The Docket · Government Meeting · DKT-2026-004307

On the agenda: Westwhiteland meeting — data center (Oct 20)

Past  ⚠ Agenda Watch  Westwhiteland, Pennsylvania · Tuesday, October 20, 2026 — 7 days ago

About this record

The published agenda for the October 20, 2026 meeting contains: "data center". The meeting has passed. The agenda stays here as a permanent public record.

WhenTuesday, October 20, 2026
Check the agenda document for the meeting time.
WhereWestwhiteland, Pennsylvania
Bodymeeting Oct 20, 2026
Money$6,270.00 was at stake
On the record“data center”

The agenda, word for word

Government public record — the full text of the published document, archived October 16, 2026. Gold highlighting of key terms is ours, not the original’s. Read the original document ↗

21 pages · scroll to read
Page 1 of 21

WEST WHITELAND TOWNSHIP
Planning Commission
Agenda
Tuesday, October 20, 2026
7:00 P.M.

Etiquette for
hybrid meetings

Meeting will be held in-person and via Zoom
Register for Zoom Meeting
Call by Phone: 1-646-558-8656
Meeting ID: 873 0897 0242
Passcode: 507637
Meeting Packets can be found on the Township website.
Reminder to meeting participants: Please speak clearly into the microphone
CALL TO ORDER
REVIEW OF MEETING MINUTES
Approval of Meeting Minutes: October 6, 2026
PUBLIC COMMENT/CONCERNS/QUESTIONS
Comments or questions regarding issues NOT on the agenda should be raised at this time.
Members of the public will have an opportunity to ask questions and comment upon agenda
items during the discussion on those items.
PLANS
1. Oak Knoll, LLC (Shenkin Tract)
Site Address 1358 Glen Echo Rd.
Second Review: Subdivision & Land Development Plan
Project Description: Review for a proposed subdivision of a parcel containing four acres into
four individual lots with access from Glen Echo Road. The existing dwelling will remain.
OLD BUSINESS
NEW BUSINESS
ANNOUNCEMENTS
Ordinance regarding data centers – approval.
ADJOURNMENT
Next Meeting: November 5, 2026 (Thursday)

Page 2 of 21

MEMORANDUM
TO:

Planning Commission

FROM:

Patrick Gorman, AICP, Township Planner
John R. Weller, AICP, Director of Planning and Zoning

SUBJECT:

1358 Glen Echo Rd. subdivision and land
development plan

DATE:

October 16, 2026

APPLICANT:

Oak Knoll, LLC
c/o Glenn White
4 Zachary Dr.
West Chester, PA 19382

SITE ADDRESS:

1358 Glen Echo Rd.
West Chester, PA 19380

TAX PARCEL:

41-8D-4

ZONING:

R-2, Residential

DESCRIPTION:

Subdivision of a 4-acre residential lot into 4 lots: one to
accommodate the existing dwelling and 3 to be developed
with 1 single-family home each

EXPIRES:

December 23, 2026

Background
The subject property is a four-acre residential lot in the Ivy Glen neighborhood near the West
Goshen Township border in the R-2 Residential zoning district. Most of the lots in Ivy Glen are
about half an acre, so this property is unusually large for the area. The property includes the
historic Daniel Meredith House (Twp. Historic Site 061.01), which is on the National Register of
Historic Places. The house remains in use as a private residence; accessory structures include a
detached garage and the ruins of a spring house. About two-thirds of the site is wooded, and
there is a wetland area of about 7,000 sq.ft. near its northwest corner. There are no regulated
steep slopes (15% and steeper) or any FEMA-designated flood hazard areas on the site.
The Planning Commission reviewed the application as a sketch plan in June 2024 and later
reviewed the land development/subdivision plan officially on February 17, 2026. The
Commission took no action at this meeting due to several concerns, with stormwater
management being the most significant. In April, the applicant submitted a revised submission,
which Township staff and their consultants reviewed. However, the applicant chose to withdraw
from the agenda due to unresolved stormwater concerns and conflicts with zoning standards.

1

Page 3 of 21

The plan before you this evening is significantly revised from the former plan set and proposes
dividing the property into four lots instead of the previously proposed five. Proposed lot 4 will
be larger than the others and will include the spring house ruin and wetland-related areas. The
alterations address past concerns about stormwater and lot configuration and yard setbacks.
Lot 2 will accommodate the existing home; the remaining three lots will be sold as sites for
single-family detached dwellings. The Zoning Officer has confirmed that the proposed lots
satisfy the minimum requirements of the R-2 zoning district, and the proposed development on
each lot complies with the applicable area and bulk standards. The plan also addresses
concerns raised in our consultants' reviews and in public comments.
Regarding the historic resource, the Historical Commission discussed the impact of the new
houses on the historic house, the number of lots, and the preservation/stabilization of the
spring house ruins. At the August 11, 2025, meeting, the Commission passed a motion
supporting approval of the plan, including conditions that the Applicant consider reducing the
number of lots to provide a better setting for the historic house and preserve a visual
connection between the house and the spring house. The motion also memorialized concerns
about the proposed landscaping. Because of the revisions involved with this application, the
applicant will appear before this Commission at its November 9th meeting. However, this plan
appears to address most of those conditions.
Consultant Reviews
•

Spotts, Stevens and McCoy (“SSM”) review dated October 9, 2026. The review
is divided into sections according to topic.
−

Comments #1 through #4 identified the requested waivers from the Stormwater
Ordinance and the Subdivision and Land Development Ordinance (“S/LDO”). SSM
has no objection to the requested waivers from the Stormwater Ordinance
(comments #1 through #2 & #4). Comment #3 cites that a waiver can be granted
with a slight modification of the spillway design.

−

Comment #5 addresses a waiver from the sidewalk requirement in the S/LDO. This
request has been made since the original plan submission because no other
sidewalks are in the general vicinity of the proposed subdivision.

−

Comments #6 and #7 emphasize the S/LDO requirements that pertain to
landscaping, which is to be addressed by, our landscaping consultant [Theurkauf, as
outlined below].

−

Comment #8 requests that a table shall be included in the plans that clearly
demonstrate parking compliance, though it appears adequate parking is provided.

−

Comments #9 through #11 address S/LDO requirements. Comments # 9 and 11
address that applicant shall provide written descriptions for all easements, rights of
way and to include a probable cost estimate. The applicant generally submits these
items upon post-approval review. Comment #10 addresses the placement of
overhead utility lines which are otherwise required to be buried. The applicant shall
provide certification from the appropriate utilities if underground placement is not
possible.

2

Page 4 of 21

•

−

Compliance with the Stormwater Management Ordinance is addressed in comments
#12 through #22. All of the comments are either administrative issues, direct minor
revisions, or specify information to be added to the plan drawing.

−

Comments # 23 through #25 are comments directed to address minor revisions or
specify information, or within best management practices.

Carroll Engineering review dated October 12, 2026.
The existing house has a gravity connection to the public sewer main in Glen Echo Rd.
The home proposed for Lot 4 will also have a gravity connection to this main. The
remaining three houses will have gravity connections to an existing main on the
adjoining Hollow Run property, near the southwest property line. In all cases, treatment
is provided by the West Goshen Authority. Carroll, comments 1and 2 under section C,
address minor edits to be made to the Sewer Planning Exemption

•

Theurkauf Design and Planning (“Theurkauf”) review dated October 2, 2026.
The review identifies that the following comments remain:
−

Comment #1 addresses the request for a waiver from the sidewalk requirement.
Theurkauf notes that there are no sidewalks in this neighborhood and supports the
request, subject to a contribution by the Applicant to the Township Sidewalk Fund
equivalent to the construction cost of the sidewalk that could be required, as is our
practice. SSM did not object to this waiver in their review; Staff agrees, and we note
that no sidewalks are shown along Glen Echo Rd. in the Township’s Bicycle and
Pedestrian Plan.

−

Comment #2 provides a tally of the required compensatory plantings and concludes
that the plan does not show all the required trees. It appears that additional trees
could be provided, but if the Applicant chooses not to, they have the option to pay a
fee in lieu of the deficiency as provided for by §281-34.G(6)(a) of the S/LDO.1
Based upon the landscaping shown, the fee amount is $6,270.00.

−

Comments on #3 notes that a minor error was found in the sizing of the trees for
the compensatory planting requirements. Involving 4 of the trees and requires a
revision of the table.

−

Comment #4 reviews the buffer plantings. Comment #4a supports a partial waiver
from the buffer width minimum to allow the design to be shown, noting that only a
portion of the buffer is undersized and all required buffer plantings have been
provided.

The remaining comments list resolved issues, minor errors to be corrected, and
administrative items.
•

1

Bowman review dated October 12, 2026. Bowman has no remaining concerns.
They also support the waiver requested from the sidewalk requirement and advise that
this project is subject to payment of a traffic impact fee of $5,796.00.

This is listed as a waiver on Sheet 2 of the plan set; however, payment of a fee in lieu of planting all
the required trees is an alternative allowed by this section of the S/LDO. No waiver is required.

3

Page 5 of 21

The review of the Chester County Planning Commission was provided with the previous review.
They concluded that the plan is consistent with the County Comprehensive Plan and had no
concerns beyond those already raised by our consultants. The current plan shows a reduction
in the number of subdivided lots, and the same proposed use for single-family dwellings;
further review from the County is not required.
Staff Comment
The Applicant has taken steps to resolve of the concerns raised at the February 17th meeting
and in their subsequent April resubmission. From the onset of this application in late 2024, staff
has insisted that the initially five proposed lots present an imperfect lot configuration for the
available land, including impacts to stormwater, natural features, zoning standards, and
historical elements and brought about concerns from both the Planning and Historical
Commission.
If the Commission recalls its February meeting, there was extensive discussion citing that most
lots had impervious limits close to the 20% maximum coverage. This could limit future property
owners from making improvements (additions, patios) and thus require variance requests to the
Zoning Hearing Board. In response, staff inquired the Township Solicitor about the feasibility of
a deed restriction prohibiting the owners of these lots from applying to the Zoning Hearing
Board for relief from the limits on building and impervious cover. He responded that such a
deed restriction was possible, noting, “A deed restriction lawfully enacted does serve to override
the zoning applicable to the property and would run as a restrictive covenant with the land.”
However, he also cautioned that “…if a future owner ever is to challenge the deed restriction,
the law also dictates that if there is any ambiguity as to the interpretation of [the] language … a
court will always favor the interpretation in the scope of the least restrictive … use…” He also
stated that while this is a legal course of action, deed restrictions of this kind are too easily
forgotten – even with title searches – and there is also the challenge of enforcement, as such
restrictions are usually enforced privately (like by an HOA), leaving the question of what entity
would be in a position to enforce it. He concluded that, although this is possible, he does not
recommend this course of action. Applicant’s counsel did provide such an agreement.
The new lot configuration makes impervious coverage concerns in conjunction with executing
and enforcing a potential covenant agreement less of a concern. The chart below compares the
net lot areas and the proposed impervious coverages on each of the parcels. Lot 2, which
contains the existing dwelling, is the only property that comes within 2% of the maximum
impervious coverage. However, this could be further reduced if the shared lot line between Lot
2 and Lot 3 were moved slightly to the west to provide additional land to Lot 2.
Lot

Old Net Lot Area

1
2 (existing
dwelling)
3
4

30,864 s.f.
36,862 s.f.

Old Proposed
Imp.
16.5 %
19.7 %

27,639 s.f.
31,305 s.f.

15.8 %
20 %

5
NC= No Chang

29,259 s.f

16.9 %

4

New Net Lot
Area
NC
36,9258 s.f.

New Proposed
Imp.
16.8%
19.7 %

30,577 s.f.
62,230 s.f.

14.8 %
10 %

Page 6 of 21

Owners of nearby properties have expressed a variety of concerns, principally the effect upon
stormwater runoff and flooding, the size of the proposed homes, and the impact upon the
historic character of the property and the neighborhood more generally. Staff notes that SSM
has concluded that the proposed stormwater management system will manage new runoff in
compliance with our regulations, and as such will not worsen existing conditions – and may
improve them. While we understand the impacts on character, this is largely subjective; we can
only enforce the objective standards of our ordinances. Additionally, the reduction of the lot
and associated improvements will provide retention of additional naturalized areas, as noted,
especially with the larger Lot 4. In addition, Township staff has requested a condition that the
applicant provide a covenant for lot 4 restricting it from further subdivision.
The Commission should discuss with the applicant how the Operation and Maintenance
agreements for the Stormwater Management Systems will be implemented, as each lot (with
exception of lot 2) has its own system that an HOA will not oversee. Though this is a fairly
common practice (especially for a submission as small as this one), it would be best if this item
was addressed now and included as part of the conditions of approval, rather than debated as
part of any potential post-approval process.
We note that the plan now shows that the existing home on Lot 2 will be connected to public
water supply (required to allow the lot to be smaller than one acre) and fire connections are
now shown for all the proposed homes.
SSM’s prior review expressed concern about the impact of the construction of the various utility
connections upon Glen Echo Rd. We note that Sheet 5 of the plan now indicates an area of the
street to be milled and overlain following construction; Staff advises that the full width of the
road should be restored in this way, not just half of it.
In conclusion, Staff is now satisfied that the remaining concerns are sufficiently minor to be
addressed as conditions of approval. Please find attached a draft motion for your consideration.
Attachments
1.
2.
3.
4.
5.
6.
7.

SSM review dated October 9, 2026.
Carroll Engineering review dated October 12, 2026.
Theurkauf review dated October 2, 2026.
Bowman review dated October 9, 2026.
Draft motion dated October 16, 2026.
Draft “Notice of Impervious Coverage Limitations,” provided by the Applicant, undated.
Plan set prepared by JMR Engineering, dated November 18, 2024, most recently revised September
25, 2026.

Plans\RST\Shenkin\PC memo – 261016

5

Page 7 of 21

Spotts, Stevens and McCoy
1047 N. Park Road > Reading PA 19610
610.621.2000 > F. 610.621.2001 > SSMGROUP.COM

October 9, 2026

Mr. John R. Weller, AICP
Director of Planning and Zoning
West Whiteland Township
101 Commerce Drive
Exton, PA 19341

RE:

1358 Glen Echo Road Subdivision
Preliminary Subdivision and Land Development Plan
SSM File 101008.0390

Dear Mr. Weller:
We have received the above-referenced submission consisting of the following documents:
•

1358 Glen Echo Road Subdivision (14 sheets), prepared by JMR Engineering, LLC (JMR), dated
November 18, 2024, last revised September 25, 2026;

•

Post-Construction Stormwater Management Narrative & Report, prepared by JMR, dated
November 18, 2024, last revised September 25, 2026;

•

1358 Glen Echo Road Waiver Request Letter, prepared by JMR, dated September 25, 2026;

•

Stream Investigation Email, prepared by Arm Group, LLC, dated May 15, 2026;

•

Request for sewage planning exemption package; including:
o

Phase I Bog Turtle Habitat Assessment Report, prepared by Liberty Environmental, Inc.,
dated December 12, 2024;

o

Pennsylvania Natural Diversity Inventory (PNDI), prepared by JMR, dated November
15, 2024;

•

Response Letter to SSM’s April 9, 2026 Review, prepared by JMR, dated September 25, 2026;

•

Response Letter to Bowman’s March 31, 2026 Review, prepared by JMR, dated September 25,
2026;

•

Response Letter to Carroll Engineering’s April 6, 2026 Review, prepared by JMR, dated
September 25, 2026;

•

Response Letter to Theurkauf’s April 2, 2026 Review, prepared by JMR, dated September 25,
2026;

•

Response Letter to Township Staff’s April 24, 2026 Review, prepared by JMR, dated September
25, 2026; and

•

Amended Site Layout Narrative Letter, prepared by JMR, dated September 25, 2026.

Page 8 of 21

Mr. John Weller | West Whiteland Township
SSM File 101008.0390
October 9, 2026
Page 2 of 5

BACKGROUND
Oak Knoll, LLC (C/o Glenn White) is proposing to subdivide the 4 gross acre property at 1358 Glen Echo
Road into four separate lots. Lot 2 is proposed to contain an existing dwelling and driveway while Lot 1,
Lot 3, and Lot 4 are proposed to contain new single-family detached dwellings. An existing stone
springhouse within a wetlands area is present on Lot 4.
The subject property is in the R-2 Residential District and fronts along Glen Echo Road at the intersection
with Twin Oaks Lane. The property is bound by existing residential uses (apartments to the west; single
family homes in all other directions).
REVIEW
The submitted information has been reviewed for compliance with the West Whiteland Township Zoning
(Chapter 325); Subdivision and Land Development (Chapter 281), and Stormwater Management (Chapter
270) Ordinances, as well as current engineering practices.
Issues regarding landscaping and buffering, sanitary sewer and traffic will be addressed by Theurkauf
Design and Planning, Carroll Engineering and Bowman, respectively.
We have the following comments.
WAIVER REQUESTS
1. Section 270-20.J(2) – A partial waiver is requested from the requirement that all infiltration
systems to be set back 20 feet from all property lines and right-of-way boundaries.
The waiver request is specifically for SCM-2 (Lot 1), SCM-4 (Lot 4) and SCM-5 (Lot 4). All
proposed infiltration beds are no less than 15-ft from a dwelling and right-of-way line; therefore,
we have no objection to this request.
2. Section 270-29.A(4)(a) – A waiver is requested to permit a 5-foot basin berm top width when
typically a minimum 8-foot wide top width berm is required.
Due to the shallow depths and small sizes of the basins, we have no objection to this request.
3. Section 270-29.A(5)(d) – A waiver is requested to provide less than 1-foot of freeboard in the
design of emergency spillways when typically a minim of 1-foot of freeboard is required.
All basins are relatively small and the spillways have been revised to contain a 12-foot width and
6-inch depth. We support the waiver subject to keeping the emergency spillways a minimum of
12-feet wide width while still providing a minimum 6-inches of freeboard. The current spillway
designs provide a minimum of 6-inches of freeboard.
4. Section 270-29.D(1) – A waiver is requested to permit a swale design of 6 inches of freeboard in
the 100-year storm event in lieu of the requirement that swales shall be designed with 1 foot of
freeboard in the 25-yr storm event.
We have no objection to this request.
5. Section 281-31.A – A waiver is requested to not provide sidewalks.
We have no objection to this request as there is no existing sidewalk in the general vicinity of this
subdivision.

Page 9 of 21

Mr. John Weller | West Whiteland Township
SSM File 101008.0390
October 9, 2026
Page 3 of 5

6. Section 281-34.G – A waiver is requested to not provide all required compensatory plantings
requirements.
We defer landscaping related requests to the Township’s Landscaping Consultant.
7. Section 281-35.E – A waiver is requested from the requirement that a 25 foot wide perimeter
buffer is required along the tract boundary lines on the south east side of Lot 1.
We defer landscaping related requests to the Township’s Landscaping Consultant.
ZONING
8. Section 325-39.G – Off-street parking calculations shall be provided on the plans and
demonstrate that parking requirements have been met.
It is noted that it appears adequate parking is provided; however, off-street parking calculations
demonstrating the same shall be provided on the plans.
SUBDIVISION AND LAND DEVELOPMENT
9. Section 281-16.D(7) – Applications for all preliminary plans shall contain all proposed
easements, rights-of-way, and any covenants applicable and/or references thereto, including
utility and maintenance easements as well as easements to extend utilities to adjoining properties
and such easements or covenants requiring maintenance and repair of sidewalks by the property
owners abutting thereon. All such easements, rights-of-way and covenants shall be in a form
capable of recordation and in a form and substance satisfactory to the Township Solicitor.
All proposed easements and right-of-way dedications shall include exhibits and associated legal
descriptions. The response letter indicates such items will be provided prior to the recording of
the plans.
10. Section 281-43 – All utility lines, including, but not limited to, electric, gas, cable television,
streetlight supply, and telephone, shall be placed underground at a depth no less than 24 inches.
The plans propose overhead electric along Glen Echo Road with three new utility poles proposed
within the Township’s right-of-way. Utilities shall be installed underground unless determined to
not be feasible by the electric provider.
If underground electric transmission is determined by the utility provider to not be feasible, the
total number of utility poles shall be minimized. Correspondence with the utility provider shall be
provided for consideration. It is further noted that a 27-inch pine tree conflicts with the proposed
overhead utility on Lot 2.
11. Section 281-54 – An improvements agreement and guarantee will be required. An Engineer’s
Probable Cost Opinion shall be provided for review.
STORMWATER MANAGEMENT
12. Sections 270-17.A(1)(a) and 270-32.G – The applicant shall provide the Township with a “letter
of adequacy” from the Chester County Conservation District for the E&S Plan prior to the
Township endorsing the plan.
13. Section 270-17.A(1)(b) – The applicant shall provide the Township with a copy of the required
Individual NPDES Permit prior to the Township endorsing the plan.

Page 10 of 21

Mr. John Weller | West Whiteland Township
SSM File 101008.0390
October 9, 2026
Page 4 of 5

14. Section 270-20.Q – All infiltration practices shall have appropriate positive overflow controls.
The contours (468, 470 & 472), downhill of the Type M inlet at SCM-3 (Inlet 3-1), shall be
shaped to channel the runoff into the downstream channel.
15. Sections 270-29.D (swales) and 270-29.E (storm sewers) – As previously requested, drainage
areas correlating to the design of the swales and storm sewers have been delineated on Sheet 6.
The grading associated with Swale 2 (SCM – 7) shall clearly direct the discharge of the
driveway/pipe on Lot 2 around Swale 2 (SCM-7) or the design for downstream facilities (Swale
SCM-7 and Infiltration Bed SCM-3) shall account for this additional drainage.
16. Section 270-29.E(7) – All storm sewers shall be constructed per PennDOT specifications as
outlined in Publication 408 Design Manual, Part 2, Highway Design and Standards for Roadway
Construction, RC-Series unless otherwise dictated by the Township Code.
The above shall be noted on the plans. Additionally, multiple 18-inch diameter Nyroplast
standpipes are proposed at a depth greater than 5-ft. Any stormwater structure which is greater
than a 5-ft depth must be replaced with a standard inlet which contains steps and is accessible. It
is noted that this is a requirement of PennDOT RC-46M.
17. Section 270-32.A(3) – The applicant’s statement on Sheet 6 shall be signed prior to the Township
endorsing the plan.
18. Section 270-43 – A stormwater operation and maintenance agreement shall be provided. The
agreement shall include the O&M requirements noted on the PCSM Plan detail sheets, or
reference the PCSM Plan drawing numbers where the O&M requirements are noted. O&M
agreements for each individual lot (Lots 1, 3, & 4) will be required.
19. The plan now proposes to connect the discharge pipe from SCM-03/Inlet 4-5 (Lot 4) directly into
the existing inlet in Glen Echo Road. We have the following comments specific to this storm
sewer:
a. The plan shall clearly note that the lot owner is responsible for the maintenance of the
outlet pipe including that portion within the right-of-way.
b. The plan shall note that the pipe connection shall be fully grouted to provide a watertight
connection.
c. A profile of this storm sewer shall be provided.
20. The weir wall materials (concrete, steel, etc.) and dimensions (thickness, etc.) in outlet structures
SCM-3 (Inlet 3-1) and SCM-5 (Inlet 4-5) shall be specified.
21. The plans shall provide sanitary sewer lateral profiles and note the anticipated depth of the
laterals. It is noted that these traverse under the proposed swale along the rear property line,
which may affect the overall lateral coverage.
22. We recommend the level spreader detail be revised to propose geotextile fabric along the top of
the stone trench a 6-inch depth below grade and that a 6-inch depth of R-4 Rock or river rock be
placed on top of the geotextile fabric in an effort to prevent the spreader from becoming clogged.
GENERAL
23. The plans shall note within the demolition notes on Sheet 2 that a West Whiteland Township
Demolition permit shall be acquired prior to commencing the demolition of any buildings or
structures on site.

Page 11 of 21

Mr. John Weller | West Whiteland Township
SSM File 101008.0390
October 9, 2026
Page 5 of 5

24. The plans shall note that all proposed sanitary sewers shall be in accordance with the West
Whiteland Township Sanitary Sewer Standards.
25. The existing dwelling contains a fence. It appears this fence is proposed to be removed. The plans
shall clarify if this fence is to be removed on the demolition plan.
26. Concrete monuments shall be along the shared access and utility easement, and at all bends of the
easement, such that the limits of the easement can easily be determined in the field.
We respectfully request for ease of review that response letters include a response to each comment and
indicate the sheet number(s) and/or report page numbers corresponding to the changes that have been
made.

If you have any questions please feel free to call me.
Sincerely,
Spotts, Stevens and McCoy

Nick Szeredai, P.E.
Municipal Engineering Manager
[email protected]
cc:

Patrick Gorman, AICP, PP, West Whiteland Township ([email protected])
Justin Smiley, AICP, West Whiteland Township ([email protected])
Kent D. Morey, P.E., CBLP, Spotts, Stevens and McCoy ([email protected])

Page 12 of 21

October 12, 2026
John Weller, Director of Planning and Zoning
West Whiteland Township
100 Commerce Drive
Exton, PA 19341
Dear John:
Subject: 1358 Glen Echo Road
This office has reviewed the subdivision and land development plans for the above-subject project. This
is the fifth submission to Carroll Engineering Corporation, and we offer the following comments:
A.

B.

SUBMISSION
1.

“Preliminary Subdivision and Land Development Plan for 1358 Glen Echo Road”
prepared by JMR Engineering for Oak Knoll, LLC. The plans consist of 14 sheets dated
November 18, 2024, and last revised on September 25, 2026

2.

Sewage facilities planning exemption.

GENERAL
1.

The plan proposes subdividing an existing four-acre parcel (UPI 41-8D-4) to create four
(4) lots. Three new single-family dwellings will be constructed. An existing dwelling
(Lot 2) will remain. The project is located at 1358 Glen Echo Road in the R-2 Residential
District.

2.

Sewer service for lots 1 and 3 is proposed by saddling the existing sewer in an easement
on the Hollow Run Apartments. Sewer service for lot 4 is proposed by saddling the
sewer in Glen Echo Road. Wastewater will be conveyed by the Grubbs Mill Pump Station
to the West Goshen Sewer Authority for treatment.

Engineering and Surveying Excellence Since 1973
Corporate Office:
949 Easton Road
Warrington, PA 18976
215.343.5700

101 Larry Holmes Drive
Suite 201
Easton, PA 18042
610.989.4940

433 Lancaster Avenue
Suite 200
Malvern, PA 19355
610.489.5100

2173 Embassy Drive
Fourth Floor
Lancaster, PA 17603
717.997.4750

www.carrollengineering.com
8942_000_285 005.docx

105 Raider Boulevard
Suite 206
Hillsborough, NJ 08844
908.874.7500

Page 13 of 21

John Weller, Director of Planning and Zoning
West Whiteland Township
Page 2
October 12, 2026

C.

PLANNING EXEMPTION
1.

Under Item 3, the description should be revised to read (3) proposed single detached
family dwellings to be constructed.

2.

Under Item 6.a., the box for “Existing (connection only) should be checked.

Should you have any questions or require additional information, please feel free to contact this office.
Very truly yours,
CARROLL ENGINEERING CORPORATION

Bill
William N. Malin, P.E.
Senior Vice President
WNM:cam
Attachments

8942_000_285 005.docx

Page 14 of 21

MEMORANDUM
TO:

John Weller, AICP, West Whiteland Township Director of Planning and Zoning
Patrick Gorman, AICP, Township Planner
Jack Robinson, P.E., JMR Engineering LLC
Michael V. Naseef, Esq., Gawthrop Greenwood
Anne F. Walters, RLA

FROM:

Edward A. Theurkauf, RLA, ASLA, APA
Celia E. Winters, ASLA, MLA

DATE:

October 2, 2026

SUBJECT:

REVIEW COMMENTS – 1358 GLEN ECHO ROAD
PRELIMINARY SUBDIVISION/LAND DEVELOPMENT PLAN DATED 9-25-26

Please note our review comments pertaining to the following documents received on 9-29-26, and to a
site visit on 12-3-24:
•

Plan consisting of 14 sheets;

•

Response letter from Jack Robinson dated 9-25-26; and

•

Waiver request letter from Jack Robinson dated 9-25-26

Issues that have been addressed are so noted. New comments are in bold.

1350 Elbow Lane • Chester Springs, PA 19425 phone 484-888-5574 email [email protected] www.theurkauf.com

Page 15 of 21

Page |2

REVIEW COMMENTS – 1358 GLEN ECHO ROAD
PRELIMINARY SUBDIVISION/LAND DEVELOPMENT PLAN DATED 9-25-26
October 2, 2026
1.

Sidewalks – Section 281-321.A of the subdivision and land development ordinance (SLDO)
requires minimum 5-foot-wide sidewalks at all new developments. The plan does not indicate a
sidewalk on either of the Glen Echo Road frontages. It is noted that there are no existing sidewalks
in the area. A waiver has been requested.
If the Township has no plans to construct sidewalks within this neighborhood, a fee in lieu could
be considered to construct pedestrian access in an area of greater need.

2.

Tree Removal and Compensatory Plantings – Section 281-34.G (SLDO) requires mitigation for
viable mature trees (12-inch DBH and greater) that are removed. For the 48 trees proposed to be
removed, there is a replacement requirement of 164 trees.
Plantings applicable to the replacement requirement are as follows:
Deciduous trees, 2-inch cal.
Evergreen trees, 7-foot ht.

59
86

Total compensatory trees proposed
Total compensatory trees required
Compensatory tree deficit

145
164
19

Additional trees could be placed in the buffer areas between lots and on the southwest perimeter.
If no additional compensatory trees are planted, the fee in lieu should be $6,270.00.
3.

Compensatory Planting Requirements Table Error - The Compensatory Planting Requirements
Table currently categorizes (4) 24-inch trees under the 12-inch to 24-inch replacement category
rather than the 24-inch to 36-inch category. The table shall be revised to reflect that these (4)
trees are subject to a replacement criterion of 3 inches of replacement planting for every 1 inch
of tree removal.

4.

Perimeter Buffers - Section 281-35.E (SLDO) requires 25-foot-wide planted perimeter buffers
along property lines and around basins as follows:
Buffer/Length

Plant Type

Southeast cleared/225 LF

Shade Tree
Evergreen Tree
Large Shrub

Required

Proposed

2
5
11

2
11
12

1350 Elbow Lane • Chester Springs, PA 19425 phone 484-888-5574 email [email protected] www.theurkauf.com

Page 16 of 21

Page |3

REVIEW COMMENTS – 1358 GLEN ECHO ROAD
PRELIMINARY SUBDIVISION/LAND DEVELOPMENT PLAN DATED 9-25-26
October 2, 2026
Northwest wooded/170 LF

Shade Tree
Evergreen Tree
Large Shrub

2
4
9

*
6
*

Southwest wooded/360 LF

Shade Tree
Evergreen Tree
Large Shrub

4
7
18

*
12
*

Buffer/Length

Plant Type

Required

Proposed

Southwest cleared/250 LF

Shade Tree
3
Evergreen Tree
5
Large Shrub
13
* Requirement met by existing to remain

3
17
10

a. Southeast buffer – Part of the buffer is under-width at only 8 feet. A waiver is requested for
the noncompliant buffer. In light of the additional proposed plantings, we have no objection
to the requested waiver.
b. Northwest buffer – This issue has been resolved.
c. Southwest buffer – This issue has been resolved.
5.

Street Trees – This issue is resolved.

6.

Tree Protection – This issue has been resolved.

7.

Plant List Errors – The following shall be corrected:
a. The Evergreen Tree Compensatory Plant Schedule lists 9 Norway Spruce but the plan shows
12.
b. The Evergreen Tree Compensatory Plant Schedule lists 31 White Spruce but the plan shows 28.

8.

Plan Authorship – This issue has been resolved.

9.

Plan Graphic Errors – The following shall be corrected:
a. Norway Spruces are represented as two different symbol sizes on the plan between lot 2 and
4. Plant symbols should be consistent for legibility.
1350 Elbow Lane • Chester Springs, PA 19425 phone 484-888-5574 email [email protected] www.theurkauf.com

Page 17 of 21

REVIEW COMMENTS – 1358 GLEN ECHO ROAD
PRELIMINARY SUBDIVISION/LAND DEVELOPMENT PLAN DATED 9-25-26

Page |4

October 2, 2026
10.

Cost Estimate – A landscape cost estimate will be required with the final plan in accordance with
section 281-33.C.6.h (SLDO).

11.

Conclusion – The Township shall consider the following prior to preliminary approval:
•
•

Waiver/fee on sidewalks – comment 1
Waiver on southeast buffer width – comment 4.a

The other identified issues can be addressed on the final plan.

Please contact this office with any questions.

1350 Elbow Lane • Chester Springs, PA 19425 phone 484-888-5574 email [email protected] www.theurkauf.com

Page 18 of 21

October 9, 2026

Mr. John R. Weller, AICP
Director of Planning & Zoning / Zoning Officer
West Whiteland Township
101 Commerce Drive
Exton, PA 19341
RE:

Traffic Engineering Review - 1358 Glen Echo Road – Land Development Plan
West Whiteland Township, Chester County, PA
Bowman Project No. 310538-24-005

Dear Mr. Weller:
Bowman completed a traffic review of the proposed development located at 1358 Glen Echo Road. The
site currently contains a single-family home with a driveway to Glen Echo Road. It is proposed to subdivide
the lot, retain the existing home, and build three new homes. Access to Lot 1 is proposed by a conventional
residential driveway. Access to Lot 2 (existing home) is provided by the existing residential driveway. Access
to Lots 3 and 4 is proposed by a shared driveway. Our traffic review is based on the following documents.
-

Preliminary Subdivision & Land Development Plan for 1358 Glen Echo Road, prepared by JMR
Engineering, LLC., revised September 25, 2026.
Waiver Request Letter, prepared by JMR Engineering, LLC., dated September 25, 2026

Our office has no further traffic review comments; however, we offer the following for informational
purposes only.
1.

SALDO Section 281-31.A – The applicant requests a waiver to not construct sidewalk along the
site frontage. The Township’s Bicycle and Pedestrian Plan does not show sidewalk or other similar
infrastructure along Glen Echo Road. Furthermore, there are no existing sidewalks in the vicinity
of the site. Our office can support this waiver subject to review by the Township.

2.

Chapter 295-12 – This development is subject to the Township’s Transportation Impact Fee which
is equal to $1,449.00 per new weekday afternoon peak hour trip. Based on the Institute of
Transportation Engineers (ITE) publication Trip Generation Manual, 12th Edition for Single Family
Detached Housing (ITE Land Use Code 210), three new single-family homes will generate four
new weekday afternoon peak hour trips, and the resultant Transportation Impact Fee is $5,796.

If there are any questions or if additional information is requested, please contact our office.
Sincerely,

Christopher J. Williams, P.E.
V:\310538 - West Whiteland PA\310538-24-005 (TRA) - 1358 Glen Echo\Engineering\Reviews\2026-10-13 Review\Review\2026-10-9 - 1358 Glen Echo Rd Traffic Review.docx

1 of 1

835 Springdale Drive, Suite 200, Exton, PA 19341
P: 610.594.9995
bowman.com

Page 19 of 21

EXHIBIT ___
NOTICE OF IMPERVIOUS COVERAGE LIMITATIONS
The Buyer is hereby advised and acknowledges that, upon completion of construction of the improvements contemplated by this Agreement, the Property will contain impervious coverage that
is at or near the maximum impervious coverage permitted for the Property under the current
Zoning Ordinance of West Whiteland Township, Chester County, Pennsylvania.
Buyer understands and acknowledges that, due to the amount of impervious coverage created by
the construction of the dwelling, driveway, walkways, patios, and other site improvements, the
ability to construct or install any additional improvements on the Property may be limited or
prohibited under applicable zoning, land development, and stormwater management regulations.
Buyer is specifically advised that future improvements that may increase impervious coverage,
including, by way of example and not limitation, sheds, patios, decks, driveways, walkways, additions, pools, or other structures or hardscape features, may not be permitted without zoning relief, stormwater management approvals, or may be prohibited altogether.
Buyer acknowledges that it is Buyer’s sole responsibility to review and comply with the West
Whiteland Township Zoning Ordinance and all other applicable laws and regulations prior to
planning, constructing, or installing any additional improvements on the Property after settlement. Seller makes no representation or warranty that any additional impervious coverage or improvements will be permitted.
By execution below, Buyer acknowledges receipt of this Notice of Impervious Coverage Limitations and accepts the Property subject to these restrictions.

_____________________________________________
WITNESS/DATE

_____________________________________________
BUYER/DATE

_____________________________________________
WITNESS/DATE

_____________________________________________
BUYER/DATE

_____________________________________________
WITNESS/DATE

_____________________________________________
SELLER/DATE

Page 20 of 21

MEMORANDUM
TO:

Planning Commission

FROM:

Patrick Gorman, AICP, Township Planner
John R. Weller, AICP
Director of Planning and Zoning

SUBJECT:
DATE:

Draft motion for the 1358 Glen Echo Rd. subdivision and
land development plan
October 20, 2026

To recommend that the Board of Supervisors approve the five-lot residential subdivision plan for
1358 Glen Echo Rd., as depicted on a 14-sheet plan set prepared by JMR Engineering, LLC,
dated November 18, 2024 and most recently revised S5, 2026 (the “Plan”), with the sixteen
following waivers and conditions:
1.

The Plan is approved as a Final Plan pursuant to §281-10.H of the West Whiteland
Township Subdivision and Land Development Ordinance (“S/LDO”).

2.

Waiver of §270-20.J(2) of the Stormwater Management Ordinance to allow stormwater
infiltration systems to be not less than fifteen feet from dwellings and right-of-way lines,
pursuant to comment #1 of the Spotts, Stevens and McCoy (“SSM”) review dated
October 9 2026.

3.

Waiver of §270-29.A(4)(a) of the Stormwater Management Ordinance to allow stormwater basins with a top-of-berm width of not less than five feet, pursuant to comment
#2 of the SSM review dated October 9, 2026.

4.

Waiver of §270-29.A(5)(d) of the Stormwater Management Ordinance to allow an emergency spillway with not less than six inches of freeboard, pursuant to comment #3 of
the SSM review dated October 9, 2026.

5.

Waiver of §281-31.A of the S/LDO such that no sidewalks need be provided, subject to
the Applicant donating to the Township sidewalk fund a sum equivalent to the construction cost of the sidewalk that could be required, pursuant to comment #1 of the Theurkauf Design and Planning (“Theurkauf”) review dated October 2, 2026. Such donation
shall be made in full before the Plan is recorded at the Office of the Recorder of Deeds.

6.

Waiver of §281-35.E of the S/LDO to allow the perimeter buffer as shown on the Plan,
pursuant to comment #3a of the Theurkauf review dated October 2, 2026.

7.

Payment of a fee in lieu of preservation of permanent open space, pursuant to §28147.B of the S/LDO. The amount of the fee shall be determined at such time that the
Board of Supervisors grants final approval to the Plan. Such fee shall be paid in full at
or before the time that application is in full before the Plan is recorded at the Office of
the Recorder of Deeds.

8.

Payment of a traffic impact fee as required by Township Ordinances 427 and 461. If
there is no substantive change to the design of this project, the amount of the said fee
shall be $7,245.00 as noted in the Bowman review dated October 9, 2026.

1

Page 21 of 21

9.

The Plan proposes three (3) new connections to the West Goshen sewage treatment
facility. A tapping fee must be paid to West Whiteland Township for each connection
prior to recording the Plan at the Office of the Recorder of Deeds.

10.

The Plan shall be revised prior to submission to the Board of Supervisors to provide the
additional trees described in comment #2 of the Theurkauf review dated October 9,
2026. If these additional trees are not sufficient to satisfy the compensatory planting
requirement in §281-34.G of the S/LDO, the Applicant shall make a payment to the
Township equivalent to the installed cost of the trees needed to satisfy the requirement,
as provided for in §281-34.G(6)(a)[1] of the S/LDO.

11.

Upon completion of the new utility connections and principal construction, the Applicant
shall restore Glen Echo Rd. pursuant to comment #33 of the SSM review dated February
10, 2026. The cost of such restoration shall be included in the financial security for this
project, required below.

12.

The applicant shall include a deed restriction for further subdivision of lot 4. Such
notation and details shall also appear any future updated plan prior to recording.

13.

Execution and recording of the Township’s Stormwater Facilities Maintenance Agreement
pursuant to Township practice. If the Applicant makes no material revisions or additions
to the standard form of the said documents, then the Township Manager should be
authorized to sign these forms on behalf of the Township. The Township’s Stormwater
Facilities Maintenance Agreement shall be effective for all lots containing individual
stormwater structures pursuant to sheets 6, 12 and 13 of the plan set. The applicant
shall provide proof to the Township that the new purchasers of the property have been
provided with the agreement and informed of performance maintenance of these
systems prior to the issuance of a certificate of occupancy.

14.

Execution and recording of the Townships Landscape Maintenance covenant pursuant to
Township practice. If the Applicant makes no material revisions or additions to the
standard form of the said documents, then the Township Manager should be authorized
to sign these forms on behalf of the Township.

15.

Execution of a Developer Agreement and a Financial Security Agreement pursuant to
Township practice. The amount of such security shall be based upon construction cost
estimates for the site improvements, including landscaping, to be provided by the Applicant, which shall be reviewed and deemed sufficient by SSM and Theurkauf. If the
Applicant makes no material revisions or additions to the standard form of the said
agreements, then the Township Manager should be authorized to sign these forms on
behalf of the Township.

16.

Payment of all outstanding Township invoices within 45 days of the date of Final Plan
approval by the Board.

Plans\RST\Shenkin\PC DRAFT motion – 261020

2

Outcome

Not yet recorded. The record stays open — outcomes are added as minutes and vote results are published.

Provenance

Where this record came from. Every source is listed, permanently.

  • Agenda Watch · Oct 16, 2026
  • DeFlock research desk · Oct 16, 2026

Permanent ID DKT-2026-004307 — this record is never deleted.

Record history

Every change to this record, logged as it happened.

  • Oct 16, 2026 Filed on the Docket
  • Oct 16, 2026 Full document archived — public record
  • Oct 16, 2026 Corroborated by another source DeFlock research desk
  • Oct 16, 2026 Record updated
  • Oct 21, 2026 Record updated

← The full Docket · every meeting, vote, and action on the permanent record · also in the National Record Index.