On the agenda: Burbank Infrastructure Oversight Board - Mar 26, 2026 — data center (Mar 26)
Past ⚠ Agenda Watch Thursday, March 26, 2026 — 6 months ago
About this record
The published agenda for this March 26 meeting contains: "data center". The meeting has passed; the record and its outcome live here permanently.
Check the agenda document for the meeting time.
The agenda, word for word
Government public record — the full text of the published document, archived July 20, 2026. Gold highlighting of key terms is ours, not the original’s. Read the original document ↗
CITY OF BURBANK
INFRASTRUCTURE OVERSIGHT BOARD MEETING
AGENDA
March 26, 2026
6:00 P.M.
A regular meeting of the Infrastructure Oversight Board (Board or IOB) will be held on Thursday,
March 26, 2026, at 6:00 PM in Room 104, located on the first floor of the Community Services Building,
150 North Third Street, Burbank, California 91502. This facility is disabled accessible and can be accessed
through the side door facing East Olive Avenue. In compliance with the Americans with Disabilities Act
(ADA), if any special assistance is needed to participate in this meeting, please contact the City’s ADA
Coordinator at (818) 238-5051 (voice) or (818) 238-5035 TDD. Advance notification of 48 hours will permit
the City to make reasonable accommodations to assure accessibility.
This agenda contains a summary of each item of business which the Board may discuss or act on at this
meeting. The agenda packet consisting of the staff reports and all other documentation relating to each
item on this agenda are on file in the office of the Public Works Department located at 150 North Third
Street, Burbank, California 91502 and will be posted on the City's website at www.burbankca.gov. Any
writings or documents provided to the Board regarding any item on this agenda subsequent to distribution
of the agenda packet will be made available for public inspection in the office of the Public Works
Department or at the meeting location. If you have a question about any matter on the agenda, please
contact the Public Works Department at (818) 238-3915.
Public Comment: Members of the public will have a total of three minutes to speak and have the option
to participate in the meeting via in-person and/or telephone for general Public Comment. Written comments
can be provided using the eComment feature on the City website. In-person comments shall be taken
before phone comments. Commenting by phone can be done by calling (818) 238-3335 by
6:00 PM. City staff will connect speakers with the Board Chair when the Public Comment portion of the
agenda is announced.
Interpretation Requests: If you would like to participate in Public Comments and require an interpreter,
please telephone the City Clerk’s Office at (818) 238-5851 at least 48 hours in advance of the meeting.
Si desea participar en los comentarios públicos y necesita un intérprete, por favor llame a la Oficina de la
Secretaria Municipal al (818) 238-5851 al menos 48 horas antes de la reunión.
Եթե ցանկանում եք մասնակցել հանրային մեկնաբանություններին և թարգմանիչ եք պահանջում,
խնդրում ենք զանգահարել քաղաքապետարանի գրասենյակ՝ (818) 238-5851 հեռախոսահամարով
հանդիպումից 48 ժամ առաջ.
How to View the Meeting: Local Cable: Spectrum Channel 6 or AT&T Uverse Channel 99. YouTube
Live Streaming Channel: https://www.youtube.com/user/TheBurbankChannel/live. City Website Live
Streaming: http://burbank.granicus.com/MediaPlayer.php?publish_id=133.
A. FLAG SALUTE
B. ROLL CALL
C. ANNOUNCEMENTS
D. PUBLIC COMMENT
E. BOARD MEMBER RESPONSE TO PUBLIC COMMENTS
F. CONSENT CALENDAR
1. Approval of Minutes of IOB Meeting held on January 22, 2026
Recommendation:
Approve the minutes of the meeting held by the Infrastructure Oversight Board on
January 22, 2026.
G. REPORTS TO BOARD
1. Fiscal Year 2026-2027 Capital Improvement Program (CIP) Projects Presentation
Staff will present the proposed Fiscal Year 2026-2027 Capital Improvement Program
Projects.
H. INTRODUCTION OF ADDITIONAL AGENDA ITEMS
I.
FUTURE AGENDA ITEMS
J. ADJOURNMENT
The next scheduled meeting is on April 23, 2026, at 6:00 p.m. in Room 104 of the Community
Services Building.
CITY OF BURBANK
Infrastructure Oversight Board
Regular Meeting Minutes
January 22, 2026
A regular meeting of the Infrastructure Oversight Board (IOB) was held in Room 104 of the
Community Services Building, 150 North Third Street, Burbank, California 91502 on the above
date. Armen Avazian, Vice Chair, called the meeting to order at 6:01 p.m.
ROLL CALL
Present:
Armen Avazian, Lori Stearns, Maria Coronado, Duanne Gilmore, Colin
Hoffmeister, Shane Weber
Absent:
None.
Also Present:
Damian Skinner, Public Works Director
Lifan Xu, Chief Assistant Public Works Director – City Engineer
Jennifer Becker, Financial Services Director
Catherine Kim, Assistant City Attorney
Matthew De Vera, Recording Secretary
ANNOUNCEMENTS
Mr. Skinner announced that the Burbank City Clerk’s Office is taking applications for the IOB
board member vacancy.
PUBLIC COMMENT
None.
BOARD MEMBER RESPONSE TO PUBLIC COMMENTS
None.
CONSENT CALENDAR
1. Approval of Minutes of the IOB meeting held on October 23, 2025
It was moved by Board Member Coronado and seconded by Board Member Hoffmeister
to approve the October 23, 2025, meeting minutes. The motion was approved 5-0 and
one abstention.
REPORTS TO BOARD
1. Nomination of new Chair and Vice Chair
Board Members nominated and unanimously voted to elect Vice Chair Avazian as Chair
and Board Member Gilmore as Vice Chair of the IOB.
2. Fiscal Year 2024-25 Municipal Infrastructure Fund Financial Report
Ms. Becker presented the Fiscal Year 2024/25 Municipal Infrastructure Fund Financial
Report.
DISCUSSION ITEMS
None.
INTRODUCTION OF ADDITIONAL AGENDA ITEMS
None.
FUTURE AGENDA ITEMS
None.
ADJOURNMENT
The meeting adjourned at 6:45 p.m.
Respectfully submitted,
Matthew De Vera
Recording Secretary
FY 26/27 Budget - Proposed Projects:
Item Funding Source
Project Name
Project Project
Prior Year
Dept
#
Manager
Appropriation
Fiscal Year
2026-27
Municipal Infra. Measure R
Fund 534
Fund 107
Measure M
Fund 108
RMRA Fund Measure W Gas Tax Fund
123
109
125
Dev Impact
Fees
127
Asset
Fofeiture
Fund 124
Police Grants
Fund 121
Civic Center SetAside Fund 534
General City
Capital
Projects
Metro
Measure R
Highway
Fund Grant
Park Dev
Fees
Parks
Vehicle Equip Grants/ Dev
Measure A
Fund 532
Contrib
Fiscal Year
2027-28
Unfunded
Fiscal Year
2028-29
FY 26/27 Proposed Budget - Ongoing Projects
1
Lib Set Asides/Muni Inf/Bonds
New Central Library Civic Center
25286
Eric L.
LIB
$
11,880,810
$
11,098,190
2
Muni Inf
CSB Fountain Repair
25315
TBD
PW
$
100,000
$
500,000
$
500,000
3
Veh Equip/Muni Inf/Grant
Exhaust Systems Modernization
24893
Damian
PW
$
1,025,000
$
950,000
$
285,000
$
285,000
4
Veh Equip
Underground Fuel System Replacement at Various Facilities
24546
TBD
PW
$
1,560,000
$
950,000
$
950,000
5
Veh Equip
Fuel Systems Modernization
23018
TBD
PW
$
370,000
$
200,000
$
200,000
6
Muni Inf/Unfunded
McCambridge Central Kitchen Renovation
25106
TBD
PW
$
150,000
$
1,600,000
7
Muni Inf
Multi-Facilities Security Upgrades
25105
TBD
PW
$
110,000
$
200,000
$
200,000
8
Muni Inf/Inf Reserve
Roof Repair/Restoration
21472
TBD
PW
$
1,596,275
$
250,000
$
250,000
$ 1,098,190
$
10,000,000
$
9
Veh Equip
Vehicle Lift Equipment Modernization
24547
Jose
PW
$
1,200,000
$
600,000
Meas R Hwy Ops
Olive Bridge Replacement
24975
Artin
PW
$
150,000
$
897,000
11
Meas W/Unfunded
McCambridge Park Stormwater Capture Multi-Benefit
24822
Steve
PW
$
1,597,632
$
1,000,000
12
Meas R Hwy Ops/Grant/Unfund
Chandler Bikeway Extension
22702
Kriske
CDD $
1,400,090
$
2,314,037
$ 258,590
13
Meas R Hwy Ops
Olive/Verdugo Intersection Improvements
21239
Kriske
CDD $
1,600,000
$
2,000,000
$ 2,000,000
14
DIF/Muni Inf/Cap/Grant/Donations
Dick Clark Dog Park
24253
Mike
PR
$
2,955,490
$
620,000
$
620,000
15
Grant/ DIF/Muni Inf/Cap Proj
McCambridge Pool Replacement
24979
Diego
PR
$
1,566,035
$
15,620,890
$
10,520,890
16
Muni Inf/DIF/PRR Dev/BAF/Unf
Olive Recreation Center and Theater Building Replacement
25122
Diego
PR
$
4,779,650
$
1,190,250
$
1,190,250
Total Ongoing Projects $ 32,040,982
$
39,990,367
$
13,566,140
$
5,300,000
$
1,600,000
$
1,600,000
$
9,949,896
$
635,000
$
600,000
$
1,000,000
$
600,000
$
1,600,000
380,000
$
10
$
1,600,000
600,000
$ 897,000
$ 1,000,000
$ 5,000,000
$ 2,055,447
$ 100,000
$ 115,971,750
$
-
$
-
$
2,000,000
$
-
$ 1,000,000
$
-
$
800,000
$ 1,098,190
$
-
$
-
$ 10,000,000
$ 5,000,000
$ 3,155,590
$ 100,000
$
-
$ 2,035,000
$ 2,435,447
$
1,600,000
$ 127,156,646
FY 26/27 Proposed New Projects
1
Gas Tax/Meas M/RMRA
2027 Annual Street and Sidewalk Improvement Project
25331
Artin
PW
$
2
Muni Inf
FY 26-27 Annual Facilities Small Capital
25341
Kenny
PW
$
3
Veh Equip
Beam Solar
25332
Craig
PW
$
-
$
100,000
4
Muni Inf
Buena Vista Branch Library Upgrades
25333
Lifan
Lib
$
-
$
65,000
5
Veh Equip
City Hall Emergency Generator
25334
Kenny
PW
$
-
$
100,000
6
Muni Inf
City Yard Main Building Painting
25335
Kenny
PW
$
-
$
380,000
7
DIF/Muni Inf
Firefighter PPE Contamination Control and Storage
TBD
TBD
Fire
$
-
$
50,000
8
Muni Inf
PD/Fire HQ Elevator Modernization
25336
Kenny
PW
$
-
$
1,600,000
$ 2,500,000
$
$
380,000
750,000
$
750,000
$
9
Muni Inf
PD & Fire HQ Exterior Painting
25337
Kenny
PW
$
-
$
220,000
$
220,000
10
Muni Inf
PD Fire HQ Emergency Generator Modernization
25338
Kenny
PW
$
-
$
100,000
$
100,000
11
PD Grants
PD Real-Time Intelligence Center
25342
Lifan
PD
$
-
$
700,000
12
Meas R Local
Downtown Burbank Metrolink Station Rehab
TBD
CDD
CDD $
-
$
300,000
13
DIF
Downtown Mobility Hub
TBD
CDD
CDD $
-
$
500,000
14
Muni Inf/Meas A
Earthwalk Park Playground Replacement
TBD
TBD
PR
$
-
$
716,000
15
Muni Inf
IT Server Room Conversion
25339
Lifan
IT
$
-
$
100,000
$
500,000
$
585,000
$
585,000
11,466,000
$
3,635,000
$ 300,000
$
2,000,000
$ 2,500,000
$
-
$
800,000
$
615,000
$
700,000
$
Total Proposed CIP Budget $ 33,640,982
$
51,456,367
$
17,201,140
$ 300,000
$
2,000,000
$ 2,500,000
$ 1,000,000
$
800,000
$ 1,713,190
$
700,000
$
Fund 534 - Available Funding in Prior Years
FY 25-26
$20,067,115
$
692,977
$
450,000
$
2,700,000
$
500,000
$
4,342,977
$
-
$ 131,499,623
$
1,600,000
700,000
$
FY 24-25
$23,026,590
$
$ 300,000
$
FY 23-24
$23,588,413
100,000
50,000
1,600,000
Total New Projects $
$
65,000
-
Total FY 26-27
Available 534 Funds
Total FY 26-27
New Project Requests
Total FY 26-27 Ongoing
Project Requests
$26,891,610
$3,635,000
$13,566,140
$
-
$ 10,000,000
Total Fund 534
FY 26-27
Requests
$17,201,140
$
-
$ 5,000,000
$
-
$ 3,155,590
$
-
$ 716,000
$
$ 100,000
$ 716,000
$ 2,235,000
FY 26-27 Total Remaining
in Fund 534
$9,690,470
716,000
200,000
$
-
$
-
$ 2,435,447
$
1,600,000
Infrastructure Funding Resources
FY 2026-27 Estimates
Fund
Source Description
Unrestricted Funds
001
001
001
370
370
370
534
534
General Fund Balance
RDA Loan Repayment Set-aside
Youth Endowment
Library Improvements Holding Account
Capital Projects - Library Holding
General City Capital Projects Fund
Municipal Infrastructure Fund
Civic Center Set-aside (Library)
28,333,063
10
14,209
23,570,011
10,897,527
10,000,000
104
105
107
108
123
125
Proposition A - Transportation
Proposition C - Transportation
Measure R - Transportation
Measure M - Transportation
RMRA Fund
State Gas Tax
109
001
001
001
001
001
001
121
122
124
127
5,091,335
(723,933)
6,509,330
1,928,457
3,556,151
1,124,139
300,000
2,000,000
2,500,000
800,000
5,091,335
(723,933)
6,209,330
(71,543)
1,056,151
324,139
650,442
6,547,209
1,000,000
5,547,209
50,000
259,562
33,961
130,845
709,565
1,436,323
1,258,624
1,204,597
773,336
247,107
-
259,562
33,961
30,845
709,565
720,323
1,258,624
504,597
773,336
247,107
3,295,464
2,815,237
2,182,469
2,048,736
3,082,386
3,125,821
3,080,979
3,920,164
993,376
36,171
19,718
2,822,941
Measure W - Stormwater
5,797,651
1,400,000
Burbank Athletic Federation
Capital Improvements - Tennis Center
Capital Improvements - Park Development
Art in Public Places Reserve
Measure A - Parks and Recreation
PEG Fees
Police Grants Fund
Community Development Block Grants (CDBG)
Asset Fofeiture Fund
Public Improvements (Development Impact Fees)
Transportation
CDD Admin
Fire
Information Technology
Library
Police
Parks
HUD Home Program Fund
Low Mod Housing Fund
Parking Authority
Vehicle Equipment Replacement Fund
Grants
309,562
33,961
130,845
729,565
1,436,323
1,326,219
1,204,597
761,467
247,107
TOTAL FUNDS:
inary funding as of December 2025
20,000
67,595
12,205,597
562,681
184,824
127,656
2,562,786
246,139
(905,330)
201,855
12,990,834
1,002,045
16,153,219
-
$ 141,933,139
$
1,099,784
1,087,915
390,954
6,982
4,776
3,533,649
35,102
20,010
76,675
747,700
231,400
1,006,548
12,499,641
40,000
56,143,161
$
Remaining Funds
5,000,000
17,201,140
10,000,000
4,876,850
380,994
5,320,237
(84,108)
493,483
821,259
Restricted: Other
FY 2026-27
Projected FY 2026Proposed
27 Available
Infrastructure
Funds
Spending
10
14,209
18,570,011
9,690,470
-
6,079,395
Restricted: Storm Water
128
305
310
532
FY 2026-27 Projected FY 2026-27 Operating
Revenue
Expenses
22,073,478
Restricted: Transit/Streets
U
FY 2025-26
Projected YearEnd Balance*
10
14,209
23,570,011
26,891,610
10,000,000
692,402
1,072,205
1,486,166
11,709,163
9,062,902
569,663
189,600
127,656
2,557,888
266,149
(828,655)
257,153
12,150,029
522,427
16,943,697
37,362,282
$ 132,380,955
100,000
716,000
700,000
500,000
8,562,902
569,663
139,600
127,656
1,394,698
266,149
(828,655)
257,153
12,150,029
522,427
14,708,697
50,000
1,163,190
2,235,000
5,591,037
$ 49,856,367
$
88,115,625
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Project Name:
New Burbank Central Library & Civic Center
Managing Department:
Public Works
Project Number:
25286
Project Status:
Ongoing: Active Project Requesting an Appropriation
Estimated Completion Date:
Spring 2029
Funding Source:
370.PW33A.70019.0000.25286
370.LB01A.70019.0000.25286
534.PW33A.70019.0000.25286
127.LB01A.70019.0000.25286
Expenditure Plan
Funding Source
Prior Years
Central Library
Capital Holding
3,580,810
Civic Center SetAside
Municipal
Infrastructure Fund
FY 2026-27
FY 2027-28
FY 2028-29
FY 2029-30
Years
6 - 10
10,000,000
10,000,000
8,300,000
8,300,000
1,098,190
1,000,000
State Library Grant
9,949,896
Bond Proceeds
53,385,717
97,186,993
63,335,613
98,186,993
11,880,810
Totals
3,580,810
Development
Impact Fees
Totals
FY 2029-30
11,098,190
2,098,190
9,949,896
150,572,710
-
-
-
184,501,606
Project Description
This project will result in the construction of a new Central Library and Administrative Services Building, a multi-story parking garage, and
functional open space on the Civic Center block bounded by Olive Avenue, Glenoaks Boulevard, Orange Grove Avenue and 3rd Street. The
project will be delivered via a progressive design/build procurement process that will also contractually consider the long-term operation and
maintenance needs of the new Library.
Project Status
The Project is currently in the procurement phase to secure a Progressive Design Build Team to be approved by City Council in October
2026, with a notice to proceed also in October 2026, which is the preferred delivery method for construction. Following the notice to proceed,
the following steps will be taken in Phase 1 of the project with the Progressive Design Build team for more comprehensive design and for
construction; including project validation, collaborative design scoping, and a final guaranteed maximum pricing for the project. The City
estimates breaking ground in June 2027. The project is expected to take 21 months to complete after breaking ground. Construction for the
new library should be completed December 2028 and project close out and move-in should be in Spring 2029.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Insert Photo (Optional)
Project Name:
CSB Fountain Repair
Managing Department:
Public Works
Project Number:
25315
Project Status:
Ongoing: Active Project Requesting an Appropriation
Estimated Completion Date:
TBD
Funding Source:
534.PW33A.70019.0000.25315
Expenditure Plan
Funding Source
Municipal
Infrastructure Fund
Prior Years
FY 2026-27
100,000
500,000
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
600,000
-
Totals
100,000
500,000
-
-
-
-
-
600,000
Project Description
The CSB fountain was taken offline because of a severe leak. The project will deconstruct the fountain to reline its base, repair pump equipment
and reconstruct the fountain.
Project Status
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Project Name:
Exhaust Systems Modernization
Managing Department:
Public Works
Project Number:
24893
Project Status:
Ongoing: Active Project Requesting an Appropriation
Estimated Completion Date:
June 2027
Funding Source:
370.PW33A.70019.0000.24893
534.PW33A.70019.0000.24893
532.PW34A.70019.0000.24893
Expenditure Plan
Funding Source
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Prior Years
FY 2026-27
Totals
Vehicle Equipment
Replacement Fund
225,000
285,000
510,000
Municipal
Infrastructure Fund
400,000
285,000
685,000
Grant Funding
400,000
380,000
780,000
-
Totals
1,025,000
950,000
-
-
-
-
-
1,975,000
Project Description
This project replaces specialized ventilation equipment that collects and expels diesel fumes, carbon monoxide, particulates, and other harmful
airborne products occurring in fire stations and in vehicle repair shops.
The work will occur at the Police/Fire Headquarters fire apparatus room, vehicle maintenance bays at the City Yard, and in all Fire Stations (12, 13,
14, 15, and 16). The work will include replacing leaking or inoperable ductwork, new magnetic connectors, new rails, ductwork overhead, new fans
and automatic controls.
Project Status
Design and bid specifications are complete. The project is anticipated to advertise in Q3 FY 25-26. Construction is estimated to be completed in
Q3 FY 26-27.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Project Name:
Undreground Fuel System Replacement at Various Facilities
Managing Department:
Public Works
Project Number:
24546
Project Status:
Ongoing: Active Project Requesting an Appropriation
Estimated Completion Date:
June 2027
Funding Source:
532.PW34A.15032.0000.24546
534.PW34A.15032.0000.24546
Expenditure Plan
Funding Source
Prior Years
FY 2026-27
Vehicle Equipment
Replacement Fund
1,560,000
950,000
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
2,510,000
-
Totals
1,560,000
950,000
-
-
-
-
-
2,510,000
Project Description
Underground fuel storage tanks at Fire Stations 12 & 16 were installed prior to 1990. Recently, tanks at each station developed leaks and were
removed. The scope of this project will include the replacement of one (1) new Owner Furnished Contractor Installed (OFCI) above ground (2,000gallon combined (1,000- Diesel & 1,000-Unleaded) at Fire Station 12 and one (1) new OFCI above ground 2,000-gallon (Diesel) fuel tank system at
Fire Station 16. Each new tank will be installed adjacent to the previously removed underground storage tank locations. New fuel dispensers and a
new tank management system including consoles, probes, sensors, and detector systems will be installed. Other construction efforts will include
the selective demolition, replacement of affected concrete and/or asphalt paving, planting, irrigation, and site drainage. The Project will be
inspected and tested to meet all applicable local, county, and state regulatory agency requirements. Additional funds will replace funds used for
immediate repairs in FY 26-27.
Project Status
Tanks at Fire Stations 12 and 16 were removed in June 2024 to address immediate environmental concerns. The project is planned to be
advertised in FY 26-27. Additional funding will cover the for cost of construction, increased construction administration costs, construction
management services, design, and cost escalation.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Project Name:
Fuel Systems Modernization
Managing Department:
Public Works
Project Number:
23018
Project Status:
Ongoing: Active Project Requesting an Appropriation
Estimated Completion Date:
December 2026
Funding Source:
532.PW34A.15032.0000.23018
Expenditure Plan
Funding Source
Vehicle Equipment
Replacement Fund
Prior Years
FY 2026-27
370,000
200,000
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
570,000
-
Totals
370,000
200,000
-
-
-
-
-
570,000
Project Description
Public Works utilizes a fuel pump management system for diesel and gas pumps throughout the City. This project will replace terminal data cabling
and other necessary infrastructure to support the new operating system at all City Fire Stations (Stations 11-16), the mobile pump unit at DeBell,
the Maintenance Yard, and the Recycle Center. This project will also include replacing tank monitoring equipment for more accurate reporting.
Project Status
Four terminal card readers were replaced in 2025. The fuel system engineer will design needed mondernization of the entire system in Q3 FY 2526. Staff will pursue sole source justification for the selected vendor in Q4 FY 25-26. Construction is estimated to be completed by Q2 FY 26-27.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Insert Photo (Optional)
Project Name:
McCambridge Central Kitchen Remodel
Managing Department:
Public Works
Project Number:
25106
Project Status:
Ongoing: Active Project Requesting an Appropriation
Estimated Completion Date:
June 2027
Funding Source:
534.PW33A.70019.0000.25106
Expenditure Plan
Funding Source
Municipal
Infrastructure Fund
Prior Years
FY 2026-27
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
150,000
Unfunded
Totals
FY 2027-28
150,000
1,600,000
150,000
1,600,000
1,600,000
-
-
-
-
-
1,750,000
Project Description
The McCambridge Recreation Center was originally built in 1956. The project will renovate the Central Kitchen to bring the kitchen up to current
codes and standard, and add walk-in refrigeration and freezer spaces to adequately serve the community. The kitchen serves over 10,000
meals each month to the City's senior community and requires reliable refrigeration. Currently, there is inadequate refrigeration and freezer
spaces. Additionally, the kitchen and storage area needs to be thoroughly renovated to meet the LA County Aging and Disability Department
Food Service Operation Procedures for the Elderly Nutrition Program Standards, and to ensure food and supplies be stored at appropriate
temperatures in clean and well-ventilated areas.
Project Status
The design began in December 2025 and will be completed in April 2026. Construction award is anticipated in August 2026 and preconstruction
activities are expected in September 2026. Construction will begin in January 2027 and estimated to be completed in June 2027.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Project Name:
Multi-Facilities Security Upgrades
Managing Department:
Public Works
Project Number:
25105
Project Status:
Ongoing: Active Project Requesting an Appropriation
Estimated Completion Date:
June 2026
Funding Source:
534.PW33A.70019.0000.25105
Expenditure Plan
Funding Source
Municipal
Infrastructure Fund
Prior Years
FY 2026-27
FY 2027-28
110,000
200,000
635,000
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
945,000
-
Totals
200,000
635,000
-
-
-
-
945,000
Project Description
This project will modernize the City's existing Winpac/Honeywell facility access control systems at multiple City facilities. Existing numeric
keypads and supporting equipment will be replaced with RFID readers that will enable employee badges to be used as access keys for secured
City Facilities. The project will include design, engineering, and construction.
Project Status
Design and bid will start in fiscal year 2025/26.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2025-26 City of Burbank CIP
MUNICIPAL FACILITIES
Project Name:
Roof Repair/Restoration to Multiple Roofs
Managing Department:
Public Works
Project Number:
21472
Project Status:
Ongoing: Active Project Requesting an Appropriation
Estimated Completion Date:
December 2025
Funding Source:
534.PW33A.70019.0000.21472
370.PW33A.70019.0000.21472
Expenditure Plan
Funding Source
Prior Years
Infrastructure Reserve
Municipal
Infrastructure Fund
FY 2026-27
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
285,500
1,310,775
285,500
250,000
1,560,775
-
Totals
1,596,275
250,000
-
-
-
-
-
1,846,275
Project Description
This project will repair and restore various roof systems on multiple facilities at the Olive Recreation Center, Joslyn Adult Center, Creative Art
Center, Pottery Building, and the Burbank Animal Shelter.
Project Status
The project will be advertised in FY 25-26 and construction will be completed in FY 26-27.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Project Name:
Vehicle Lift Equipment Modernization
Managing Department:
Public Works
Project Number:
24547
Project Status:
Ongoing: Active Project Requesting an Appropriation
Estimated Completion Date:
Fiscal Year 2031/2032
Funding Source:
532.PW34A.15042.0000.24547
Expenditure Plan
Funding Source
Prior Years
FY 2026-27
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Vehicle Equipment
Replacement Fund
1,200,000
600,000
600,000
600,000
600,000
1,200,000
Years
6 - 10
Totals
4,800,000
-
Totals
1,200,000
600,000
600,000
600,000
600,000
1,200,000
-
4,800,000
Project Description
Complete modernization of fourteen (14) vehicle lifts to accommodate current Fleet requirements including all City light, medium, and heavy-duty
vehicles. Public Works will split the project into 6 phases (1 phase per year). Phases 1 and 2 will replace all light duty and medium duty lifts (total
of 7 lifts), Phases 3-6 will be the replacement of Heavy-duty lifts (1 lift per phase).
Project Status
Design for the entire project to be completed from January to Febuary 2026. Proposal for phase 1 to be completed January 2026. Phase 1
construction is anticipated to start in fiscal year 25/26 through a co-op agreement.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 CITY OF BURBANK CIP
TRAFFIC, TRANSPORTATION PEDESTRIAN ACCESS
Project Name:
Olive Avenue Bridge Replacement
Managing Department:
Public Works
Project Number:
24975
Project Status:
Ongoing: Active Project Requesting an Appropriation
Estimated Completion Date:
January 2035
Funding Source:
127.CD33A.70002.0000.24975
370.PW21A.70002.0000.24975
125.PW21A.70002.0000.24975
Expenditure Plan
Funding Source
Development Impact
Fees
Measure R Highway
Ops fronted with
Development Impact
Fees
Prior Years
FY 2026-27
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
150,000
897,000
150,000
Totals
150,000
897,000
Unidentified
State/Fed Funding
Totals
Years
6 - 10
897,000
-
-
-
150,000,000
150,000,000
150,000,000
151,047,000
Project Description
The Olive Avenue Bridge was constructed in 1959 and spans over the Burbank Western Channel, the Metrolink Tracks, Interstate 5, and several
local streets including Bonnywood Place and Front Street. It is 1,420 feet long including the approach roadways. The first three spans (east end)
are owned and maintained by Caltrans and the remaining seven spans are owned by the City of Burbank. The City owned structures are
maintained by the County of Los Angeles under contract with the City of Burbank. The Bridge (and Magnolia) had a Feasibility Study completed in
2016 to potentially widen the bridges. This project will update that study to determine the best rehabilitation strategy for the Bridge as well as
consider the new needs based upon the upcoming Bus Rapid Transit (BRT) line that Metro is going to implement in Olive Avenue.
Project Status
This project will advance pre-planning, early design, environmental analyses, and community engagement towards replacing the Olive Avenue
Bridge. PID and PAED (30%) activities expected to be completed in approximately 24-36 months.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Project Name:
McCambridge Park Stormwater Capture Multi-Benefit Project
Managing Department:
Public Works
Project Number:
24822
Project Status:
Ongoing: Active Project Requesting an Appropriation
Estimated Completion Date:
FY 2028-29
Funding Source:
109.PW23A.71000.0000.24822
370.PW23A.71000.0000.24822
Expenditure Plan
Funding Source
Measure W Stormwater
Prior Years
FY 2026-27
1,597,632
1,000,000
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Grant Funding
Years
6 - 10
Totals
8,000,000
10,597,632
32,402,368
32,402,368
-
Totals
1,597,632
1,000,000
-
-
-
-
40,402,368
43,000,000
Project Description
This is a stormwater capture multi-benefit project. The scope of work includes the following improvements: an underground stormwater capture
system (infiltration gallery), bioswales in two parking lots, planting of native trees, improved ADA paths, picnic tables with shade structures, fitness
stations and a 9-hole disc golf course, LED pedestrian and/or ballfield lighting throughout park, and solar power at the recreation center and
basketball court.
Project Status
The feasibility study has been completed and submitted to LA County. In prior years (23/24 and 24/25), a grant funding application for $2.93M for
design work was submitted to LA County and finished just outside of those projects receiving funding. The project is currently in the design
phase, and the 70% design document package is scheduled to be completed in December 2026. The additional design funds requested for FY
2026-27 are to finalize the design and make the project more competitive when submitting applications for grant funds from the County and other
sources.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
COMMUNITY DEVELOPEMENT
Project Name:
Chandler Bikeway Extension
Managing Department:
Community Development
Project Number:
22702
Project Status:
Ongoing: Active Project Requesting an Appropriation
Estimated Completion Date:
Summer 2028
Funding Source:
127.CD33A.70002.0000.22702
370.CD33A.70002.0000.22702
107.CD33A.70002.0000.22702
Expenditure Plan
Funding Source
FY 2026-27
Measure R Highway
Operations
401,231
258,590
659,821
Metro Grant
583,837
2,055,447
2,639,284
Fund 127 DIF
415,022
Totals
1,400,090
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Prior Years
-
Totals
415,022
2,314,037
-
3,714,127
Project Description
The project will extend the Chandler Bikeway from its current eastern terminus at Chandler Boulevard and Mariposa Street to the future San
Fernando Bikeway along the Western Burbank Channel, which will then carry cyclists on Chandler to the Downtown Burbank Metrolink Station.
The completion of this project will help to close the gap between two regionally significant Class I bikeways and will provide pedestrian and
bicycle connectivity to the City's Downtown Burbank Metrolink Station. This gap is identified in the Burbank2035 General Plan, the Bicycle
Master Plan, and the Complete Streets Plan. The Greenhouse Gas Reduction Plan calls for buildout of the City's Bicycle Master Plan and
Complete Streets Plan as a means to reduce the City's greenhouse gas emissions caused by vehicle miles traveled.
Project Status
Staff has procured consultant design services and has begun preliminary design and environmental review for the project, including evaluation
of alignment options along Victory Boulevard. City Council approved final project alignment on November 18, 2025, and Staff is advancing
design for final alignment.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
COMMUNITY DEVELOPEMENT
Project Name:
Olive/Verdugo Intersection Improvements
Managing Department:
Community Development
Project Number:
21239
Project Status:
Ongoing: Active Project Requesting an Appropriation
Estimated Completion Date:
Winter 2030
Funding Source:
370.PW22A.70002.0000.21239
Expenditure Plan
Funding Source
Prior Years
FY 2026-27
Measure R Hwy Ops
1,600,000
2,000,000
Totals
1,600,000
2,000,000
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
3,600,000
-
3,600,000
Project Description
In 2013, Burbank was allocated funds by Metro to improve traffic flow and safety through the Olive/Verdugo intersection. The project will upgrade traffic
signal equipment, install signing and striping, and construct street improvements. It will reduce travel times, delays, and vehicle emissions. In addition, it
will improve bicycle and pedestrian safety.
Project Status
In 2018, based on community input from residents near the project intersection, City Council directed staff to return with a revised design alternative that
included additional elements. Based on preliminary cost estimates, an additional $2 million in Measure R funding from Metro was secured to complete
construction for the City's preferred alternative that was presented to Council in 2018. Staff plans to return to the City Council in mid-2026 to request
approval of the revised design alternative that now includes the additional design elements requested by the community at the 2018 Council Meeting. If
directed to proceed, final design would begin in late 2026.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
Parks and Recreation
Project Name:
Dick Clark Dog Park
Managing Department:
Parks and Recreation
Project Number:
24253
Project Status:
Ongoing: Active Project Requesting an Appropriation
Estimated Completion Date:
June 2025
Funding Source:
127.CD33E.70003.0000.24253
127.PR28A.70003.0000.24253
370.PR21A.70003.0000.24253
534.PR21A.70003.0000.24253
Expenditure Plan
Funding Source
Prior Years
FY 2026-27
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
Donation
150,000
150,000
Prop 68 Per Capita Grant Funds
243,440
243,440
1,313,255
1,313,255
Development Impact Fees
Municipal Infrastructure
822,977
General City Capital Projects
425,818
Totals
2,955,490
620,000
1,442,977
425,818
620,000
3,575,490
Project Description
Preserve and expand open space to develop an off-leash dog park that promotes exercise and wellness for dogs and their owners. Park design will include planting,
landscape, irrigation, fencing, site furnishings, lighting, drinking fountains, and parking.
Project Status
The project is in the construction document phase. Anticipated bid date in Spring 2026.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
For Internal Use Only:
IOB COMMENTS
Total
Prioritization Score
0
FY 2026-27 City of Burbank CIP
Parks and Recreation
Project Name:
McCambridge Pool Replacement
Managing Department:
Parks and Recreation
Project Number:
24979
Project Status:
Ongoing: Active Project Requesting an Appropriation
Estimated Completion Date:
June 2028
Funding Source:
127.PR21A.70003.0000.24979
370.PR21A.70003.0000.24979
Expenditure Plan
Funding Source
Prior Years
Grant Funding
1,566,035
Park Development Fees
FY 2026-27
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
1,566,035
100,000
100,000
General City Capital Projects Fund
5,000,000
5,000,000
Municipal Infrastructure
10,520,890
10,520,890
Totals
1,566,035
15,620,890
-
-
17,186,925
Project Description
This multi-phased renovation project for the McCambridge Pool facility will include a new lap pool, activity pool, waterslides, play features, pool deck, equipment
room, locker room upgrades, and staff offices. Design completion is anticipated by December 2026 and construction to begin in early 2027.
Project Status
Project delivery method will be design-bid-build.
Phase 1: Aquatics Facility Needs Assessment Report and extensive community engagement completed in FY 2021-22.
Phase 2: Includes design development, construction documents, project management services, and CEQA analysis to progress into the procurement bidding phase
once construction documents are completed.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
For Internal Use Only:
IOB COMMENTS
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
Parks and Recreation
Project Name:
Olive Recreation Center and Theater Building Replacement
Managing Department:
Parks and Recreation
Project Number:
25122
Project Status:
Ongoing: Active Project Requesting an Appropriation
Estimated Completion Date:
Jun-30
Funding Source:
534.PR21A.70003.0000.25122
370.PR28A.70003.0000.25122
127.PR28A.70003.0000.25122
Expenditure Plan
Funding Source
FY 2026-27
Municipal Infrastructure Fund
3,529,225
1,190,250
Development Impact Fees
1,150,425
1,150,425
Park Development Fees/BAF
100,000
100,000
Unfunded
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Prior Years
Totals
4,719,475
115,971,750
Totals
4,779,650
1,190,250
115,971,750
115,971,750
-
-
-
-
121,941,650
Project Description
The City Council approved the George Izay Park Master Plan on October 11, 2022. This is a multi-phased project that will ultimately result in the renovation of George
Izay Park. The first segment of this project will include a new recreation center, performing arts center, and new exterior park restrooms.
Funding request includes CEQA analysis and Construction Document Development. This phase also includes engaging Project Management services to represent the
Department.
Project Status
The Izay Master Plan was completed in FY 2021-22. Topographic survey and 3D renderings were approved by Council in December 2024. Architect was selected to
perform schematic design and design development. Once funding is in place, design agreement can be awarded in July 2025 and design is anticipated to be completed
by spring 2027. If construction funding is approved in FY 2027-28, construction can start in fall 2028 and is anticipated to be completed by spring 2030.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
$0
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
Traffic, Transportation, and Pedestrian Access
Project Name:
2027 Annual Street and Sidewalk Improvement Project
Managing Department:
Public Works
Project Number:
25331
Project Status:
New: New Project Requesting an Appropriation
Estimated Completion Date:
June 2027
Funding Source:
125.PW21A.70002.0000.25331
108.PW21A.70002.0000.25331
123.PW21A.70002.0000.25331
Expenditure Plan
Funding Source
Prior Years
FY 2026-27
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
Gas Tax Fund 125
800,000
800,000
Measure M Fund 108
2,000,000
2,000,000
Road Maintenance
and Rehabilitation
(RMRA)
2,500,000
2,500,000
-
Totals
5,300,000
-
-
-
-
-
5,300,000
Project Description
The 2027 annual street and sidewalk improvement project is a continuation of the City's ongoing efforts to maintain its sidewalks and roadways.
The project will remove and reconstruct damaged curbs, gutters, sidewalks, driveways, and pedestrian ramps in targeted areas throughout the
City. The project will also address roadways and alleyways rated poor and below condition to achieve a Citywide pavement condition index (PCI) of
70 with alleyway PCI to 55 by FY 2030-31.
Project Status
Design is estimated to take place from July 2026 to April 2027. Construction is estimated to take place from September 2027 through December
2027.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Insert Photo (Optional)
Project Name:
FY 2026/27 Annual Facilities Small Capital Improvement
Managing Department:
Public Works
Project Number:
25341
Project Status:
New: New Project Requesting an Appropriation
Estimated Completion Date:
June 2026
Funding Source:
534.PW33A.70019.0000.25341
Expenditure Plan
Funding Source
Prior Years
FY 2026-27
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Municipal
Infrastructure Fund
3,400,000
1,600,000
1,600,000
1,600,000
1,600,000
1,600,000
Years
6 - 10
Totals
11,400,000
-
Totals
3,400,000
1,600,000
1,600,000
1,600,000
1,600,000
1,600,000
-
11,400,000
Project Description
Facility capital program/small capital planned and unplanned replacement/repair/strategic maintenance to extend life/modernization/new building
components, all aspects of facility related infrastructure such as; Interior building systems, electrical panels and lighting systems, HVAC, roofs
and waterproofing systems , plumbing, and elevators. Small Capital programs do not include general maintenance and small repair.
Project Status
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Insert Photo (Optional)
Project Name:
Beam Solar
Managing Department:
Public Works
Project Number:
25332
Project Status:
New: New Project Requesting an Appropriation
Estimated Completion Date:
TBD
Funding Source:
532.PW34A.15042.25332
Expenditure Plan
Funding Source
Prior Years
FY 2026-27
Vehicle Fund 532
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
100,000
100,000
-
Totals
-
100,000
-
-
-
-
-
100,000
Project Description
Beam is a turnkey solar vehicle charging solution that is self-contained and completely off the electrical grid. The project will place two solar
powered vehicle charges at a City facility for staff use.
Project Status
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Insert Photo (Optional)
Project Name:
Buena Vista Branch Library Upgrades
Managing Department:
Library Services
Project Number:
25333
Project Status:
New: New Project RequestingNew:
an Appropriation
New Project Requesting an Appropriation
Estimated Completion Date:
TBD
Funding Source:
127.LB01A.70019.0000.25333
Expenditure Plan
Funding Source
Prior Years
FY 2026-27
DIF
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
65,000
Unfunded
65,000
692,977
Totals
-
65,000
692,977
692,977
-
-
-
-
757,977
Project Description
The Buena Vista Branch opened in 2002 and has not had any major renovation after over 20+ years. It serves as the most highly visited library
branch with over 320,000 patrons annually. Due to high public use, the carpet and flooring has passed its useful life and require frequent repair
with it being difficult to source adequate replacement to current style and design. In the best interest to improve the space while flooring is
replaced and in coordination with planned HVAC upgrades, renovations to improve the safety, usage, and staff needs are as follows: 1. Currently
there is not any dedicated teen space, which is critical for this location as it is in close proximity to area public and private high schools and middle
schools. This project will replace an underutilized area to provide a glass partition, study booth, and lounge furniture to facilitate teen usage. 2. In
addition, to address growing usage, additional staff spaces can be developed to accomodate 5 staff pods. 3. To enhance patron usage, convert
fixed window to operable glass door to provide connection to outdoor space and provide acoustical treatment to main lobby entrance area.
Project Status
Project is in design and will be finalized in FY 2026-27.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Insert Photo (Optional)
Project Name:
City Hall Emergency Generator
Managing Department:
Public Works
Project Number:
25334
Project Status:
New: New Project Requesting an Appropriation
Estimated Completion Date:
TBD
Funding Source:
534.PW33A.70019.0000.25334
Expenditure Plan
Funding Source
Prior Years
FY 2026-27
Municipal
Infrastructure Fund
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
100,000
100,000
-
Totals
-
100,000
-
-
-
-
-
100,000
Project Description
The City Hall Emergency Generator is at the end of its reliable service life and requires replacement. The project will validate current generator
loads and facility requirements and replace with a modern generator. The project includes design, engineering and construction.
Project Status
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Insert Photo (Optional)
Project Name:
City Yard Main Building Painting
Managing Department:
Public Works
Project Number:
25335
Project Status:
New: New Project Requesting an Appropriation
Estimated Completion Date:
June 2027
Funding Source:
534.PW33A.70019.25335
Expenditure Plan
Funding Source
Prior Years
FY 2026-27
Municipal
Infrastructure Fund
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
380,000
380,000
-
Totals
-
380,000
-
-
-
-
-
380,000
Project Description
Re-painting the Public Works Building at the City Yard. The Public Works building exterior is in need of a refresh.
Project Status
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Insert Photo (Optional)
Project Name:
Firefighter PPE Contamination Control and Storage
Managing Department:
Fire Department
Project Number:
TBD
Project Status:
New: New Project Requesting an Appropriation
Estimated Completion Date:
June 2028
Funding Source:
127.FD07A.XXXXX.XXXX.XXXXX
534.FD07A.XXXXX.XXXX.XXXXX
Expenditure Plan
Funding Source
Prior Years
FY 2026-27
DIF Fund 127
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
50,000
Municipal
Infrastructure Fund
50,000
450,000
450,000
-
Totals
-
50,000
450,000
-
-
-
-
500,000
Project Description
This project entails constructing an add-on space to provide a dedicated turnout gear storage area for firefighter personal protective equipment
(PPE) at Stations 14 and 15. Turnouts are currently stored on the apparatus floor at each of these stations, subjecting them to exposure to
diesel fumes from vehicles. The new space would be physically separated from living and work areas and designed with appropriate ventilation
to reduce the spread of contaminants associated with fireground operations. Creating a designated turnout storage area supports safe handling,
drying, and organization of gear while improving overall station functionality. The project also advances firefighter health and safety by limiting
exposure of clean PPE to products of combustion. It aligns with nationally recognized fire service best practices and standards for cancer
prevention, while also reducing long-term health risks. The additional space would enhance operational readiness by ensuring turnout gear is
properly stored, readily accessible, and maintained in a manner that extends its service life.
Project Status
Project will undergo design in FY26-27, with construction expected to occur in FY27-28.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Project Name:
Police and Fire Headquarters Elevator Modernization
Managing Department:
Public Works
Project Number:
25336
Project Status:
New: New Project Requesting an Appropriation
Estimated Completion Date:
September 2028
Funding Source:
534.PW33A.70019.0000.25336
Expenditure Plan
Funding Source
Prior Years
FY 2026-27
Municipal
Infrastructure Fund
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
750,000
Totals
750,000
-
Totals
-
750,000
-
-
-
-
-
750,000
Project Description
The three elevators at the Police and Fire headquarters have reached the end of their lifecycle and require replacement. Replacement parts are
becoming extremely difficult to source because of the age of the elevators. A comprehensive modernization of critical elevator components is now
necessary.
Project Status
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Insert Photo (Optional)
Project Name:
PD & Fire Headquarter Exterior Painting
Managing Department:
Public Works
Project Number:
25337
Project Status:
New: New Project Requesting an Appropriation
Estimated Completion Date:
June 2027
Funding Source:
534.PW33A.70019.25337
Expenditure Plan
Funding Source
Prior Years
FY 2026-27
Municipal
Infrastructure Fund
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
220,000
220,000
-
Totals
-
220,000
-
-
-
-
-
220,000
Project Description
Re-painting PD and Fire Headquarter as the exterior is in need of a refresh.
Project Status
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Insert Photo (Optional)
Project Name:
PD Fire HQ Emergency Generator Modernization
Managing Department:
Public Works
Project Number:
25338
Project Status:
New: New Project Requesting an Appropriation
Estimated Completion Date:
TBD
Funding Source:
534.PW33A.70019.0000.25338
Expenditure Plan
Funding Source
Prior Years
FY 2026-27
Municipal
Infrastructure Fund
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
200,000
200,000
-
Totals
-
200,000
-
-
-
-
-
200,000
Project Description
The Emergency Generator serving the PD Fire HQ Facility is at the end of its reliable service life and requires replacement. Phase 1 of the project
will validate current generator loads, analyze facility requirements for a modern generator, and design and engineer the facility improvements for
the replacement generator. Additional funding is included for strategic maintenance/repairs to extend the life of the existing generator until a new
emergency generator system can be constructed.
Project Status
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Insert Photo (Optional)
Project Name:
PD Real-Time Intelligence Center
Managing Department:
Public Works
Project Number:
25267
Project Status:
New: New Project Requesting an Appropriation
Estimated Completion Date:
TBD
Funding Source:
121.PD03A.70019.25342
Expenditure Plan
Funding Source
Prior Years
FY 2026-27
Fund 121
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
700,000
700,000
-
Totals
-
700,000
-
-
-
-
-
700,000
Project Description
Convert the Department’s current mid-level report writing room into a fully functional Real-Time Intelligence Center (RTIC). The project includes
the installation of four modern workstations equipped with the necessary technology and infrastructure to support real-time intelligence operations,
including multiple wall monitors. Facility upgrades will include new electrical connections and power distribution to support high-capacity
equipment, improved lighting suitable for an operations environment, demolition of existing indoor wall, modification to current door, updated
flooring, and interior modifications to accommodate display monitors and technology systems. This project includes design, construction, and
technology integration to ensure the development of a modernized, functional space that enhances the Department’s operational efficiency and
supports public safety.
Project Status
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
Traffic, Transportation, and Pedestrian Access
Insert Photo (Optional)
Project Name:
Downtown Burbank Metrolink Station Rehabilitiation
Managing Department:
Community Development
Project Number:
TBD
Project Status:
New: New Project Requesting an Appropriation
Estimated Completion Date:
FY 2028
Funding Source:
Measure R Local Return
Expenditure Plan
Funding Source
Prior Years
Measure R Local
Return
FY 2026-27
300,000
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
2,700,000
3,000,000
-
Totals
-
300,000
2,700,000
-
-
-
-
3,000,000
Project Description
The Downtown Burbank Metrolink Station is over 30 years old and is in need of a significant amount of minor capital improvements to bring the station
back to a state of good repair. An overhaul of most of the station, including improvements to the pavement, plumbing, building facades, paint, lighting,
and HVAC systems are needed, among other things. The project will be funded by Local Return monies.
Project Status
A high level facilities assessment has been completed. Public Works and CDD will commence with design of the repairs in summer 2026.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
Traffic, Transportation, and Pedestrian Access
Insert Photo (Optional)
Project Name:
Downtown Burbank Mobility Hub Network
Managing Department:
Community Development
Project Number:
TBD
Project Status:
New: New Project Requesting an Appropriation
Estimated Completion Date:
Summer 2028
Funding Source:
127.CD33A.70002.0000…....
*Forthcoming grant funding
Expenditure Plan
Funding Source
Prior Years
FY 2026-27
FY 2027-28
500,000
500,000
Fund 127 DIF
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
1,000,000
-
Totals
-
500,000
500,000
-
-
-
-
1,000,000
Project Description
Construction of Mobility Hub at 1st Street and Olive Avenue to connect the various transit lines, pedestrian pathways, and bicycle lanes in
Downtown Burbank as well as providing open space for residents, employees, and visitors. Mobility Hub will include expanded bus stop
amenities, like seating and shade, as well as streamlined informational signage. Wayfinding throughout Downtown Burbank will be deployed to
enhance connectivity between the various miltimodal projects.
Project Status
Staff have been selected by SCAG for grant award, but SCAG has not yet obligated funds. Current funding is intended as a placeholder until
funds are awarded and Staff can determine additional funding needs.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
FY 2026-27 City of Burbank CIP
Parks and Recreation
Project Name:
Earthwalk Park Playground Replacement
Managing Department:
Parks and Recreation
Project Number:
TBD
Project Status:
New: New Project Requesting an Appropriation
Estimated Completion Date:
June 2027
Funding Source:
370.PR21A.70003.0000.TBD
Expenditure Plan
Funding Source
Prior
Years
Measure A
FY 2026-27
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
716,000
716,000
-
Totals
-
716,000
-
-
-
-
-
716,000
Project Description
This project will install new play equipment at Earthwalk Park to meet community needs and maintain safety and longevity. This project aligns with the
Department's replacement schedule based on age, condition, industry standards, and compliance requirements. The new playground will offer inclusive
play elements supporting cognitive, physical, social-emotional, sensory, and motor development, along with new poured-in-place surfacing and an
integrated shade structure. The existing playground was installed in 2017.
Project Status
The project delivery method will be design-build. Design and construction will occur in FY 2026-27.
Prioritization Score
$0
JL
Total
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
Estimated Annual O&M
Impact/(Savings)
SC
CO
CI
0
FY 2026-27 City of Burbank CIP
MUNICIPAL FACILITIES
Project Name:
IT Server Room Conversion
Managing Department:
Public Works
Project Number:
25339
Project Status:
New: New Project Requesting an Appropriation
Estimated Completion Date:
June 2027
Funding Source:
534.PW33A.70019.0000.25339
Expenditure Plan
Funding Source
Prior Years
FY 2026-27
Municipal
Infrastructure Fund
FY 2027-28
FY 2028-29
FY 2029-30
FY 2030-31
Years
6 - 10
Totals
585,000
585,000
-
Totals
-
585,000
-
-
-
-
-
585,000
Project Description
This project involves the renovation and conversion of the existing server room located in the City Hall basement, into a functional, modern workspace with
a separate, secure area to stage, prepare, configure and troubleshoot technical equipment. The existing space, currently designed for housing data center
equipment, will be repurposed to provide a comfortable, efficient, and technology-enabled office environment with 16 individual cublicles to accomodate a
fully staffed and centrally located IT Department. Currently, the IT Department has staff in two separate locations. The goal is to relocate staff from the CSB
to the City Hall basement. The work includes selective demolition, construction, finishes, electrical, mechanical, and low-voltage upgrades to meet current
building and workplace standards.
Project Status
Phase I design will begin in FY 26-27 and be completed in FY 27-28.
Estimated Annual O&M
Impact/(Savings)
Prioritization Score
IOB COMMENTS
For Internal Use Only:
HS
Prioritization Score
SC
JL
CO
CI
Total
0
Not yet recorded. The record stays open — outcomes are added as minutes and vote results are published.
Provenance
Where this record came from. Every source is listed, permanently.
- Agenda Watch · Jul 20, 2026
Permanent ID DKT-2026-000128 — this record is never deleted.
Record history
Every change to this record, logged as it happened.
- Jul 20, 2026 Filed on the Docket
- Jul 20, 2026 Full document archived — public record
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
- Aug 7, 2026 Record updated
← The full Docket · every meeting, vote, and action on the permanent record · also in the National Record Index.