The published agenda for the September 28, 2026 meeting contains: "Data Center", "data center". The meeting has passed. The agenda stays here as a permanent public record.
Check the agenda document for the meeting time.
The agenda, word for word
Government public record — the full text of the published document, archived September 24, 2026. Gold highlighting of key terms is ours, not the original’s. Read the original document ↗
AGENDA
PLANNING COMMISSION MEETING
Chesterfield City Hall
690 Chesterfield Parkway West
Monday, September 28, 2026
7:00 PM
I.
ROLL CALL
II. PLEDGE OF ALLEGIANCE
III. SILENT PRAYER
IV. PUBLIC HEARINGS
V. APPROVAL OF MEETING SUMMARY
A. Approval of September 14, 2026 Planning Commission Meeting Summary
VI. PUBLIC COMMENT
VII. SITE PLANS, BUILDING ELEVATIONS, PLATS, AND SIGNS
VIII. UNFINISHED BUSINESS
A. P.Z. 04-2026 84 Lumber (17519 Chesterfield Airport Road): An ordinance
amendment to modify development criteria of an existing "PC" Planned
Commercial District for a 7.42-acre tract of land located south of
Interstate 64 and north of Chesterfield Airport Road.
The Planning Commission may vote on this item tonight.
IX. NEW BUSINESS
X. COMMITTEE REPORTS
A. Report from Nominating Committee
XI. ADJOURNMENT
Note: The Planning Commission will consider and act upon the matters listed above, and such
other matters as may be presented at the meeting and determined to be appropriate for discussion
Page 1 of 29
at that time.
PERSONS REQUIRING AN ACCOMMODATION TO ATTEND AND PARTICIPATE IN
THE PLANNING COMMISSION MEETING SHOULD CONTACT CITY CLERK VICKIE
MCGOWND AT (636) 537-6716 AT LEAST TWO (2) BUSINESS DAYS PRIOR TO THE
MEETING.
Page 2 of 29
V.A.
PLANNING COMMISSION
OF THE CITY OF CHESTERFIELD
MEETING SUMMARY
SEPTEMBER 14, 2026
The meeting was called to order at 7:00 p.m.
I.
ROLL CALL
PRESENT
ABSENT
Commissioner Gail Choate
Commissioner Khalid Chohan
Commissioner Allison Harris
Commissioner John Marino
Commissioner Debbie Midgley
Commissioner Robert Rodermund
Commissioner Jane Staniforth
Commissioner Steven Wuennenberg
Chair Guy Tilman
Councilmember Merrell Hansen, Acting Council Liaison
Mr. Nathan Bruns, representing City Attorney Christopher Graville
Mr. Justin Wyse, Director of Planning
Ms. Alyssa Ahner, Senior Planner
Mr. Isaak Simmers, Planner
Ms. Shilpi Bharti, Planner
Ms. Erica Blesener, Recording Secretary
Chair Tilman acknowledged the attendance of Councilmember Gary Budoor, Ward IV, and
Councilmember Merrell Hansen, Ward IV, acting Council Liaison on behalf of Councilmember
Lane Koch.
II.
PLEDGE OF ALLEGIANCE
III.
SILENT PRAYER
IV.
PUBLIC HEARINGS – None.
V.
APPROVAL OF MEETING SUMMARY
Commissioner Choate made a motion to approve the Meeting Summary of the August 10,
2026 Planning Commission Meeting. The motion was seconded by Commissioner Staniforth
and passed by a voice vote of 8 to 0. (Commissioner Harris abstained.)
Page 3 of 29
VI.
PUBLIC COMMENT
1.
VII.
George Stock, Stock and Associates, 257 Chesterfield Business Pkwy,
Chesterfield, MO, representing the Petitioner for the following projects:
Chesterfield Village Mall; Chesterfield Village Mall, Lot 3B; The Overlook
(14001 Olive Blvd.); and Spirit of St. Louis Air Park (18600 Edison Ave.,
Mistwood Aviation) – available for questions.
SITE PLANS, BUILDING ELEVATIONS, PLATS, AND SIGNS
A.
Chesterfield Village Mall: A Partial Amended Site Development Concept Plan for
a 16.82-acre tract of land zoned “PC&R” Planned Commercial and Residential
located east of Chesterfield Parkway West and west of Chesterfield Center.
Commissioner Choate, representing the Site Plan Committee, made a motion
recommending approval of the Partial Amended Site Development Concept Plan for
Chesterfield Village Mall. The motion was seconded by Commissioner Wuennenberg and
passed by a voice vote of 8 to 1. (Commissioner Rodermund voted nay.)
B.
Chesterfield Village Mall, Lot 3B: An Amended Site Development Section Plan,
Landscape Plan, and Lighting Plan for a 16.82-acre tract of land zoned “PC&R”
Planned Commercial and Residential located east of Chesterfield Parkway West
and west of Chesterfield Center.
Commissioner Choate, representing the Site Plan Committee, made a motion
recommending approval of the Amended Site Development Section Plan, Landscape
Plan, and Lighting Plan with inclusion of the requested street tree variance for
Chesterfield Village Mall, Lot 3B. The motion was seconded by Commissioner Wuennenberg
and passed by a voice vote of 8 to 1. (Commissioner Rodermund voted nay.)
C.
The Overlook (14001 Olive Blvd.): A Record Plat for a 29.4-acre tract of land
zoned “PUD” Planned Unit Development located on the north side of Olive Blvd.
Commissioner Choate, representing the Site Plan Committee, made a motion
recommending approval of the Record Plat for The Overlook (14001 Olive Blvd.) The
motion was seconded by Commissioner Wuennenberg.
DISCUSSION
Commissioner Harris expressed concerns regarding existing traffic conditions along Olive
Boulevard and the potential impact of the additional residential development. She noted that
traffic in the area is already heavy and that residents can experience difficulty turning onto Olive
Boulevard from nearby neighborhoods. She stated that she has received questions from
residents regarding the number of homes planned for the development and the effect the
development may have on traffic. She also expressed concern regarding the safety of motorists
entering and exiting the area.
The motion passed by a voice vote of 7 to 2. (Commissioners Harris and Rodermund voted
nay.)
Planning Commission Meeting Summary
September 14, 2026
2
Page 4 of 29
D.
Spirit of St. Louis Air Park (18600 Edison Ave, Mistwood Aviation): A Site
Development Section Plan, Lighting Plan, and Architectural Elevations for a
3.972-acre lease lot zoned “M-3” Planned Industrial located between two (2)
separate parcels that are part of the Spirit of St. Louis Air Park, located north
of Edison Ave and south of Old Olive Street Road.
Commissioner Choate, representing the Site Plan Committee, made a motion
recommending approval of the Site Development Section Plan, Lighting Plan,
Architectural Elevations, and Light Fixture Design Exemption for Spirit of St. Louis Air
Park (18600 Edison Ave, Mistwood Aviation). The motion was seconded by Commissioner
Midgley and passed by a voice vote of 9 to 0.
VIII.
UNFINISHED BUSINESS – None.
IX.
NEW BUSINESS
A.
Data Centers
DISCUSSION
Mr. Justin Wyse, Director of Planning, explained that several months ago, the City Council and
the Planning and Public Works Committee asked staff to begin evaluating data centers and to
work with the Planning Commission to develop appropriate regulations. He stated that the
proposed process outlined in the memorandum continues to meet the City’s procedural
requirements, including a public hearing, and includes additional steps intended to encourage
community participation and provide opportunities for interested parties to offer input before
regulations are developed. Mr. Wyse stated that the purpose of presenting the memorandum
was to make the Commission aware of the upcoming discussion and allow the Commissioners
time to consider the topic in preparation for a productive discussion. He also requested the
Commission’s general concurrence with the proposed framework, noting that the process could
be modified as necessary based on community input. No formal motion was requested.
Chair Tilman expressed support for proactively developing guidelines before the City receives a
data center proposal. He noted that Chesterfield has established planning processes, a
Comprehensive Plan, and development regulations that provide an opportunity to consider
appropriate standards and obtain community input in advance. He identified five primary areas
for consideration: siting and appropriate land uses; power generation and infrastructure; water
usage; noise and sound levels; and potential community benefits, including tax revenue,
employment, infrastructure improvements, or other benefits. He also suggested reviewing the
experiences of comparable communities where data centers have been operating to better
understand their impacts and community benefits.
Commissioner Choate suggested that air quality also be considered. She raised concerns
regarding the eventual decommissioning of data centers and questioned what legal or financial
protections, including bonding requirements, could be established to protect the City and
minimize potential negative impacts on residents.
Commissioner Staniforth raised concerns regarding potential environmental impacts on wildlife,
including impacts associated with noise and electrical infrastructure, and requested that these
issues be researched as part of the process.
Planning Commission Meeting Summary
September 14, 2026
3
Page 5 of 29
Commissioner Marino agreed that environmental impacts should be considered and also raised
the issue of feasibility, particularly regarding potential locations within the Chesterfield Valley.
He discussed water availability and questioned who would bear the cost of providing water and
other utilities. He also emphasized the importance of understanding how tax revenues
generated by a data center would be distributed and what direct financial benefit the City of
Chesterfield could receive.
Chair Tilman emphasized that community engagement should include not only residents, but
also businesses and others who live, work, or otherwise have an interest in Chesterfield,
particularly those located near areas that may be considered appropriate for data centers. He
further discussed potential community benefits, including whether infrastructure or powergeneration investments associated with a data center could provide benefits to nearby City
facilities, businesses, or residents.
Commissioner Rodermund discussed the economics of data centers, noting that they are
capital-intensive developments but generally do not employ large numbers of people. He
questioned the potential economic benefit to Chesterfield given the City’s tax structure and lack
of a municipal property tax. He emphasized that when comparing Chesterfield with other
communities that have data centers, differences in local tax structures should be considered to
determine whether those comparisons are applicable.
Commissioner Harris questioned how staff would identify reliable and accurate information
regarding data centers given the amount of conflicting information available. She asked whether
staff would review communities of a similar size and how staff would determine which
information should be relied upon. Mr. Wyse acknowledged the challenge of identifying and
presenting reliable information on a topic that has generated significant disagreement. He stated
that staff would work to develop fact-based information for the Commission and community
while recognizing that differing perspectives and levels of trust may remain.
Commissioner Wuennenberg asked whether future discussions and community engagement
would occur during regular Planning Commission meetings or through separate meetings
similar to those held during the Comprehensive Plan process. He stated that identifying the
format would help Commissioners encourage community participation. Mr. Wyse stated that his
initial recommendation was to begin the discussions during regularly scheduled Planning
Commission meetings and adjust the process if additional community engagement meetings
become necessary. He noted that utilizing regularly scheduled meetings could also make
participation easier as the City approaches the end of the year.
Commissioner Wuennenberg suggested reviewing large data center projects currently being
developed in nearby communities to understand the designs and standards being proposed. He
noted that data centers can vary significantly in scale and that the City should consider those
differences when developing its standards. Mr. Wyse noted that comparisons with other
communities may be challenging because Chesterfield has different land characteristics and
development conditions. He emphasized that the City has not received a data center proposal
and that staff has not been contacted by a data center developer. He stated that the discussion
is intended to be proactive rather than a response to a pending development proposal.
Commissioner Rodermund noted that land costs in Chesterfield may also affect the feasibility of
locating a data center within the City.
Commissioner Wuennenberg reiterated that data centers vary in scale and stated that the City
should establish appropriate guidance regardless of whether a proposal is currently anticipated.
Planning Commission Meeting Summary
September 14, 2026
4
Page 6 of 29
Commissioner Chohan suggested that the Commission review data center proposals that have
both been approved and denied in other jurisdictions. He also emphasized the importance of
considering emerging technologies, including technologies that may reduce water consumption.
He also raised concerns regarding potential impacts on emergency services, including training
and other costs to the City, and suggested considering ongoing reporting, inspection, and
monitoring requirements if a data center is ultimately approved.
Councilmember Hansen emphasized the importance of considering technological change and
the long-term future of data centers. She noted that technology continues to evolve rapidly and
questioned how changes over a longer period could affect the need for, design of, or continued
use of data center facilities.
Chair Tilman stated that technological change also raises the issue of obsolescence and
emphasized the importance of considering how a data center and its supporting infrastructure
would be managed if the facility were no longer needed.
Commissioner Marino stated that, while potential impacts and obsolescence should be carefully
evaluated, the City should also consider potential opportunities associated with future
technology. He expressed support for developing a complete understanding of both the
potential benefits and impacts before establishing regulations.
Commissioner Chohan reiterated that technological advancements may change current
assumptions regarding data center operations, including water usage and cooling systems, and
stated that the City’s review should account for emerging technologies.
Commissioner Wuennenberg stated that the Commission should clearly define the Planning
Commission’s role, goals, rights, and responsibilities in developing data center standards, as
distinguished from the responsibilities of the City’s elected officials.
B. Appointment of Nominating Committee
Commissioner Marino made a motion recommending approval to appoint the following
members to serve on the Nominating Committee:
•
•
•
Commissioner Marino, Chair
Commissioner Midgley
Commissioner Staniforth
The motion was seconded by Commissioner Staniforth and passed by a voice vote of 9 to 0.
The Committee will present a Nominating Slate of Officers at the September 28 Planning
Commission Meeting.
X.
COMMITTEE REPORTS – None.
XI.
ADJOURNMENT
The meeting adjourned at 7:44 p.m.
_______________________________________________
Gail Choate, Secretary
Planning Commission Meeting Summary
September 14, 2026
5
Page 7 of 29
VIII.A
690 Chesterfield Pkwy W ● Chesterfield MO 63017-0760
Phone: 636-537-4000 ● Fax 636-537-4798 ● www.chesterfield.mo.us
Planning Commission Staff Report
Meeting Date:
September 28, 2026
From:
Isaak Simmers, Planner
Location:
17519 Chesterfield Airport Road
Description:
P.Z. 04-2026 84 Lumber (17519 Chesterfield Airport Road): An ordinance
amendment to modify development criteria of an existing "PC" Planned
Commercial District for a 7.42-acre tract of land located south of Interstate
64 and north of Chesterfield Airport Road.
PROPOSAL SUMMARY
Stock & Associates Consulting Engineers, Inc., on behalf of Car Craft Auto Body, submitted a
request for an ordinance amendment to modify the development criteria for a tract of land
located along Chesterfield Airport Road, east of its intersection with Long Road, and south of
Interstate 64. The applicant is proposing three (3) changes to the development criteria as part of
this request: increase the total allowed building area from 60,000 square feet to 72,000 square
feet; reduce the required northernmost parking setback from 290 feet to 55 feet; and reduce the
northernmost building setback from 300 feet to 55 feet.
Figure 1: Subject Site
Page 8 of 29
Planning Commission
September 28, 2026
P.Z. 04-2026
84 Lumber (17519 Chesterfield Airport Road)
SITE HISTORY
▪ The site was zoned “NU” Non-Urban District prior to the incorporation of the City of
Chesterfield.
▪
In 1995, the site was rezoned from “NU” Non-Urban District to “C8” Planned Commercial
District for a retail lumber yard. A Site Development Plan and Record Plat were also
approved that year, designating the 7.42-acre parcel as Lot 2 of 84 Lumber Subdivision.
▪
In 2009, the applicant requested rezoning from “C8” Planned Commercial District to “PI”
Planned Industrial District. During the review, the request changed to “PC” Planned
Commercial District at the request of City Council.
▪
In 2020, the applicant requested an ordinance amendment to further modify the
development criteria for the "PC" Planned Commercial District. After multiple revisions,
City Council approved the amendment in 2022 as Ordinance No. 3181.
The approved amendment required that Arnage Road be extended to the west property
line, and that the private north-south access to Chesterfield-Airport Road be removed
once Arnage Road connects to Caprice Drive. There was significant discussion about this
during that time, but ultimately this requirement was never completed and would need
to be addressed, subject to Site Development Plan approval, as part of any future
expansion.
Similarly, the approved ordinance required that outdoor storage areas be depicted on the
Site Development Plan and screened through berming, landscaping, fencing, or other
methods approved by the City of Chesterfield. The Preliminary Development Plan
approved under Ordinance No. 3181 depicted improvements that were never completed
through Site Development Plan review; this, too, would need to be addressed as part of
any future expansion, subject to Site Development Plan approval.
PUBLIC HEARING
A Public Hearing was held on June 22, 2026. At that time, the Planning Commission and the public
had the opportunity to speak on the petition. Following the date of the Hearing, the City issued
a letter identifying seven (7) issues and concerns that were raised at the meeting. A copy of the
applicant's Public Hearing response letter has been included in the packet.
Concerns raised during the Public Hearing included future operations, including used and new
auto sales; the visual impact of the proposed expansion; the elevation difference relative to I-64;
the location of areas used for inventory, display, and service; justification for the requested
square footage relative to what was proposed on the Preliminary Development Plan; and plans
for future demolition or rehabilitation of the existing structures. Also discussed was the issue of
vehicles parking in unauthorized locations, such as the private north-south street. This violation
has since been abated by the property owner, and addressed in the proposed attachment to be
reviewed by the Commission.
2|Page
Page 9 of 29
Planning Commission
September 28, 2026
P.Z. 04-2026
84 Lumber (17519 Chesterfield Airport Road)
Figure 2: Private north-south street, pictures taken (left to right) 6/16/26, 7/20/26
ATTACHMENT A
A draft of Attachment A has been included in the packet for review. The revisions reflect the
applicant's request, as well as additional changes made to update the language of Attachment A
to meet current City standards. Minor revisions were made to the required structure setbacks to
ensure consistency and compliance with the location of the existing structures on site.
Requested changes to Ord. 3181 (Attachment A) by the petitioner:
1. Amend Section I.B.a. to increase the total allowed square footage of buildings from
60,000 square feet to 72,000 square feet.
2. Amend Section I.C.1.a. to modify the structure setback from 300 feet to 55 feet.
3. Amend Section I.C.2.a. to modify the parking setback from 290 feet to 55 feet.
PRELIMINARY DEVELOPMENT PLAN
Following the Public Hearing, the applicant revised the Preliminary Development Plan to address
comments received. Existing Buildings #1 through #4 have been labeled and are now depicted as
"To Be Improved and Expanded." The plan reflects proposed access aligned to mirror 34 Arnage
Road, along with an extension of Arnage Road to the private north-south street. A dedicated
employee parking area has been provided, and sidewalks have been added along Arnage Road
and the north-south private road to allow pedestrian access to the northern structure, identified
as Proposed Building A.
The revised Preliminary Development Plan also depicts removal of the existing chain link fence
along Arnage and between the property to the east, replacing it with a gated, six (6)-foot-tall,
sight-proof vinyl fence enclosure to screen outdoor storage of wrecked or immobilized vehicles.
Parking has also been allocated behind Proposed Building A, to the north, for vehicles requiring
minor service and repair for the automobile dealership. Customer parking is labeled directly east
and west of Proposed Building A, while new/pre-owned inventory and visitor parking are labeled
along the same structure's east and west sides. Overall, the revised plan addresses Public Hearing
comments through improved circulation, screening, and site organization.
3|Page
Page 10 of 29
Planning Commission
September 28, 2026
P.Z. 04-2026
84 Lumber (17519 Chesterfield Airport Road)
During the Planning Commission meeting, it was also noted that the Preliminary Development
Plan presented at the Public Hearing reflected approximately 61,300 square feet of total building
area, while the request seeks a maximum allowed building area of 72,000 square feet. The
revised Preliminary Development Plan now depicts approximately 68,380 square feet, bringing
the proposal closer to the requested maximum.
Figure 3: PDP reviewed during Public Hearing (left), Revised PDP (right), NORTH
Figure 4: PDP reviewed during Public Hearing (left), Revised PDP (right), SOUTH
DEPARTMENT INPUT
Tree Stand Delineation (TSD): A Tree Stand Delineation was provided by Loomis Associates
Landscape Architects and Planners. The plan depicts 138,098 square feet (3.17 acres) of total
existing tree canopy. No Monarch trees were identified on the plan. Most of the existing tree
canopy is located on the northern portion of the site, where the parking area and Proposed
Building A are depicted. The applicant has indicated in their responses to the City that meeting
the minimum 30% Tree Preservation requirement would be difficult, and this will most likely be
addressed through the Site Development Plan review process by submitting a Landscape
Mitigation Plan.
4|Page
Page 11 of 29
Planning Commission
September 28, 2026
P.Z. 04-2026
84 Lumber (17519 Chesterfield Airport Road)
Landscape Buffer: The Chesterfield Valley Master Storm Water Plan indicates a flat bottom ditch
along the north property line of this site. The property owner is required to maintain the cross
section and flowline of this channel across the portion that runs through their property. Due to
this channel, the applicant is not permitted to install any landscape plantings below the 100 year
base flood elevation level. To accommodate this restriction, the applicant has requested a fiftyfive (55) foot landscape buffer in lieu of the required thirty (30) foot landscape buffer to allow
for the proposed landscaping to be installed in a Landscape Buffer along the Interstate 64
corridor. A Landscape Plan will be required for review during the Site Development Plan review.
Cross Access with Lou Fusz Ford: There is an existing unauthorized cross-access connection
between the subject site and the Lou Fusz Ford subdivision to the west. An active violation is on
file for this connection, and the City has been in contact with the property manager for Lou Fusz
to bring the site into compliance. Revisions to the Preliminary Development Plan include removal
of the unauthorized connection and the addition of a future cross-access easement, which can
be added and recorded at a later time. Establishment of the future cross-access easement will
require coordination between the subject site and the property owner to the west, and would
be reviewed and approved by the City on the Site Development Plan.
MOTION
City Staff has completed review of this petition, and all agency comments have been received.
Staff requests action on P.Z. 04-2026 84 Lumber (17519 Chesterfield Airport Road). The following
options have been provided to the Commission for consideration relative to this petition:
1. “I move to make a recommendation to approve (or deny) P.Z. 04-2026 84 Lumber (17519
Chesterfield Airport Road), as presented”
2. “I move to make a recommendation to approve P.Z. 04-2026 84 Lumber (17519
Chesterfield Airport Road) with the following conditions…”
Attachments:
1. Issues Response Letter
2. Draft Attachment A
3. Revised Preliminary Development Plan
4. Tree Stand Delineation
5|Page
Page 12 of 29
P.Z. 04 – 2026 84 Lumber (17519 Chesterfield Airport Rd)
Public Hearing, June 22, 2026
Planning Commission, September 28, 2026
Page 1 of 10
ATTACHMENT A
All provisions of the City of Chesterfield City Code shall apply to this development
except as specifically modified herein.
I. SPECIFIC CRITERIA
A. PERMITTED USES
1. The uses allowed in this “PC” Planned Commercial District shall be:
a. Automobile Dealership
b. Automotive Retail Supply
c. Car Wash
d. Car Wash, Self-Service
e. Motorcycle, RV, and Similar Motor Vehicles Dealership
f. Office, General
g. Office, Medical
h. Oil Change Facility
i.
Professional and Technical Service Facility
j.
Recreational Vehicle Dealership
k. Retail Sales Establishment, Community
l.
Retail Sales Establishment, Neighborhood
m. Retail Sales Establishment, Regional
n. Vehicle Repair and Service Facility
2. Hours of Operation
a. Uses “b”, “k”, “l”, and “m” listed above are considered retail uses and retail
sales, with respect to those uses, will be subject to hours of operation from
6:00 AM to 11:00 PM.
b. Hours of operation for retail uses and retail sales may be expanded for
Thanksgiving Day and the day after Thanksgiving Day upon review and
approval of a Special Activity Permit, signed by the property owner and
Page 13 of 29
P.Z. 04 – 2026 84 Lumber (17519 Chesterfield Airport Rd)
Public Hearing, June 22, 2026
Planning Commission, September 28, 2026
Page 2 of 10
submitted to the City of Chesterfield at least seven (7) business days in
advance of said holiday.
3. Telecommunication siting permits may be issued for wireless
telecommunications facilities per the requirements of the City Code.
B. FLOOR AREA,
REQUIREMENTS
HEIGHT,
BUILDING
AND
PARKING
STRUCTURE
1. Floor Area
a. Combined total building floor area shall not exceed 72,000 square feet.
2. Height
a. The maximum height of the building, exclusive of roof screening, shall not
exceed thirty (30) feet, or two (2) stories, whichever is less.
3. Building Requirements
a. A minimum of thirty-five (35%) openspace is required for this development.
4. Outdoor Storage
a. Outdoor storage areas shall be depicted on the Site Development Plan with
screening to include a berm, landscaping, or other methods as approved by
the City of Chesterfield. Section profiles may be required to verify the
adequacy of proposed screening.
C. SETBACKS
1. Structure Setbacks
No building or structure, other than a freestanding project identification sign,
light standards, or flag poles, will be located within the following setbacks:
a. Fifty-five (55) feet from the right-of-way of Interstate 64 on the northern
boundary of the “PC” Planned Commercial District.
b. Sixty-five (65) feet from the right-of-way of Arnage Road along the southern
boundary of the “PC” Planned Commercial District.
c. Thirty (30) feet from the right-of-way of Chesterfield Airport Road along the
southern boundary of the “PC” Planned Commercial District.
d. Fifty-eight (58) feet from the eastern boundary of the “PC” Planned
Commercial District.
e. Fifty-two (52) feet from the western boundary of the “PC” Planned
Commercial District.
Page 14 of 29
P.Z. 04 – 2026 84 Lumber (17519 Chesterfield Airport Rd)
Public Hearing, June 22, 2026
Planning Commission, September 28, 2026
Page 3 of 10
2. Parking Setbacks
No parking stall, loading space, internal driveway, or roadway, except points of
ingress or egress, will be located within the following setbacks:
a) Fifty-five (55) feet from the right-of-way of Interstate 64 on the northern
boundary of the “PC” Planned Commercial District.
b) Thirty (30) feet from the right-of-way of Arnage Road along the southern
boundary of the “PC” Planned Commercial District.
c) Thirty (30) feet from the right-of-way of Chesterfield Airport Road along the
southern boundary of the “PC” Planned Commercial District.
d) Thirty (30) feet from the eastern boundary of the “PC” Planned Commercial
District.
e) Ten (10) feet from the western boundary of the “PC” Planned Commercial
District.
D. PARKING AND LOADING REQUIREMENTS
1. Parking and loading spaces for this development will be as required in the City
of Chesterfield Code.
2. Parking lots shall not be used as streets.
3. No construction related parking shall be permitted within the right-of-way or on
any existing roadways. All construction related parking shall be confined to the
development.
4. No parking is permitted along the north-south private road.
E. LANDSCAPE AND TREE REQUIREMENTS
1. The development shall adhere to the Landscape and Tree Preservation
Requirements of the City of Chesterfield Code.
2. This development shall require a fifty-five (55) foot Landscape Buffer along
Interstate 64.
F. SIGN REQUIREMENTS
1. Signs shall be permitted in accordance with the regulations of the City of
Chesterfield Code, or a Sign Package may be submitted for the planned district.
Sign Packages shall adhere to the City Code and are reviewed and approved
by the City of Chesterfield Planning Commission.
Page 15 of 29
P.Z. 04 – 2026 84 Lumber (17519 Chesterfield Airport Rd)
Public Hearing, June 22, 2026
Planning Commission, September 28, 2026
Page 4 of 10
2. Ornamental Entrance Monument construction, if proposed, shall be reviewed
by the City of Chesterfield and/or the St. Louis County Department of
Transportation (or MoDOT) for sight distance considerations prior to installation
or construction.
G. LIGHT REQUIREMENTS
1. Provide a lighting plan and cut sheet in accordance with the City of Chesterfield
Code.
H. ARCHITECTURAL
1. The development shall adhere to the Architectural Review Standards of the
City of Chesterfield Code.
2. All exterior trash areas will be enclosed with a minimum six (6) foot high sightproof enclosure complemented by adequate landscaping. The location,
material, and elevation of any trash enclosures will be as approved by the City
of Chesterfield on the Site Development Plan.
I. ACCESS/ACCESS MANAGEMENT
1. Access to the development shall substantially conform to the Preliminary Site
Plan, which shall be provided and as directed by the City of Chesterfield, the
Missouri Department of Transportation, and St. Louis County Department of
Transportation, as applicable.
2. The private access road to Chesterfield-Airport Road shall be removed at such
time that Arnage Road connects to Caprice Drive.
3. Cross access with associated easements shall be provided as shown on the
Preliminary Plan. Physical connectivity shall not be made prior to a
corresponding Amended Site Development Plan approval showing the cross
access.
4. Provide a public access and utility easement over the Arnage Road extension
across this property to the west property line.
5. The proposed north-south road must be constructed to City roadway standards.
J. PUBLIC/PRIVATE
CIRCULATION
ROAD
IMPROVEMENTS,
INCLUDING
PEDESTRIAN
1. Stub street signage shall be posted within 30 days of the street pavement being
placed.
2. Provide a five (5) foot-wide sidewalk, conforming to ADA standards, along all
the Arnage Road frontage, Chesterfield-Airport Road Frontage, and adjacent
to the north-south private road between Arnage Road and Chesterfield-Airport
Page 16 of 29
P.Z. 04 – 2026 84 Lumber (17519 Chesterfield Airport Rd)
Public Hearing, June 22, 2026
Planning Commission, September 28, 2026
Page 5 of 10
Road. The sidewalk shall provide for future connectivity to adjacent
developments and/or roadway projects. The sidewalk may be located within
right-of-way controlled by another agency, if permitted by that agency, or on
private property within a six (6) foot-wide private sidewalk easement, dedicated
for public use.
3. Additional right-of-way and road improvements shall be provided, as required
by the Missouri Department of Transportation, St. Louis County Department of
Transportation, and/or the City of Chesterfield.
4. Any request to install a gate at the entrance to this development must be
approved by the City of Chesterfield and St. Louis County and be installed in
accordance with City Code requirements. No gate installation will be permitted
on public right-of-way.
5. If a gate is installed on a street in this development, the streets within the
development, or that portion of the development that is gated, shall be private
and remain private forever.
K. TRAFFIC STUDY
1. Provide a traffic study as directed by the City of Chesterfield and/or St. Louis
County. The scope of the study shall include internal and external circulation
and may be limited to site-specific impacts, such as the need for additional
lanes, entrance configuration, geometrics, sight distance, traffic signal
modifications, or other improvements required, as long as the density of the
proposed development falls within the parameters of the City’s traffic model.
Should the density be other than the density assumed in the model, regional
issues shall be addressed as directed by the City of Chesterfield.
2. Provide a sight distance evaluation report, as required by the City of
Chesterfield, for the proposed entrance onto Chesterfield Airport Road. If
adequate sight distance cannot be provided at the access location, acquisition
of right-of-way, reconstruction of pavement, including correction to the vertical
alignment, and/or other off-site improvements shall be required, as directed by
the City of Chesterfield and/or St. Louis County.
L. POWER OF REVIEW
The development shall adhere to the Power of Review Requirements of the City
of Chesterfield Code.
M. STORM WATER
1. Storm water shall be as approved by the City of Chesterfield, the Metropolitan
St. Louis Sewer District, and the Monarch Chesterfield Levee District, as
appropriate.
Page 17 of 29
P.Z. 04 – 2026 84 Lumber (17519 Chesterfield Airport Rd)
Public Hearing, June 22, 2026
Planning Commission, September 28, 2026
Page 6 of 10
2. A wetland mitigation reimbursement payment is required prior to Improvement
Plan approval. The City of Chesterfield previously delineated and mitigated for
5.26 acres of wetland impacts on this property. The total mitigation amount paid
by the City for this property was $131,507. A partial reimbursement payment of
$50,624 was made to the City in 1996. Therefore, the remaining balance of
$80,883 is required to be paid to the City prior to Improvement Plan approval.
3. The Chesterfield Valley Master Storm Water Plan indicates a ten (10) foot flatbottom ditch along the north property line of this site and that drainage from this
site is to be directed to the north to Pump Station #4 at Long Road and the
North Outer Forty Road. The property owner is required to maintain the cross
section and flowline of this channel across the portion that runs through this
property.
N. SANITARY SEWER
1. Sanitary sewers shall be as approved by the City of Chesterfield and the
Metropolitan St. Louis Sewer District.
2. The site is currently served via an existing private pump station and force main.
These shall remain private. Sanitary improvements, including pump station
upgrades may be required based on the flow rates provided, as directed by
Metropolitan St. Louis Sewer District.
O. GEOTECHNICAL REPORT
1. Prior to Site Development Plan approval, the developer shall provide a
geotechnical report, prepared by a registered professional engineer licensed to
practice in the State of Missouri, as directed by the City of Chesterfield. The
report shall verify the suitability of grading and proposed improvements with
soil and geologic conditions and address the existence of any potential
sinkholes, ponds, dams, septic fields, etc., and recommendations for treatment.
A statement of compliance, signed and sealed by the geotechnical engineer
preparing the report, shall be included on all Site Development Plans and
Improvement Plans.
R. MISCELLANEOUS
1. All utilities will be installed underground.
2. An opportunity for recycling shall be provided.
3. Road improvements and right-of-way dedication shall be completed prior to the
issuance of an occupancy permit. If development phasing is anticipated, the
developer shall complete road improvements, right-of-way dedication, and
access requirements for each phase of development as directed by the City of
Chesterfield and St. Louis County Department of Transportation. Delays due
Page 18 of 29
P.Z. 04 – 2026 84 Lumber (17519 Chesterfield Airport Rd)
Public Hearing, June 22, 2026
Planning Commission, September 28, 2026
Page 7 of 10
to utility relocation and adjustments will not constitute a cause to allow
occupancy prior to completion of road improvements.
4. All required easements must be recorded prior to Improvement Plan approval.
II. GENERAL CRITERIA
A. SITE DEVELOPMENT PLAN SUBMITTAL REQUIREMENTS
The Site Development Plan shall include, but not be limited to, the following:
1.
Location map, north arrow, and plan scale. The scale shall be no greater than
one (1) inch equals one hundred (100) feet.
2.
Outboundary plat and legal description of property.
3.
Density calculations.
4.
Parking calculations. Including calculations for all off street parking spaces,
required and proposed, and the number, size and location for handicap
designed.
5.
Provide openspace percentage for overall development, including separate
percentage for each lot on the plan.
6.
A note indicating all utilities will be installed underground.
7.
A note indicating signage approval is a separate process.
8.
Depict the location of all buildings, size, including height and distance from
adjacent property lines, and proposed use.
9.
Specific structure and parking setbacks along all roadways and property
lines.
10. Indicate location of all existing and proposed freestanding monument signs.
11. Zoning district lines, subdivision name, lot number, dimensions, and area,
and zoning of adjacent parcels where different than the site.
12. Floodplain boundaries.
13. Depict existing and proposed improvements within 150 feet of the site as
directed. Improvements include, but are not limited to, roadways, driveways
and walkways adjacent to and across the street from the site, significant
natural features, such as wooded areas and rock formations, and other karst
features that are to remain or be removed.
Page 19 of 29
P.Z. 04 – 2026 84 Lumber (17519 Chesterfield Airport Rd)
Public Hearing, June 22, 2026
Planning Commission, September 28, 2026
Page 8 of 10
14. Depict all existing and proposed easements and rights-of-way within 150 feet
of the site and all existing or proposed off-site easements and rights-of-way
required for proposed improvements.
15. Indicate the location of the proposed storm sewers, detention basins, sanitary
sewers and connection(s) to the existing systems.
16. Depict existing and proposed contours at intervals of not more than one (1)
foot, and extending 150 feet beyond the limits of the site as directed.
17. Address trees and landscaping in accordance with the City of Chesterfield
Code.
18. Comply with all preliminary plat requirements of the City of Chesterfield
Subdivision Regulations per the City of Chesterfield Code.
19. Signed and sealed in conformance with the State of Missouri Department of
Economic Development, Division of Professional Registration, Missouri
Board for Architects, Professional Engineers and Land Surveyors
requirements.
20. Provide comments/approvals from the appropriate Fire District, Monarch
Levee District, Spirit of St. Louis Airport, Metropolitan St. Louis Sewer District
(MSD) and the Missouri Department of Transportation.
21. Compliance with Sky Exposure Plane.
22. Compliance with the current Metropolitan Sewer District Site Guidance as
adopted by the City of Chesterfield.
III. TRUST FUND CONTRIBUTION
The developer shall be required to contribute to the applicable Traffic Generation
Assessment (TGA) area as established by City of Chesterfield Ordinance 3207 or
amendments thereafter.
The amount of all required contributions for storm water and primary water line
improvements, if not submitted by January 1, 2026, shall be adjusted on that date
and on the first day of January in each succeeding year thereafter in accordance
with the construction cost index as determined by the St. Louis County
Department of Transportation.
A. ROADS
The roadway improvement contribution is based on land and building use. The
roadway contributions are necessary to help defray the cost of engineering, rightof-way acquisition, and major roadway construction. This contribution shall be
Page 20 of 29
P.Z. 04 – 2026 84 Lumber (17519 Chesterfield Airport Rd)
Public Hearing, June 22, 2026
Planning Commission, September 28, 2026
Page 9 of 10
established by the City of Chesterfield Trust Fund Rate Schedule effective at the
time of development.
The Traffic Generation Assessment (TGA) contribution shall be made prior to the
issuance of a Municipal Zoning Approval (MZA) by the City of Chesterfield.
Allowable credits for required improvements will be awarded as directed by the
City of Chesterfield. Sidewalk construction and utility relocation, among other
items, are not considered allowable credits.
As this development is located within a trust fund area, any portion of the traffic
generation assessment contribution which remains following completion of road
improvements required by the development will be retained in the appropriate
trust fund.
B. WATER MAIN
The primary water line contribution is based on gross acreage of the
development land area. The contribution shall be a sum of $1,148.96 per acre
for the total area as approved on the Site Development Plan to be used solely
to help defray the cost of constructing the primary water line serving the
Chesterfield Valley Area.
The primary water line contribution shall be deposited with the St. Louis
County Department of Transportation. The deposit shall be made before St.
Louis County approval of the Site Development Plan or Concept Plan unless
otherwise directed by the St. Louis County Department of Transportation.
Funds shall be payable to the Treasurer, St. Louis County/City of Chesterfield.
C. STORM WATER
The storm water contribution is based on gross acreage of the development
land area. These funds are necessary to defray the cost of engineering and
construction improvements for the collection and disposal of storm water from
Chesterfield Valley in accordance with the Master Plan on file with and jointly
approved by St. Louis County and the Metropolitan St. Louis Sewer District.
The amount of the storm water contribution will be computed based on District.
The amount of the storm water contribution will be computed based on
$3,645.37 per acre for the total area as approved on the Site Development
Plan.
D. SANITARY SEWER
The sanitary sewer contribution is collected as the Caulk Creek impact fee.
Page 21 of 29
P.Z. 04 – 2026 84 Lumber (17519 Chesterfield Airport Rd)
Public Hearing, June 22, 2026
Planning Commission, September 28, 2026
Page 10 of 10
The sanitary sewer contribution within the Chesterfield Valley area shall be
deposited with the Metropolitan St. Louis Sewer District as required by the
District.
IV. RECORDING
Within sixty (60) days of approval of any development plan by the City of Chesterfield,
the approved Plan will be recorded with the St. Louis County Recorder of Deeds.
Failure to do so will result in the expiration of approval of said plan and require reapproval of a plan by the Planning Commission.
V. ENFORCEMENT
A. The City of Chesterfield, Missouri will enforce the conditions of this ordinance in
accordance with the Plan approved by the City of Chesterfield and the terms of
this Attachment A.
B. Failure to comply with any or all the conditions of this ordinance will be adequate
cause for revocation of approvals/permits by reviewing Departments and
Commissions.
C. Non-compliance with the specific requirements and conditions set forth in this
Ordinance and its attached conditions or other Ordinances of the City of
Chesterfield shall constitute an ordinance violation, subject, but not limited to, the
penalty provisions as set forth in the City of Chesterfield Code.
D. Waiver of Notice of Violation per the City of Chesterfield Code.
E. This document shall be read as a whole and any inconsistency shall be integrated
to carry out the overall intent of this Attachment A.
Page 22 of 29
257 Chesterfield Business Parkway, St. Louis, MO 63005
636.530.9100 – Main | 636.530.9130 – Fax
www.stockassoc.com
July 9, 2026
City of Chesterfield
690 Chesterfield Pkwy W.
Chesterfield MO 63017-0760
Attention:
RE:
Mr. Issak Simmers -Planner ([email protected])
P.Z. 04-2026 84 Lumber (17519 Chesterfield Airport Road) (Stock Project No. 219-6513)
Response letter to comments issued on 6/25/26.
Dear Issak,
We are pleased to offer the following written responses to your comments contained within your
departmental letter, dated 6/25/2026.
1. The applicant has indicated that future operations will include auto sales. Please provide additional
details regarding the permitted uses proposed for the site, as well as how pedestrian and vehicular
traffic will be accommodated and navigated in the future.
Response: Ordinance #3181 allows automobile dealerships as a permitted use. Proposed building is
intended to provide the potential location of an automobile dealership. Similar to the
“JLR” Dealership to the East governed by Ordinance # 3181, new vehicles, pre-owned
vehicles would be placed to the North, West and East sides of the building. Employee
parking and vehicles for service would be to the South. Notes and illustrations have been
added to the Preliminary Plan to demonstrate pedestrian and vehicular circulation.
2. Address the Planning Commission's concern regarding the visual impact of the proposed expansion by
demonstrating how outdoor storage areas and vehicle inventory will be clearly organized, buffered,
and screened. Each use area should have well-defined, identifiable boundaries, and the site layout
should prevent inventory and vehicles awaiting service from encroaching into parking areas and access
drives.
Response: Similar to Response #1, new and preowned vehicles will be displayed along I-64 side of
new building. (See Preliminary Plan)
3. Address the elevation difference between I-64 and the proposed expansion, and explain how the site
will be designed to minimize the visual impact of vehicles awaiting service along the interstate.
Response: The future development of the site will involve “raising” and setting finished floor to
approximate elevation of 461.00; similar to Jaquar / Land Rover. The edge of shoulder of
I-64 is approximate elevation 461.30
4. Provide additional details regarding the location and layout of proposed vehicle display areas.
Response: Information added to Preliminary Plan.
Page 1
Page 23 of 29
257 Chesterfield Business Parkway, St. Louis, MO 63005
636.530.9100 – Main | 636.530.9130 – Fax
www.stockassoc.com
5. The Planning Commission raised concerns about vehicles parking in unauthorized locations. Any
vehicles parked along the private access road must be removed prior to being scheduled for the next
Planning Commission meeting to bring the site into compliance with City Code.
Response: As discussed at meeting, referenced vehicles do not belong to car craft. City staff was
going to follow- up with code enforcement.
6. The Planning Commission noted that the proposed Preliminary Development Plan reflects
approximately 61,300 square feet of total building area, while the request seeks a maximum allowed
building area of 72,000 square feet. Please provide a justification for the approximately 10,700 square
foot difference.
Response: The building expansion and the new building have not been designed as a result the
additional gross floor area request provides flexibility. In addition, 72,000 GSF is well
below the F.A.R of 0.55
7. The Planning Commission inquired about the future demolition or rehabilitation of the existing
structures on site. Please provide additional detail regarding the future development plans for the
existing buildings.
Response: Car Craft does intend to expand the existing buildings # 1, 2, 3 & 4 to consolidate and
expand its automotive repair business.
General
1. Revise the setback requirements under General Notes on sheet No. 1 to be consistent with the rezoning
request.
Response: Revised accordingly.
Preliminary Development Plan
2. Depict all parking setbacks on the Preliminary Development Plan.
Response: Added.
3. Depict the required 30’ landscape buffer along all major and arterial roadways.
Response: Added.
4. Show a 5’ wide sidewalk along the Arnage Road frontage to the west property line.
Response: Added.
July 9, 2026
Page 2
Page 24 of 29
257 Chesterfield Business Parkway, St. Louis, MO 63005
636.530.9100 – Main | 636.530.9130 – Fax
www.stockassoc.com
5. Show a 5’ wide sidewalk from the property south to Chesterfield Airport Road adjacent to the Private
Road.
Response: Added.
6. Existing building 1 does not meet the minimum required setback of 55 feet from the western boundary.
Revise the plan or the rezoning request accordingly.
Response: Revised to 52 feet so the existing structure complies.
7. Existing building 3 does not meet the minimum required setback of 70 feet from Arnage road along
the southern boundary. Revise the plan or the rezoning request accordingly.
Response: Revised to 65 feet so the existing structure complies.
8. Existing building 3 does not meet the minimum required setback of 60 feet from the eastern boundary.
Revise the plan or the rezoning request accordingly.
Response: Revised to 58 feet so the existing structure complies.
9. There appears to be an unapproved connection between the subject site and the neighboring property
to the west that has also been depicted on the Preliminary Development Plan. This access point must
either be removed, or Lou Fusz Ford Subdivision will be required to revise their Site Development
Plan to accommodate the cross-access.
Response: Labeled as future connection with cross access easement dedication. We will
coordinate with Lou Fusz Ford.
10. Depict the location of any proposed gates, fencing, or screening on the preliminary development plan.
Be advised, gated access within the City requires a minimum stacking distance of sixty (60) feet, and a
turnaround for rejected vehicles, designed to accommodate a single unit truck.
Response: Added to Preliminary Plan.
11. Site layout does not meet the minimum driveway throat length (45’) as specified in City Code Section
405.04.100(I)(8). Revise as necessary.
Response: Revised accordingly.
12. It appears the proposed expansion will remove a significant amount of existing tree canopy and open
space. Confirm that the future redevelopment of the site can meet the required minimum of 30% tree
preservation and a minimum of 35 % open space.
Response: The current PDP is providing approximately 36% open space verses the required 35%
open space. However, due to required “grading” tree preservation is very difficult on
Chesterfield Valley projects. At such time we move forward with a Site Development Plan
this issue will be addressed and tree mitigation may be required.
July 9, 2026
Page 3
Page 25 of 29
257 Chesterfield Business Parkway, St. Louis, MO 63005
636.530.9100 – Main | 636.530.9130 – Fax
www.stockassoc.com
Floor Area
▪ Combined total building floor area shall not exceed 72,000 square feet.
Response: Understood.
Structure Setbacks
▪ Fifty-five (55) feet from the right-of-way of Interstate 64 on the northern boundary of the “PC” Planned
Commercial District.
Response: Understood.
Parking Setbacks
▪ Fifty-five (55) feet from the
Response: Understood.
As always, we appreciate your continued assistance and support for this project. Should you have any
questions or comments, please feel free to call.
Sincerely,
George M. Stock, P.E.
President
CC:
Mr. Justin Wyse, Director of Planning ([email protected])
Mr. Steve Merk, City Engineer ([email protected])
Mr. Ty Gramling, PE – Associate ([email protected])
Mr. Garry Goddard Jr. ([email protected])
July 9, 2026
Page 4
Page 26 of 29
TE 40
257 Chesterfield Business Parkway
St. Louis, MO 63005 PH. (636)
530-9100 FAX (636) 530-9130
e-mail: [email protected]
Web: www.stockassoc.com
INTERSTA
PRELIMINARY PLAN FOR
CAR CRAFT
B
B
17519 CHESTERFIELD AIRPORT ROAD
CHESTERFIELD, MISSOURI 63005
A
CAR CRAFT
A
A PRELIMINARY PLAN FOR ZONING TEXT AMENDMENT:
PREPARED BY:
C
ARNAGE (56'w) ROAD
GENERAL NOTES:
DRAWING FILE: O:\DRAW6500\2196513\Civil\Preliminary\6513-Base.dwg LAYOUT: 1-Pre Plan PLOTTED: Sep 11, 2026 - 4:35pm PLOTTED BY: ty.gramling
1) Subject property is Zoned PC Planned Commercial (Ord.# 3181)
Note: The above zoning provided by the City of Chesterfield and to verify the
client should obtain a zoning endorsement from their title company.
JAGUAR LAND ROVER WAY (63'w)
C
Height shall not exceed 30 feet, or two (2) stories, whichever is less.
1
05/12/26 SUBMITTAL #1
2 07/31/26 ADDRESSED CITY COMMENTS
Proposed setback requirements:
3 08/18/26 ADDRESSED CITY COMMENTS
a.) 55 feet from Interstate 64 on the North Property line.
b.) 30 feet from the right of way of Chesterfield Airport Road along the
Southern Property line.
4 08/31/26 ADDRESSED CITY COMMENTS
5 09/11/26 ADDRESSED CITY COMMENTS
c.) 65 feet from Arnage Road on the South Property line.
d.) 58 feet from the eastern boundary of this district.
e.) 52 feet from the western property line.
f.) Fifty-five (55) from the northern boundary of this district that fronts
on I-64/ US 40.
2) Subject property lies within Flood Zone X Shaded (Areas of reduced risk
due to levee) and Zone AE (Base Flood Elevation=454) according to the
National Flood Insurance Rate Map Number 291C89C0161l with a preliminary
issue date of 10/17/2024.
3) Utilities shown hereon are shown from record and/or survey information.
Any location, size and type information should be considered as approximate
only. It is the Contractors responsibility to call Dig-Rite to verify utility
locations.
4) Basis of Bearings Missouri State Plane Grid North.
PROPERTY DESCRIPTION
Source: Esri, Vantor, GeoEye, Earthstar Geographics, CNES/Airbus DS, USDA, USGS, AeroGRID, IGN, and the GIS User Community Powered by Esri
CHESTERFIELD
AIRPORT RD.
Lot 1 of 84 Lumber Subdivision, a Subdivision in the County of Saint Louis,
Missouri, according to the plat thereof recorded in Plat Book 339, Page 80 of
the Saint Louis County Records.
PRELIMINARY PLAN
FOR ZONING TEXT
AMENDMENT
1
Page 27 of 29
DRAWING FILE: C:\Users\ty.gramling\appdata\local\temp\AcPublish_69544\6513-Base.dwg LAYOUT: 3-Pre-Site Sections PLOTTED: May 12, 2026 - 7:39am PLOTTED BY: ty.gramling
480
480
460
460
440
440
420
420
500
500
480
480
460
460
440
440
420
420
PR-SITE-SECTION-C-C
500
500
480
480
460
460
440
440
420
420
1
17519 CHESTERFIELD AIRPORT ROAD
CHESTERFIELD, MISSOURI 63005
CAR CRAFT
PREPARED BY:
500
A PRELIMINARY PLAN FOR ZONING TEXT AMENDMENT:
500
05/12/26 SUBMITTAL #1
PRELIMINARY PLAN
SITE SECTIONS
3
Page 28 of 29
257 Chesterfield Business Parkway
St. Louis, MO 63005 PH. (636)
530-9100 FAX (636) 530-9130
e-mail: [email protected]
Web: www.stockassoc.com
Easement area;
Refer to Civil drawings
Existing trees
less than 5" DBH
at property corner
Existing
offsite
woodland
Existing Ash trees
(4"-8" DBH)
in poor condition
Existing Ash and
Maple trees
(8"-12" DBH)
Existing Ash trees
(8"-10" DBH)
89
Existing
offsite
trees
Consultants:
Existing trees
less than 5" DBH
at property corner
Existing Ash trees
(4"-8" DBH)
88
Jerald Saunders - Landscape Architect
MO License # LA-007
Existing Ash and
Maple trees
(6"-8" DBH)
87
86
85
Existing Boxelder
trees (6"-8" DBH)
84
Existing
woodland
Existing Maple and
Ash trees (8"-12" DBH)
at high elevation area
Existing Ash, Maple,
and Cottonwood trees
at perimeter of pond
Existing Ash and
Boxelder trees
(3"-6" DBH)
65
Existing Ash, Maple,
and Boxelder trees
less than 5" DBH
82
68
61
76
75
Existing
Cottonwood trees
(8"-14" DBH)
71
72
73
74
81
TSD
67
70
LOT 1
78
79
62
69
77
80
63
66
Existing Ash trees (2"-4" DBH)
at perimeter of low elevation area
Existing
offsite
tree
64
Existing
Cottonwood trees
(8"-20" DBH)
Existing
Cottonwood
trees
(6"-15" 58
DBH)
56
59
55
54
Existing
Cottonwood trees
(10"-14" DBH)
TSD
60
57
53
52
51
50
49
48
47
46
44
45
43
42
17519 CHESTERFIELD AIRPORT ROAD
CHESTERFIELD, MISSOURI 63005
Existing
water
CAR CRAFT
83
A PRELIMINARY PLAN FOR ZONING TEXT AMENDMENT:
Existing
offsite
trees
41
40
39
37
17
18
18
Existing
36
tree
31 32
10' wide easement;
Refer to Civil drawings
Existing
tree
25
19
20
21
22
23
27
26
28
29
24
33
38
35
34
30
16
15
14
Tree Condition Rating:
13
Excellent
Good
Fair
Poor
Dead
12
JAGUAR LAND ROVER WAY (63'w)
11
Existing tree
9
8
10
7
Total Site Area
=
323,240 s.f. (7.42 acres)
Individual Tree Canopy Area
=
17,977 s.f. (0.41 acres)
Woodland Canopy Area
=
120,121 s.f. (2.76 acres)
Total Existing Tree Canopy Area
=
=
=
=
=
=
Revisions:
4
3
2
1
0
Date
Description
No.
Drawn:
KP
Checked: RS
138,098 s.f. (3.17 acres)
Loomis Associates Inc.
Missouri State Certificate of Authority #: LAC #000019
Existing
offsite
trees
Tree Stand Delineation Narrative
This project site comprises a total of 7 acres and has a total of 138,098 s.f. of
tree canopy. The Tree Stand Delineation map was completed by field inspection.
6
The individual trees found onsite along the road consist mainly of Maple, Ash
and Pear in fair to good condition. Individual trees found onsite along the fence
perimeter include primarily Apple and Pine along with some Cottonwood and
Sycamore trees in poor to fair condition.
5
4
3
The trees found onsite within the woodland area consist of Ash, Maple, and
Cottonwood with some Boxelder, Sycamore, Willow, and young Mulberry trees.
The Ash trees are in poor condition overall. There are vines and a Honeysuckle
understory throughout the wooded area along with some invasive groundcover
vegetation.
2
1
There are no Monarch, state champion, or rare trees found onsite.
Sheet
Title:
Legend
Symbol
Tree Stand Delineation
SCALE 1"=40'
0
40
80
160
Description
Symbol
Description
Existing
Trees
Existing Dead
Trees
Existing
Tree Canopy
Existing Offsite
Woodland
Tree Stand Delineation Prepared
under direction of:
Kristin Provinse
Certified Arborist MW-6075A
Sheet
No:
Date:
Job #:
Tree Stand
Delineation
TSD
5/11/26
813.155
Page 29 of 29
The government’s own published record — read it yourself, then decide what to do about it.
The facilities, the coverage, and the local record for this community.
Not yet recorded. The record stays open — outcomes are added as minutes and vote results are published.
Provenance
Where this record came from. Every source is listed, permanently.
- Agenda Watch · Sep 24, 2026
Permanent ID DKT-2026-003057 — this record is never deleted.
Record history
Every change to this record, logged as it happened.
- Sep 24, 2026 Filed on the Docket
- Sep 24, 2026 Full document archived — public record
- Sep 29, 2026 Record updated
← The full Docket · every meeting, vote, and action on the permanent record · also in the National Record Index.