastating in areas several thousand miles across.

Since 1812, the most significant recorded earthquakes from the New Madrid Zone were in
1895 and 1968. Since seismic measurement instruments were installed in and around the
zone in the 1970s, more than 4,000 small earthquakes have been recorded, with the vast
majority being too small to be felt.

Figure 6 NMSZ Earthquakes Recorded Since 1974 (Source: USGS)

According to a 2008 FEMA report, a severe earthquake in the NMSZ could result in the
highest economic loss due to a natural disaster in U.S. history. Based on this report, a 7.7
magnitude quake in the NMSZ would result in thousands of fatalities, hundreds of billions
of dollars in damage to structures, and total disruption of vital infrastructure in Western
Tennessee, including Sumner County.
Probability of Future Events – Unlikely
A catastrophic earthquake at the NMSZ would result in $100-200 million in building
damages. Furthermore, according to the HAZUS, Sumner County will experience the
following in a catastrophic earthquake scenario:
Table 16 HAZUS Data (Earthquakes)
Impact Overview
Fatalities
Injuries

Numerical Value

2023 Sumner County Hazard Mitigation Plan
36

Page 76 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT
Displaced Residents
Residents Requiring Shelter
Debris (tons)
Residencies experiencing >moderate damage
Day 1
Households without power
Households without potable water
Resources Functioning on Day 1
Resource
Percentage Functioning
Hospitals
Police Stations
Fire Stations
Schools
Communications

Infrastructure Functioning after Day 1
Resource
Percentage Functioning
Highway Segments
Railway Segments
Airport Segments
Bus facilities
Ports

Many buildings and the majority of infrastructure networks throughout the county could
be vulnerable to earthquake impacts. Sumner County’s building stock can be broken down
into the following percentage categories: 63.2% residential, 20.8% commercial, 9.9%
industrial, 1% agricultural, 2.8% religious, 0.9% governmental, and 1.5% educational.
Throughout the county, all buildings and infrastructure are vulnerable to earthquake
impacts.

Figure 7 National Seismic Hazard Map (Source: USGS)
Ground Motions with a 2% Chance of Occurring in 50 Years

2023 Sumner County Hazard Mitigation Plan
37

Commented [AJ2]: Earthquake HAZUS Data

Page 77 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

Figure 8 Mercalli Intensity Zones in Sumner County based on a 7.5 Earthquake (Source: USGS)

As indicated in the above map, all of Sumner County’s jurisdictions and districts sit within
intensity zones IV and V of the Modified Mercalli Intensity Scale due to its proximity to the
NMSZ if a 7.5 earthquake were to occur.
According to the Central United States Earthquake Consortium (CUSEC), Sumner County is
at an extremely low level of risk for liquefaction following an earthquake.

2023 Sumner County Hazard Mitigation Plan
38

Page 78 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

Figure 9 Earthquake Induced Liquification (Source: CUSEC)

C. Risk Assessment
The National Risk Index is a dataset and online tool to help illustrate the United States
communities most at risk for natural hazards. It was built and designed by FEMA in close
collaboration with various stakeholders and partners in academia; local, state and federal
government. The Risk Index leverages available source data for natural hazards and
community risk factors to develop a baseline relative risk assessment for each county and
census trace. Some of these community risk factors include social vulnerability which is
determined by the data pulled from the Census preformed every ten years. A higher social
vulnerability score is proportional to a higher risk score.
National Risk Index Score for Earthquake = relatively low
Although the National Risk Index is a well-valued tool it fails to properly show the feedback
from the participating jurisdictions. Therefore, all identified hazards were evaluated in
regard to risk in FEMA lifelines per jurisdiction. The scenario that local jurisdictions would
evaluate the conditions off of was a mid-level impact of the identified hazard. The results
are below:

2023 Sumner County Hazard Mitigation Plan
39

Page 79 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

Table 17: Earthquake Risk based on selected FEMA Lifelines

County
Gallatin
Goodlettsville
Hendersonville
Millersville
Mitchellville
Portland
Sumner County
Board of
Education
Volunteer State
Community
College
Westmorland
White House
Jurisdictions did not view the hazard as one of prime concern

Colors indicate lifeline or component conditions:
Red

Significant Impact, Multiple Required Resources

2023 Sumner County Hazard Mitigation Plan
40

Hazardous
Materials

Transportation

Communications

Health & Medical

Food, Water &
Shelter

Safety & Security

Jurisdiction

Energy

FEMA Lifelines

Earthquake

Page 80 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT
Yellow

Some Impact, Some Outside Resources Required

Green

Little to No Impact, No Outside Resources Required

As shown in the above table, the Sumner County HMPC chose to rank earthquakes as low
risk to the community with a majority of the jurisdictions not ranking it as a hazard of
concern. However, they wanted to include the hazard within the plan to better understand
the possible impacts if an earthquake were to occur. Due to the extremely low risk ranking
no mitigation actions will be included for earthquake hazards.

D. Land Use and Development Trends
Heavily populated or industrialized centers are at a higher risk for catastrophic earthquake
damage. Sumner County, like much of Tennessee, is experiencing rapid growth increasing
the likelihood of significant impacts to life and property from a significant earthquake.

E. Multi-Jurisdictional Differences
Counties predominantly in the West Portion of Tennessee will be more likely impacted by
the New Madrid Zone. However, a significant magnitude earthquake can cause primary
and secondary effects across the state.

F. Summary
Due to its proximity to the New Madrid Fault, the entirety of Sumner County could be
subject to an earthquake. This includes the entire County population and all infrastructure.
A significant earthquake event would result in a substantial loss of life and billions of
dollars in damages.

2023 Sumner County Hazard Mitigation Plan
41

Page 81 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

2.3 Flood
A. Hazard Overview
Flooding events occur when excess water from rivers and other bodies of water overflow
onto riverbanks and adjacent floodplains. In addition, lower-lying regions can collect water
from rainfall, and poorly drained land can accumulate rain through ponding on the surface.
Floods in Sumner County are usually caused by rain and may also be caused by snowmelt
and man-made incidents.
The area adjacent to a channel is the floodplain, as shown in Figure 10. A floodplain is flat or
nearly flat land adjacent to a stream or river that experiences occasional or periodic
flooding. It includes the floodway, which consists of the stream channel and adjacent areas
that carry flood flows, and the flood fringe, which are areas covered by the flood but do not
experience a strong current. Floodplains are made when floodwaters exceed the capacity
of the main channel or escape the channel by eroding its banks. When this occurs,
sediments (including rocks and debris) are deposited that gradually build up over time to
create the floor of the floodplain. Floodplains generally contain unconsolidated sediments,
often extending below the stream’s bed.

Figure 10 Characteristics of a Floodplain (Source: FEMA)

Three general health hazards common to flood events:
1. Floodwaters carry anything on the ground that the upstream runoff picked up,
including dirt, oil, bacteria, animal waste, lawn, farm, and industrial chemicals.
Pastures and areas where farm animals are kept, or their wastes are stored can
contribute to polluted waters in the receiving streams. Floodwaters also saturate
the ground, which leads to infiltration into sanitary sewer lines. When wastewater
treatment plants are flooded, there is nowhere for the sewage to flow. Infiltration
and lack of treatment can lead to overloaded sewer lines that can back up into lowlying areas and homes. Even when flood waters dilute it, raw sewage can be a
breeding ground for bacteria such as E. coli and other disease-causing agents.
2. The second health problem arises after most water has gone. Stagnant pools can
become breeding grounds for mosquitoes, and wet building areas that have not
been adequately cleaned breed mold and mildew. A building that is not thoroughly

2023 Sumner County Hazard Mitigation Plan
42

Page 82 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

cleaned becomes a health hazard, especially for small children and the elderly.
Another health hazard occurs when ducts in a forced air system are not adequately
cleaned after inundation. When the furnace or air conditioner is turned on, the
sediments left in the ducts are circulated throughout the building and breathed in
by the occupants. If the county water system loses pressure, a boil order may be
issued to protect people and animals from contaminated water.
3. The third problem is the long-term psychological impact of having been through a
flood and seeing one’s home damaged and personal belongings destroyed. The cost
and labor needed to repair a flood-damaged home severely strain people, especially
the unprepared and uninsured. There is also a long-term problem for those who
know their homes can be flooded again. The resulting stress on floodplain residents
takes its toll in the form of aggravated physical and mental health problems.

B. County Profile
Riverine flooding occurs from inland water bodies such as streams and rivers. In
Tennessee, flooding is highly dependent on precipitation amounts and is highly variable
within the State.
HAZUS is a regional multi-hazard loss estimation model developed by FEMA and the
National Institute of Building Sciences (NIBS). The primary purpose of HAZUS is to provide a
methodology and software application to develop multi-hazard losses at a regional scale.
These loss estimates would be used primarily by local, state, and regional officials to plan
and stimulate efforts to reduce multi-hazard risks to prepare for emergency response and
recovery.
Table 18 Mapped Flood Insurance Zones
Flood Hazard Area
HAZUS
(100-yr)
HAZUS
(500-yr)
Non-highlighted Areas

Description

Areas subject to inundation by the 1-percent-annual-chance flood event are
generally determined using approximate methodologies. Mandatory flood
insurance purchase requirements and floodplain management standards
apply.
A 500-year flood zone is a moderate flood hazard area and is an area between
the limits of the base flood and the 0.2- percent-annual-chance (or 500year) flood. Mandatory flood insurance is not required.
Minimal risk areas outside the 1-percent and .2 percent-annual-chance
floodplains.

2023 Sumner County Hazard Mitigation Plan
43

Page 83 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

Figure X: HAZUS 100-year Flood Map

Figure X: HAZUS 500-year Flood Map

2023 Sumner County Hazard Mitigation Plan
44

Page 84 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT
Table 19: NFIP Policy Data
Jurisdiction
Sumner County
City of Gallatin
City of
Hendersonville
City of Portland
City of Goodlettsville
City of White House
City of Millersville
Town of
Westmoreland

NFIP Policy Data for Sumner County
Insurance In-Force
CID Number
Policies In-Force
Whole $
470349
178
51,020,000
470185
160
52,607,000
470186
277
82,588,000
470187
470287
470339
470388
470415

Written Premium
In-Force
162,888
127,164
205,812

40
103
n/a
44

9,414,000
28,512,000
642,000
9,983,000

26,848
96,205
1,493
39,400

n/a

n/a

n/a

Policies In-force: number of NFIP flood insurance policies
Insurance In-force whole $: the value of building and contents insured by the NFIP
Written Premium In-Force: total premiums paid for NFIP insurance policies

According to the National Flood Insurance Program, repetitive flood loss is a facility or
structure that has experienced two or more insurance claims of at least $1,000 in any given
10-year period since 1978. Severe repetitive loss is defined as a facility or structure that has
experienced four or more insurance claims exceeding $5,000 or two claims exceeding the
value of the building. Within the NFIP, flood loss properties are usually considered the most
vital structures to mitigate. The chart below provides a summary of repetitive and severe
repetitive losses for Sumner County in 2019.
Table 20: NFIP Loss Data (2019)
Jurisdiction

NFIP Loss Data for Sumner County
CID Number
Total Loses RL
Total Loses SRL

Total Payments

Sumner County

470349

25

0

4,641,154

City of Gallatin

470185

11

2

2,985,870

City of Hendersonville

470186

24

3

4,006,000

City of Portland

470187

0

0

85,545

City of Goodlettsville

470287

0

0

1,373,169

City of White House

470339

0

0

80,751

City of Millersville

470388

0

0

301,002

Town of Westmoreland

470415

0

0

RL: Repetitive Loss
SRL: Severe Repetitive Loss
Total Losses: number of flood insurance claims filed by policyholders
Total Payments: total dollars paid to policyholders

Over the past 73 years, there have been approximately 68 flooding events in Sumner
County. A table of NOAA-reported flooding events is located in Appendix C. The following
narratives were obtained via the NOAA Storm Event Database. Only events resulting in
injury, death, or extensive damage (greater than $200.0K property/crop damage) were
included as expanded narratives.

2023 Sumner County Hazard Mitigation Plan
45

Page 85 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

May 9, 2009 (White House): An early morning severe weather event let to flash flooding in
the county. Residents in the Walnut Grove community and surrounding areas were
stranded in cars and multiple homes were flooded due the event.
August 8, 2013 (Old Hickory): After 5 to 7 inches fell in the southwest portion of the
county six homes were flooded in Hendersonville and multiple roadways were closed due
to high levels of flooding.
May 11, 2016 (Mitchellville): Flash flooding affected the northern and central portions of
the county. Multiple homes and businesses were flooded in the county and 12 water
rescues took place for residents, with one 90 year old needing to be transported to the
Portland ER. Per the NOAA Storm Event Database “numerous primary and secondary roads
were flooded and closed or even washed out, including Highway 52, Highway 259, William
Mack Lane, Harper Road, North Corinth Road, Cora Street, Harper Road, Jim Courtney
Road, and Airport Road in Portland; Duffer Hollow Road, Rock Bridge Road, Chipman Road,
Red Tuttle Road, Rogana Road, Alexander Road, and Rock Springs Road in Bethpage; and
Highway 25 at the Bledsoe Creek Bridge in Castalian Springs.”

2023 Sumner County Hazard Mitigation Plan
46

Page 86 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

Figure 13: May 11, 2016 Floods damage and depths (The Tennessean)

July 7, 2016 (Mitchellville): Severe flooding affected much of the county with depths
around 1 foot or more on roadways. Thirty homes and four bridges were damaged during
the flooding with some roads washing. Multiple homes were inundated with water across
the county, some homes experienced inundation levels of 3 feet. One individual was
rescued from a tree after his vehicle was washed away and another after driving into flood
water.

2023 Sumner County Hazard Mitigation Plan
47

Page 87 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

Figure 14: Sumner County Emergency Crews Responding to July 7, 2016 Floods (The Tennessean)

Table 21: Flooding Extent History
Location
Extent & Impact
Sumner County
Castalian Springs/Bethpage – 8”-1’ depth of water on roadways and
bridges causing damage and wash out
Gallatin
Nashville Pike and Old Douglas Road – 3’ depth in residential homes,
multiple roads closed, and bridges washed out
Hendersonville
Drakes Creek & Stop 30 Rd – 3’ depth for several hours, roads were
closed resulting in minimal damages
Portland
Richland Neighborhood – 18” depth surrounding homes, damaged
roads and structures
Goodlettsville
Goodlettsville RV Park – 2’ depth in RV Park covering wheel wells of
most RVS.
White House
Local School – 8” water out front of local school in White House
Millersville
Southern portion of the city (Bellar Drive & Louisville HWY) –
roadways covered 6”-1’
Westmoreland
Clark Hollow Rd/Rabe Coats Rd/Dutch Creek Rd – 6”-8” standing
water on roadways
Mitchellville
Throughout the area – 1’ depth along creeks and up into roadways

Event Date
May 11, 2016
July 7, 2016

May 11, 2016
Feb 23, 2019
Sept 27, 1996
Feb 23, 2019

July 7, 2016

Probability of Future Events - Likely
The impact of extreme weather events may increase the frequency and intensity of flash
flooding within Tennessee, particularly in highly urbanized regions such as Memphis,
Nashville, Knoxville, and Chattanooga. Any area with extreme changes in deep terrain,
predominately in East Tennessee, will experience significant flooding impacts.
2023 Sumner County Hazard Mitigation Plan
48

Page 88 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

Based on a historical record of 68 flood events over 73 years (1950 - 2023), there is a
likelihood for a flood event to occur annually or semiannually. In conjunction with the
future weather projections developed by ETSU Geoinformatics & Disaster Science Lab, it
can be assumed that a flooding event could occur in Sumner County on a BLANK year
basis. Figure X illustrates the projections developed by the ETSU Geoinformatics & Disaster
Science Lab.
Insert: Climate Projection Figure (ETSU)

C. Risk Assessment
The HMPC meeting cited flooding as a repetitive hazard in the county and jurisdictions.
Discussion of commonly flood-prone areas took place, as did mention of improvements that
have already been made to mitigate risks. Future projects were also discussed at this time
and can be found in the Mitigation Action Plan.
The National Risk Index is a dataset and online tool to help illustrate the United States
communities most at risk for natural hazards. It was built and designed by FEMA in close
collaboration with various stakeholders and partners in academia; local, state and federal
government. The Risk Index leverages available source data for natural hazards and
community risk factors to develop a baseline relative risk assessment for each county and
census trace. Some of these community risk factors include social vulnerability which is
determined by the data pulled from the Census preformed every ten years. A higher social
vulnerability score is proportional to a higher risk score.
National Risk Index Score for Flooding = relatively low
Although the National Risk Index is a well-valued tool it fails to properly show the feedback
from the participating jurisdictions. Therefore, all identified hazards were evaluated in
regard to risk in FEMA lifelines per jurisdiction. The scenario that local jurisdictions would
evaluate the conditions off of was a mid-level impact of the identified hazard. The results
are below:
Table 22: Flooding Risk based on selected FEMA Lifelines

County

2023 Sumner County Hazard Mitigation Plan
49

Hazardous
Materials

Transportation

Communications

Health & Medical

Food, Water &
Shelter

Safety & Security

Jurisdiction

Energy

FEMA Lifelines

Flooding

Commented [AJ3]: Climate Projections

Page 89 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

Gallatin
Goodlettsville
Hendersonville
Millersville
Mitchellville
Portland
Sumner County
Board of
Education
Volunteer State
Community
College
Westmorland
White House
Jurisdictions did not view the hazard as one of prime concern

Colors indicate lifeline or component conditions:
Red

Significant Impact, Multiple Required Resources

Yellow

Some Impact, Some Outside Resources Required

Green

Little to No Impact, No Outside Resources Required

Given the information above it becomes vital that all participating jurisdictions are able to
prioritize the necessity of mitigation actions in the following lifeline categories so that they
can become more resilient in the whole community that they serve.
HAZUS Data
HAZUS Methodology

Commented [AJ4]: Flood HAZUS Data

A Level I HAZUS analysis was completed using a probabilistic risk assessment for the 100-yr
and 500-year return periods. The Level I vulnerability assessment is presented below by
return period.
Building Inventory (General Building Stock)

2023 Sumner County Hazard Mitigation Plan
50

Page 90 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

HAZUS estimates that XX buildings in the region have an aggregate total replacement value
of $XX million. The tables below present the relative distribution of the value concerning
the general occupancies by Study Region and Scenario, respectively.
Table 23: Building Exposure by Occupancy Type
Sumner County (Study Region)
Occupancy Type
Exposure ($1000)
Agricultural
Commercial
Education
Government
Industrial
Religion
Residential
Total
Table 24: Building Exposure by Occupancy Type for 100-yr Flood Scenario
100-year River Flood Scenario
Occupancy Type
Exposure ($1000)
Agricultural
Commercial
Education
Government
Industrial
Religion
Residential
Total
Table 25: Building Exposure by Occupancy Type for 500-yr Flood Scenario
500-yr River Flood Scenario
Occupancy Type
Exposure ($1000)
Agricultural
Commercial
Education
Government
Industrial
Religion
Residential
Total

Percent Total

100%

Percent Total

100%

Percent Total

100%

Essential Facility Inventory
HAZUS indicates that there are XX hospitals in the region with a total capacity of XX beds.
There are XX schools, XX fire stations, XX police stations, and XX emergency operation
centers.
General Building Stock Damage
For the 100-year flood scenario, HAZUS estimates that about XX buildings will be at least
moderately damaged. This is over XX% of the total number of buildings in the scenario.
There are estimated XX buildings that will be destroyed completely. Table 26 below
2023 Sumner County Hazard Mitigation Plan
51

Page 91 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

summarizes the expected damage by general occupancy type for the buildings in the
County during a 100-yr flood scenario.
Table 26: Expected Building Damage by Occupancy for 100-yr Flood Scenario
% Damaged
1-10
11-20
21-30
31-40
41-50
Occupancy
Count
%
Count
%
Count
%
Count
%
Count
%
Agricultural
0
0
0
0
0
0
0
0
0
0
Commercial
0
0
0
0
0
0
0
0
0
0
Education
0
0
0
0
0
0
0
0
0
0
Government
0
0
0
0
0
0
0
0
0
0
Industrial
0
0
0
0
0
0
0
0
0
0
Religion
0
0
0
0
0
0
0
0
0
0
Residential
0
0
0
0
0
0
0
0
0
0
Total
0
0
0
0
0

>50%
Count
%
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

For the 500-year flood scenario, HAZUS estimates that about XX buildings will be at least
moderately damaged. This is over XX% of the total number of buildings in the scenario.
There are estimated XX buildings that will be destroyed completely. Table 27 below
summarizes the expected damage by general occupancy type for the buildings in the
County during a 500-yr flood scenario.
Table 27: Expected Building Damage by Occupancy for 500-yr Flood Scenario
% Damaged
1-10
11-20
21-30
31-40
Occupancy
Count
%
Count
%
Count
%
Count
%
Residential
0
0
0
0
0
0
0
0
Commercial
0
0
0
0
0
0
0
0
Education
0
0
0
0
0
0
0
0
Government
0
0
0
0
0
0
0
0
Industrial
0
0
0
0
0
0
0
0
Religion
0
0
0
0
0
0
0
0
Residential
0
0
0
0
0
0
0
0
Total
0
0
0
0

41-50
Count
%
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

>50%
Count
%
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Essential Facility Damage
Table 28 and Table 29 summarize the expected damage to essential facilities following a
100-yr and 500-yr flood, respectively. Both scenarios analyzed have determined that on the
day of the event, all XX beds in the local hospital would be available for use.
Table 28: Expected Damage to Essential Facilities 100-yr Flood Scenario
Number of Facilities
Classification
Total
At Least
At Least
Moderate
Substantial
EOC
Fire Stations
Hospitals
Police Stations
Schools
Table 29: Expected Damage to Essential Facilities 500-yr Flood Scenario
Classification
Total
Number of Facilities
2023 Sumner County Hazard Mitigation Plan
52

Loss of Use

Page 92 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT
At Least
Moderate

At Least
Substantial

Loss of Use

EOC
Fire Stations
Hospitals
Police Stations
Schools

Debris Generation
100-year Scenario
The model estimates that a total of XX,XXX tons of debris will be generated. Of the total
amount, Finishes comprises XX% of the total, Structure comprises XX% of the total, and
Foundation comprises XX%. If the debris tonnage is converted into an estimated number of
truckloads, it will require XXX truckloads (@25 tons/truck) to remove the debris generated
by the flood.
500-year Scenario
The model estimates that a total of XX,XXX tons of debris will be generated. Of the total
amount, Finishes comprises XX% of the total, Structure comprises XX% of the total, and
Foundation comprises XX%. If the debris tonnage is converted into an estimated number of
truckloads, it will require XXX truckloads (@25tons/truck) to remove the debris generated
by the flood.
Shelter Requirements
HAZUS estimates the number of households expected to be displaced due to the flood and
the associated potential evacuation. HAZUS also estimates those displaced people that will
require accommodations in temporary public shelters.
100-year Scenario
The model estimates X,XXX households (or X,XXX of people) will be displaced due to the
flood. Displacement includes households evacuated from within or very near to the
inundated area. Of these, XXX people (out of a total population of XX,XXX) will seek
temporary shelter in public shelters.
500-year Scenario
The model estimates X,XXX households (or X,XXX of people) will be displaced due to the
flood. Displacement includes households evacuated from within or very near to the
inundated area. Of these, XXX people (out of a total population of XX,XXX) will seek
temporary shelter in public shelters
Building Related Losses
The building losses are broken into two categories: direct building losses and business
interruption losses. The direct building losses are the estimated costs to repair or replace
the damage caused to the building and its contents. Business interruption losses are the
2023 Sumner County Hazard Mitigation Plan
53

Page 93 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

losses associated with the inability to operate a business because of the damage sustained
during the flood. Business interruption losses also include the temporary living expenses
for those displaced from their homes because of the flood. Total building-related losses
were $XXX.XX million in the 100-year flood scenario and $XXX.XX million in the 500-yr flood
scenario. Table 30 and Table 31 summarize the losses associated with the building damage
in each scenario.

Business
Interruptio
n

Building
Loss

Table 30: Building Related Economic Loss Estimates for the 100-yr Flood Scenario ($ Millions)
Category
Area
Residential
Commercial
Industrial
Other
Total
Building
Content
Inventory
Subtotal
Income
Relocation
Rental Income
Wage
Subtotal
Total

Business
Interruption

Building
Loss

Table 31: Building Related Economic Loss Estimates for the 100-yr Flood Scenario ($ Millions)
Category
Area
Residential
Commercial
Industrial
Other
Total
Building
Content
Inventory
Subtotal
Income
Relocation
Rental
Income
Wage
Subtotal
Total

D. Land Use and Development
All future development within the floodplain may be considered at risk. An increase in
population will likely increase the number of buildings and infrastructure. New
development in unincorporated areas could potentially occur in areas prone to flooding
and increase vulnerabilities and potential losses; however, most land use regulations
require the consideration of flooding during the development process.

E. Multi-Jurisdictional Differences
Flooding affects all jurisdictions differently; that is why it is essential to document the
depth, duration, and time that flooding occurred. These differences are noted in past
occurrences to demonstrate the toll that flooding can take on the county’s rural and urban
areas. Due to the topography of Sumner County with its rolling hills and deep valleys, flood

2023 Sumner County Hazard Mitigation Plan
54

Page 94 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

events are prone to occur near the streams within the county. FIRM Panels are located
within Appendix D to help illustrate the areas at risk and depth of flooding within the
county and its incorporated jurisdictions.
Intersections & Roads that consistently flood in Sumner County and the incorporated Jurisdictions:









Station Camp Creek Rd (lower section)
Drakes Creek Rd & Stop 20 Rd
Drakes Creek Rd & Stop 30 Rd
Hilton Ln & Harsh Ln
Bug Hollow Rd & Hwy 25 W
Brights Ln & Hwy 25 E
Blade St & Marrell St
Hale Ave W to Town Creek
S. Westland Ave to W. Winchester St
Slaters Creek Access & Longbourne Dr








Gateview Dr
N. Russel St
Poplar St
Jerry St
Hwy 52 & SR 109
Hwy 259 (raw water intake area)
Williamson Rd & Trace Dr
Hwy 31 at Hwy 76 (Portland Rd)

Waterways that are prone to flooding in Sumner County and the incorporated Jurisdictions:

Town Creek (Maple Street Industrial Area)
Station Camp Creek

Subdivisions/Mobile Home Parks that are prone to flooding in Sumner County and the
incorporated Jurisdictions:



Evergreen Subdivision
Halewood Subdivision
Autumn Creek Subdivision
Glen Oak Subdivision




1021 Slaters Creek Rd (Mobile Home
Park)
850 C. Smith St (Mobile Home Park)
1049 Louisville Hwy (Mobile Home Park)
1330 Williamson Rd (Mobile Home Park)

F. Summary
Severe flooding has the potential to inflict significant damage in Sumner County. The total
economic loss estimated for the 100-year riverine flood is $XXX.XX million. The total
economic loss estimated for the 500-year riverine flood is $XXX.XX million. Residential,
commercial, and public buildings and critical infrastructures such as transportation, water,
energy, and communication systems may be damaged or destroyed by flood waters.
During a flood event, chemicals and other hazardous substances may contaminate local
water bodies. Flooding kills animals and, in general, disrupts the ecosystem. Snakes and
insects may also make their way to the flooded areas.

2023 Sumner County Hazard Mitigation Plan
55

Page 95 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

2.4 Severe Weather
A. Hazard Overview
Thunderstorms
Thunderstorms result from the rapid upward movement of warm, moist air. They can
occur inside warm, moist air masses and at fronts. As the warm, moist air moves upward, it
cools, condenses, and forms cumulonimbus clouds that can reach heights greater than
35,000 ft. Thunderstorms are responsible for developing and forming many severe
weather phenomena, posing significant hazards to the population and landscape. Damage
from thunderstorms is mainly inflicted by downburst winds, large hailstones, and flash
flooding caused by heavy precipitation. Stronger thunderstorms can produce tornadoes
and waterspouts.
Wind
All jurisdictions are vulnerable to receiving damage from severe winds. The NOAA Storm
Data Preparation document categorizes wind into three different types, as defined below.


High Wind: Sustained non-convective winds of 40mph or greater lasting for one
hour or longer or winds (sustained or gusts) of 58 mph for any duration on a
widespread or localized basis.
Strong Wind: Non-convective winds gusting less than 58 mph or sustained winds
less than 40 mph, resulting in a fatality, injury, or damage.
Thunderstorm Wind: Winds arising from convection (occurring within 30 minutes of
lightning being observed or detected), with speeds of at least 58 mph, or winds of
any speed (non-severe thunderstorm winds below 58 mph) producing a fatality,
injury, or damage.

Historically, severe wind events occur multiple times yearly in Sumner County. It is not
unusual for Sumner County to experience winds speeds up to 85 knots (97.8 mph), causing
structural damage, power outages, and downed trees. Based on a historical record of 378
wind events over 72 years (1950- 2022), the historic data suggest and annual occurrence of
a severe wind event.

2023 Sumner County Hazard Mitigation Plan
56

Page 96 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

Figure 15 Mean Number of >50-knot Wind Days per Year (1986-2015) (source: NOAA)

Hail
Hail forms when updrafts carry raindrops into icy areas of the atmosphere, where they
freeze into ice. Hailstorms occur throughout the spring, summer, and fall but are more
frequent in late spring and early summer. Hailstones are usually less than two inches in
diameter and can fall at speeds of 120 mph. Hail causes nearly $1 billion in damage to
crops and property yearly in the United States. Table 32 provides an overview of the typical
impacts on a community related to hailstone size.
Table 32: TORRO Hail Index (Source: The Tornado and Storm Research Organization)
Max Diameter
Scale
Description
Typical Damage
(mm)
H0
Pea
5-9
No damage
H1
Mothball
10-15
Slight general damage to crops and plants
H2
Marble
16-20
Significant damage to crops and vegetation
Severe damage to fruits and crops, damage to glass
H3
Walnut
21-30
and plastic structures, wood and paint scored
H4
Pigeons Egg
31-40
Widespread glass damage, auto-body damage
Destruction of glass, damage to tiled roofs,
H5
Golf Ball
41-50
significant risk of injuries
H6
Hens Egg
51-60
Grounded aircrafts dented; brick walls pitted
H7
Tennis Ball
61-75
Severe roof damage and risk of serious injury
2023 Sumner County Hazard Mitigation Plan
57

Page 97 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT
H8

Softball

76-90

H9

Grapefruit

91-100

H10

Melon

>100

Severe damage to aircrafts
Extensive structural damage, risk of severe or fatal
injuries to people caught in storm
Extensive structural damage, risk of severe or fatal
injuries to people caught in storm

Lightning
Lightning is an electrical discharge between positive and negative regions of a
thunderstorm. Lightning is one of the more dangerous weather hazards in the United
States. Annually, lightning is responsible for deaths, injuries, and millions of dollars in
property damage, including damage to buildings, communications systems, power lines,
and electrical systems. Lightning also causes forest and brush fires and deaths, and injuries
to livestock and other animals. According to the National Lightning Safety Institute,
lightning causes more than 26,000 fires in the United States annually. The institute
estimates property damage, increased operating costs, production delays, and lost revenue
from lightning and secondary effects to be more than $6 billion annually. Impacts can be
direct or indirect. People or objects can be struck or damaged when the current passes
through or nearby.
Winter Weather
A freeze occurs when temperatures are below 32 degrees Fahrenheit for a period. These
temperatures can damage crops, burst water pipes, and create layers of “black ice.” Winter
storms are events that can range from a few hours of moderate snow to blizzard-like
circumstances that can affect driving conditions and impact communications, electricity,
and other services. In Sumner County, all jurisdictions are vulnerable to freezes and
moderate winter storms, but not to the severity level seen in much of the northern U.S.
Based on previous occurrences, Sumner County can experience multiple winter weather
events in one year affecting all jurisdictions equally. The severity of winter storms is
commonly measured by inches of snowfall. It is possible for snowfall to accumulate up to 9
inches in Sumner County and/or ice accumulations to cause hazardous conditions due to
its proximity to and around the mountains. U.S. Mean snowfall per year is from 6-12”
annually average mean snowfall per year is below in Figure 16.

2023 Sumner County Hazard Mitigation Plan
58

Page 98 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

Figure 16 Average Snowfall per Year (Source: NOAA)

B. County Profile
The entirety of Sumner County is at risk of severe weather. Severe weather events are most
likely in the spring and summer months and during the afternoon and evening hours, but
they can occur year-round and at all hours. In terms of magnitude, the NWS defines
thunderstorms in terms of severity. A severe thunderstorm produces winds greater than
57 miles per hour and/or hail greater than 1 inch in diameter and/or a tornado. The NWS
chose these severity measures as parameters more capable of producing considerable
damage. Hail stones can vary in diameter, and in Tennessee, there have been records of
hail up to 2.75 inches.
Event narratives were obtained via the NOAA Storm Event Database and are included
below for each severe weather category. Tables containing all NOAA-recorded severe
weather events between 1950- 2023 for Sumner County are contained in Appendix C.
Thunderstorms
May 11, 2016 (Rock Bridge): Scattered supercell thunderstorms moved into the area
overnight bringing with them high winds, hail, and heavy rain. The county received
between 3-7 inches of rain in different regions.
May 19, 2017 (White House): Thunderstorms developed during the morning hours and
continued for several hours across the county, over 6 inches of rain were observed in some
areas.
Wind
March 25, 2021 (Corinth): A 4 mile wide by 1 mile long microburst straight-line winds
resulted in severe wind damage. Severeal trees were uprooted landing on homes and
blocking roads. Multiple homes suffered damages as did numerous outbuildings. Four
injuries were reported due to this wind event that reached about 85mph.
2023 Sumner County Hazard Mitigation Plan
59

Page 99 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

July 26,2022 (Portland): High winds from a storm system damaged the Portland High
School baseball field, damages included: the dugout, outfield fence, and roof damage to
the indoor facility.

Figure 17: Wind Damage to Portland High School July 26, 2016 (Source: WKRN)

Hail
June 19, 2011 (Westmoreland): Golf ball sized hail knocked down tree limbs and power
lines across the area.
March 14, 2012 (Highland Academy): Hail damage occurred to multiple vehicles.
March 3, 2021 (Cherry Mound ARPT): Hail up to 2 inches was reported in the county
Lightning
July 7, 2016 (Millersville): A single family home in Millersville caught fire after being struck
by lightning during a severe storm system.

Figure 18: Home fire after lightning strike July 7, 2016 (Source: WKRN)

Winter Weather
December 8, 2018: Ice accumulations of up to two-tenths of an inch were reported. Icy
precipitation brought down several trees, tree limbs, and powerlines throughout the
northern two-thirds of Sumner County. Icing on roadways also resulted in multiple
accidents.

2023 Sumner County Hazard Mitigation Plan
60

Page 100 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

Figure 19: Ice on trees in White House December 8, 2018 (Source: NWS)

December 12, 2022: An abnormally cold and strong low-pressure system traveled through
the region in late December bringing with it a blast of Artic air. The strong winds
accompanying the cold temperatures resulted in a wind chill of -15 to -30 degrees
throughout December 24th. The combination of freezing temperatures, wind, and
snowy/icy conditions resulted in treacherous road conditions. SR 6 E was shut down due to
a multi-vehicle crash. Thousands were without power during this event.
Probability of Future Events - Likely
In order to determine the likelihood of future severe weather occurrences in Sumner
County historic data and weather patterns were analyzed. Since 1950, multiple severe
weather events have occurred within the county. In conjunction with the future weather
projections developed by ETSU Geoinformatics & Disaster Science Lab, it can be assumed
that severe weather could occur in Sumner County on a BLANK year basis. Figure X
illustrates the projections developed by the ETSU Geoinformatics & Disaster Science Lab.

C. Risk Assessment
Severe weather is not as spatially defined in any location in Sumner County; therefore, the
entire County is equally at risk of severe weather. This includes the entire County
population, all critical facilities, buildings (commercial and residential), and infrastructure.
The National Risk Index is a dataset and online tool to help illustrate the United States
communities most at risk for natural hazards. It was built and designed by FEMA in close
collaboration with various stakeholders and partners in academia; local, state and federal
2023 Sumner County Hazard Mitigation Plan
61

Commented [AJ5]: Climate Projections

Page 101 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

government. The Risk Index leverages available source data for natural hazards and
community risk factors to develop a baseline relative risk assessment for each county and
census trace. Some of these community risk factors include social vulnerability which is
determined by the data pulled from the Census preformed every ten years. A higher social
vulnerability score is proportional to a higher risk score.
National Risk Index Score for Hail = relatively low
National Risk Index Score for Lightning = relatively low
National Risk Index Score for Strong Wind = relatively moderate
National Risk Index Score for Ice Storm = very high
National Risk Index Score for Winter Weather = relatively low
Although the National Risk Index is a well-valued tool it fails to properly show the feedback
from the participating jurisdictions. Therefore, all identified hazards were evaluated in
regard to risk in FEMA lifelines per jurisdiction. The scenario that local jurisdictions would
evaluate the conditions off of was a mid-level impact of the identified hazard. The results
are below:
Table 33: Severe Weather Risk based on selected FEMA Lifelines

Severe
Weather

County
Gallatin
Goodlettsville
Hendersonville
Millersville
Mitchellville

2023 Sumner County Hazard Mitigation Plan
62

Hazardous
Materials

Transportation

Communications

Energy

Health & Medical

Food, Water &
Shelter

Safety & Security

Jurisdiction

FEMA Lifelines

Page 102 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

Portland
Sumner County
Board of
Education
Volunteer State
Community
College
Westmorland
White House

Colors indicate lifeline or component conditions:
Red

Significant Impact, Multiple Required Resources

Yellow

Some Impact, Some Outside Resources Required

Green

Little to No Impact, No Outside Resources Required

Given the information above it becomes vital that all participating jurisdictions are able to
prioritize the necessity of mitigation actions in the following lifeline categories so that they
can become more resilient in the whole community that they serve.

D. Land Use & Development
Increased development and population growth can reasonably translate to increased
damages resulting from severe weather events. The population in Sumner County is
expected to rise similarly to its surrounding counties and Tennessee. An increase in
population will lead to an increase in the number of residential and commercial structures
as well as new and improved infrastructure, which in turn means an increase in the
number and value of assets at risk of wind damage.

E. Multi-Jurisdictional Differences
The entirety of Sumner County and the incorporated jurisdictions, including all assets, can
be considered equally at risk of severe weather events. This includes the entire population,
all critical facilities, buildings (commercial and residential), and infrastructure.

F. Summary
Sumner County is subject to severe weather hazards, including thunderstorms, wind,
lightning, and hail. Associated damages include impacts to utilities, residential and
commercial buildings/property, and agricultural losses. High wind can cause trees to fall
and potentially result in injuries or death; lightning can lead to house fires and serious
injury. Hail can cause injury and severe property damage to homes and automobiles.
2023 Sumner County Hazard Mitigation Plan
63

Page 103 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

2.5 Tornadoes
A. Hazard Overview
Tornadoes have the potential to produce winds over 200 mph (EF5 on the Enhanced Fujita
Scale) and can be very expansive. Before February 1, 2007, tornado intensity was measured
by the Fujita (F) scale. This scale was revised and is now the Enhanced Fujita scale. Both
scales are wind estimates (not measurements) based on damage. The new scale provides
more damage indicators (28) and associated degrees of damage. Table 34 shows the wind
speeds associated with the enhanced Fujita scale ratings and the damage that could result
at different intensity levels.
Table 34: Enhanced Fujita Scale
EF
3 Second Wind
Estimated Damage
Rating
Gust (mph)
Light Damage. Slight damage to roofs, gutters, siding, tree branches
0
65-85
broken, shallow-rooted trees overturned
Moderate Damage. Mobile homes damaged, exterior portions of homes
1
86-110
damaged or lost (i.e., roofs, doors, windows)
Considerable Damage. Mobile homes destroyed, cars lifted, well2
111-135
constructed home frames shifted, roofs torn off, light-object missiles
generated, large trees uprooted or snapped.
Severe Damage. Severe damage to large buildings, entire home stories
3
136-165
destroyed, trees debarked, trains overturned, heavy vehicles lifted and
thrown, structures with weaker foundations thrown
Devastating Damage. Well-constructed houses and whole frame houses
4
166-200
leveled, cars thrown, small missiles generated
Incredible Damage. Substantial frame houses leveled off foundations and
5
200+
the automobile-sized missiles generated, and high rises experience
considerable damage and deformation

According to the Glossary of Meteorology (AMS 2000), a tornado is "a violently rotating
column of air, pendant from a cumuliform cloud or underneath a cumuliform cloud, and
often (but not always) visible as a funnel cloud." Most tornadoes move from southwest to
northeast or west to east.
Although tornadoes can occur in any location, most of the tornado activity in the United
States exists in the Mid-West and Southeast. An exact season does not exist for tornadoes;
however, most occur between early spring and mid-summer (February – June). The onset of
tornado events is rapid, giving those in danger minimal time to seek shelter. The current
average lead time, according to NOAA, is 13 minutes. A tornado can reach wind speeds of
40 mph to 250 mph and higher. The following map illustrates the frequency of tornadoes in
Tennessee.

2023 Sumner County Hazard Mitigation Plan
64

Page 104 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

B. County Profile

Figure 20: Tornadoes by County (NWS/NOAA)

Figure 20 illustrates the track of tornadoes through Sumner County as recorded by the
National Weather Service Nashville and the National Climatic Data Center and compiled
into a visual database by Mississippi State University. Figure 22 provides a breakdown of
tornado frequency by the hour in Sumner County; tornadoes commonly occur between
0300 and 0500 hours.

Figure 21: Tornadoes Tracks in Sumner County (Mississippi State University)

2023 Sumner County Hazard Mitigation Plan
65

Page 105 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

Tornado Frequency by Hour
9
8

# of Tornadoes

7
6
5
4
3
2
1

23:00

22:00

21:00

20:00

19:00

18:00

17:00

16:00

15:00

14:00

13:00

12:00

11:00

9:00

10:00

8:00

7:00

6:00

5:00

4:00

3:00

2:00

1:00

0:00

0

Figure 22: Tornadoes Frequency per Hour

The following narratives were obtained via the NOAA Storm Event Database. Only events
resulting in injury, death, or extensive damage (greater than $200K property/crop damage)
were included as expanded narratives. A table containing all NOAA-recorded tornadoes
between 1950- 2023 for Sumner County is contained in Appendix C.
April 7, 2006: An F3 Tornado traveled through Davidson and Sumner County for a total
path length of 22.75 miles. 7 deaths were directly attributed to the tornado and 1 was
considered an indirect death. 700 homes and business were damaged or destroyed as a
result of the F3 tornado and an estimated $69 million in damages occurred.
February 5, 2008: Known as the ‘Super Tuesday” tornado outbreak, three tornadoes
touched down in the county (EF-3, EF-1, EF-0). The EF-3 that touched down in the county left
a 50.32 mile long track through 5 counties including Sumner. 85 homes were destroyed, a
post office was destroyed, and 102 trees were uprooted. The tornadic storm directly killed
7 individuals and injured a further 14. The storm also took the roof off of Wynnewood, the
counties only National Historic Landmark, and shifted the foundation.

2023 Sumner County Hazard Mitigation Plan
66

Page 106 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

Figure 23: February 5, 2008 Tornado Damage to Wynnewood (Source: The Tennessean)

Figure 24: February 5, 2008 Tornado Damage residential homes (Source: The Tennessean)
2023 Sumner County Hazard Mitigation Plan
67

Page 107 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT

December 11, 2021: An EF-1 tornado with a total path length of 6.82 miles touched down
in Old Hickory and traveled to Mt. Juliet, leaving numerous trees uprooted, homes with roof
damage, and damaged outbuildings in its path.
Probability of Future Events - Likely
Historical data and weather patterns were analyzed to determine the likelihood of future
tornado occurrence in Sumner County. Since 1950, 44 tornadoes have occurred within the
county. In conjunction with the future weather projections developed by ETSU
Geoinformatics & Disaster Science Lab, it can be assumed that a tornado could occur in
Sumner County on a BLANK year basis. Figure X illustrates the projections developed by
the ETSU Geoinformatics & Disaster Science Lab.

C. Risk Assessment
The entirety of Sumner County can be considered at risk for a tornado. This includes the
entire County population, all critical facilities, buildings (commercial and residential), and
infrastructure. Tornadoes tracked in Tennessee predominantly travel in a northeasterly
direction in the state. While all assets are considered at risk from this hazard, a particular
tornado would only cause damages along its specific track.
The National Risk Index is a dataset and online tool to help illustrate the United States
communities most at risk for natural hazards. It was built and designed by FEMA in close
collaboration with various stakeholders and partners in academia; local, state, and federal
government. The Risk Index leverages available source data for natural hazards and
community risk factors to develop a baseline relative risk assessment for each county and
census trace. Some of these community risk factors include social vulnerability which is
determined by the data pulled from the Census preformed every ten years. A higher social
vulnerability score is proportional to a higher risk score.
National Risk Index Score for Tornado = relatively high
Although the National Risk Index is a well-valued tool it fails to properly show the feedback
from the participating jurisdictions. Therefore, all identified hazards were evaluated in
regard to risk in FEMA lifelines per jurisdiction. The scenario that local jurisdictions would
evaluate the conditions off of was a mid-level impact of the identified hazard. The results
are below:

2023 Sumner County Hazard Mitigation Plan
68

Commented [AJ6]: Climate Projections

Page 108 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT
Table 35: Tornado Risk based on selected FEMA Lifelines

County
Gallatin
Goodlettsville
Hendersonville
Millersville
Mitchellville
Portland
Sumner County
Board of
Education
Volunteer State
Community
College
Westmorland
White House

Colors indicate lifeline or component conditions:
Red

Significant Impact, Multiple Required Resources

Yellow

Some Impact, Some Outside Resources Required

2023 Sumner County Hazard Mitigation Plan
69

Hazardous
Materials

Transportation

Communications

Health & Medical

Food, Water &
Shelter

Safety & Security

Jurisdiction

Energy

FEMA Lifelines

Tornado

Page 109 of 171

CHAPTER 2: RISK AND VULNERABILITY ASSESSMENT
Green

Little to No Impact, No Outside Resources Required

Given the information above it becomes vital that all participating jurisdictions are able to
prioritize the necessity of mitigation actions in the following lifeline categories so that they
can become more resilient in the whole community that they serve.

D. Land Use and Development Trends
Sumner County codes include proper wind strength and safety regulations consistent with
state and federal regulations. While the adopted code provides adequate protection, older
and mobile homes are highly susceptible to tornado events. The county has multiple
mobile home areas within the county that are more susceptible to the damaging impacts of
tornadic weather.

E. Multi-Jurisdictional Differences
The entirety of Sumner County and its incorporated jurisdictions are at risk for a tornado
event; however, historically, a large portion of tornado events have taken place at or below
the middle region of the county. It is also worth noting that given the county’s sizeable rural
component, some tornadic events may have gone unreported.

F. Summary
This includes the entire County population, all critical facilities, buildings (commercial and
residential), and infrastructure. While all assets are considered at risk from this hazard, a
tornado would only cause damages along its specific track. The weakest tornadoes, EF0,
can cause minor roof damage, and stronger tornadoes can destroy frame buildings and
badly damage steel reinforced concrete structures. Given the strength of the wind impact
and construction techniques, buildings are vulnerable to direct impact, including potential
destruction, from tornadoes and wind debris that tornadoes turn into missiles. Structures
constructed of light materials such as mobile homes are most susceptible to damage.

2023 Sumner County Hazard Mitigation Plan
70

Page 110 of 171

CHAPTER 3: MITIGATION STRATEGY

Chapter 3. Mitigation Strategy
3.1 Mitigation Goals
Goals are general guidelines that explain what is to be achieved. They are usually broadbased policy-type statements, long-term, and represent global visions. Goals help define
the benefits that the plan is trying to achieve.
Goal Setting Exercise
In 2017, the HMPC agreed upon the goals for their hazard mitigation plan. It was decided
that the goals from the 2017 plan should be carried over into the 2023 plan. They still
reflect the current hazards and current conditions in the community.
Resulting 2023 Plan Update Goals
At the end of the meeting, the HMPC agreed upon three general goals for planning efforts.
Those goals are as follows:
Goal 1: Protect the Lives and health of citizens from the effects of natural hazards.
Goal 2: Emphasize mitigation planning to decrease vulnerability to new and existing
structures.
Goal 3: Encourage public support and commitment to hazard mitigation by
communicating mitigation benefits.

2023 Sumner County Hazard Mitigation Plan
71

Page 111 of 171

CHAPTER 3: MITIGATION STRATEGY

Expanding & Improving Mitigation Programs
The participating jurisdictions determined which areas they could improve or expand. Gaps
and limitations for each jurisdiction may be addressed in the mitigation strategy.
Table 36: Expansion Narrative
Jurisdiction/Applicant
Sumner County

How are you able to expand?
Increase weather readiness for vulnerable
populations through messaging and NOAA weather
radio programs.
Increase awareness and mitigation activities for
older structures that are built in floodplains or karst
areas.
Create and maintain a Flood Planning program that
involves a FWM (Flood Watch Manager) as well as
measures necessary to respond to flooding in
defined areas.

City of Gallatin

City of Goodlettsville

City of Hendersonville
City of Millersville
City of Mitchellville
City of Portland

Increase stormwater management programs to
better deal with flooding and increase retention of
water for times of drought.

Town of Westmoreland
City of White House
Sumner County Board of Education

Continued support and attendance as part of the
HMPC. Increased public messaging and signage in
schools about storm preparedness.
Continued support and attendance as part of the
HMPC.

Volunteer State Community College

3.3 Compliance with NFIP
Sumner County, Hendersonville, Westmoreland, White House, Portland, Gallatin,
Goodlettsville, and Millersville participate in FEMA’s National Flood Insurance Program
(NFIP). Each participating community enforces a flood damage prevention ordinance that
regulates development within the Special Flood Hazard Area (SFHA). Additionally, as
members of FEMA’s NFIP, each community requires Elevation Certificates on all new
buildings and substantial improvements within the SFHA.
Given the flood hazards in the planning area, an emphasis will be placed on continued
compliance with the NFIP. The below table lists the Ordinance Adoption dates and citations
for each NFIP jurisdiction in the county.
Table 37: NFIP Designee and Ordinance Adoption
Jurisdiction
Sumner County
Gallatin
Hendersonville

CID #
470349
470185
470186

Title of NFIP Designee
County Engineer
City Planner
Public Works Dir.

2023 Sumner County Hazard Mitigation Plan
72

Ordinance
Adoption Date
1/21/2021
2/6/2021
2/25/2021

Citation
2012-02
01201-9
021-05

Page 112 of 171

CHAPTER 3: MITIGATION STRATEGY
Portland
Goodlettsville
White House
Millersville
Westmoreland

470187
470287
470339
470388
470415

Community Planner
Dir. Planning & Development
Planning & Codes Dir.
Building Inspector
Codes/Building Inspector

4/16/2012
2/4/2022
1/14/2021
1/15/2021
4/6/2012

21-1020
20-25
20-750
175

The State National Flood Insurance Program Office hosts monthly webinars to review and
educate entities on NFIP, each jurisdictional representative is invited and encouraged to
attend. Each participating community will take the following steps to meet or exceed the
following minimum requirements as set by the NFIP:



Issuing or denying floodplain development/building permits;
Inspecting all development to ensure compliance with the local ordinance;
Maintaining records of floodplain development;
Assisting in the preparation and revision of floodplain maps;

Helping residents obtain information on flood hazards, floodplain map data, flood
insurance, and proper construction measures.

3.4 Prioritization Process
The prioritization process was necessary as most mitigation projects represent a significant
investment of financial and personal resources. By evaluating each project’s degree of
feasibility and the level of costs versus benefits, Sumner County could determine which
projects should include based on the available funding and time. The HMPC used the SAFET method to prioritize these projects. This approach was adopted from the successful
methodology used by other counties in FEMA Region 4. This rating system uses five
variables to evaluate each project's overall feasibility and appropriateness. Figure 25 further
explains this method.

2023 Sumner County Hazard Mitigation Plan
73

Page 113 of 171

CHAPTER 3: MITIGATION STRATEGY

Project Prioritization Method: SAFE-T
Variable
Societal: The public must support the overall

S

A

implementation strategy and specified mitigation
actions. The projects will be evaluated in terms of
community acceptance, social vulnerability and

E

T

Description

1

Low community acceptance/priority
Moderate community

2

acceptance/priority

societal benefits

3

High community acceptance/priority

Administrative: The projects will be evaluated for

1

High staffing, outside help needed

2

Some staffing, no outside help needed

3

Low staffing, no outside help needed

anticipated staffing and maintenance requirements
to determine if the jurisdiction has the personnel and
administrative capabilities necessary to implement
the project or whether outside help will be needed.

F

Value

Financial: The projects will be evaluated on their

1

Somewhat cost-effective

general cost-effectiveness and whether additional

2

Moderately cost effective

outside funding will be required.

3

Very cost-effective

1

Many environmental impacts

2

Some environmental impacts

3

Few environmental impacts

1
2
3

Medium-term fix

Environmental: The projects will be evaluated for
any immediate or long-term environmental impacts
caused by their construction or operation.
Technical: the projects will be evaluated on their
ability to reduce losses in the short term or long term.

Short-term fix
Long-term fix

Figure 25 SAFE-T Project Prioritization

The identification and analysis process of mitigation alternatives allowed the HMPC to come
to a consensus and prioritize recommended mitigation actions. The HMPC discussed the
contribution of the effort to save lives or property first and foremost, with additional
consideration given to the benefit-cost aspect of a project; however, this was not a
quantitative analysis. The team agreed that prioritizing the actions collectively enabled the
actions to be ranked in order of relative importance and helped steer the development of
additional actions that meet the more essential objectives while eliminating some of the
actions which did not garner much support. The cost-effectiveness of any mitigation
alternative will be considered in greater detail by performing benefit-cost project analyses
when seeking FEMA mitigation grant funding for eligible actions associated with this plan.

2023 Sumner County Hazard Mitigation Plan
74

Page 114 of 171

CHAPTER 3: MITIGATION STRATEGY

3.5 Mitigation Action Plan
The Mitigation Action Plan was developed to present the recommendations developed by
the HMPC for how the communities can reduce the risk and vulnerability of people,
property, infrastructure, and natural and cultural resources to future disaster losses.
Emphasis was placed on both future and existing development. The action plan
summarizes who is responsible for implementing each of the prioritized actions and when
and how the actions will be implemented. Due to funding availability and other criteria, it
should be clarified that the actions included in this mitigation strategy are subject to
further review and refinement, alternatives analyses, and reprioritization. This document
does not obligate Sumner County and the incorporated jurisdictions to implement any or
all of these projects. Rather this mitigation strategy represents the desires of the
community to mitigate the risks and vulnerabilities from identified hazards.

2023 Sumner County Hazard Mitigation Plan
75

Page 115 of 171

CHAPTER 3: MITIGATION STRATEGY
Table 38: Sumner County Mitigation Actions and Projects

Environmental

Technical

Total

Property Acquisition of RL/SRL properties

Financial

Hazard Mitigated

Administrative

Action Description

Societal

Priority Score

Jurisdictional
Mayor/City
Manager Offices

Gallatin,
Hendersonville,
Portland,
County

MediumTerm (3-5
years)

2

3

2

3

3

13

$300K

HMGP,
FMA,
Local

Existing

Town Mayor's
Office/Planning
Dept.

Westmoreland

MediumTerm (3-5
years)

2

2

2

2

2

10

$200K

HMGP,
BRIC,
Local

New

City Planning
Dept./Police Dept.

Gallatin

MediumTerm (3-5
years)

2

1

2

2

2

9

$200K

HMGP,
BRIC,
Local

Existing

City Planning
Dept./Fire Depts.

Gallatin

MediumTerm (3-5
years)

2

1

2

2

2

9

$200K

HMGP,
BRIC,
Local

Existing

Sumner County
EMA/ Jurisdictional
City Mayor Offices

Gallatin,
Westmoreland,
County

Short-Term
(0-3years)

3

2

2

3

2

12

$100K

HMGP,
Local

Both New and
Existing

Responsible
Department

Jurisdiction

Time Frame

Est.
Cost

Funding
Sources

Infrastructure

Flood
Safe Room near Mobile Home Parks

Severe Weather, Tornadoes
Retrofit the Gallatin PD Training area for
high winds and severe weather (safe
room, hardened walls, etc.)

Severe Weather, Tornadoes
Retrofit the Gallatin Fire Stations #3, #4,
#5 for high winds and severe weather
(safe room, hardened walls, etc.)

Severe Weather, Tornadoes
NOAA Weather Radio distribution and
training for LMI households

2023 Sumner County Hazard Mitigation Plan
76

Page 116 of 171

CHAPTER 3: MITIGATION STRATEGY

Flood, Severe Weather, Tornadoes
Retrofit Sumner County EMS for high
winds and severe weather (safe rooms,
hardened walls, etc.)

County EMS/EMA

County

MediumTerm (3-5
years)

2

1

2

2

2

9

$200K

HMGP,
Local

Existing

County EMA

All

Ongoing

3

3

3

3

1

13

$10K

Local

Both New and
Existing

County Board of
Education

Sumner County
Board of
Education

Short-Term
(0-3years)

3

3

3

3

1

13

$10K

Local

Both New and
Existing

County Board of
Education/VSCC

Volunteer State
Community
College, Sumner
County Board of
Education

Short-Term
(0-3years)

3

2

2

3

2

12

$250K

HMGP,
BRIC,
Local

Existing

Jurisdictional
Planning
Dept./Public Work's
Depts.

Gallatin,
Hendersonville,
Portland

Short-Term
(0-3years)

2

2

2

3

2

11

$20K

HMGP,
BRIC,
Local

Existing

County
Development
Services

All

Short-Term
(0-3years)

2

2

3

3

2

12

$50K

HMGP,
FMA,
Local

Both New and
Existing

Severe Weather, Tornadoes
Provide and distribute pamphlets/flyers
on how to stay safe in natural,
technological, and person-made disasters.

Flood, Severe Weather, Tornadoes
Create and distribute signage to all
schools detailing locations of safe areas
and how to respond to various natural
disaster alerts.

Flood, Severe Weather, Tornadoes
Retrofit windows with shatterproof film.

Severe Weather, Tornadoes
Replacement of traffic light cables to mast
arms

Severe Weather, Tornadoes
Stormwater Drainage Study

2023 Sumner County Hazard Mitigation Plan
77

Page 117 of 171

CHAPTER 3: MITIGATION STRATEGY
(Stormwater
Manager and
Engineer)
Flood
Retention basin system

City Public Works

Portland

MediumTerm (3-5
years)

2

1

2

2

2

9

$80K

HMGP,
BRIC,
FMA,
Local

New

City Planning Dept.

Goodlettsville

MediumTerm (3-5
years)

2

2

2

2

2

10

$200K

HMGP,
BRIC,
Local

New

City Public
Works/Stormwater
Management Dept.

Goodlettsville

MediumTerm (3-5
years)

3

1

2

2

3

11

$150K

HMGP,
BRIC,
FMA,
Local

Both New and
Existing

City Public Works

Portland

MediumTerm (3-5
years)

2

2

2

2

3

11

$200K

HMGP,
Local

Existing

City Public Works

Westmoreland

MediumTerm (3-5
years)

2

2

2

2

3

11

$200K

HMGP,
Local

New

City Public Works

Portland

Short-Term

2

3

2

3

2

12

$15K

HMGP,

Existing

Flood
Community Safe Room

Severe Weather, Tornadoes
Stormwater drainage system to reduce
flooding (culverts, permeable pavement
sidewalks)

Flood
Upgrade current water delivery stem

Drought
Increased water storage system

Drought
Generators at sewer lift stations

2023 Sumner County Hazard Mitigation Plan
78

Page 118 of 171

CHAPTER 3: MITIGATION STRATEGY
(0-3years)

BRIC,
Local

Flood, Severe Weather, Tornadoes
Generators for critical infrastructure
throughout the city (i.e. city hall)

City Mayor's Office

Gallatin

Short-Term
(0-3years)

2

3

2

3

2

12

$15K

HMGP,
Local

Existing

City Mayor's Office

Hendersonville

Short-Term
(0-3years)

2

3

2

3

2

12

$15K

HMGP

Existing

County Mayor's
Office/EMA

County

Short-Term
(0-3years)

2

3

2

3

2

12

$15K

HMGP,
Local

Existing

City Mayor's Office

Millersville

Short-Term
(0-3years)

2

3

2

3

2

12

$15K

HMGP,
Local

Existing

County Board of
Education

Sumner County
Board of
Education

Short-Term
(0-3years)

2

3

2

3

2

12

$15K

HMGP,
Local

Existing

City Mayor's Office

Hendersonville

Short-Term
(0-3years)

2

3

2

3

2

12

$15K

HMGP,
Local

Existing

Flood, Severe Weather, Tornadoes
Generators for critical infrastructure
throughout the city (i.e. Police Dept.
Annex)

Flood, Severe Weather, Tornadoes
Generators for critical infrastructure
throughout the county (i.e. Sheriff's Office,
Shackle Island PD)

Flood, Severe Weather, Tornadoes
Generators for critical infrastructure
throughout the county (i.e. City Hall, Police
Stations)

Flood, Severe Weather, Tornadoes
Battery power backs-ups (UPS) for
essential school functions

Flood, Severe Weather, Tornadoes
Battery power backs-ups (UPS) for
essential government functions

2023 Sumner County Hazard Mitigation Plan
79

Page 119 of 171

CHAPTER 3: MITIGATION STRATEGY
Flood, Severe Weather, Tornadoes
Safe Space retrofit in key locations on
campus

VSCC

Volunteer State
Community
College

MediumTerm (3-5
years)

2

1

2

1

2

8

$200K

HMGP,
Local

Both New and
Existing

City Mayor's Office

Millersville

Short-Term
(0-3years)

2

3

2

3

2

12

$15K

HMGP,
Local

Existing

City Mayor's Office

Mitchellville

Short-Term
(0-3years)

2

3

2

3

2

12

$15K

HMGP,
Local

Both New and
Existing

Fire Dept./IT GIS

Gallatin

Ongoing

2

3

3

3

1

12

$5K

HMGP,
Local

Both New and
Existing

City IT GIS

Gallatin

Short-Term
(0-3years)

2

2

3

3

2

12

$5K

HMGP,
Local

Both New and
Existing

City Mayor's
Office/Planning
Commission

White House

MediumTerm (3-5
years)

2

2

2

2

2

10

$200K

HMGP,
BRIC,
Local

New

Severe Weather, Tornadoes
Generators for 3-Sewer Pump Stations
throughout the city

Flood, Severe Weather, Tornadoes
Generators for critical infrastructure
throughout the city (i.e. fire stations)

Flood, Severe Weather, Tornadoes
Create and maintain a storm shelter
database

Severe Weather, Tornadoes
Identify business, continuity, and disaster
recovery options for critical GIS services in
the event the primary location of servers
become unavailable

Flood, Severe Weather, Tornadoes
Community Safe Room

Severe Weather, Tornadoes

2023 Sumner County Hazard Mitigation Plan
80

Page 120 of 171

CHAPTER 3: MITIGATION STRATEGY
Generators for critical infrastructure
throughout the city

City Mayor's Office

White House

Short-Term
(0-3years)

2

Flood, Severe Weather, Tornadoes

2023 Sumner County Hazard Mitigation Plan
81

3

2

3

2

12

$15K

HMGP,
Local

Both New and
Existing

Page 121 of 171

CHAPTER 4: IMPLEMENTATION, INTEGRATION, AND MAINTENANCE

Chapter 4. Implementation, Integration, and Maintenance
This section provides an overview of the overall plan implementation, integration and
maintenance strategy and outlines the method and schedule for monitoring, evaluating,
and updating the plan. This section also discusses incorporating the plan into existing
planning mechanisms and how to address continued public involvement.

4.1 Plan Adoption, Implementation, Monitoring, and Evaluation
4.1.1 Plan Adoption
The purpose of formally adopting this plan is to secure buy-in, raise awareness of the plan,
and formalize the plan’s implementation. This plan will be adopted by the appropriate
governing body for each participating community. Copies of the executed resolutions are
shown below.
Note to Reviewer: Executed resolutions will be inserted when they become available.

4.1.2 Implementation
Implementation and maintenance of the plan is critical to the overall success of hazard
mitigation planning. This section provides an overview of the overall strategy for plan
implementation and maintenance.
Mitigation is most successful when it is incorporated into the day-to-day functions and
priorities of the government. Implementation will be accomplished by adhering to the
schedules identified for each action and through constant, pervasive, and energetic efforts
to network and highlight the multi-objective benefits to each program and the community.
This effort is achieved through the routine actions of monitoring agendas, attending
meetings, and promoting a safe, sustainable community. Additional mitigation strategies
could include consistent and ongoing enforcement of existing policies and vigilant review
of programs for coordination and multi-objective opportunities.
Simultaneous to these efforts, it is important to maintain constant monitoring of funding
opportunities that can be leveraged to implement some of the more costly actions. This will
include creating and maintaining a list of ideas on how to meet local match or participation
requirements. When funding does become available, the communities will be able to
capitalize on the opportunity due to the diligence of the HMPC. Funding opportunities to be
monitored include special pre- and post-disaster funds, state and federal funds, benefit
assessments, and other grant programs, including those that can serve or support multiobjective applications.
Elected officials, officials appointed to head community departments and community staff
are charged with the implementation of various activities in the plan. Recommendations
will be made to modify timeframes for the completion of activities, funding resources, and
responsible entities. On an annual basis, the priority standing of various activities may also
be changed. Some activities that are found unachievable may be removed from the plan
2023 Sumner County Hazard Mitigation Plan
82

Page 122 of 171

CHAPTER 4: IMPLEMENTATION, INTEGRATION, AND MAINTENANCE

entirely and activities addressing problems unforeseen during plan development may be
added.

4.1 Integration into Local Planning Mechanism
A vital implementation mechanism that is highly effective and low-cost is the incorporation
of the Hazard Mitigation Plan recommendations and their underlying principles into other
plans and tools. All plan participants will use existing methods and programs to implement
hazard mitigation actions where possible. As previously stated, mitigation is most
successful when it is incorporated into government and public service's day-to-day
functions and priorities. This plan builds upon the momentum developed through previous
and related planning efforts and mitigation programs and recommends implementing
actions, where possible, through these other program mechanisms. These existing
mechanisms include:


Regularity Capabilities
Administrative Capabilities
Fiscal Capabilities

For further information regarding the different capabilities refer to Chapter 3 – Mitigation
Strategy.
Implementation and incorporation into existing planning mechanisms will be conducted by
respective planning authorities and will be done through the routine actions of:



Monitoring other planning/program agendas;
Attending other planning/program meetings;
Participating in other planning processes; and
Monitoring community budget meetings for other community program
opportunities.

The successful implementation of this mitigation strategy will require constant and vigilant
review of existing plans and programs for coordination and multi-objective opportunities
that promote a safe, sustainable community. Efforts should continuously be made to
monitor the progress of mitigation actions implemented through other planning
mechanisms. Where appropriate, priority actions should be incorporated into Hazard
Mitigation Plan updates.

4.2 Monitoring, Evaluating, Updating
For the Hazard Mitigation Plan update review process, the Sumner County Emergency
Management Agency Director will be responsible for facilitating, coordinating, and
scheduling reviews and maintenance of the plan. The review of the Hazard Mitigation Plan
will be conducted as follows:

The Sumner County Emergency Management Agency will be responsible for leading
the meeting to review the plan.

2023 Sumner County Hazard Mitigation Plan
83

Page 123 of 171

CHAPTER 4: IMPLEMENTATION, INTEGRATION, AND MAINTENANCE



Notices will be emailed to the members of the HMPC, federal, state, and local
agencies, non-profit groups, local planning agencies, and representatives of
business interests, neighboring communities, and others advising them of the date,
time, and place for the review.
Local City officials will be notified by email or phone call.
Before the review, department heads and others tasked with implementing various
projects/actions will be queried concerning progress in their area of responsibility
and asked to present a report at the review meeting.
A copy of the current plan will be available for public comment.
After the review meeting, a status report will be developed outlining the
implementation of projects over the past year.

Criteria for Annual Reviews
The criteria recommended for annual reviews will include the following:







Community growth or change in the past year to include residential, commercial,
and industrial growth trends.
The number of substantially damaged or improved structures by flood zone and
review of jurisdictional NFIP membership.
Renovations to public infrastructure, including water, sewer, drainage, roads,
bridges, gas lines, and buildings.
Natural hazard occurrences that required activation of the Emergency Operations
Center (EOC) and whether the event resulted in a presidential disaster declaration.
Natural hazard occurrences that were not of a magnitude to warrant activation of
the EOC or a federal disaster declaration but were severe enough to cause damage
in the community or closure of businesses, schools, or public services.
The dates of hazardous events, narratives, and documented damages.
Closures of places of employment or schools and the number of days closed.
Road or bridge closures due to the hazard and the length of time closed.
Assessment of the number of private and public buildings damaged and whether
the damage was minor, substantial, major, or if buildings were destroyed. The
assessment will include residences, mobile homes, commercial structures, industrial
structures, and public buildings, such as schools and public safety buildings.
Review of any changes in federal, state, and local policies to determine the impact of
these policies on the community and how and if the policy changes can or should be
incorporated into the Hazard Mitigation Plan.
Review of the implementation status of projects/actions (mitigation strategies). The
reason for delay will be discussed for any projects that are behind schedule or not
yet started.

4.2.1 Continued Public Involvement
Continued public involvement is imperative to the overall success of the plan’s
implementation. The update process provides an opportunity to solicit participation from
2023 Sumner County Hazard Mitigation Plan
84

Page 124 of 171

CHAPTER 4: IMPLEMENTATION, INTEGRATION, AND MAINTENANCE

new and existing stakeholders, publicize mitigation success stories, and seek additional
public comment. The plan maintenance and update process will include continued public
and stakeholder involvement and input through attendance at designated committee
meetings, web postings, press releases to local media, and public hearings.
Public Involvement Process for Annual Reviews
The public will be notified via the Sumner County website or any other form of a publicized
social platform (i.e., local newspaper, Facebook, Twitter) well in advance of any public
meetings or comment periods.
Public Involvement for Five-year Update
When the HMPC reconvenes for the five-year update, they will coordinate with all
stakeholders participating in the planning process—including those that joined the
committee since the planning process began—to update and revise the plan. In
reconvening, the HMPC will develop a plan for public involvement and will be responsible
for disseminating information through various media channels detailing the plan update
process. As part of this effort, public meetings will be held, and public comments will be
solicited on the plan update draft.

2023 Sumner County Hazard Mitigation Plan
85

Page 125 of 171

APPENDIX A: PLANNING DOCUMENTATION

APPENDIX A
Planning Documentation

2023 Sumner County Hazard Mitigation Plan
i

Page 126 of 171

APPENDIX A: PLANNING DOCUMENTATION

Attendance Sheets:

2023 Sumner County Hazard Mitigation Plan
ii

Page 127 of 171

APPENDIX A: PLANNING DOCUMENTATION

2023 Sumner County Hazard Mitigation Plan
iii

Page 128 of 171

APPENDIX A: PLANNING DOCUMENTATION

2023 Sumner County Hazard Mitigation Plan
iv

Page 129 of 171

APPENDIX A: PLANNING DOCUMENTATION

Mapped Public Notice Locations with CDC SVI Layer:

2023 Sumner County Hazard Mitigation Plan
v

Page 130 of 171

APPENDIX A: PLANNING DOCUMENTATION

Public Notice Flyer Locations:

2023 Sumner County Hazard Mitigation Plan
vi

Page 131 of 171

APPENDIX A: PLANNING DOCUMENTATION

2023 Sumner County Hazard Mitigation Plan
vii

Page 132 of 171

APPENDIX A: PLANNING DOCUMENTATION

Social Media Post:

2023 Sumner County Hazard Mitigation Plan
viii

Page 133 of 171

APPENDIX B: HISTORICALHAZARD DATA

APPENDIX B
Historical Hazard Data

2023 Sumner County Hazard Mitigation Plan
ix

Page 134 of 171

APPENDIX C: HISTORICAL HAZARD DATA

Drought
Location

Date

Deaths

Injuries

Property Damages

Crop Damages

SUMNER (ZONE)

5/1/2007

0

0

0

0

SUMNER (ZONE)

6/1/2007

0

0

0

0

SUMNER (ZONE)

7/1/2007

0

0

0

0

SUMNER (ZONE)

8/1/2007

0

0

0

0

SUMNER (ZONE)

9/1/2007

0

0

0

0

SUMNER (ZONE)

10/1/2007

0

0

0

0

SUMNER (ZONE)

11/1/2007

0

0

0

0

SUMNER (ZONE)

11/1/2008

0

0

0

0

SUMNER (ZONE)

12/1/2008

0

0

0

0

SUMNER (ZONE)

7/3/2012

0

0

0

0

SUMNER (ZONE)

11/1/2016

0

0

0

0

SUMNER (ZONE)

12/1/2016

0

0

0

0

SUMNER (ZONE)

6/25/2022

0

0

0

0

SUMNER (ZONE)

7/1/2022

0

0

0

0

SUMNER (ZONE)

5/1/2007

0

0

0

0

Flood
Location

Date

Event Type

Deaths

Injuries

Property
Damage

Crop
Damage

HENDERSONVILLE

6/23/1996

Flash Flood

0

0

0

0

HENDERSONVILLE

7/21/1996

Flash Flood

0

0

0

0

WHITE HOUSE

9/27/1996

Flash Flood

0

0

0

0

HENDERSONVILLE

9/27/1996

Flash Flood

0

0

0

0

HENDERSONVILLE

12/16/1996

Flash Flood

0

0

0

0

COUNTYWIDE

3/1/1997

Flash Flood

0

0

50000

0

WESTMORELAND

3/2/1997

Flash Flood

0

0

80000

0

GALLATIN

3/5/1997

Flash Flood

0

0

0

0

COUNTYWIDE

4/16/1998

Flash Flood

0

0

0

0

PORTLAND

5/10/1998

Flash Flood

0

0

0

0

GALLATIN

6/5/1998

Flash Flood

0

0

0

0

PORTLAND

6/10/1998

Flash Flood

0

0

0

0

COUNTYWIDE

1/22/1999

Flash Flood

0

0

0

0

SOUTHWEST
PORTION

2/13/2000

Flash Flood

0

0

0

0

COUNTYWIDE

12/16/2000

Flash Flood

0

0

0

0

COUNTYWIDE

2/16/2001

Flash Flood

0

0

0

0

COUNTYWIDE

1/24/2002

Flash Flood

0

0

0

0

COUNTYWIDE

3/17/2002

Flash Flood

0

0

0

0

COUNTYWIDE

6/6/2002

Flash Flood

0

0

0

0

2023 Sumner County Hazard Mitigation Plan
x

Page 135 of 171

APPENDIX C: HISTORICAL HAZARD DATA

WEST PORTION

6/18/2003

Flash Flood

0

0

0

0

PORTLAND

7/13/2003

Flash Flood

0

0

0

0

COUNTYWIDE

9/22/2003

Flash Flood

0

0

10000

0

2/5/2004

Flood

0

0

0

0

HENDERSONVILLE

3/20/2004

Flash Flood

0

0

0

0

GALLATIN

12/7/2004

Flash Flood

0

0

1000

0

GALLATIN

4/30/2005

Flash Flood

0

0

1000

0

PORTLAND

8/29/2005

Flash Flood

0

0

2000

0

COUNTYWIDE

1/22/2006

Flash Flood

0

0

1000

0

GALLATIN

8/10/2006

Flash Flood

0

0

1000

0

WHITE HOUSE

5/9/2009

Flash Flood

0

0

200000

0

BRANSFORD

9/26/2009

Flash Flood

0

0

1000

0

BRANSFORD

5/2/2010

Flood

0

0

5800

1000

ROCKLAND

5/14/2010

Flash Flood

0

0

50000

1000

TROUSDALE

8/19/2010

Flash Flood

0

0

50000

1000

ROGANA

8/5/2012

Flood

0

0

0

0

MILLERSVILLE

4/27/2013

Flash Flood

0

0

25000

0

OLD HICKORY

8/8/2013

Flash Flood

0

0

500000

0

BRANSFORD

8/12/2013

Flash Flood

0

0

0

0

CLEARVIEW

8/20/2014

Flood

0

0

0

0

MITCHELLVILLE

5/11/2016

Flash Flood

0

1

3000000

0

MITCHELLVILLE

5/26/2016

Flash Flood

0

0

5000

0

TROUSDALE

6/13/2016

Flood

0

0

0

0

MITCHELLVILLE

7/7/2016

Flash Flood

0

0

5000000

0

PLEASANT GROVE

7/29/2016

Flash Flood

0

0

100000

0

BETHPAGE

5/11/2017

Flash Flood

0

0

0

0

OCANA

5/19/2017

Flash Flood

0

0

10000

0

OCANA

5/19/2017

Flash Flood

0

0

5000

0

MITCHELLVILLE

6/5/2017

Flash Flood

0

0

0

0

MITCHELLVILLE

6/5/2017

Flood

0

0

5000

0

MILLERSVILLE

9/1/2017

Flash Flood

0

0

10000

0

MITCHELLVILLE

12/23/2017

Flash Flood

0

0

0

0

ROCKLAND

2/10/2018

Flood

0

0

0

0

MILLERSVILLE

4/23/2018

Flash Flood

0

0

5000

0

FOUNTAIN HEAD

5/20/2018

Flash Flood

0

0

0

0

SAUNDERSVILLE

10/15/2018

Flood

0

0

0

0

MILLERSVILLE

11/5/2018

Flash Flood

0

0

5000

0

TWO CHESNUT

2/23/2019

Flash Flood

0

0

0

0

MILLERSVILLE

2/23/2019

Flash Flood

0

0

50000

0

HENDERSONVILLE

6/9/2019

Flash Flood

0

0

0

0

GALLATIN

6/26/2019

Flash Flood

0

0

10000

0

2023 Sumner County Hazard Mitigation Plan
xi

Page 136 of 171

APPENDIX C: HISTORICAL HAZARD DATA

CLEARVIEW

6/26/2019

Flash Flood

0

0

0

0

PORTLAND

12/16/2019

Flash Flood

0

0

0

0

WESTMORELAND

12/16/2019

Flash Flood

0

0

0

0

GALLATIN

12/29/2019

Flash Flood

1

0

0

0

KANSAS

9/13/2020

Flash Flood

0

0

0

0

ROCKLAND

9/13/2020

Flash Flood

0

0

0

0

GALLATIN

9/13/2020

Flash Flood

0

0

0

0

ROGANA

9/13/2020

Flash Flood

0

0

0

0

Location

Date

Mag
(kts.)

Deaths

Injuries

Property
Damage

Crop
Damage

0

0

0

0

0

53

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

50

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

Wind

5/26/1960
7/23/1960
8/7/1962
8/9/1969
7/1/1973
4/1/1974
4/3/1974
1/13/1976
8/24/1976
8/24/1976
3/3/1979
7/19/1982
6/3/1983
7/1/1983
3/15/1984
3/15/1984
5/6/1984
5/6/1984

Event Type
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind

2023 Sumner County Hazard Mitigation Plan
xii

Page 137 of 171

APPENDIX C: HISTORICAL HAZARD DATA

6/11/1985
8/30/1985
8/30/1985
7/10/1986
7/14/1986
7/31/1986
7/31/1986
3/18/1987
11/4/1988
5/20/1989
6/12/1989
8/26/1989
5/16/1990
6/6/1990
9/10/1990
9/10/1990
10/4/1990
4/9/1991
5/12/1991
8/6/1991
5/12/1992
6/18/1992
6/18/1992
6/24/1992
6/24/1992

Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

2

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

2023 Sumner County Hazard Mitigation Plan
xiii

Page 138 of 171

APPENDIX C: HISTORICAL HAZARD DATA

7/16/1992
7/16/1992
8/27/1992
8/27/1992
11/22/1992
11/22/1992
GALLATIN

4/15/1993

WHITE HOUSE

5/3/1993

CASTALIAN
SPRINGS

8/17/1993

GALLATIN

3/7/1995

WHITE HOUSE

5/18/1995

GALLATIN

6/6/1995

GALLATIN

6/7/1995

WHITE HOUSE

7/22/1995

GALLATIN

1/18/1996

HENDERSONVILLE

4/20/1996

PORTLAND

4/20/1996

PORTLAND

5/26/1996

PORTLAND

5/27/1996

GALLATIN

5/27/1996

PORTLAND

5/27/1996

NORTHERN
SECTIONS

6/3/1996

COUNTYWIDE

7/21/1996

GALLATIN

7/29/1996

GALLATIN

9/16/1996

Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

0

500

0

0

0

0

500

0

0

0

0

500

0

0

0

0

30000

0

0

0

0

1

0

0

0

0

1000

0

0

0

0

10000

0

0

0

0

1000

0

0

0

100

0

0

0

500

0

0

0

0

0

0

0

500

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

50

0

0

1000

0

2023 Sumner County Hazard Mitigation Plan
xiv

Page 139 of 171

APPENDIX C: HISTORICAL HAZARD DATA

MITCHELLVILLE

9/27/1996

HENDERSONVILLE

1/4/1997

BETHPAGE

1/4/1997

WHITE HOUSE

1/24/1997

COUNTYWIDE

2/21/1997

GALLATIN

3/1/1997

WESTMORELAND

3/1/1997

HENDERSONVILLE

6/13/1997

GALLATIN

6/13/1997

GALLATIN

6/13/1997

COUNTYWIDE

7/28/1997

GALLATIN

8/19/1997

GALLATIN

9/9/1997

PLEASANT GROVE

3/8/1998

WEST CENTRAL
PORTION

5/21/1998

GALLATIN

5/21/1998

PORTLAND

5/25/1998

NORTHEAST
PORTION
NORTHEAST
PORTION

5/31/1998
5/31/1998

COUNTYWIDE

6/14/1998

HENDERSONVILLE

6/20/1998

WEST CENTRAL
PORTION

6/21/1998

PORTLAND

7/2/1998

HENDERSONVILLE

7/3/1998

GALLATIN

1/17/1999

Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind

0

0

30000

0

0

0

5000

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

0

0

50000

0

50

0

0

0

0

50

0

0

5000

0

50

0

0

1000

0

50

0

0

0

0

50

0

0

0

0

50

0

0

20000

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

2023 Sumner County Hazard Mitigation Plan
xv

Page 140 of 171

APPENDIX C: HISTORICAL HAZARD DATA

WEST PORTION

1/17/1999

PORTLAND

2/7/1999

GALLATIN

4/5/1999

GALLATIN

5/5/1999

GALLATIN

6/4/1999

PORTLAND

8/12/1999

NORTH PORTION

1/3/2000

WEST CENTRAL
PORTION

1/3/2000

WESTMORELAND

1/3/2000

WESTMORELAND

4/20/2000

GALLATIN

5/27/2000

GALLATIN

8/3/2000

GALLATIN

8/5/2000

COUNTYWIDE

11/9/2000

EAST PORTION

11/9/2000

HENDERSONVILLE

5/7/2001

WESTMORELAND

5/7/2001

PORTLAND

6/21/2001

MILLERSVILLE

6/21/2001

BETHPAGE

7/4/2001

WEST PORTION

7/5/2001

GALLATIN

10/24/2001

HENDERSONVILLE

4/28/2002

WEST CENTRAL
PORTION

5/1/2002

COUNTYWIDE

5/13/2002

6/4/2001

Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
High Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind

50

0

0

0

0

50

0

0

0

0

52

0

0

0

0

80

0

0

0

0

51

0

0

0

0

0

0

5000

0

0

0

0

0

0

0

500

0

50

0

0

0

0

60

0

0

0

0

65

0

0

100000

0

50

0

0

0

0

50

0

0

0

0

50

0

0

10000

0

55

0

0

0

0

50

0

0

0

0

50

0

0

0

0

52

0

0

0

0

60

0

0

0

0

52

0

0

0

0

50

0

0

0

0

55

0

0

0

0

61

0

0

0

0

55

0

0

0

0

50

0

0

0

0

50

0

0

0

0

50

2023 Sumner County Hazard Mitigation Plan
xvi

Page 141 of 171

APPENDIX C: HISTORICAL HAZARD DATA

HENDERSONVILLE

6/25/2002

PORTLAND

7/2/2002

HENDERSONVILLE

7/10/2002

WESTMORELAND

11/10/2002

HENDERSONVILLE

5/1/2003

HENDERSONVILLE

5/5/2003

PORTLAND

5/7/2003

CASTALIAN SPGS

5/7/2003

GALLATIN

6/10/2003

GALLATIN

6/11/2003

HENDERSONVILLE

6/16/2003

HENDERSONVILLE

6/16/2003

PORTLAND

7/16/2003

GALLATIN

7/16/2003

CASTALIAN SPGS

7/16/2003

HENDERSONVILLE

7/21/2003

CASTALIAN SPGS

7/21/2003

PORTLAND

8/4/2003

HENDERSONVILLE

8/11/2003

GALLATIN

8/22/2003

GRABALL

8/22/2003

HENDERSONVILLE

8/22/2003

HENDERSONVILLE

8/27/2003

GALLATIN

3/20/2004

BETHPAGE

5/30/2004

Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

55

0

0

0

0

65

0

0

0

0

55

0

0

0

0

85

0

1

0

0

50

0

0

0

0

57

0

0

0

0

55

0

0

0

0

50

0

0

0

0

60

0

0

0

0

60

0

0

0

0

60

0

0

0

0

50

0

0

0

0

55

0

0

0

0

55

0

0

0

0

50

0

0

0

0

55

0

0

0

0

55

0

0

0

0

57

0

0

0

0

50

0

0

50000

0

50

0

0

0

0

50

0

0

0

0

2023 Sumner County Hazard Mitigation Plan
xvii

Page 142 of 171

APPENDIX C: HISTORICAL HAZARD DATA

COUNTYWIDE

5/30/2004

HENDERSONVILLE

6/12/2004

HENDERSONVILLE

6/13/2004

GALLATIN

7/5/2004

PORTLAND

7/13/2004

GALLATIN

7/13/2004

WESTMORELAND

1/13/2005

WESTMORELAND

1/13/2005

COUNTYWIDE

4/22/2005

HENDERSONVILLE

5/19/2005

GALLATIN

6/14/2005

PORTLAND

8/4/2005

COUNTYWIDE

8/6/2005

TYREE SPGS

8/13/2005
8/30/2005

GALLATIN

11/6/2005
11/28/2005

HENDERSONVILLE

3/9/2006

HENDERSONVILLE

3/9/2006

PORTLAND

3/9/2006

PORTLAND

4/2/2006

SUGAR GROVE

6/22/2006

HENDERSONVILLE

9/23/2006

HENDERSONVILLE

6/8/2007
1/29/2008

GALLATIN

2/5/2008

CAIRO

2/5/2008

Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Strong Wind
Thunderstorm
Wind
High Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
High Wind
Thunderstorm
Wind
Thunderstorm
Wind

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

70

0

0

10000

0

55

0

0

50000

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

50

0

0

0

0

55

0

0

10000

0

55

0

0

20000

0

50

0

0

0

0

50

0

0

0

0

35

0

0

1000

0

50

0

0

0

0

50

0

0

5000

0

50

0

0

0

0

50

0

0

0

0

60

0

0

2000

0

70

0

0

0

0

50

0

0

0

0

50

0

0

0

0

50

0

0

800

0

50

0

0

10000

0

70

0

0

50000

0

60

0

0

5000

0

2023 Sumner County Hazard Mitigation Plan
xviii

Page 143 of 171

APPENDIX C: HISTORICAL HAZARD DATA

PORTLAND

7/22/2008

TYREE SPGS

8/6/2008

JOHNSONS XRDS

8/6/2008

GALLATIN

2/11/2009

HENDERSONVILLE

2/11/2009

SUGAR GROVE

6/11/2009

HENDERSONVILLE

6/11/2009

GRABALL

6/16/2009

WHITE HILL

6/22/2009

WHITE HOUSE

6/22/2009

GALLATIN

6/22/2009

BETHPAGE

6/30/2009

GRABALL

7/12/2009

GALLATIN

4/24/2010

HENDERSONVILLE

5/2/2010

GALLATIN

5/16/2010

CAIRO

6/2/2010

COTTONTOWN

6/2/2010

GALLATIN

6/2/2010

BUCK LODGE

7/31/2010

PLEASANT GROVE

8/5/2010

CASTALIAN SPGS

8/5/2010

HENDERSONVILLE

2/24/2011

ROCKLAND

2/24/2011

ROCKLAND

4/4/2011

Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind

50

0

0

5000

0

50

0

0

200

0

50

0

0

5000

0

60

0

0

0

0

62

0

0

12000

0

50

0

0

10000

0

55

0

0

10000

0

50

0

0

8000

0

55

0

0

2000

0

55

0

0

10000

0

55

0

0

50000

0

40

0

1

50000

0

55

0

0

50000

0

50

0

0

10000

0

60

0

0

10000

0

55

0

0

5000

0

55

0

0

1500

0

55

0

0

15000

0

55

0

0

1500

0

55

0

0

15000

0

55

0

0

7500

0

55

0

0

10000

0

74

0

0

75000

0

55

0

0

5000

0

55

0

0

5000

0

2023 Sumner County Hazard Mitigation Plan
xix

Page 144 of 171

APPENDIX C: HISTORICAL HAZARD DATA

GALLATIN

4/4/2011

GALLATIN

4/4/2011

GALLATIN

4/4/2011
4/15/2011
4/15/2011

BETHPAGE

4/27/2011

AVONDALE

5/21/2011

AVONDALE

5/21/2011

GALLATIN MUNI
ARPT

5/21/2011

KANSAS

5/23/2011

GALLATIN

5/24/2011

PLEASANT VLY

5/25/2011

PORTLAND

5/25/2011

HENDERSONVILLE

5/25/2011

HENDERSONVILLE

5/25/2011

GALLATIN

5/25/2011

ROCKLAND

6/28/2011

JOHNSONS XRDS

6/28/2011

WHITE HOUSE

7/7/2011

GALLATIN MUNI
ARPT

9/3/2011

WHITE HOUSE

1/23/2012

CUMMINGS XRDS

1/23/2012

ROCK BRIDGE

1/23/2012

HENDERSONVILLE

1/23/2012

AVONDALE

1/23/2012

LIBERTY

1/23/2012

Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Strong Wind
Strong Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind

55

0

0

1000

0

55

0

0

5000

0

55

0

0

10000

0

43
43

0
0

0
0

25000
1000

0
0

55

0

0

25000

0

55

0

0

5000

0

55

0

0

5000

0

55

0

0

5000

0

70

0

0

50000

0

55

0

0

25000

0

55

0

0

10000

0

55

0

0

5000

0

52

0

0

0

0

58

0

0

25000

0

55

0

0

25000

0

52

0

0

10000

0

52

0

0

1000

0

55

0

0

10000

0

55

0

0

10000

0

50

0

0

5000

0

50

0

0

5000

0

50

0

0

10000

0

50

0

0

1000

0

50

0

0

5000

0

54

0

0

0

0

2023 Sumner County Hazard Mitigation Plan
xx

Page 145 of 171

APPENDIX C: HISTORICAL HAZARD DATA

GALLATIN

3/17/2012

GALLATIN

5/31/2012

PORTLAND

5/31/2012

CUMMINGS XRDS

6/11/2012

GALLATIN

7/6/2012

GALLATIN

7/6/2012

CEDAR GROVE

7/6/2012

GALLATIN

7/6/2012

PORTLAND

7/19/2012

PLEASANT VLY

7/19/2012

ROCKLAND

7/19/2012

ROCKLAND

7/19/2012

HENDERSONVILLE

7/19/2012

KANSAS

8/9/2012

PORTLAND

8/16/2012

COTTONTOWN

1/30/2013

ROCKLAND

1/30/2013

NUBIA

1/30/2013
5/3/2013

CEDAR GROVE

5/21/2013

SOUTH TUNNEL

6/9/2013

WALNUT GROVE

6/20/2013

SOUTH TUNNEL

6/20/2013
10/31/2013

WHITE HILL

10/31/2013

TYREE SPGS

12/21/2013

Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Strong Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Strong Wind
Thunderstorm
Wind
Thunderstorm
Wind

55

0

0

0

0

55

0

0

30000

0

55

0

0

10000

0

52

0

0

2000

0

55

0

0

10000

0

55

0

0

30000

0

55

0

0

25000

0

55

0

0

25000

0

55

0

0

10000

0

55

0

0

10000

0

55

0

0

5000

0

55

0

0

5000

0

55

0

0

15000

0

52

0

0

3000

0

52

0

0

5000

0

52

0

0

10000

0

56

0

0

20000

0

52

0

0

10000

0

35

0

0

2000

0

60

0

1

250000

0

52

0

0

3000

0

48

0

0

2000

0

52

0

0

3000

0

43

0

0

5000

0

52

0

0

2000

0

52

0

0

1000

0

2023 Sumner County Hazard Mitigation Plan
xxi

Page 146 of 171

APPENDIX C: HISTORICAL HAZARD DATA

WHITE HOUSE

12/21/2013
12/21/2013

PORTLAND

2/20/2014

TWO CHESNUT

4/28/2014

WESTMORELAND

4/28/2014

BETHPAGE

7/27/2014

WESTMORELAND

7/27/2014

PORTLAND

8/7/2014

HENDERSONVILLE

8/23/2014

LIBERTY

10/7/2014

TYREE SPGS

10/13/2014

HENDERSONVILLE

4/3/2015

SAUNDERSVILLE

4/3/2015

SOUTH TUNNEL

4/10/2015

PROVIDENCE

4/20/2015

PORTLAND

5/17/2015

SAUNDERSVILLE

5/17/2015

GALLATIN

5/17/2015

SAUNDERSVILLE

5/27/2015

PEYTONA

6/26/2015

TROUSDALE

7/14/2015

WHITE HILL

7/28/2015

ROCKLAND

7/28/2015

ROCKLAND

7/28/2015

ROCKLAND

7/28/2015

GALLATIN

11/6/2015

Thunderstorm
Wind
Strong Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind

48

0

0

1000

0

43

0

0

2000

0

52

0

0

3000

0

70

0

0

10000

0

52

0

0

5000

0

50

0

0

1000

0

50

0

0

1000

0

52

0

0

2000

0

52

0

0

3000

0

48

0

0

1000

0

52

0

0

1000

0

60

0

0

3000

0

52

0

0

1000

0

52

0

0

1000

0

52

0

0

1000

0

65

0

0

20000

0

52

0

0

1000

0

52

0

0

2000

0

56

0

0

10000

0

52

0

0

1000

0

52

0

0

3000

0

48

0

0

1000

0

52

0

0

5000

0

56

0

0

15000

0

52

0

0

1000

0

50

0

0

1000

0

2023 Sumner County Hazard Mitigation Plan
xxii

Page 147 of 171

APPENDIX C: HISTORICAL HAZARD DATA

HENDERSONVILLE

4/6/2016

CEDAR GROVE

4/6/2016

HENDERSONVILLE

5/10/2016

TROUSDALE

6/13/2016

PORTLAND

6/15/2016

SHACKLE IS

6/15/2016

HENDERSONVILLE

6/15/2016

GALLATIN

6/15/2016

GALLATIN

6/15/2016

CASTALIAN SPGS

6/15/2016

KANSAS

6/15/2016

PLEASANT VLY

6/16/2016

JOHNSONS XRDS

6/16/2016

BRANSFORD

7/6/2016

PORTLAND

7/6/2016

COTTONTOWN

7/6/2016

HENDERSONVILLE

7/6/2016

HENDERSONVILLE

7/6/2016

CASTALIAN SPGS

7/6/2016

PORTLAND

7/7/2016

WESTMORELAND

7/7/2016

HENDERSONVILLE

7/7/2016

TWO CHESNUT

7/8/2016

FOUNTAIN HEAD

7/8/2016

HIGHLAND
ACADEMY

7/8/2016

Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind

52

0

0

1000

0

52

0

0

1000

0

48

0

0

1000

0

50

0

0

4000

0

52

0

0

2000

0

52

0

2

1000

0

50

0

0

2000

0

52

0

0

5000

0

48

0

0

1000

0

50

0

0

1000

0

52

0

0

3000

0

50

0

0

2000

0

52

0

0

3000

0

50

0

0

1000

0

50

0

0

5000

0

50

0

0

3000

0

50

0

0

2000

0

50

0

0

1000

0

50

0

0

3000

0

48

0

0

3000

0

50

0

0

5000

0

48

0

0

3000

0

50

0

0

2000

0

50

0

0

1000

0

50

0

0

2000

0

2023 Sumner County Hazard Mitigation Plan
xxiii

Page 148 of 171

APPENDIX C: HISTORICAL HAZARD DATA

MILLERSVILLE

7/8/2016

CORINTH

7/8/2016

SAUNDERSVILLE

7/8/2016

GALLATIN

7/8/2016

ROCK BRIDGE

7/8/2016

GALLATIN

7/8/2016

HENDERSONVILLE

8/5/2016

KANSAS

9/10/2016

CEDAR GROVE

11/28/2016

HENDERSONVILLE

12/17/2016
1/10/2017

ROCKLAND

3/1/2017

PORTLAND

3/1/2017

BETHPAGE

3/1/2017

BRANSFORD

3/1/2017

HENDERSONVILLE

3/9/2017

TWO CHESNUT

3/27/2017

GALLATIN

3/27/2017
4/22/2017

OLD HICKORY

4/30/2017

HENDERSONVILLE

4/30/2017

HENDERSONVILLE

4/30/2017

GALLATIN

4/30/2017
5/1/2017

WHITE HOUSE

5/20/2017

CORINTH

5/20/2017

GALLATIN

5/27/2017

Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Strong Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Strong Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Strong Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind

50

0

0

1000

0

50

0

0

2000

0

52

0

0

6000

0

50

0

0

5000

0

52

0

0

5000

0

50

0

0

3000

0

52

0

0

3000

0

48

0

0

1000

0

52

0

0

2000

0

52

0

0

1000

0

43

0

0

3000

0

65

0

0

30000

0

56

0

0

15000

0

52

0

0

2000

0

52

0

0

2000

0

43

0

0

3000

0

50

0

0

3000

0

52

0

0

3000

0

43

0

1

50000

0

50

0

0

2000

0

50

0

0

2000

0

50

0

0

1000

0

50

0

0

1000

0

39

0

0

1000

0

50

0

0

1000

0

50

0

0

2000

0

50

0

0

3000

0

2023 Sumner County Hazard Mitigation Plan
xxiv

Page 149 of 171

APPENDIX C: HISTORICAL HAZARD DATA

CEDAR GROVE

5/27/2017

PORTLAND

11/18/2017

CEDAR GROVE

11/18/2017

CEDAR GROVE

11/18/2017

HENDERSONVILLE

2/24/2018

OAK GROVE

4/3/2018

ROCK BRIDGE

5/20/2018

PORTLAND

6/10/2018

PORTLAND

6/10/2018

CAIRO

6/11/2018

PROVIDENCE

6/12/2018

PROVIDENCE

6/12/2018

GALLATIN

6/17/2018

TWO CHESNUT

6/27/2018

HIGHLAND
ACADEMY

6/27/2018

CASTALIAN SPGS

6/27/2018

GALLATIN

8/30/2018

8/31/2017

3/14/2019
PLEASANT VLY

3/30/2019

CASTALIAN SPGS

3/30/2019

GALLATIN

5/2/2019

HENDERSONVILLE

6/19/2019

WHITE HOUSE

6/21/2019

HENDERSONVILLE

6/21/2019

GALLATIN

6/26/2019

Thunderstorm
Wind
Strong Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Strong Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind

50

0

0

1000

0

43

0

0

10000

0

48

0

0

1000

0

61

0

0

5000

0

52

0

0

3000

0

48

0

0

2000

0

50

0

0

1000

0

50

0

0

3000

0

50

0

0

3000

0

50

0

0

5000

0

50

0

0

3000

0

50

0

0

2000

0

48

0

0

2000

0

43

0

0

3000

0

50

0

0

3000

0

52

0

0

4000

0

50

0

0

3000

0

45

0

0

5000

0

43

0

1

50000

0

50

0

0

1000

0

50

0

0

3000

0

50

0

0

2000

0

50

0

0

5000

0

52

0

0

15000

0

52

0

0

3000

0

50

0

0

3000

0

2023 Sumner County Hazard Mitigation Plan
xxv

Page 150 of 171

APPENDIX C: HISTORICAL HAZARD DATA

CEDAR GROVE

6/27/2019

PEYTONA

6/27/2019

GALLATIN

6/27/2019

PORTLAND

6/27/2019

CASTALIAN SPGS

7/2/2019

WHITE HOUSE

8/6/2019

GALLATIN MUNI
ARPT

9/10/2019

HENDERSONVILLE

4/8/2020

GALLATIN MUNI
ARPT

4/8/2020

KANSAS

4/8/2020

GALLATIN

5/3/2020

MILLERSVILLE

5/25/2020

CORINTH

3/25/2021

WHITE HOUSE

5/4/2021

CLEARVIEW

5/4/2021

GALLATIN

5/4/2021

COTTONTOWN

12/6/2021

GALLATIN

12/11/2021
3/30/2022

TROUSDALE

3/30/2022

PORTLAND

6/17/2022

CEDAR GROVE

7/5/2022

AVONDALE

7/7/2022

SOUTH TUNNEL

7/7/2022

PORTLAND

7/26/2022

Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Strong Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind
Thunderstorm
Wind

50

0

0

1000

0

50

0

0

1000

0

50

0

0

1000

0

50

0

0

3000

0

45

0

0

1000

0

52

0

0

3000

0

51

0

0

0

0

50

0

0

3000

0

50

0

0

3000

0

50

0

0

1000

0

52

0

0

15830

0

43

0

0

1000

0

74

0

4

200000

0

56

0

0

15000

0

56

0

0

10000

0

52

0

0

3000

0

52

0

0

2000

0

61

0

0

10000

0

48

0

0

10000

0

52

0

0

3000

0

50

0

0

1000

0

52

0

0

10000

0

50

0

0

1000

0

50

0

0

1000

0

56

0

0

25000

0

2023 Sumner County Hazard Mitigation Plan
xxvi

Page 151 of 171

APPENDIX C: HISTORICAL HAZARD DATA

Hail
Location

WHITE HOUSE
PORTLAND
PORTLAND
WHITE HOUSE
PORTLAND
BETHPAGE
WHITE HOUSE
GALLATIN
GALLATIN
WESTMORELAND
GALLATIN
WALNUT GROVE
COTTONTOWN
GALLATIN
PORTLAND
PORTLAND
WESTMORELAND
HENDERSONVILLE
GALLATIN
GALLATIN
BETHPAGE
SHACKLE IS
GALLATIN
HENDERSONVILLE
GALLATIN
PORTLAND
GALLATIN
GALLATIN
BETHPAGE
WESTMORELAND
MILLERSVILLE
MILLERSVILLE
PORTLAND
HENDERSONVILLE
WEST CENTRAL
PORTION
WEST CENTRAL
PORTION
GALLATIN
GALLATIN

Date
3/26/1959
4/6/1965
5/19/1973
3/7/1975
5/6/1984
5/7/1984
6/4/1985
3/31/1993
3/31/1993
6/26/1994
2/27/1996
3/16/1996
3/16/1996
5/26/1996
1/4/1997
3/5/1997
3/28/1997
7/4/1997
4/3/1998
4/3/1998
4/3/1998
4/16/1998
4/16/1998
4/16/1998
4/16/1998
5/21/1998
5/25/1998
5/29/1998
6/10/1998
1/17/1999
4/5/1999
4/5/1999
4/19/1999
4/19/1999
4/19/1999
5/4/2000
5/24/2000
7/27/2000
7/27/2000
5/7/2001
4/28/2002

Magnitude
(in.)
1.75
0.75
1.75
1.75
1
1
1.5
0.75
0.75
1
0.75
0.75
1.75
0.75
0.75
0.75
1.5
0.75
2.75
1.75
1.75
0.75
0.88
0.88
1
0.88
0.75
0.75
0.88
0.75
0.75
0.75
0.75
0.75
0.75
0.75
1.75
0.75
1
0.75
0.88

Deaths
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Injuries
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Property
Damage
0
0
0
0
0
0
0
0
0
50
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Crop
Damages
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

5/1/2002

0.75

0

0

0

0

5/1/2002

0.88

0

0

0

0

5/1/2002
5/1/2002

0.75
0.88

0
0

0
0

0
0

0
0

2023 Sumner County Hazard Mitigation Plan
xxvii

Page 152 of 171

APPENDIX C: HISTORICAL HAZARD DATA
GALLATIN
BETHPAGE
GALLATIN MUNI ARPT
PORTLAND
PORTLAND
GALLATIN
PORTLAND
GALLATIN
GALLATIN
GALLATIN
GALLATIN
HENDERSONVILLE
GALLATIN
GALLATIN
GALLATIN
SUGAR GROVE
GALLATIN
GALLATIN
HENDERSONVILLE
GALLATIN
GALLATIN
GALLATIN
PORTLAND
PORTLAND
WESTMORELAND
NUBIA
OLD HICKORY
HENDERSONVILLE
GALLATIN
KANSAS
CAIRO
PORTLAND
GALLATIN
SHACKLE IS
GALLATIN
WESTMORELAND
GALLATIN
GALLATIN
BON AIR
WESTMORELAND
WESTMORELAND
WESTMORELAND
HENDERSONVILLE
GALLATIN
GALLATIN
CASTALIAN SPGS
HIGHLAND ACADEMY
WESTMORELAND
MILLERSVILLE
MILLERSVILLE

4/29/2003
4/29/2003
5/5/2003
5/5/2003
8/4/2003
5/30/2004
7/14/2004
4/2/2006
4/2/2006
4/7/2006
4/7/2006
4/7/2006
4/19/2006
6/22/2006
6/22/2006
6/22/2006
2/21/2007
2/21/2007
2/5/2008
2/5/2008
2/5/2008
2/5/2008
7/22/2008
3/28/2009
4/10/2009
5/8/2009
6/2/2009
5/14/2010
5/14/2010
5/28/2010
4/15/2011
4/20/2011
4/24/2011
5/2/2011
6/5/2011
6/5/2011
6/15/2011
6/15/2011
6/19/2011
6/19/2011
6/19/2011
6/19/2011
10/18/2011
1/21/2012
1/21/2012
3/2/2012
3/14/2012
3/14/2012
3/14/2012
3/14/2012

1
0.75
0.75
0.75
1
1.5
1
0.88
1
1
1
1.75
0.75
1.75
0.88
0.75
1.75
0.88
0.88
1
1
1
0.88
0.75
0.75
0.88
0.88
0.88
1
1
0.75
1
0.88
0.88
0.88
0.88
0.88
0.88
2.75
1.75
1.75
1
0.75
1
1
0.88
1.5
1
1
1

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

2023 Sumner County Hazard Mitigation Plan
xxviii

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
2000
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Page 153 of 171

APPENDIX C: HISTORICAL HAZARD DATA
HIGHLAND ACADEMY
GALLATIN
OAK GROVE
BETHPAGE
WESTMORELAND
GALLATIN
WESTMORELAND
WESTMORELAND
HENDERSONVILLE
HENDERSONVILLE
HENDERSONVILLE
PEYTONA
CLEARVIEW
MILLERSVILLE
SHACKLE IS
KANSAS
BETHPAGE
CEDAR GROVE
COTTONTOWN
GALLATIN
WHITE HOUSE
ROCK BRIDGE
WESTMORELAND
MITCHELLVILLE
PORTLAND
WHITE HOUSE
SOUTH TUNNEL
GRABALL
GRABALL
HENDERSONVILLE
NEW DEAL
PORTLAND
GALLATIN
WHITE HOUSE
MILLERSVILLE
PORTLAND
HENDERSONVILLE
BETHPAGE
WESTMORELAND
CAIRO
PORTLAND
GALLATIN
HENDERSONVILLE
HENDERSONVILLE
HENDERSONVILLE
HENDERSONVILLE
COTTONTOWN
CHERRY MOUND ARPT
PORTLAND
HIGHLAND ACADEMY

3/14/2012
3/14/2012
3/15/2012
3/15/2012
3/15/2012
3/15/2012
4/26/2012
4/26/2012
4/26/2012
4/26/2012
5/6/2012
5/19/2012
4/27/2013
6/9/2013
6/9/2013
6/9/2013
6/9/2013
7/27/2014
10/7/2014
10/7/2014
4/3/2015
4/3/2015
5/15/2015
6/8/2015
6/8/2015
5/10/2016
5/10/2016
5/10/2016
5/10/2016
5/10/2016
7/6/2016
7/8/2016
7/19/2016
3/27/2017
3/27/2017
4/5/2017
5/6/2018
6/11/2018
6/11/2018
6/11/2018
3/9/2019
6/26/2019
9/10/2019
2/28/2021
2/28/2021
2/28/2021
3/25/2021
3/25/2021
3/25/2021
7/7/2022

1.75
1
1
1.75
0.88
0.88
1
1.75
0.88
1
1
0.88
0.88
0.75
0.88
0.88
1
0.88
0.88
1
1
1
0.75
1.25
1
1
1
1.25
1
1.75
0.75
0.88
0.75
0.88
1
0.88
0.75
0.88
0.75
1
0.75
1
1
0.75
0.88
1
1.5
2
1.5
1.5

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

2023 Sumner County Hazard Mitigation Plan
xxix

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

5000
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Page 154 of 171

APPENDIX C: HISTORICAL HAZARD DATA
PORTLAND

7/12/2022

0.75

0

0

0

0

Lightning
Location

Date

Deaths

Injuries

Property
Damage

Crop
Damages

PORTLAND

8/19/1997

0

0

20000

0

PORTLAND

9/20/1999

0

0

40000

0

OAK GROVE

7/10/2001

0

1

0

0

GALLATIN

3/15/2002

0

1

0

0

PORTLAND

6/11/2003

0

0

100

0

PORTLAND

2/24/2011

0

0

1000

0

SAUNDERSVILLE

7/1/2015

0

0

300000

0

ROCKLAND

7/28/2015

0

0

1000

0

MILLERSVILLE

7/7/2016

0

0

250000

0

GALLATIN MUNI ARPT

7/14/2017

0

0

2000

0

SAUNDERSVILLE

8/8/2018

0

0

5000

0

Winter Weather
Location

Date

Event Type

Deaths

Injuries

Property
Damage

Crop
Damages

SUMNER (ZONE)

1/6/1996

Winter Storm

0

0

0

0

SUMNER (ZONE)

1/6/1996

Winter Storm

0

0

0

0

SUMNER (ZONE)

12/24/1998

Winter Storm

0

0

0

0

SUMNER (ZONE)

12/4/2002

Winter Storm

0

0

0

0

SUMNER (ZONE)

12/22/2004

Winter Storm

0

0

0

0

SUMNER (ZONE)

3/7/2008

Winter Storm

0

0

0

0

SUMNER (ZONE)

1/19/2009

Winter Weather

0

0

0

0

SUMNER (ZONE)

2/8/2010

Winter Weather

0

0

0

0

SUMNER (ZONE)

2/10/2010

Winter Weather

0

0

0

0

SUMNER (ZONE)

2/14/2010

Winter Weather

0

0

0

0

SUMNER (ZONE)

12/15/2010

Winter Weather

0

0

0

0

SUMNER (ZONE)

12/24/2010

Winter Weather

0

0

0

0

SUMNER (ZONE)

1/7/2011

Winter Weather

0

0

0

0

SUMNER (ZONE)

1/10/2011

Winter Weather

0

0

0

0

SUMNER (ZONE)

1/11/2011

Winter Weather

0

0

0

0

SUMNER (ZONE)

1/20/2011

Winter Weather

0

0

0

0

SUMNER (ZONE)

2/7/2011

Winter Weather

0

0

0

0

SUMNER (ZONE)

2/9/2011

Winter Weather

0

0

0

0

SUMNER (ZONE)

1/12/2012

Winter Weather

0

0

0

0

SUMNER (ZONE)

2/10/2012

Winter Weather

0

0

0

0

SUMNER (ZONE)

2/19/2012

Winter Weather

0

0

0

0

2023 Sumner County Hazard Mitigation Plan
xxx

Page 155 of 171

APPENDIX C: HISTORICAL HAZARD DATA

SUMNER (ZONE)

1/15/2013

Winter Weather

0

0

7000

0

SUMNER (ZONE)

1/25/2013

Winter Weather

0

0

5000

0

SUMNER (ZONE)

1/25/2013

Winter Weather

0

0

50000

0

SUMNER (ZONE)

1/25/2013

Winter Weather

0

0

10000

0

SUMNER (ZONE)

1/31/2013

Winter Weather

0

0

0

0

SUMNER (ZONE)

3/1/2013

Winter Weather

0

0

0

0

SUMNER (ZONE)

3/1/2013

Winter Weather

0

0

0

0

SUMNER (ZONE)

12/7/2013

Winter Weather

0

0

0

0

SUMNER (ZONE)

12/9/2013

Winter Weather

0

0

0

0

SUMNER (ZONE)

1/2/2014

Winter Weather

0

0

0

0

SUMNER (ZONE)

1/5/2014

Winter Weather

0

0

0

0

SUMNER (ZONE)

1/21/2014

Winter Weather

0

0

0

0

SUMNER (ZONE)

1/25/2014

Winter Weather

0

0

0

0

SUMNER (ZONE)

2/2/2014

Winter Weather

0

0

0

0

SUMNER (ZONE)

2/7/2014

Winter Weather

0

0

0

0

SUMNER (ZONE)

3/2/2014

Winter Weather

0

0

0

0

SUMNER (ZONE)

11/17/2014

Winter Weather

0

0

0

0

SUMNER (ZONE)

1/23/2015

Winter Weather

0

0

0

0

SUMNER (ZONE)

1/26/2015

Winter Weather

0

0

0

0

SUMNER (ZONE)

2/16/2015

Winter Storm

0

0

100000

0

SUMNER (ZONE)

2/18/2015

Winter Weather

0

0

0

0

SUMNER (ZONE)

2/20/2015

Winter Storm

0

0

500000

0

SUMNER (ZONE)

2/25/2015

Winter Weather

0

0

0

0

SUMNER (ZONE)

3/4/2015

Winter Storm

0

0

0

0

SUMNER (ZONE)

1/20/2016

Winter Weather

0

0

0

0

SUMNER (ZONE)

1/21/2016

Winter Storm

0

0

10000

0

SUMNER (ZONE)

2/8/2016

Winter Weather

0

0

0

0

SUMNER (ZONE)

2/12/2016

Winter Weather

0

0

0

0

SUMNER (ZONE)

2/14/2016

Winter Weather

0

0

0

0

SUMNER (ZONE)

12/18/2016

Winter Weather

0

0

0

0

SUMNER (ZONE)

1/6/2017

Winter Weather

0

0

0

0

SUMNER (ZONE)

3/11/2017

Winter Weather

0

0

0

0

SUMNER (ZONE)

1/12/2018

Winter Storm

0

0

0

0

SUMNER (ZONE)

1/15/2018

Winter Weather

0

0

0

0

SUMNER (ZONE)

3/12/2018

Winter Weather

0

0

0

0

SUMNER (ZONE)

3/20/2018

Winter Weather

0

0

0

0

SUMNER (ZONE)

12/8/2018

Winter Weather

0

0

10000

0

SUMNER (ZONE)

1/19/2019

Winter Weather

0

0

0

0

SUMNER (ZONE)

11/11/2019

Winter Weather

0

0

0

0

SUMNER (ZONE)

2/6/2020

Winter Weather

0

0

0

0

SUMNER (ZONE)

11/30/2020

Winter Weather

0

0

0

0

2023 Sumner County Hazard Mitigation Plan
xxxi

Page 156 of 171

APPENDIX C: HISTORICAL HAZARD DATA

SUMNER (ZONE)

1/15/2021

Winter Weather

0

0

0

0

SUMNER (ZONE)

2/1/2021

Winter Weather

0

0

0

0

SUMNER (ZONE)

2/14/2021

Winter Storm

0

0

0

0

SUMNER (ZONE)

2/17/2021

Winter Storm

0

0

0

0

SUMNER (ZONE)

1/2/2022

Winter Weather

0

0

0

0

SUMNER (ZONE)

1/6/2022

Winter Storm

0

0

0

0

SUMNER (ZONE)

1/16/2022

Winter Weather

0

0

0

0

SUMNER (ZONE)

1/19/2022

Winter Weather

0

0

0

0

SUMNER (ZONE)

3/11/2022

Winter Storm

0

0

0

0

Date

Magnitude
(EF Scale)

Deaths

Injuries

Property
Damages

Crop
Damages

0
0
0
0
1
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
7
7
0
0
0

4
0
4
0
10
0
0
3
0
0
0
0
0
3
0
28
0
0
0
17
6
0
0
121
14
0
0
0

0
250000
25000
25000
2500000
0
0
25000
25000
25000
250000
25000
250000
25000
10000
3000000
5000
0
200000
1000000
500000
0
0
69000000
10000000
0
0
200000

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0

Tornado
Location

Bethpage
Millersville to
PORTLAND
COTTONTOWN
GALLATIN
PORTLAND
GALLATIN
HENDERSONVILLE
GALLATIN
CASTALIAN SPGS
MILLERSVILLE
LIBERTY
JOHNSONS XRDS

3/4/1955
4/24/1955
2/27/1956
4/3/1956
4/27/1970
6/19/1971
5/19/1973
5/17/1980
7/5/1980
3/20/1982
5/6/1984
5/6/1984
5/7/1984
11/10/1984
3/7/1995
5/18/1995
5/18/1995
1/24/1997
4/3/1998
5/5/1999
11/10/2002
5/11/2003
11/15/2005
4/7/2006
2/5/2008
2/6/2008
2/6/2008
4/10/2009

F2
F2
F3
F1
F4
F0
F1
F1
F2
F1
F2
F2
F1
F1
F0
F2
F1
F0
F2
F2
F2
F1
F0
F3
EF3
EF0
EF1
EF1

2023 Sumner County Hazard Mitigation Plan
xxxii

Page 157 of 171

APPENDIX C: HISTORICAL HAZARD DATA

BRANSFORD
ROCKLAND
MILLERSVILLE
CLEARVIEW
AVONDALE
CASTALIAN SPGS
ROGANA
PORTLAND
WHITE HOUSE
CLEARVIEW
SAUNDERSVILLE
GALLATIN MUNI
ARPT
CASTALIAN SPGS
OLD HICKORY
GRABALL
HUNTERS PT

7/30/2009
5/2/2010
1/30/2013
1/30/2013
1/30/2013
1/30/2013
1/30/2013
11/17/2013
5/4/2021
5/4/2021
5/4/2021

EF1
EF1
EF0
EF0
EF0
EF0
EF0
EF0
EF0
EF0
EF0

0
0
0
0
0
0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0
0

100000
450000
120000
19000
225000
65000
45000
200000
5000
5000
25000

0
15000
30000
15000
40000
25000
25000
0
0
0
0

5/4/2021
5/4/2021
12/11/2021
12/11/2021
12/11/2021

EF0
EF0
EF1
EF0
EF0

0
0
0
0
0

0
0
0
0
0

15000
10000
1500000
25000
10000

0
0
0
0
0

Deaths
0
0
0
0
0
0
0
0
0
0

Injuries
0
0
0
0
0
0
0
0
0
0

Thunderstorm
Location
ROCK BRIDGE
ROCK BRIDGE
CASTALIAN SPRINGS
ROCK BRIDGE
SAUNDERSVILLE
CASTALIAN SPRINGS
BETHPAGE
ROCK BRIDGE
WHITE HOUSE
OCANA

Date
5/11/2016
5/11/2016
7/6/2016
7/6/2016
7/6/2016
7/7/2016
5/11/2017
5/18/2017
5/19/2017
4/23/2018

Event Type
Heavy Rain
Heavy Rain
Heavy Rain
Heavy Rain
Heavy Rain
Heavy Rain
Heavy Rain
Heavy Rain
Heavy Rain
Heavy Rain

2023 Sumner County Hazard Mitigation Plan
xxxiii

Property
Damage
0
0
0
0
0
0
0
0
0
0

Crop
Damage
0
0
0
0
0
0
0
0
0
0

Page 158 of 171

APPENDIX C: HAZUS/FIRM PANELS

APPENDIX C
HAZUS/FIRM Panels

2023 Sumner County Hazard Mitigation Plan
xxxiv

Page 159 of 171

APPENDIX C: HAZUS/FIRM PANELS

2023 Sumner County Hazard Mitigation Plan
xxxv

Page 160 of 171

APPENDIX C: HAZUS/FIRM PANELS

2023 Sumner County Hazard Mitigation Plan
xxxvi

Page 161 of 171

APPENDIX C: HAZUS/FIRM PANELS

2023 Sumner County Hazard Mitigation Plan
xxxvii

Page 162 of 171

APPENDIX C: HAZUS/FIRM PANELS

2023 Sumner County Hazard Mitigation Plan
xxxviii

Page 163 of 171

APPENDIX C: HAZUS/FIRM PANELS

2023 Sumner County Hazard Mitigation Plan
xxxix

Page 164 of 171

APPENDIX C: HAZUS/FIRM PANELS

2023 Sumner County Hazard Mitigation Plan
xl

Page 165 of 171

APPENDIX C: HAZUS/FIRM PANELS

2023 Sumner County Hazard Mitigation Plan
xli

Page 166 of 171

APPENDIX D: REFERENCES

APPENDIX D
References

2023 Sumner County Hazard Mitigation Plan
xlii

Page 167 of 171

APPENDIX F: REFERENCES

https://www.midsouthtornadoes.msstate.edu/index.php?cw=ohx
https://www.ncdc.noaa.gov/stormevents/choosedates.jsp?statefips=47%2CTENNESSEE
https://www.census.gov/quickfacts/fact/table/US/PST045221
https://hazards.fema.gov/nri/map
https://droughtmonitor.unl.edu/DmData/TimeSeries.aspx
https://www.countyhealthrankings.org/explore-health-rankings/how-to-use-your-datasnapshot
https://www.fema.gov/data-visualization/disaster-declarations-states-and-counties
https://www.mtida.org/regions-listings/northern-middle-region/sumner-county

2023 Sumner County Hazard Mitigation Plan
xliii

Page 168 of 171

RESOLUTION

City of Portland, Tennessee
No. 23 - 54
A RESOLUTION TO RESCIND RESOLUTION 21-54 AND REPLACE WITH THIS
RESOLUTION TO AUTHORIZE CSR ENGINEERING AND KLOBER ENGINEERING
SERVICES FOR PROFESSIONAL ON-CALL SERVICES FOR ENGINEERING
REVIEW FOR PLANNING SUBMITTALS
WHEREAS, at certain times and on certain projects, the City requires outside
consultants for engineering review services for planning submittals; and
WHEREAS, two (2) engineering firms are necessary for plans review in the event that
one of the above identified firms submits plans for review; and
WHEREAS, CSR Engineering and Klober Engineering Service have both consented to
assist the City with plans review; and
WHEREAS, CSR Engineering will be the primary firm used for plan reviews, with
Klober Engineering as a secondary; and
WHEREAS, these services shall be billed on a time and material basis as listed in the
attachment; and
NOW, THEREFORE BE IT RESOLVED by the Mayor and Board of Aldermen of the
City of Portland to approve CSR Engineering and Klober Engineering Services for professional
On-Call Services for engineering review for Planning Submittal reviews; and
BE IT FURTHER RESOLVED that this Resolution shall become effective upon its
passage, the public welfare requiring it.
________________________________
Mike Callis, Mayor
Approved this ____ day of ________________.

_____________________________
Rachel Slusser, City Recorder

Page 169 of 171

CSR Engineering Inc.
1116 Main Street
Pleasant View, TN 37146
Phone: (615) 212-2389
Fax:
(615) 246-3815
www.csrengineers.com

2022 SCHEDULE OF FEES
RATE SCHEDULE FOR PROFESSIONAL SERVICES
Classification

2022
Billing Rate

Principal Engineer

$135.00

Civil Manager

$125.00

Senior Engineer / Manager

$115.00

Project Manager

$110.00

Project Engineer

$100.00

Senior Design Associate

$95.00

Engineer Intern

$80.00

Environmental Specialist

$80.00

Senior Technician / Inspector

$80.00

Design Associate

$75.00

Technician / Inspector

$60.00

Administrative

$48.00

REIMBURSABLE EXPENSE SCHEDULE
Expense

Cost

Vehicle Mileage

$0.50 / mile

Hi-Rail Vehicle (on or off rail)

$0.75 / mile

Per Diem (meals)

$50 / day

All other necessary direct expenses, including subcontractors, third party printing, lodging, airfare,
equipment rental, and overnight mail will be reimbursed at actual cost.

Page 170 of 171

KLOBER ENGINEERING STANDARD RATES
All civil engineering work on this project would be performed according to the following rate schedule:
• Managing Principal
$ 185 per hour
• Senior Project Manager
$ 160 per hour
• Project Manager
$ 135 per hour
• Project Engineer (PE)
$ 135 per hour
• Project Engineer Intern
$ 100 per hour
• Senior Civil Designer
$ 115 per hour
• Civil Designer
$ 100 per hour
• CAD Technician
$ 85 per hour
• Mileage
$ 0.67 per mile
• Reimbursable and Applicable expenses
Cost plus 15%
• Black and White Plotting
$ 3/sheet (24x36)
• Color Plotting
Varies ($6 to $18/sheet)

Page 171 of 171

Ordinance

City of Portland, Tennessee
No. 23 - 27
First Reading
AN ORDINANCE TO ENTER AN AGREEMENT WITH BRATTON & ASSOCIATES
TO PROVIDE PROFESSIONAL LAND ACQUISITION SERVICES FOR THE CITY OF
PORTLAND OAK HILL WATER SYSTEM IMPROVEMENTS AND 2021 MASON
TANK 12-INCH CONNECTOR FOR WATER SYSTEM IMPROVEMENTS
WHEREAS, the following proposal has been received for professional land acquisition
services for the 2021 Mason Tank 12-inch Connector and Oak Hill Water System Improvements;
and
WHEREAS, Bratton & Associates proposal is to provide professional land acquisition
services for the water main easements related to the 2021 Mason Tank 12-inch Connector and
Oak Hill Water System Improvements; and
WHEREAS, the scope of services will include establishing fair market value for utility
easements for eight (8) separate parcels related to the 2021 Mason Tank 12-inch Connector and
eighteen (18) separate parcels related to Oak Hill Water System Improvements; and
WHEREAS, the proposed fees are:
2021 Mason Tank 12-inch Connector
Oak Hill Water System Improvements
Total Fee:

$24,000.00
$54,000.00
$78,000.00

NOW, THEREFORE BE IT ORDAINED by the Mayor and the Board of Aldermen of
the City of Portland that an agreement shall hereby be approved with Bratton and Associates for
professional land acquisition services for water easements related to the 2021 Mason Tank 12inch Connector and Oak Hill Water System Improvements; and
BE IT FURTHER ORDAINED that this Ordinance shall become effective upon its
passage, the public welfare requiring it.

________________________________
Mike Callis, Mayor
Passed First Reading:
Passed Second Reading:

_____________________________
Attest: Rachel Slusser, City Recorder

Outcome

Not yet recorded. The record stays open — outcomes are added as minutes and vote results are published.

Provenance

Where this record came from. Every source is listed, permanently.

  • Agenda Watch · Aug 12, 2026

Permanent ID DKT-2026-000634 — this record is never deleted.

Record history

Every change to this record, logged as it happened.

  • Aug 12, 2026 Filed on the Docket
  • Aug 12, 2026 Full document archived — public record

← The full Docket · every meeting, vote, and action on the permanent record · also in the National Record Index.