⚡︎ Independent, reader-supported & ad-free · Follow the megawatts in all 50 states ⚡︎ Support Us
Watch · Our Take

Inside a $500B AI Data Center: You Won't Believe What It Takes to Run ChatGPT

Apex Engineering · 3 weeks ago

The short version: Apex Engineering's slick tour of Stargate's guts glosses over the gigawatts, gallons, and tax breaks Abilene actually signed up for.

Our Take

Apex Engineering's documentary walks through the impressive plumbing of Stargate — GPUs, liquid cooling loops, fiber, the works — and as a piece of engineering explainer content, it's well made. But a tour of the machine room isn't the same as an accounting of the bill. A $500B buildout backed by OpenAI, Oracle, and SoftBank doesn't materialize on "the plains outside Abilene" without a very specific set of local deals: substations, transmission upgrades, water contracts, and property tax abatements that get negotiated by a handful of officials on behalf of everyone who lives there.

That's the part these glossy walkthroughs routinely skip. Every gigawatt of power Stargate pulls off the Texas grid, and every gallon its cooling systems consume, is a gigawatt and gallon a neighboring community isn't getting at yesterday's price. Abilene didn't get a seat at the table when Sam Altman needed a site — it got a pitch deck, and the terms of that pitch deck matter a lot more to ratepayers than the specs of the GPUs inside.

Credit to Apex Engineering for making the hardware legible. Our job at GridWatch is the other half of the ledger: who approved this, what ratepayers and water users actually signed up for, and whether the promised jobs and tax revenue match reality. Check our facility map to see what's landing near you, and hit take-action if you want to push your local officials for the terms of the deal.

This is GridWatch the USA’s original commentary. The video above is the work of Apex Engineering, published on YouTube — full credit to the creator.