On the agenda: Charlotte Courthouse Packet — Data Center (Nov 19)
⚠ Agenda Watch Charlotte Courthouse, Virginia · Thursday, November 19, 2026 — today
About this record
The published agenda for this November 19 meeting contains: "Data Center", "data center". This is the public record BEFORE the vote — read the document, then show up. Public comment is where cancellations start.
Check the agenda document for the meeting time.
The agenda, word for word
Government public record — the full text of the published document, archived November 13, 2026. Gold highlighting of key terms is ours, not the original’s. Read the original document ↗
Charlotte County Planning Commission
250 LeGrande Avenue, Suite A
Charlotte Court House, VA 23923
Thursday November 19th, 2026
7:00 PM
•
Call to Order
•
Invocation
•
Consider Approval of Agenda
•
Consider Approval of October 15th Meeting Minutes
•
Recess for Public Hearing – Zoning Amendments for Solar
o Call Public Hearing to Order
o Staff Report – Monica Elder
o Public Comments
o Commissioner Questions/Comments
o Adjourn Public Hearing & Reconvene Regular Meeting
•
Consider a Recommendation on Solar Zoning Amendments
•
Recess for Public Hearing – Zoning Amendments for Battery Energy Storage
o Call Public Hearing to Order
o Staff Report – Monica Elder
o Public Comments
o Commissioner Questions/Comments
o Adjourn Public Hearing & Reconvene Regular Meeting
•
Consider a Recommendation on Battery Energy Storage Zoning Amendments
•
General Public Comments
•
Consider Draft Bylaws – Conner Francis
•
Consider Draft FOIA Policy – Conner Francis
•
Discuss Establishing a Commercial Zoning District & Associated Regulations – Monica Elder
•
Discuss Zoning Amendments for the Cannabis Market – Conner Francis
•
Zoning Amendments for Recreational Vehicles/Campers – Monica Elder
•
General Staff Report
•
Commissioners' Time
•
Adjourn
1 / 67
Charlotte County Planning Commission
October 15th, 2026, 7:00 p.m.
Charlotte County Administration Office
Present:
J. Miller Adams*
James Benn**
Andrew Carwile
Tina Morgan
Absent:
Patrick Andrews
Kerwin Kunath
David Watkins, Jr.
Curtis Morton
Brian Poindexter
Belinda Strom
Eugene Wells
*Board of Supervisors Representative – Non-voting (Alternate Substitution for Supervisor Tharpe)
** Chairman of the Charlotte County Planning Commission
Staff in Attendance: Monica Elder, Deputy County Administrator/Zoning Administrator;
Conner Francis, County Administrative Planner
Call to Order
Chairman Jim Benn called the October 15, 2026, meeting of the Charlotte County Planning Commission to
order at 7:00 p.m.
Invocation
The invocation was delivered by Commissioner Eugene Wells.
Approval of Agenda
A motion was made by Andrew Carwile and seconded by Belinda Strom to approve the agenda as presented.
The motion carried with all members present voting in favor.
Approval of Minutes
The Commission considered the September 17, 2026, meeting minutes. Chairman Benn noted a correction to the
attendance record, stating that Commissioner David Evans had been incorrectly listed as present and should be
listed as absent.
A motion was made by Andrew Carwile and seconded by Brian Poindexter to approve the September 17, 2026,
meeting minutes with the noted correction. The motion carried with all members present voting in favor.
Conditional Use Permit – John Swarey Sawmill – Tax Parcel 16-A-18
Chairman Benn recessed the regular meeting and called the public hearing to order for the Conditional Use
Permit application submitted by John Swarey for a sawmill.
Staff Report
Conner Francis presented the staff report and summarized the application as follows:
•
The application was received September 22, 2026, and deemed complete September 23, 2026.
•
The subject property, Tax Parcel 16-A-18, consists of approximately 81 acres and is zoned General
Agricultural.
1
2 / 67
•
The property is owned by Steven and Susan Swarey and is located adjacent to 1155 Wards Fork Mill
Road in Cullen, approximately 1.1 miles north of the intersection of Wards Fork Mill Road (Route 661)
and Thomas Jefferson Highway (Route 47).
•
The applicant proposed operating a family-owned rural sawmill specializing in timber processing and
lumber products, utilizing approximately five acres of the property.
•
The proposed site complies with the applicable 300-foot setbacks and is located approximately 750 feet
from the rear property boundary and at least 600 feet from the centerline of Wards Fork Mill Road.
•
Existing vegetation and tree cover would provide natural screening, with supplemental plantings
potentially required.
•
The applicant proposed utilizing an existing private driveway for access.
Mr. Francis advised that an existing sawmill owned by the applicant's father, Steven Swarey, operates nearby on
Wards Fork Mill Road. He noted that the County's Director of Public Safety and Building Inspector had
expressed concerns regarding additional logging truck traffic on the narrow roadway.
Staff also identified concerns regarding the weight-restricted bridge between Route 47 and the proposed
sawmill. The bridge's posted weight limit had been reduced from 27 tons to 24 tons, requiring fully loaded
logging trucks exceeding the limit to utilize alternative routes.
Mr. Francis reported that staff had received comments from the Virginia Department of Transportation (VDOT)
regarding the proposed entrance. An additional condition addressing VDOT access and permitting requirements
was presented for consideration.
Staff recommended approval of the Conditional Use Permit subject to the recommended conditions contained in
the staff report and the additional VDOT-related condition, for a total of eight conditions.
Applicant Comments
The applicant was present at the meeting. No substantive applicant comments were recorded during the public
hearing.
Public Comments
Chairman Benn read a written public comment submitted by Copeland Casati of Tower Road in Pamplin.
Ms. Casati expressed opposition to locating sawmills and other industrial operations in agricultural and
residential areas. Her concerns included noise, impacts on surrounding residents, preservation of the rural
character of the community, and the compatibility of industrial activities with neighboring properties. She
encouraged the location of industrial businesses in areas more appropriately suited for such uses.
No additional public comments were received.
Commissioner Questions/Comments
Commissioners discussed the proposed sawmill's potential impact on Wards Fork Mill Road, particularly
regarding truck traffic, roadway width, and the weight-restricted bridge.
Staff explained that the bridge's weight restriction had been reduced from 27 tons to 24 tons in 2024. Fully
loaded logging trucks unable to use the bridge must travel alternative routes, resulting in additional travel along
narrow sections of Wards Fork Mill Road and County Line Road.
2
3 / 67
Staff reported that VDOT traffic-count information indicated approximately 150 vehicles per day, although the
count did not distinguish between passenger vehicles and commercial trucks. Staff also noted that additional
information regarding the bridge's condition and potential improvements had been requested from VDOT but
had not yet been received.
Commissioners discussed the existing commercial and agricultural operations along the roadway, including
another sawmill, a logging business, and a dairy operation. Concerns were expressed regarding the inability of
two large trucks to pass while remaining on the paved roadway and a recent accident involving an overturned
logging truck.
Commissioner Belinda Strom expressed support for the proposed sawmill and the importance of encouraging
rural businesses. She emphasized that the roadway and bridge concerns existed prior to the proposed application
and suggested that improvements to the bridge would benefit existing businesses, truck operators, and residents.
Other Commissioners discussed whether the proposed sawmill could operate under the same transportation
limitations as existing businesses and whether additional truck traffic would worsen existing roadway
conditions.
There being no further questions or comments, Chairman Benn closed the public hearing and reconvened the
regular meeting.
Consider Conditional Use Permit – John Swarey Sawmill
Commissioner Belinda Strom made a motion to recommend that the Charlotte County Board of Supervisors
approve John Swarey's Conditional Use Permit for a sawmill, subject to the recommended conditions presented
by staff, including the additional VDOT entrance requirement, for a total of eight conditions.
The motion was seconded by Brian Poindexter.
There being no further discussion, the motion carried with all members present voting in favor.
General Public Comments
Mrs. P.K. Pettus of Keysville addressed the Commission and invited members to attend an upcoming Charlotte
County VA250 event scheduled for Sunday, October 18, 2026, from noon until 4:00 p.m. at the Charlotte Court
House, Courthouse Square.
The event was sponsored by the Charlotte County VA250 Committee.
There being no additional speakers, Chairman Benn concluded the general public comment period.
Discussion of Zoning Amendments for Recreational Vehicles/Campers
Monica Elder provided an update regarding proposed zoning amendments regulating the residential use of
recreational vehicles and campers.
Ms. Elder reported that the Board of Supervisors had adopted a resolution formally referring the matter to the
Planning Commission for review and recommendation. She explained that the Commission had 100 days from
its first meeting following the referral to provide its recommendation, establishing a deadline in January 2027.
Ms. Elder explained that the County currently permits recreational vehicles for temporary recreational use,
recreational campgrounds through a Conditional Use Permit, and extended-stay RV parks under recently
adopted regulations. However, the County has experienced an increase in recreational vehicles being used as
permanent residences.
3
4 / 67
Staff identified several concerns associated with this trend, including improper wastewater disposal, placement
in flood-prone areas or beneath power lines, public safety during severe weather, unpermitted accessory
structures, difficulties assigning or locating emergency addresses, and challenges with zoning enforcement.
Ms. Elder reported that the Board of Supervisors recommended utilizing Campbell County's RV regulations as a
starting framework, with additional provisions addressing specific local circumstances.
The proposed framework included:
•
Temporary recreational use, with consideration of Campbell County's limitation of 14 days within a 90day period.
•
Temporary residential occupancy during construction of a dwelling for up to 12 months, with the
possibility of a six-month extension.
•
Temporary occupancy during emergencies or hardship situations.
•
Temporary accommodations for qualifying traveling workers.
•
Provisions allowing the Zoning Administrator to seek an inspection warrant, where authorized by law
and supported by appropriate findings.
Commissioners engaged in an extensive discussion regarding the proposed amendments, particularly the
distinction between temporary recreational use and permanent residential occupancy.
Commissioner Belinda Strom presented a hypothetical situation involving a retired property owner who wished
to permanently reside in an RV on a substantial tract of privately owned land with appropriate well and septic
facilities. She questioned whether the proposed regulations should prohibit such an arrangement when the
property owner could meet applicable setbacks and wastewater requirements.
Several Commissioners expressed sympathy for property owners seeking affordable or alternative housing
arrangements and discussed whether minimum acreage, setbacks, and appropriate utility connections could
provide a reasonable regulatory framework.
Other Commissioners expressed concern regarding the safety of permanent RV occupancy, the limitations of
recreational vehicles compared to structures built under residential building codes, and the potential difficulty of
enforcing exceptions.
The Commission also discussed the treatment of existing RVs under new regulations, the legal status of
previously permitted residential uses, and the challenges of distinguishing lawful temporary occupancy from
permanent residence.
Ms. Elder explained that staff would continue reviewing the legal and enforcement implications of the proposed
amendments, including existing nonconforming uses and the interaction between zoning regulations and state
health requirements.
Commissioners also discussed the recently adopted E-911 addressing policy and the importance of ensuring
emergency responders can identify and access occupied properties.
Following discussion, Chairman Benn suggested that the Commission continue reviewing the proposed
regulations at its November meeting. Staff would evaluate the concerns raised and provide additional
information for further consideration.
No formal action was taken.
4
5 / 67
Discussion of Draft Planning Commission Bylaws
Conner Francis presented proposed Planning Commission bylaws for the Commission's review and
consideration.
Mr. Francis explained that the Planning Commission was established by the Board of Supervisors during the
1960s and that historical meeting minutes referenced the adoption of bylaws. However, staff had been unable to
locate an existing copy.
Following consultation with County Attorney Russell Slayton, staff prepared a new draft utilizing provisions
from other Virginia localities, particularly Campbell County, and incorporating feedback received from legal
counsel.
Mr. Francis highlighted several provisions of the proposed bylaws, including:
•
Procedures for notifying appointing authorities when Commissioners have repeated unexcused absences.
•
Designation of the Zoning Administrator or designee as Secretary of the Planning Commission.
•
Recognition of a separately adopted public comment policy.
•
Continued use of Robert's Rules of Order as the Commission's parliamentary authority, while allowing
future revisions.
•
Clarification that official action may not be taken during Planning Commission work sessions.
Mr. Francis explained that maintaining a separate public comment policy would provide greater flexibility for
future updates without requiring amendments to the bylaws.
Commissioners discussed the sources used in preparing the draft and the extent of the County Attorney's review.
Staff advised that legal counsel had reviewed the preliminary document and that his comments had been
incorporated.
Commissioners also discussed the Commission's existing officer structure, including the positions of Chairman,
Vice Chairman, and Second Vice Chairman.
Several Commissioners expressed appreciation for staff's work and indicated general support for the proposed
document.
Staff advised that the purpose of the presentation was to obtain feedback and that a finalized version could be
brought before the Commission for formal consideration and adoption.
No formal action was taken.
Staff Update/Discussion on Zoning Amendments for Landowners' Enforceable Rights – Battery Energy
Storage and Solar
Monica Elder provided an update regarding proposed zoning amendments addressing participating landowners'
enforceable rights associated with decommissioning and financial assurance requirements for Battery Energy
Storage Systems and solar facilities.
Ms. Elder reported that staff had again consulted the County Attorney regarding possible mechanisms to ensure
that the County would carry out required decommissioning if a project owner failed to fulfill its obligations.
She explained that the County Attorney continued to express concerns regarding the proposed enforceable-rights
language and had not identified an alternative mechanism that he would recommend for adoption.
5
6 / 67
Ms. Elder suggested that, given the continued legal concerns and the Commission's previous discussions, the
matter could be advanced through the public hearing process and ultimately presented to the Board of
Supervisors for consideration.
Commissioners discussed the importance of maintaining consistent language between the County's Battery
Energy Storage and solar regulations.
Following discussion, the Commission reached a consensus to proceed with scheduling a public hearing for the
November meeting to consider the revised landowners' enforceable-rights language for Battery Energy Storage
Systems, along with the proposed solar zoning amendments incorporating the same revised language.
Staff advised that the County Attorney's concerns regarding the proposed language would remain part of the
consideration process.
No formal vote was taken.
General Staff Report
Monica Elder presented the General Staff Report and highlighted recent activity within the County's planning,
zoning, and building departments.
Ms. Elder reported that building and zoning activity remained steady, although the number of applications had
decreased from approximately 50 during the previous reporting period to approximately 30 during the most
recent period.
She also provided updates regarding ongoing solar projects, including Tall Pines, Courthouse, and Randolph.
Staff anticipated receiving additional information from Dominion Energy later in October, with a presentation
expected at the Board of Supervisors' November meeting.
Ms. Elder reported that the Board of Supervisors had approved Levi Yoder's Conditional Use Permit for a
sawmill at its October 14, 2026, meeting. The Board also supported the Commission's recommendation
regarding the associated civil penalty for operating without the required permit.
She further reported that the Board had adopted the revised E-911 addressing policy and had formally referred
the recreational vehicle zoning amendments to the Planning Commission.
Ms. Elder advised that the Board of Supervisors continued to consider establishing a commercial zoning district
along Four Locust Highway near Keysville. She explained that the proposal would involve more than rezoning
individual parcels, as it would require establishing a new commercial zoning district and identifying permitted
and conditional uses within the County's zoning ordinance.
Staff anticipated that the Board would formally refer the commercial zoning matter to the Planning Commission
at an upcoming meeting.
Commissioners' Time
During Commissioners' Time, Commissioner Belinda Strom inquired about compensation for a previous joint
meeting, stating that she had not received the expected payment. Staff acknowledged the concern and indicated
that the matter would be reviewed.
A Commissioner raised several additional matters for discussion.
First, the Commissioner referenced a proposed Dominion Energy transmission line connecting the Farmville and
Appomattox areas and encouraged staff and Commissioners to review publicly available information regarding
the project.
6
7 / 67
The Commissioner also inquired about reports concerning the status of a separate proposed high-voltage
transmission line originating near Joshua Falls. Staff did not confirm the reported approval.
Finally, the Commissioner expressed concern regarding advertisements for residential building lots containing
fewer than three acres in Charlotte County and questioned whether such parcels could lawfully be developed
under the County's zoning ordinance.
Ms. Elder explained that certain legally established lots of record predating current minimum acreage
requirements may remain eligible for development, provided applicable setback and other requirements can be
satisfied.
She noted that the County contains numerous legally established nonconforming or substandard lots and that the
buildability of individual parcels depends on their legal status, configuration, and ability to meet applicable
regulations.
No formal action was taken during Commissioners' Time.
Adjournment
There being no further business, a motion was made by Eugene Wells and seconded by Belinda Strom to
adjourn. The motion carried with all members present voting in favor.
The meeting adjourned at approximately 8:20 p.m.
7
8 / 67
Planning Commission
Staff Report
Meeting Date: November 19, 2026
Subject Title: Zoning Amendments – Solar
SUBJECT HIGHLIGHTS
Initial Review
At the June 18th public hearing for solar zoning amendments, the Board of Supervisors voted (3-2
with two absent) to exclude four additional amendments associated with solar decommissioning that
were proposed by a citizen and presented during the hearing. Reasons stated included concerns
regarding the limited time for review and lack of input from the County attorney.
Generally, the proposed amendments would have accomplished the following:
1. Amended 10-23-19.1 to require developers to reimburse the County’s third-party
decommissioning review costs & to establish requirements for reviewers & the review.
2. Amended 10-23-19.3 to require developers to reimburse the County’s third-party costs for 5year decommissioning reviews & to establish requirements for reviewers & the review.
3. Added 10-23-19.9 to establish environmental assessment requirements & testing criteria and
require owner/operator remediation.
4. Added 10-23-19.10 to provide participating landowners enforceable rights under the
decommissioning financial insurance instrument.
Legal Counsel & Berkley Group Review
Following the hearing, staff submitted those amendments to County Attorney Russell Slayton and
Michael Zehner with the Berkley Group for review. Of the amendments, Mr. Slayton identified the
one related to landowners’ enforceable rights (#4) as the only concern. Mr. Zehner & Mr. Slayton’s
responses are attached, and summaries of their general positions are below.
Mr. Zehner - “All in all, no real concerns with these additions … it is just the case that they were
already or could be addressed through other means.” He also noted that the fourth amendment,
Landowner Enforcement Rights, “would be more for Russell (Slayton) to review and comment on.”
Mr. Slayton – “It is my opinion that Amendments 1-3 are within the purview of the County, through
County staff, to regulate, and defer to County staff on the enforcement of these requirements.”
“It is my opinion that providing the property owner with rights under the ‘financial assurance
instrument or equivalent County-approved agreement’ to secure the decommissioning obligations is
not a best practice and has the potential to create additional hardship for the County. My
9 / 67
recommendation is that the County should be the only party benefitted under an escrow, letter of
credit, bond or other financial assurance to secure the decommissioning obligations.”
Mr. Slayton identified the following specific concerns in his memo:
•
“A landowner has the ability to contract for any rights that it desires from the BESS facility
owner or operator. Presumably, one right could be the requirement to remove (or
decommission) the BESS facility after it is no longer in operation.”
•
“By providing the property owner with ‘enforceable rights’ the County will give up its primary
control of the financial assurance”
•
“It is conceivable that a situation could exist that the County and the property owner have a
difference of opinion about what might occur in 30 or 40 years when the BESS is no longer in
operation. Because the financial assurance will be issued by a third party, that third party will
want agreement of all benefitted parties before any funds are paid. The County should
maintain the sole ability to direct the use of the escrow, letter of credit, bond or other financial
assurance to secure the decommissioning obligations if that becomes necessary in the future.”
Staff Review
As noted by Mr. Slayton, navigating landowners’ various expectations may pose a significant
challenge for the County. If approved, these amendments will only apply to newly approved projects.
There is no way to determine if new projects will be approved in the future or the number of
landowners that might be involved. While there are one parcel/one landowner solar projects, they
are not typical here. (Taro Solar, approved December 2025, included thirty-five parcels and sixteen
different landowners or groups of landowners.) We must also anticipate that some property transfers
will occur during a project’s life of 30+ years, likely increasing the number of landowners.
Each landowner or landowner group negotiates an individual lease agreement with the project
developer, which may include specific decommissioning requirements for their property that would
be in addition to local requirements. This may result in different decommissioning requirements for
individual properties and landowner expectations beyond local requirements, creating potential
conflicts if the developer fails to perform the required decommissioning, leaving the County to do so.
Planning Commission Review
After reviewing the comments from Mr. Slayton, Mr. Zehner, and staff, the Commission stated an
interest in aligning solar decommissioning requirements with battery energy storage requirements
and noted the importance of providing landowners confidence that, if a solar operator fails to
decommission their facility, the county will use the decommissioning bond to perform the task of
decommissioning. The Planning Commission then recommended two revisions to the enforceable
rights requirement. One was aimed at addressing Mr. Slayton’s concern regarding primary rights by
10 / 67
identifying the landowners’ rights as secondary. The other specified that the decommissioning
obligations referenced are those established by applicable ordinances and the siting agreement. The
revised language was submitted to Mr. Slayton for review; however, he did not alter his position.
Staff recommendation, if applicable:
Staff recommends the Commission consider any comments received at the public hearing as well as
those provided by the County Attorney previously. Based on the County Attorney’s determination
that Amendment 4 is not a best practice and may create additional hardship for the County, staff
does not recommend approval of Amendment 4.
Staff Review Record
Exhibits:
• Proposed Solar & BESS Zoning Amendments
• Citizen Proposed Amendments - Presented June 18, 2026
• Review Findings: Berkley Group
• Review Findings: County Attorney
11 / 67
DRAFT – 11/19/2026
Planning Commission
DRAFT
Zoning Amendments for Solar & Battery Energy Storage
November 19, 2026
All proposed changes are noted below in bold type with underlining.
10-23-19.
Decommissioning of Utility Scale Solar Energy Systems.
(Amended 6/18/2026)
1. Applications for Utility Scale Solar Energy Systems shall include a decommissioning plan
detailing the anticipated life of the project, the estimated decommissioning cost in current
dollars, an explanation of how the cost was determined, the method of ensuring funds will be
available for decommissioning, a mechanism for calculating increased removal costs due to
inflation, and an explanation of the decommissioning process. The decommissioning
estimate shall be prepared by a professional engineer licensed in the Commonwealth of
Virginia, who is engaged by the applicant, with experience in preparing decommissioning
estimates and approved by the locality. Salvage value shall not be considered when
determining the estimated decommissioning cost. The decommissioning estimate shall be
prepared and stamped by a professional engineer licensed in the Commonwealth of
Virginia, who is engaged by the project, with experience in preparing decommissioning
estimates and approved by the County. Salvage value shall not be considered when
determining the estimated decommissioning cost. The project shall further reimburse
the County for its expenses of validating decommissioning estimates by engagement of
a Virginia licensed professional engineer selected and retained by the County. The
County-engaged engineer shall provide evidence of and maintain professional liability
insurance at amounts acceptable to the County for the duration of each five-year
recalculation period referenced in Sec. 10-23-19.3. In his validation assessment of a
project's decommissioning estimate, the County-engaged engineer shall include all
removal, remediation, administrative, legal, project management, procurement,
inflation-adjustment, and any other reasonably anticipated costs.
2. The applicant shall enter into a written agreement to decommission the facility and the full
estimated decommissioning cost shall be guaranteed by escrow at a federally insured
financial institution, irrevocable letter of credit, or surety bond before a building permit is
issued to the applicant. The decommissioning cost guarantee shall remain valid until the
solar energy system has been fully decommissioned. If the facility owner/operator fails to
remove the installation in accordance with the requirements of this permit or within the
proposed date of decommissioning, the County may collect the bond or other surety and the
County or hired third party may enter the property to physically remove the installation.
3. The decommissioning cost estimate shall be recalculated every five (5) years by a
professional engineer licensed in the Commonwealth of Virginia, who is engaged by the
applicant, with experience in preparing decommissioning estimates and approved by the
12 / 67
DRAFT – 11/19/2026
Planning Commission
locality. If the recalculated estimate exceeds the original estimated decommissioning cost by
10% or more, the facility owner/operator shall increase the guarantee to meet the new cost
estimate. If the recalculated estimate is less than 90% of the original estimated cost of
decommissioning, the County may approve reducing the guarantee. The project shall
further reimburse the County for its expenses of validating the recalculation of
decommissioning estimates by engagement of a Virginia licensed professional engineer
selected and retained by the County. The County-engaged engineer shall provide
evidence of and maintain professional liability insurance at amounts acceptable to the
County for the duration of each five-year recalculation period. In his validation
assessment of the recalculation of a project's decommissioning estimate, the Countyengaged engineer shall include all removal, remediation, administrative, legal, project
management, procurement, inflation-adjustment, and any other reasonably anticipated
costs.
4. Notice shall be provided to the county within 30 days of the sale or transfer of the lease or
property, and an up-to-date decommissioning plan and new financial guarantee shall be
provided by the new leaseholder or property owner.
5. Utility Scale Solar Energy Systems which have reached the end of their useful life or have
not been in active service for a period of one (1) year shall be removed at the facility
owner/operator's expense. This period may be extended by the Zoning Administrator if
evidence is provided that the delay is due to circumstances beyond the facility
owner/operator's reasonable control.
6. The facility owner/operator shall notify the Zoning Administrator by certified mail of the
proposed date of discontinued operations and plans for removal.
7. The facility owner/operator shall have twelve (12) months to complete decommissioning of
the solar energy system.
8. Decommissioning shall be performed in compliance with the approved decommissioning
plan and shall include removal of all solar electric systems, buildings, cabling, electrical
components, security barriers, roads, foundations, pilings, and any other associated facilities,
so that any agricultural ground upon which the facility and/or system was located is again
tillable and suitable for agricultural uses. Disturbed earth shall be graded and re-seeded unless
the land owner requests in writing that the access roads or other land surface areas not be
restored. Hazardous material from the property shall be disposed of in accordance with
federal and state law. Once decommissioning is complete, the facility shall comply with the
most recent State policies and regulations for stormwater applicable at the time of
decommissioning.
9. Prior to the submission of an application for a land disturbance permit, the applicant
shall provide a hazardous materials inventory identifying hazardous substances as
defined by the prevailing definitions set forth by the Commonwealth of Virginia's
Department of Environmental Quality that are reasonably anticipated to be present
within the future facility and its components. The inventory shall include, but shall not
13 / 67
DRAFT – 11/19/2026
Planning Commission
be limited to, any per- and polyfluoroalkyl substances known by manufacturers to be
present in a project's components. Prior to issuance of a land disturbance permit, the
applicant shall submit a baseline environmental condition assessment including soil
sampling and testing and, where appropriate, groundwater testing for hazardous
substances deemed reasonably anticipated to be present in the future facility by the
inventory at the time of application. All testing subject to this section shall be performed
by firms and agencies possessing accreditation from the Virginia Division of
Consolidated Laboratory Services for hazardous substance testing and be subject to all
industry standard chain of custody protocol. Equivalent testing shall be performed
upon decommissioning. Any contamination attributable to the facility shall be
remediated by the owner/operator before decommissioning is deemed complete.
10. Participating landowners shall possess enforceable rights secondary to the County’s
primary position under the financial assurance instrument or equivalent Countyapproved agreement, including notice of default, notice of cancellation or reduction of
security, and the ability to seek enforcement if decommissioning obligations in
accordance with applicable ordinance and siting agreement are not fulfilled.
10-24-16.
Decommissioning of Accessory Battery Energy Storage Projects.
1. As part of their site plan review, project owners or developers shall include a
decommissioning plan detailing the anticipated life of the project, the estimated
decommissioning cost in current dollars, an explanation of how the cost was determined,
the method of ensuring funds will be available for decommissioning, a mechanism for
calculating increased removal costs due to inflation, and an explanation of the
decommissioning process. The decommissioning estimate shall be prepared and stamped
by a professional engineer licensed in the Commonwealth of Virginia, who is engaged by
the project, with experience in preparing decommissioning estimates and approved by the
County. Salvage value shall not be considered when determining the estimated
decommissioning cost. The project shall further reimburse the County for its expenses
of validating decommissioning estimates by engagement of a Virginia licensed
professional engineer selected and retained by the County. The County-engaged engineer
shall provide evidence of and maintain professional liability insurance at amounts
acceptable to the County for the duration of each five-year recalculation period referenced
in Sec. 10-24-16-3. In his validation assessment of a project's decommissioning estimate,
the County-engaged engineer shall include all removal, remediation, administrative,
legal, project management, procurement, inflation-adjustment, and any other reasonably
anticipated costs.
2. The full estimated decommissioning cost shall be guaranteed by escrow at a federally
insured financial institution, irrevocable letter of credit, or surety bond before a building
permit is issued for the project. The decommissioning cost guarantee shall remain valid
until the facility has been fully decommissioned. If the facility owner/operator fails to
remove the installation in accordance with the requirements of this permit or within the
14 / 67
DRAFT – 11/19/2026
Planning Commission
proposed date of decommissioning, the County may collect the bond or other surety and
the County or hired third-party may enter the property to physically remove the
installation.
3. The decommissioning cost estimate shall be recalculated every five (5) years at the
facility owner’s expense by a professional engineer licensed in the Commonwealth of
Virginia, who is engaged by the project, with experience in preparing decommissioning
estimates and approved by the County. If the recalculated estimate exceeds the original
estimated decommissioning cost by 10% or more, the facility owner/operator shall
increase the guarantee to meet the new cost estimate. If the recalculated estimate is less
than 90% of the original estimated cost of decommissioning, the County may approve
reducing the guarantee. The project shall further reimburse the County for its expenses
of validating the recalculation of decommissioning estimates by engagement of a Virginia
licensed professional engineer selected and retained by the County. The County-engaged
engineer shall provide evidence of and maintain professional liability insurance at
amounts acceptable to the County for the duration of each five-year recalculation period.
In his validation assessment of the recalculation of a project's decommissioning estimate,
the County-engaged engineer shall include all removal, remediation, administrative,
legal, project management, procurement, inflation-adjustment, and any other reasonably
anticipated costs.
4. Accessory Battery Energy Storage Projects which have reached the end of their useful
life or have not been in active service for a period of one (1) year shall be removed at the
facility owner/operator's expense. This period may be extended by the Zoning
Administrator if evidence is provided that the delay is due to circumstances beyond the
facility owner/operator's reasonable control.
5. Notice shall be provided to the county within 30 days of the sale or transfer of the lease
or property, and an up-to-date decommissioning plan and new financial guarantee shall
be provided by the new leaseholder or property owner.
6. The facility owner/operator shall notify the Zoning Administrator by certified mail of the
proposed date of discontinued operations and plans for removal.
7. The facility owner/operator shall have twelve (12) months to complete the
decommissioning of the facility.
8. Decommissioning shall be performed in compliance with the approved final
decommissioning plan and shall include removal of all battery energy storage system
components, structures, equipment, pads or foundations, cabling, roads, security barriers,
transmission lines, and any other associated facilities from the site, so that any agricultural
ground upon which the facility and/or system was located is again tillable and suitable
for agricultural uses. All materials removed from the property, including hazardous
materials, shall be disposed of in accordance with local, state, and federal law. Any
contaminated soil, as determined by independent testing, shall be removed and disposed
of in accordance with local, state, and federal law. Disturbed earth shall be graded and
15 / 67
DRAFT – 11/19/2026
Planning Commission
re-seeded. However, the landowner may request that access roads, stormwater
management features, or other land surface areas not be restored. Approval of such
landowner requests shall be at the zoning administrator’s discretion.
9. Prior to the submission of an application for a land disturbance permit, the applicant shall
provide a hazardous materials inventory identifying hazardous substances as defined by
the prevailing definitions set forth by the Commonwealth of Virginia's Department of
Environmental Quality that are reasonably anticipated to be present within the future
facility and its components. The inventory shall include, but shall not be limited to, any
per- and polyfluoroalkyl substances known by manufacturers to be present in a project's
components. Prior to issuance of a land disturbance permit, the applicant shall submit a
baseline environmental condition assessment including soil sampling and testing and,
where appropriate, groundwater testing for hazardous substances deemed reasonably
anticipated to be present in the future facility by the inventory at the time of application.
All testing subject to this section shall be performed by firms and agencies possessing
accreditation from the Virginia Division of Consolidated Laboratory Services for
hazardous substance testing and be subject to all industry standard chain of custody
protocol. Equivalent testing shall be performed upon decommissioning. Any
contamination attributable to the facility shall be remediated by the owner/operator before
decommissioning is deemed complete.
10. Participating landowners shall possess enforceable rights secondary to the County’s
primary position under the financial assurance instrument or equivalent Countyapproved agreement, including notice of default, notice of cancellation or reduction of
security, and the ability to seek enforcement if decommissioning obligations in
accordance with applicable ordinance and siting agreement are not fulfilled.
16 / 67
17 / 67
18 / 67
19 / 67
Monica Elder
From:
Sent:
To:
Cc:
Subject:
Michael Zehner <[email protected]>
Tuesday, June 23, 2026 10:33 AM
Monica Elder
Savannah Newbern; Grant Fore; Linds Edwards; Tori Haynes; Conner Francis; Landon
Green
RE: Action on BESS Amendments
[EXTERNAL SENDER]
Good Morning Monica,
For the first two items, the Decommissioning Plan and Five-Year Recalculation requirements, they are really
overkill and too explicit in terms of regulations and these requirements are already covered by standard
conditions imposed on at lease solar facilities. One could argue that they are more relevant to accessory BESS
since you would not have the ability to impose conditions of this type on solar projects that already have a CUP
that later wanted to add BESS (and therefore having them in the regulations is important), but you could
probably already justify requiring any addition of BESS to be taken into account in the decommissioning plan
and bond estimates that are already a requirement for the solar facility (and already accounts for
reimbursement of third party reviews).
As the for the third item, Environmental Condition Assessment and Remediation), probably overkill but no
issues really. Standard conditions already include the requirement that “The County reserves the right to
request soil and water testing,” and recently updated standard conditions require “Upon completion of
decommissioning, the Applicant shall prepare and submit a Phase I ESA in accordance with current applicable
ASTM standard in order to document the environmental conditions of the site after decommissioning is
complete.”
The last one, Participating Landowner Enforcement Rights, would be more for Russell to review and comment
on. It may have the effect of attempting to dictate terms or requirements that may be contrary to the terms or
requirements of a separate private agreement between the landowner and the developer. I do generally take
the perspective that the landowner, ultimately, has a level of responsibility with respect to land use compliance;
however, putting this provision in regulations may not be ideal, as I would imagine that a landowner would or
would not have these rights, regardless of the County establishing that they do. I think the closest that we get
to this is the following standard condition:
If the Applicant or the property owners fail to timely decommission the Solar Facilities, the County shall
have the right, but not the obligation, to commence decommissioning activities and shall have access to
the property, access to the full amount of the decommissioning security, and the right to dispose of the
Solar Facilities, equipment and materials on the property, without incurring any financial liability to the
owner of the Solar Facilities or the property owner, and without obligation for the County to secure
salvage value (if any) for the property disposed of. If applicable, any excess decommissioning security
funds shall be returned to the current owners of the properties after the County has completed the
decommissioning activities.
This condition at least intends to recognize that the owner has some ultimate responsibility for
decommissioning (if the applicant fails to do so), whereas the additional regulations does deflect that to some
degree (“…the ability to seek enforcement if decommissioning obligations are not fulfilled.”); the new
1
20 / 67
regulation may also put some more responsibility on a landowner to handle decommissioning via the financial
security versus the standard condition, which really puts the requirement on the County.
All in all, no real concerns with these additions to the BESS provisions; it is just the case that they were already
or could be addressed through other means.
Let me know if you have any questions or would like to discuss further.
Thanks,
Michael
From: Monica Elder <[email protected]>
Sent: Monday, June 22, 2026 4:38 PM
To: Michael Zehner <[email protected]>
Cc: Savannah Newbern <[email protected]>; Grant Fore <[email protected]>; Linds Edwards
<[email protected]>; Tori Haynes <[email protected]>; Conner Francis <[email protected]>;
Landon Green <[email protected]>
Subject: RE: Action on BESS Amendments
Michael,
Please see attached solar amendments that were approved. As noted, the Board did not approve any of the
additional amendments for the solar zoning, so this is what was approved. One of the biggest concerns I’m
hearing is that with the BESS, we needed an approved ordinance by July 1 st & now there is no time to hold another
hearing to remove any of these last minute additions if there are issues.
Monica L. Elder
Deputy County Administrator
434-542-5117
www.charlottecountyva.gov
From: Michael Zehner <[email protected]>
Sent: Monday, June 22, 2026 3:52 PM
To: Monica Elder <[email protected]>
Cc: Savannah Newbern <[email protected]>; Grant Fore <[email protected]>; Linds Edwards
<[email protected]>; Tori Haynes <[email protected]>; Conner Francis <[email protected]>;
Landon Green <[email protected]>
Subject: RE: Action on BESS Amendments
[EXTERNAL SENDER]
Monica,
Happy to review. Can you share the solar amendments as they were proposed so that I can review these
additions in their full context?
I will just mention, the comments in the attached were AI generated; not immediately disqualifying, we’ll review
to determine whether they are relevant, necessary, etc.
Thanks,
Michael
2
21 / 67
From: Monica Elder <[email protected]>
Sent: Monday, June 22, 2026 3:34 PM
To: Michael Zehner <[email protected]>
Cc: Savannah Newbern <[email protected]>; Grant Fore <[email protected]>; Linds Edwards
<[email protected]>; Tori Haynes <[email protected]>; Conner Francis <[email protected]>;
Landon Green <[email protected]>
Subject: Action on BESS Amendments
Michael,
The Board & PC held their joint hearings on Solar & BESS amendments Thursday, followed by PC
recommendations & then Board action. The comp plan & zoning amendments for solar & BESS were approved,
with the additional ordinance amendments to the BESS zoning regulations you recommended.
Just before the meeting started, Commissioner Belinda Strom distributed the attached, stating she had not written
it but was supportive. She read the amendments at the hearing, and the PC discussed them during their meeting,
with sta expressing several concerns. Action was as follows:
Solar Zoning Amendments – The PC voted unanimously to recommend approval with the addition of the
last item on the attachment. (The other items will be reviewed & considered in the future.) However, the
Board voted 3-2 to approve the solar zoning amendments as presented, without the additional
amendment.
BESS Zoning Amendments- Due to the July 1st deadline, the PC unanimously recommended approval with
the amendments recommended by the Berkley Group & the attached. The Board voted 3-2 to accept the
PC’s recommendation.
We are asking you & your team to review the attached under our contract for the BESS review and let us know if you
have any concerns. I will be sending the attached to Russell for review & input as well. If we need to discuss
further, please give me a call. Thank you!
Monica L. Elder
Deputy County Administrator
434-542-5117
www.charlottecountyva.gov
3
22 / 67
Planning Commission
Staff Report
Meeting Date: November 19, 2026
Subject Title: Zoning Amendments – Battery Energy Storage Systems (BESS)
SUBJECT HIGHLIGHTS
Background – Initial Review
At the June 18th public hearing for BESS zoning amendments, the Board of Supervisors, facing a
deadline of July 1st to establish BESS regulations, voted (3-2 with two members absent) to approve
four additional amendments associated with BESS decommissioning that were proposed by a citizen
and presented during the hearing. Amendment #4 added 10-24-16.10, which provides participating
landowners enforceable rights under the decommissioning financial insurance instrument.
Proposed Amendment (Additions shown in bold with underlining & italics)
10-24-16.10 Participating landowners shall possess enforceable rights secondary to the County’s
primary position under the financial assurance instrument or equivalent County-approved
agreement, including notice of default, notice of cancellation or reduction of security, and the ability
to seek enforcement if decommissioning obligations in accordance with applicable ordinance and
siting agreement are not fulfilled.
Legal Counsel & Berkley Group Review
Following the hearing, staff submitted the four amendments to County Attorney Russell Slayton and
Michael Zehner with the Berkley Group for review. Of the amendments, Mr. Slayton identified the
one related to landowners’ enforceable rights (#4) as the only concern. Mr. Zehner & Mr. Slayton’s
responses are attached, and summaries of their general positions are below.
Mr. Zehner - “All in all, no real concerns with these additions … it is just the case that they were
already or could be addressed through other means.” He also noted that the fourth amendment,
Landowner Enforcement Rights, “would be more for Russell (Slayton) to review and comment on.”
Mr. Slayton – “It is my opinion that Amendments 1-3 are within the purview of the County, through
County staff, to regulate, and defer to County staff on the enforcement of these requirements.”
“It is my opinion that providing the property owner with rights under the ‘financial assurance
instrument or equivalent County-approved agreement’ to secure the decommissioning obligations is
not a best practice and has the potential to create additional hardship for the County. My
recommendation is that the County should be the only party benefitted under an escrow, letter of
credit, bond or other financial assurance to secure the decommissioning obligations.”
23 / 67
Mr. Slayton identified the following specific concerns in his memo:
•
“A landowner has the ability to contract for any rights that it desires from the BESS facility
owner or operator. Presumably, one right could be the requirement to remove (or
decommission) the BESS facility after it is no longer in operation.”
•
“By providing the property owner with ‘enforceable rights’ the County will give up its primary
control of the financial assurance”
•
“It is conceivable that a situation could exist that the County and the property owner have a
difference of opinion about what might occur in 30 or 40 years when the BESS is no longer in
operation. Because the financial assurance will be issued by a third party, that third party will
want agreement of all benefitted parties before any funds are paid. The County should
maintain the sole ability to direct the use of the escrow, letter of credit, bond or other financial
assurance to secure the decommissioning obligations if that becomes necessary in the future.”
Planning Commission Review
After reviewing Mr. Slayton’s and Mr. Zehner’s comments the Commission noted the importance of
providing landowners confidence that, if a BESS operator fails to decommission their facility, the
county will use the decommissioning bond to perform the task of decommissioning. The Planning
Commission then recommended two revisions to the enforceable rights requirement. One was aimed
at addressing Mr. Slayton’s concern regarding primary rights by identifying the landowners’ rights as
secondary. The other specified that the decommissioning obligations referenced are those
established by applicable ordinances and the siting agreement. The revised language was submitted
to Mr. Slayton for review; however, he did not alter his position.
Staff recommendation, if applicable:
Staff recommends the Commission consider any comments received at the public hearing as well as
those provided by the County Attorney previously. Based on the County Attorney’s determination
that Amendment 4 is not a best practice and may create additional hardship for the County, staff
recommends removing 10-24-16.10 from the ordinance rather than revising the wording.
Staff Review Record
Exhibits (See Preceding Pages in the Packet):
• Proposed Solar & BESS Zoning Amendments
• Citizen Proposed Amendments - Presented June 18, 2026
• Review Findings: Berkley Group
• Review Findings: County Attorney
24 / 67
Charlotte County, Virginia
Planning Commission Report
Meeting Date: November 19th, 2026
Subject Title: Bylaws
SUBJECT HIGHLIGHTS
Background
The Charlotte County Planning Commission was established by the Board of Supervisors in
1960, and their first order of business was the adoption of bylaws. While the minutes capture
the vote on the bylaws and other later references to them, staff has not located a hardcopy of
the bylaws. Therefore, County Attorney Russell Slayton advised that the appropriate course of
action was for the Commission to adopt new bylaws. Staff has prepared the attached draft
bylaws based on current and standard practices. Mr. Slayton has reviewed the draft and his
recommendations have been incorporated as appropriate.
Items of Note
• Article II, Section 4: Addition to keep appointing authorities better informed of member
participation
• Article III, Section 6: Establishes the Zoning Administrator or his/her designee as the
Planning Commission’s Secretary
• Articles VII & VIII: Establishes that public comments will be received in accordance with the
adopted public comment policy. The policy could be incorporated into the bylaws;
however, it’s staff’s opinion that a separate policy is easier to post and share with citizens, is
consistent with current County practices, and will be easier to update in the future.
• Article IX: As written, Rules of Orders will continue to be adopted by the Commission at
their organizational meeting. However, at the discretion of the Commission, they could
instead be identified in the bylaws.
• Article X, Section 2: Clearly establishes that no final action shall be taken at work sessions.
Staff Recommendation
Staff is seeking input from the Commission on recommended additions or revisions. Once the
Commission’s review is complete, a final draft will be provided for consideration.
Staff Review Record
Exhibits: Draft Bylaws
25 / 67
DRAFT 1 –November 19, 2026
BYLAWS
CHARLOTTE COUNTY PLANNING COMMISSION
ARTICLE I - AUTHORIZATION AND PURPOSE
Section 1. Authority.
The Charlotte County Planning Commission (the "Commission") was established pursuant to Chapter
54, Article II of the Charlotte County Code and Title 15.2, Chapter 22 of the Code of Virginia, as
amended. These bylaws are adopted as rules for the transaction of Commission business pursuant
to Virginia Code § 15.2-2217.
Section 2. Purpose.
1. The Commission shall promote programs, policies, and plans to achieve responsible land
development within the County.
2.
The Commission shall serve in an advisory capacity to the Charlotte County Board of
Supervisors and shall exercise the functions, powers, and duties prescribed by the Code of
Virginia, the Charlotte County Code, the Charlotte County Zoning Ordinance, the Charlotte
County Subdivision Ordinance, and other applicable law.
Section 3. Controlling Authority.
These bylaws are intended to supplement, and not supersede, applicable federal law, the Code of
Virginia, the Charlotte County Code, County ordinances, and duly adopted policies of the Commission.
In the event of a conflict, the controlling law or ordinance shall govern.
ARTICLE II - MEMBERSHIP
Section 1. Composition.
The Commission shall consist of twelve (12) members as provided in Chapter 54 of the Charlotte
County Code:
1. Seven (7) members, with one resident representing each of the County's seven election districts;
2. Four (4) members, with one resident representing each of the four incorporated towns located
within Charlotte County, appointed by the Board of Supervisors after consideration of
recommendations requested from the respective Town Councils and/or Mayors; and
3. One (1) member of the Board of Supervisors, appointed annually by the Board at its organizational
meeting, who shall serve as liaison to the Commission and shall not vote on matters before the
Commission.
Section 2. Terms.
1. Voting members shall serve staggered terms of four (4) years as provided by the Charlotte County
Code. Vacancies shall be filled for the unexpired term in the manner provided by law and County
ordinance.
2. The term of the Board of Supervisors’ liaison shall expire when the Board appoints a new liaison
or upon the expiration of their term on the Board of Supervisors, whichever occurs first.
3. All Commission members are eligible for reappointment.
Bylaws - Draft
26for/ Review
67 | Page 1
DRAFT 1 –November 19, 2026
4. Any vacancy in membership shall be filled by appointment of the Board of Supervisors and shall
be for the unexpired portion of the term.
Section 3. Removal, Compensation, and Training.
1. Any member of the Commission may be removed from office by the Board for neglect of duty
and/or malfeasance in office.
2. Commissioners, except for the Board of Supervisors’ liaison, shall receive compensation for
each scheduled meeting they attend at a standard rate set by the Board of Supervisors.
3. All Commissioners are encouraged to attend and fulfill the requirements of the Virginia Certified
Planning Commissioners Program. However, completion of this program is not required.
Section 4. Attendance.
Members are expected to attend regular and special meetings of the Commission and should notify
the Secretary of any anticipated absences. After three (3) consecutive unexcused absences by a
member, the Zoning Administrator may notify the member's appointing authority. For purposes of this
section, the Board of Supervisors shall be considered the appointing authority for all appointed
Commission members, with notice regarding a Town representative also provided to the applicable
Town when appropriate. Nothing in this section shall constitute automatic removal from office.
ARTICLE III - OFFICERS AND ADMINISTRATIVE SECRETARY
Section 1. Chair, Vice-Chair, and Second Vice-Chair.
At the organizational meeting held at the first regular meeting of each calendar year, based on the
prior year’s meeting schedule, the voting members of the Commission shall elect from among the
appointed voting members a Chair, Vice-Chair, and Second Vice-Chair. Each shall serve for a term
of one (1) year and until a successor is elected, consistent with Virginia Code § 15.2-2217.
Section 2. Chair.
The Chair shall preside at meetings, preserve order and decorum, rule on procedural matters subject
to appeal to the Commission, recognize speakers, enforce adopted time limits, sign documents on the
Commission’s behalf, and perform such other duties as are customary to the office or as assigned by
the Commission.
Section 3. Vice-Chair.
The Vice-Chair shall perform the duties of the Chair in the Chair's absence, incapacity, or recusal from
presiding over a particular matter. If both the Chair and Vice-Chair are absent, the voting members
present may select a temporary presiding officer for that meeting.
Section 4. Second Vice-Chair.
The Second Vice-Chair shall perform the duties of the Vice-Chair in the Vice-Chair's absence,
incapacity, or recusal from presiding over a particular matter. If the Chair, Vice-Chair, and Second
Vice-Chair are absent, incapacitated, or recuse themselves from presiding over a particular matter,
the voting members present may select a temporary presiding officer for that meeting.
Section 5. Vacancy in Office.
If the office of Chair, Vice-Chair, or Second Vice-Chair becomes vacant, the Commission shall, at their
next regularly scheduled meeting, elect a successor from among its appointed voting members to
serve the remainder of the term.
Bylaws - Draft
27for/ Review
67 | Page 2
DRAFT 1 –November 19, 2026
Section 6. Administrative Secretary.
The Charlotte County Zoning Administrator or the Zoning Administrator's designee shall serve as
Secretary/Clerk to the Commission for administrative purposes. The Secretary/Clerk is not an elected
officer of the Commission and shall have no vote by reason of serving in that capacity. The
Secretary/Clerk shall prepare or coordinate meeting notices and agendas, maintain minutes and all
records, coordinate and receive correspondence, provide and post required notices and records, and
perform other administrative duties assigned by the Commission or required by law.
ARTICLE IV - MEETINGS
Section 1. Organizational Meeting and Annual Schedule.
The first regular meeting of each calendar year, based on the prior year’s meeting schedule, shall
serve as the Commission's organizational meeting. At the Planning Commission’s annual
organizational meeting a schedule of regular monthly meetings for the ensuing calendar year will be
adopted. The Commission may designate alternate meeting dates for holidays, inclement weather, or
other anticipated scheduling conflicts. The annual schedule shall be publicized as required by law.
Section 2. Regular Meetings.
Unless otherwise established and properly advertised in accordance with Virginia Code § 15.2-2214
and the Virginia Freedom of Information Act, regular meetings of the Commission shall be held in the
boardroom of the Charlotte County Administration Office, 250 LeGrande Avenue, Suite A, Charlotte
Court House, Virginia.
Section 3. Continued or Rescheduled Meetings.
A regular meeting may be continued, rescheduled, or moved to an alternate date when authorized by
law, including for holidays, hazardous weather, emergencies, or other circumstances affecting the
ability to conduct the meeting. Matters previously advertised shall be handled in accordance with
applicable notice requirements. Continuances because of hazardous weather or similar conditions
shall comply with Virginia Code § 15.2-2214.
Section 4. Special Meetings.
Special meetings may be called by the Chair or by two members upon written request to the
Secretary/Clerk. Notice of a special meeting shall be provided in the manner and within the time
required by Virginia Code § 15.2-2214 and the Virginia Freedom of Information Act.
Section 5. Open Meetings and Electronic Participation.
Meetings shall be conducted in accordance with the Virginia Freedom of Information Act. Individual
remote participation or other participation by electronic communication means shall be permitted only
as authorized by applicable law and any remote participation policy duly adopted by the Commission.
These bylaws do not independently authorize an all-virtual meeting where prohibited by law.
ARTICLE V - QUORUM AND VOTING
Section 1. Quorum.
A majority of the total Commission membership shall constitute a quorum as provided by Virginia Code
§ 15.2-2215. With a twelve-member Commission, seven (7) members constitute a quorum. The nonvoting Board of Supervisors liaison is a member of the Commission for purposes of determining the
presence of a quorum, but shall not vote on any matter.
Bylaws - Draft
28for/ Review
67 | Page 3
DRAFT 1 –November 19, 2026
Section 2. Voting.
No action of the Commission shall be valid unless authorized by a majority vote of the members
present and voting, except where a greater vote is required by law, ordinance, or these bylaws. The
Board of Supervisors liaison shall not vote. A tie vote shall result in failure of the motion.
Section 3. Abstention or Disqualification.
A member who abstains or is disqualified from participation shall not be counted as voting on the
motion. Any disclosure, recusal, or disqualification required by the Virginia State and Local
Government Conflict of Interests Act or other applicable law shall be handled and recorded as required
by law.
Section 4. Documenting Votes
In reporting a vote in the minutes and, when applicable, to the Board of Supervisors, the Secretary
shall indicate in writing the recorded vote including any abstentions.
ARTICLE VI - ORDER OF BUSINESS
Section 1. Agenda.
The Secretary/Clerk, in consultation with the Chair and appropriate County staff, shall prepare an
agenda for each regular meeting. The Commission may amend the agenda in accordance with
applicable law and parliamentary procedure.
Section 2. Regular Order.
Unless modified by the Commission, the customary order of business for regular meetings shall be:
1. Call to Order;
2. Invocation;
3. Consideration and Approval of the Agenda;
4. Consideration and Approval of Minutes;
5. Public Hearings and related matters;
6. General Public Comments;
7. Old Business, New Business, and Other Agenda Items;
8. Staff Reports and Updates;
9. Commissioners' Time; and
10. Adjournment.
Section 3. Flexibility in Order.
The Chair may adjust the order of agenda items for the efficient conduct of business, subject to any
objection or direction of the Commission and provided that such adjustment does not violate public
notice or hearing requirements.
Bylaws - Draft
29for/ Review
67 | Page 4
DRAFT 1 –November 19, 2026
ARTICLE VII - PUBLIC HEARINGS
Section 1. General Procedure.
For matters requiring or receiving a public hearing, the Chair shall conduct the hearing in an orderly
manner that provides the Commission with a complete record while allowing reasonable participation
by the applicant and the public.
Section 2. Applicant Response.
Prior to closing the hearing, the Chair may provide the applicant or applicant's representatives a
reasonable opportunity to respond to matters raised during the public hearing. The response shall be
limited to specific matters raised during the hearing and shall not constitute an additional public
comment period or permit a debate between the applicant and individual speakers.
Section 3. Public Hearing Comments.
The opportunity for public comment period provided during public hearings shall be conducted in
accordance with the Commission’s adopted Public Comment Policy.
Section 4. Questions.
Questions from Commissioners should ordinarily be directed through the Chair. The Chair may refer
questions to staff, the applicant, or speakers when useful to clarify the record. Public hearings are not
intended to become a direct question-and-answer session or a debate among members of the
audience, the applicant, and Commissioners.
Section 5. Closing the Hearing.
After the public hearing is closed, additional public testimony shall not be received on that matter
unless the Commission reopens the hearing in a manner permitted by law. The Commission may
thereafter deliberate, request clarification from staff, and take such action as is authorized by law.
ARTICLE VIII - GENERAL PUBLIC COMMENTS
Section 1. Opportunity to Comment.
The Commission shall provide a General Public Comments period at regular meetings unless
otherwise provided on the agenda. General Public Comments are intended for matters relevant to the
business, planning, development, or land-use responsibilities of Charlotte County and the
Commission.
Section 2. Public Comment Policy
The public comment period at each meeting shall be conducted in accordance with the Commission’s
official Public Comment Policy.
Section 3. Matters Subject to Public Hearing.
Comments concerning an application or matter scheduled for a public hearing at the same meeting
should be presented during that public hearing rather than during General Public Comments.
Section 4. Decorum and Repetition.
The Chair shall reasonably enforce order and decorum. Speakers shall address their remarks to the
Commission as a body and shall avoid conduct that substantially disrupts the meeting. The Chair may
request that a speaker avoid repetitive, cumulative, or clearly irrelevant comments and may conclude
a speaker's remarks when the applicable time has expired or when the speaker refuses to comply with
reasonable procedural directions. These rules shall be administered in a content-neutral manner
consistent with applicable law.
Bylaws - Draft
30for/ Review
67 | Page 5
DRAFT 1 –November 19, 2026
Section 5. Commission Response.
Public comment is an opportunity for the public to address the Commission; it is not a question-andanswer session. There will be no comment by Commissioners or staff. However, if a question is
presented to which the Planning Commission wants to respond, the speaker’s contact information will
be secured and a staff member will respond following the meeting.
ARTICLE IX - PARLIAMENTARY PROCEDURE
Section 1. Parliamentary Authority.
The Commission shall adopt rules of order annually at their organizational meeting.
Section 2. Motions and Debate.
A motion shall be stated clearly before debate and action. The Chair may require a motion to be
reduced to writing when necessary for clarity. Members shall be afforded a reasonable opportunity to
debate a pending motion before the vote is taken.
Section 3. Reconsideration and Procedural Motions.
Motions to reconsider, table, postpone, defer, amend, or otherwise dispose of a pending matter shall
be governed by applicable law and the parliamentary authority, except that no procedural motion may
be used to defeat a statutory deadline or required public hearing.
ARTICLE X - COMMITTEES AND WORK SESSIONS
Section 1. Committees.
The Commission may establish standing or temporary committees when useful to the performance of
its duties. Committee appointments shall be made by the Chair unless otherwise directed by the
Commission. Committees shall comply with the Virginia Freedom of Information Act when they
constitute public bodies under applicable law.
Section 2. Work Sessions.
The Commission may hold work sessions for study, discussion, training, or preparation of
recommendations. Work sessions shall be advertised and conducted as public meetings when
required by law. Unless separately noticed and authorized for action, a work session is primarily for
discussion and no final action shall be taken.
ARTICLE XI - RECORDS, MINUTES, AND REPORTS
Section 1. Minutes and Records.
The Commission shall keep a record of its proceedings and transactions as required by Virginia Code
§§ 15.2-2217 and 2.2-3707. Minutes shall include the information required by the Virginia Freedom of
Information Act, including attendance, a summary of matters discussed or decided, and a record of
votes taken.
Section 2. Custody of Records.
Commission records shall be maintained by the Secretary/Clerk or other appropriate County staff in
accordance with applicable records-retention requirements, the Virginia Freedom of Information Act,
and County policy.
Bylaws - Draft
31for/ Review
67 | Page 6
DRAFT 1 –November 19, 2026
Section 3. Reports and Program of Work.
The Commission shall prepare and provide reports, recommendations, a program of work, and other
materials required by Chapter 54 of the Charlotte County Code or the Code of Virginia, including
matters relating to the County Comprehensive Plan.
ARTICLE XII - INTERPRETATION AND SUSPENSION OF RULES
Section 1. Interpretation.
Questions concerning interpretation of these bylaws shall initially be ruled upon by the Chair, subject
to appeal to the Commission. The Commission may request guidance from the County Attorney or
other legal counsel when appropriate.
Section 2. Suspension of Procedural Rules.
A procedural rule contained in these bylaws may be suspended for a particular meeting or item only
when permitted by law and upon approval of a majority of the voting members present and voting. No
rule required by federal law, state law, County ordinance, public notice, due process, or the Virginia
Freedom of Information Act may be suspended.
ARTICLE XIII - AMENDMENT OF BYLAWS
Section 1. Notice.
A proposed amendment to these bylaws shall be provided in writing to all Commission members at
least seven (7) calendar days before the meeting at which the amendment is to be considered.
Section 2. Vote Required.
These bylaws may be amended by a two-thirds vote of the Commission's voting membership. With
eleven (11) voting members, adoption of an amendment requires at least eight (8) affirmative votes,
regardless of the number of members present, provided a quorum is present.
Section 3. Legal Conformance.
No amendment shall be adopted that conflicts with applicable federal law, the Code of Virginia, the
Charlotte County Code, or County ordinance.
ARTICLE XIV - ADOPTION
These bylaws shall become effective upon adoption by the Charlotte County Planning Commission
and shall remain in effect until amended or repealed.
.
______________________________________
___________________
Chair, Charlotte County Planning Commission
Date
______________________________________
___________________
Secretary/Clerk
Date
Bylaws - Draft
32for/ Review
67 | Page 7
CHARLOTTE COUNTY PLANNING COMMISSION
POLICY FOR PUBLIC COMMENTS
Adopted August 27, 2019
Updated November 19th, 2026
1. The Charlotte County (County) Planning Commission will conduct a single general Public
Comment period should and speakers shall be limited to citizens speakers who:
a. Pay personal or real estate taxes in Charlotte County, or
b. Maintain a residence in Charlotte County
2. Speakers should sign up prior to the start of the Planning Commission Meeting. At the
appropriate time the Chair will recognize each speaker and ask them to move to the
podium and clearly state for the record their full name, address, and any organizations
they represent.
3. No speaker may speak for more than 3 minutes or use another speaker's time to speak
longer.
4. Speakers should focus comments on matters related to Planning Commission Business.
5. The public comment period is not a question and answers session and does not require
the Planning Commission to answer a speaker. However, any speaker who wishes to
request a Commissioner respond at a later date, should provide the Secretary of the
Planning Commission with appropriate contact information.
6. A speaker who wishes to support earlier comments is encouraged to state their support
for the earlier comments rather than repeating them.
7. Speakers are expected to be courteous in their language and presentation and shall not:
a.
b.
c.
d.
Campaign for public office.
Promote private business ventures.
Use profane, vulgar, obscene or threatening speech.
Use language of a personal nature that insults or demeans any person or group.
8. Speakers are encouraged, but not required, to provide the Planning Commission with a
written summary of their comments either before or after their presentation.
9. Anyone unable to attend a given Planning Commission meeting may submit brief
comments in writing to the Planning Commission.
9. Citizens, as defined in Number one (#1) above, unable to attend a given Planning
Commission meeting may submit written comments or email comments to
33 / 67
Formatted: Font color: Text 1
Formatted: Font: Bold, Underline, Font color: Green
Formatted: List Paragraph, Indent: Hanging: 0.26",
Numbered + Level: 1 + Numbering Style: 1, 2, 3, … +
Start at: 1 + Alignment: Left + Aligned at: 0.26" +
Indent at: 0.26"
[email protected] , which will be summarized by staff and
provided in a written report, along with the original comments, to each Board
member. For written or emailed comments to be submitted at a Planning Commission
meeting, they must be provided by noon on the previous business day.
10. Any speaker who requires special accommodations should contact the County
Administrator's Office at (434-542-5117) in advance of the meeting.
34 / 67
Formatted: Font: Bold, Underline
Planning Commission
Staff Report
Meeting Date: November 19, 2026
Subject Title: Commercial Zoning
SUBJECT HIGHLIGHTS
Background
At their November 12th meeting, the Board of Supervisors referred the establishment of a
commercial zoning district and associated regulations to the Planning Commission for
recommendation after discussing the matter at their September Zoning Work Session and
October meeting. The proposed zone is located along Four Locust Highway (Route 15 Business)
in Keysville and would potentially encompass existing commercial properties on the eastern
side of Four Locust between the highway and the Buckingham Branch rail line, as well as a small
cluster of commercial properties and adjacent property on the western side of Four Locust.
Key Findings
• Current Uses: Commercial & light industrial, with some residential & agricultural
• Current Zoning: General Industrial and General Agricultural
• Enterprise Zone: In 2023 the County extended the Enterprise Zone to include all nonresidential properties along Four Locust Highway
• Designated Growth Area: Part of the newly established Charlotte County Designated
Growth Area
• Infrastructure: Located on a business route in close proximity to four-lane US Route 360;
MBC fiber line runs along Four Locust; and public water connections are available
through the Town of Keysville
• Tax Implications: 23 parcels in the area were evaluated for inclusion; 18 of them are
currently assessed as commercial property based on actual use or “highest and best
use.” Therefore, their assessment values would not be impacted by the zoning change.
The assessor estimated that the value increase of the other five parcels would range
from $980 for a .28-acre undeveloped property to $17,499 for the largest parcel, a 13+
acre tract. Based on the current real estate tax rate of $0.41 per $100 of assessed value,
this would amount to annual tax increases ranging from $4.02 to $71.75.
35 / 67
Zoning Map Amendment Process
Board of Supervisors
Planning Commission
o Referral to the Planning Commission ✓
o Draft Proposed District Boundaries
o Draft Zoning Ordinance Amendments
o Draft Comprehensive Plan Amendments
o Public Hearings After Proper Notice*
o Recommendation to the Board
o Board Public Hearings After Proper Notice*
o Adoption Incorporating Any Final Changes
* Advertising & Notice Requirements
Impacted Parcels
A.
25 or Fewer
B.
C.
More than 25
More than 100
Required Notice
o Street address or tax map numbers
o Written Notice to owners of all impacted & abutting property
o Same as A plus acreage
o Same as B plus description of boundaries & link to map
Next Step
The Planning Commission will have 100 days from their November 19th meeting, or until
February 27, 2027, to complete their review and provide a recommendation to the Board.
Planning Commission & Board public hearings would be required to amend the zoning
ordinance. However, a joint public hearing may be held.
Staff recommendation, if applicable:
This is provided for informational purposes. Staff will report back in December on potential
comprehensive plan and zoning amendments associated with a Commercial Zoning District.
Any guidance Commissioners can provide at this point regarding the proposed area, specific
uses or types of uses that may be priority, and preferred development standards would be
helpful.
Staff Review Record
Exhibits:
• Zoning Map Detail
• Four Locust Area Under Review
• Enterprise Zone Map
• Board Resolution
36 / 67
Zoning Map Detail
37 / 67
¯
1" = 809'
Four Locust Highway Area
42-12-4
K
1451
322
Vernie
Ln
134
y
1490
1450
42-A-69A
1414
42-A-15
585
233 42-6-5
1348
483
1149
385
219
1250
42-A-54 342
180
378 326
42-A-103B
42-A-103K
230
Heartland Rd
200
1156
341
1133
264
42-2-4
42-2-2
381
42-A-21
92.96 acre
42-A-75
1051
184
42-A-88
Kings Hwy
42-17-2
Kings Hwy
649
454
Kings Hwy
1540
42-A-103H
42-A-55
4121
Hw
1570
42-A-66
3950
gs
Kin
42-A-66J
y
Hw
Kin
s
ing
Kings
Hwy
42-A-66I
Hwy
ville
gs
Hw
y
Farm
211
1010
215
267
929
42-A-52F
115
820
815
42-A-51A
42-A-79
900
887
Kings Hwy
925
271
775
42-A-22B
756
42-14-9
42-A-49
359
601
42-5-1C
748
649
42-5-1E
42-A-81
485
477 489
42-5-1B
DISCLAIMER: This data is provided without warranty of any kind, either expressed or implied. Anyone using this map assumes all risk for the inaccuracy thereof, as Charlotte County
expressly disclaims any liability for loss or damage arising from the use of said information by any third party.
Charlotte County Virginia
County Boundary
Parcel Labels
Address Labels
Parcel Boundaries
Roads
38 / 67
Farmvi lle H
wy
15
Charlotte County Enterprise Zones
Exisiting and Expansion
Prince Edward County
1
rne
US 360
Lunenburg County
ar S
t
Charlotte County
HS
r
R ail r
Osb
o
Far
r
4
St
Lu
n enbu
rg Dr
Lunenb
urg Hw
y
9
hw
ay
5
Hi
g
King St
King s
Hwy
M
er
ry
O
ak s
Dr
10
oad A
ve
Church St
11
oe
B
3
aw
Sh D r
ge W
as hi n
g ton
Hwy
Rd
nd
Hea r tla
1st
St
9
Geo
r
Hor
s es
h
5
Four Lo
cust Hwy
8
US
1
d
dR
en
7
5
6
2
Key Employers
1. UPS Customer Service Center
2. Ontario Hardwood
3. Eastern Engineered Wood Products
4. Forest Pro
5. Tri-County Ford
6. Francisco's Cleaning & Restoration
& Dumpster Rental
7. Scotts Brothers Logging LLC
8. Keysville Building Supply
9. White Building Supply
10. Genesis Products Plant # 4
11. Keysville Town Office
Lu
ne
n
µ
Data Sources:
1. Roads, County/Town Boundaries: Geographic Bureau
VA Department of Emergency Management
2. Expansion Zone Boundaries and Key Employers:
Charlotte County Administration
0
0.25
0.5
1 inch = 0.5 miles
0.75
1
Miles
bu
rg
Legend
Co
un
Major Roads
ty
R
Heartland Business
d Park
Shaw Building Redevelopment Area
Current Enterprise Zone
Proposed Enterprise Zone Addition
Town of Keysville
County Boundary
02/14/2023
39 / 67
Map created by David I. West, GISP, 2023
40 / 67
Charlotte County Board of Supervisors
Date: November 12th, 2026
Staff Report- 2026 Virginia Cannabis Legislation (HB 30): Local Authority and Zoning Review
Purpose and Legislative Background
House Bill 30, enacted during the 2026 Special Session, establishes a framework for regulated adult-use cannabis
businesses in Virginia, with retail sales contemplated beginning July 1, 2027.
The Virginia Cannabis Control Authority (CCA), rather than the County, administers state licensing and regulatory
oversight. The legislation also addresses local land use authority, restrictions on sales hours, public conduct, and a local
retail sales tax. This report is provided for planning purposes; it does not recommend approval of a particular cannabis
establishment.
State Licensing and Types of Cannabis Establishments
The LGA model ordinance distinguishes multiple licensed uses. These are not all conventional retail shops, and each may
raise different land use questions:
•
•
•
•
•
•
•
Retail marijuana store: Consumer-facing sales on licensed premises; consider commercial zoning, parking, access, and
nearby uses.
Cannabis dispensing facility / pharmaceutical processor: Medical cannabis-related facilities; some may be authorized
for dual-use privileges and warrant separate zoning treatment.
Cultivation facility: Growing, harvesting, curing and packaging; consider agricultural/industrial compatibility, utilities
and site access.
Processing facility: Manufacture, extraction, infusion, packaging and preparation of products; consider industrial uses
and applicable building/fire standards.
Testing facility: Laboratory research and analysis for potency, contaminants and safety; evaluate compatibility with
laboratory or industrial districts.
Transporter / delivery operator: Licensed movement between establishments or delivery to consumers; consider
fleet activity, loading, storage and access.
Microbusiness: A license category that may combine cultivation, processing and retail functions as authorized by the
CCA; review the actual proposed activities.
What Local Governments May Regulate
Zoning and siting: Review where establishment types may locate, whether permitted by right or through a conditional use
permit, and appropriate land use compatibility standards, subject to statutory limitations.
Hours of sale: Consider an ordinance specifying restricted days or hours for cannabis product sales, as contemplated by
Virginia Code § 4.1-630.
Public spaces: Consider prohibitions on consumption or offering cannabis in local public parks, playgrounds, public streets
and adjoining sidewalks, as well as applicable school-ground restrictions.
Local retail taxation: Provides for a local cannabis sales tax of 1% to 3.5% under § 4.1-1004, with a rate effective for at
least three years; adoption, administration, and geographic application should be reviewed with legal and finance staff.
Licensing coordination: The CCA controls state licenses. Local staff should establish a procedure for reviewing CCA notices
and checking zoning compliance and any available objection rights.
41 / 67
Three Key Considerations for Charlotte County
1. Revenue and administration: Review the required local tax ordinance, collection procedures, potential revenue, and
coordination with incorporated towns. Revenue projections are premature without an established local market.
2. Zoning readiness: The County should distinguish retail from production, testing and logistics uses; review zoning
districts, permit processes, sensitive uses, traffic and infrastructure before receiving applications.
3. Legal consistency: The LGA model expressly notes competing interpretations of the breadth of local zoning authority
under § 4.1-629. Restrictions should not amount to an effective countywide ban, and proposed standards should be
reviewed by County counsel against enacted law and CCA regulations.
LGA Model Ordinance and Charlotte County Outlook
The Local Government Attorneys of Virginia (LGA) model is a discussion template, not a finished Charlotte County
ordinance. It contains sample language addressing public-space conduct, hours of sale, taxation, separate zoning
treatment for establishment categories, and possible location standards. The model leaves local zoning districts, permit
requirements, operating-hour limits and other choices blank. Its footnotes caution that some proposed zoning approaches
involve unresolved legal questions. Staff proposes using this document to guide a measured review of the County’s current
Zoning Ordinance, Comprehensive Plan, and permitting practices. No specific application or location is being evaluated by
this referral.
Staff Recommendation and Proposed Board Action
Staff recommends that the Board adopt the attached resolution formally referring cannabis-related land use and zoning
issues to the Charlotte County Planning Commission. Staff, working with the Planning Commission and County legal
counsel, would use the LGA model as a starting point; evaluate the appropriate treatment of each establishment type;
identify any necessary zoning amendments; and return recommendations to the Board through the applicable public
hearing and adoption process. Taxation and other non-zoning provisions should be coordinated separately with the
County Administrator, Finance staff, and legal counsel.
Attachment: Proposed Resolution – Referral of Cannabis-Related Zoning Regulations to the Planning Commission
42 / 67
43 / 67
Planning Commission
Staff Report
Meeting Date: November 19, 2026
Subject Title: RV/Camper Zoning
SUBJECT HIGHLIGHTS
Background
• RVs have long been used on private property in the County for recreational purposes and
historically have not been required to obtain zoning permits
• No specific zoning requirements have been established for the use of individual RVs.
• When use of RVs for permanent residences became noticeable around 2023, staff began
requiring a zoning permit for new permanent camper sites due to concerns regarding
proper water & sewer connections.
• Only eleven zoning permits for individual RV sites have been issued to date.
• The Board amended the zoning ordinance on March 11, 2026, to add Extended Stay RV
Parks as a conditional use in the General Ag District. Definitions for Recreational Vehicle
and Campsite were also added at that time, while the outdated definition for “Camping
Trailer,” was removed.
Camping Trailer - Any vehicle that has collapsible sides and contains sleeping quarters
but may or may not contain bathing and cooking facilities and is designed to be drawn
by a motor vehicle. (Removed 3/11/2026)
Recreational Vehicle (RV). A vehicle, either self-propelled or towed, designed to provide
temporary living quarters for recreational, camping, or travel use and including units like
motor homes, travel trailers, and camping trailers. (Added 3/11/2026)
Camper. See Recreational Vehicle (RV) (Added 3/11/2026)
Campsite. A plot of ground intended for a single camping unit, such as a Recreational
Vehicle or tent. (Added 3/11/2026)
44 / 67
Zoning Ordinance Treatment of RV’s
Minimum
Treatment
Number of RVs
Maximum
Permits
Use
in
Reference
Based on County
Stay
Issued
Ordinance
Definition*
Individual
Not
N/A
N/A
11
N/A
Campsite
Addressed
CUP
60 days per
Campground
2
0
§10-16
in Gen Ag
Calendar Year
Extended Stay
CUP
12 Months
1
5
§10-25
RV Park
in Gen Ag
Consecutive
(9 campsites)
*The Health Dept. requires a campground permit for parcels with three or more campsites.
Primary Concerns
Noted concerns of using RVs for permanent residences include:
o Inappropriate siting of RVs (under powerlines, in floodplains, close to roads, etc.)
o Improper wastewater disposal
o Vulnerability to extreme weather conditions and associated safety concerns
o Placement of RVs on vacant land without landowner permission
o Construction of associated accessory structures without permits
o Ability of emergency personnel to find RV sites when needed
o Challenges of monitoring camper land use due to vegetative screening, barriers, and
lack of right to access
Board of Supervisors’ Position
The Board of Supervisors discussed camper zoning at their September 14th work session and
stated a preference for using a framework similar to Campbell County’s regulations for RVs &
Campers as a starting point for developing local regulations.
Campbell County’s Current Position
•
•
•
•
•
RVs/campers are temporary accommodations and are not treated as single-family dwellings.
Continuous and regular presence for more than 14 days within any 90-day period is generally a
violation unless an exception applies.
One RV may be used as a temporary residence while a primary home is being constructed for up
to six months.
The construction exception requires proper building, water and septic permits; permitted water,
wastewater and temporary electric service; an operable/licensed RV; onboard plumbing/waste
facilities; and no delinquent personal property taxes.
Similar construction provisions apply in applicable residential and agricultural districts
45 / 67
Additional recommendations from the Board included the following:
• Increasing temporary residential use during home construction to 12 months, with a
6-month extension option
• Including a similar temporary use allowance for emergency/hardship situations
• Including a similar allowance for travel workers
• Adopting a regulation that would allow the administrator to request a magistrate or
court issued inspection warrant based on the administrator’s affidavit so staff can
review potential violations that cannot be confirmed from the public right-of-way
At their October 14th meeting, the Board formally referred this issue to the Commission.
Next Steps
Working with staff, legal counsel has prepared draft zoning amendments for campers based on
the Board’s recommendations. The Planning Commission has 100 days from their October 15th
meeting, or until January 23, 2027, to complete their review and provide a recommendation to
the Board. Planning Commission & Board public hearings would be required.
Discussion Topics Noted by Staff
1. Allowing RVs as Permanent Residences
Board’s Position:
Discontinue use of RVs as permanent residences due to noted concerns
Discussion Item:
At their October meeting, Commissioners inquired about allowing RVs as
permanent residences with a larger lot size. The Commission needs to
determine if they want to include this option in their recommendation.
Gentry Locke:
Gentry Locke advised that the County would need reasonable
justification for larger lot sizes; would need to allow it by ordinance; and
would need to review the definition of RV since it specifies temporary
use.
Staff Comments:
As stated in Section 1-3 of the Zoning Ordinance, the intent of the zoning
ordinance is “to promote the health, safety, and general welfare of the
public.…” RVs are marketed for temporary use and are not designed to
meet residential building requirements or for long-term habitation.
Requiring larger lot sizes does not address concerns regarding
vulnerability to extreme weather conditions & associated safety
concerns.
46 / 67
2. Allowable Uses of RVs for Temporary Housing / 10-11-1.3 through 1.5
Board’s Position:
RVs may be used as temporary housing for the following:
• During construction of a single-family home
• Travel workers with proof of employment for less than 12 month
• For emergency/hardship situations
The above uses are limited to 12 months, may receive up to a
6-month extension, & require a zoning permit for temporary use
• Is the time allowed sufficient?
• Are any other temporary housing allowances recommended?
• Input on other requirements
Discussion Items:
3. Timeframe for Recreational Use of RVs / Article XII Definitions
Board’s Position:
The Board did not provide specific guidance. The proposed amendment
to the definition of RV specifies a limit of 14 days in a 90-day period
based on Campbell County’s requirement.
Discussion Item:
Appropriate limits for recreational stays
4. Moving Forward
Gentry Locke:
In October, Gentry Lock advised that including “temporary” in the
definition of Recreational Vehicle adopted in March was sufficient to
prohibit RVs as permanent residences. (Since the purpose of the March
zoning was focused on Extended Stay RV Parks and staff & local officials
were unaware of the implications associated with the definition of RV,
staff had continued to use the previous policy of allowing permanent
use RVs with well & septic.) Gentry Locke advised that the County
needs to determine how to handle permanent RV sites established after
March 11th & recommended obtaining input from the Commission and
Board.
Options to Consider:
• Discontinue the practice of allowing new permanent use RV sites as
of October 1 or another specific date.
• Require removal of all permanent RV sites established after March
11, 2026.
• Continue with the policy of requiring zoning, well, & septic for new
permanent use RV sites until the ordinance is amended.
Staff Review Record
Exhibits: Draft Zoning Amendments
47 / 67
DRAFT – 11/19/2026
Planning Commission
DRAFT
Zoning Amendments for Recreational Vehicle Use
November 19, 2026
All proposed changes are noted below in bold type with underlining.
Article II, Section 2-2-4, Authority of the Zoning Administrator
f) The Zoning Administrator or his agent may make an affidavit under oath before a
magistrate or court of competent jurisdiction and if such affidavit establishes
probable cause that a zoning ordinance violation has occurred, request that the
magistrate or court grant the Zoning Administrator or his agent an inspection
warrant to enable the Zoning Administrator or his agent to enter the subject dwelling
for the purpose of determining whether violations of the zoning ordinance exist. After
issuing a warrant under this section, the magistrate or judge shall file the affidavit in
the manner prescribed by Va. Code §19.2-54. After executing the warrant, the Zoning
Administrator or his agent shall return the warrant to the Clerk of Charlotte County
Circuit Court. The Zoning Administrator or his agent shall make a reasonable effort
to obtain consent from the owner or tenant of the subject dwelling prior to seeking the
issuance of an inspection warrant under this section.
Article IX. USE MATRIX
B = By Right
C = Conditional Use Permit
T = Temporary Use Permit
Use Types
NP = Not Permitted
Zoning Districts
Recreational Vehicle Temporary Recreational
Use
Recreational Vehicle Temporary Housing
General
Agricultural
Intensive
Agriculture
General
Residential
Village
Center
General
Industrial
B
NP
B
B
NP
T
NP
T
T
NP
Article X, Section 10-11, Temporary Uses
10-11-1.3. One recreational vehicle may be used by the property owner as temporary housing
during the construction of a conventional single family dwelling on the same lot where the
dwelling is being constructed and for which a building permit has been issued, for no more
than 12 months. A temporary zoning permit is required for such use, and it is subject to the
following restrictions:
48 / 67
DRAFT – 11/19/2026
Planning Commission
a) This Temporary Use is limited to General Agriculture, General Residential, and
Village Center zoning districts;
b) The recreational vehicle must be operable and have a current state inspection sticker
and licenses or be marked as a rental unit from a rental agency, insurance company
or governmental entity;
c) There shall be no delinquent personal property taxes owed on the recreational
vehicle;
d) The recreational vehicle shall have available onboard electrical service, plumbing,
and waste management facilities; and
e) The recreational vehicle shall be hooked up to a permitted water supply, a permitted
waste disposal system, and a permitted temporary electrical power source.
If additional time for construction is requested by the applicant, the zoning administrator may
extend the temporary permit for a single extension of up to 6 additional months.
10-11-1.4. A recreational vehicle may be used as temporary housing for traveling workers who
are in the County, subject to the following restrictions:
a) Presentation to the zoning administrator of proof of employment for a specific
project that is not expected to require the travel worker to remain in the area for
more than 12 months;
b) A temporary use permit;
c) This Temporary Use is limited to General Agriculture, General Residential, and
Village Center zoning districts;
d) The recreational vehicle must be operable and have a current state inspection sticker
and licenses or be marked as a rental unit from a rental agency, insurance company
or governmental entity;
e) There shall be no delinquent personal property taxes owed on the recreational
vehicle;
f) The recreational vehicle shall have available onboard electrical service, plumbing,
and waste management facilities; and
g) The recreational vehicle shall be hooked up to a permitted water supply, a permitted
waste disposal system, and a permitted temporary electrical power source.
h) No more than 2 adults may use a single recreational vehicle permitted as temporary
housing under this section.
If additional time for the specific project requested by the applicant, the zoning administrator
may extend the temporary permit for a single extension of up to 6 additional months. This
section shall not apply to temporary or seasonal farmworkers.
10-11-1.5 Notwithstanding other provisions of this Code, one recreational vehicle, as defined in
Article XII of this Code, may be used by the home occupant as a temporary residence, for no
more than 12 months, in the following emergency or hardship circumstances:
a) Sudden damage to a residence on the same lot that causes a lack of a functioning
roof, water system, septic/wastewater system, or electricity.
49 / 67
DRAFT – 11/19/2026
Planning Commission
b) Sudden damage to a residence that renders the residence temporarily uninhabitable
as determined by the Charlotte County Building Official or the fire marshal.
c) Determination by the Charlotte County Building Official, a licensed engineer, or a
licensed Class A contractor that a residence is structurally unsafe for habitation.
A temporary zoning permit is required for such use, and it is subject to the following
restrictions:
a) The recreational vehicle must be operable and have a current state inspection sticker
and licenses or be marked as a rental unit from a rental agency, insurance company
or governmental entity;
b) There shall be no delinquent personal property taxes owed on the recreational
vehicle;
c) The recreational vehicle shall have available onboard electrical service, plumbing,
and waste management facilities; and
d) The recreational vehicle shall be hooked up to a permitted water supply, a permitted
waste disposal system, and a permitted temporary electrical power source. If the
waste disposal system has been damaged, the occupant of the recreational vehicle
shall provide the zoning administrator receipts documenting proper waste disposal at
a licensed facility.
If the applicant requests additional time to complete repairs, replacement, and/or cleanup the
zoning administrator may extend the temporary permit for a single extension of up to 6
additional months.
Article XII, Definitions
Recreational Vehicle - A vehicle, either self-propelled or towed, designed to provide temporary
living quarters for recreational, camping, or travel use and including units like motor homes,
travel trailers, and camping trailers. Continuous and regular presence within a Recreational
Vehicle for more than 14 days in a 90-day period shall be considered a violation of this
chapter unless otherwise expressly exempted herein unless the recreational vehicle is
located in a permitted campground, permitted Extended Stay RV park, or has an approved
temporary use permit as provided for in Article X of this ordinance.
Traveling Worker - An individual employed on a temporary or project-specific basis, away
from their permanent home, typically staying weeks or months near an active industrial,
commercial, or infrastructure job site, where they are employed, or in a community with
the client base they have been employed to temporarily serve, while not residing on the job
site.
50 / 67
Charlotte County, Virginia
Planning Commission Report
Meeting Date: November 19th, 2026
Subject: General Staff Report
General Staff Report
1. August Building/Zoning Activities
Conditional Use Permits: 0
Plats Reviewed: 8
Conservation Easements: 1
Zoning Determination Letters: 0
Zoning Permits: 10
Building Permits: 42
2. Approved Solar Project Updates:
A. CPV County Line Solar (NO CHANGE): As previously reported, CPV removed their project
from the PJM project queue last year. They have now resubmitted their application for
interconnection and are back in the PJM queue. Their Phase I PJM report is currently in
progress. Estimated date of construction for this project is second quarter 2028.
B. Charlotte Solar 1: Staff was recently notified that, as of November 4th, ownership of this 1.9
Megawatt property has been transferred to Virginia Electric & Power Company (Dominion).
As previously reported, Charlotte Solar 1 was granted a 12-month extension on their timeline
to obtain their building permit, giving them until February 14, 2028.
C. Tall Pines Solar: On November 4th, Dominion provided a favorable update on the status of
the Tall Pines, Quarter Horse, and Randolph solar projects, indicating all three remain on
track for inclusion in its December 1, 2026, filing with the State Corporation Commission
(SCC). A final decision from the SCC is anticipated by June 1, 2027.
On November 3rd, staff held a kickoff meeting with A. Morton Thomas and Associates (AMT),
who was awarded the County’s third-party solar review contract for the Tall Pines, Quarter
Horse, and Randolph solar projects. AMT will provide professional engineering services,
including performing site plan reviews and inspections and assisting the County in monitoring
compliance with state regulations and Conditional Use Permit (CUP) requirements. AMT will
soon begin reviewing the Tall Pines site plan that has been received by the County.
D. Courthouse Solar: Phase 1 of the civil work is nearing completion. Fence installation is
underway and the substation pad turnover is scheduled to start in December. Staff is working
with Dominion and the project contractor, Depcom, to address questions and issues as they
arise. Summit Engineering, the County’s engineering consultant, continues to perform site
51 / 67
visits and inspections, coordinating with County staff. The project’s estimated commercial
operation date is 2030.
E. Randolph Solar: On November 4th, Dominion provided a favorable update on the status of
the Tall Pines, Quarter Horse, and Randolph solar projects, indicating all three remain on
track for inclusion in its December 1, 2026, filing with the State Corporation Commission
(SCC). A final decision from the SCC is anticipated by June 1, 2027.
F. Quarter Horse Solar: On November 4th, Dominion provided a favorable update on the status
of the Tall Pines, Quarter Horse, and Randolph solar projects, indicating all three remain on
track for inclusion in its December 1, 2026, filing with the State Corporation Commission
(SCC). A final decision from the SCC is anticipated by June 1, 2027.
G. Taro Solar (NO CHANGE): Taro Solar was approved by the Board in December of 2025.
Estimated construction start date is late 2027.
3. Certified Planning Commissioner Training Program
Upcoming Sessions of VCU’s Certified Planning Commissioner Training Program:
•
•
January – April in Richmond
April - June Online
The program consists of two 2-day class separated by an independent study period & is designed
to provide the legal and technical background needed by citizen-planners and decision makers.
Program cost is covered by the County. If you are interested in attending, please let staff know.
4. Board Actions & Activities Related to Planning
At their November 12th meeting:
• The Board approved John Swarey’s conditional use permit application for a sawmill on
Wards Fork Mill Road with recommended conditions (correcting one duplication). They
also requested VDOT work on the road’s shoulders and trim back vegetation. To minimize
the distance trucks are travelling on Wards Fork Mill Road, VDOT also plans to limit the
bridge on end of the road near Route 47 to one lane, allowing trucks to use the bridge
despite the current weight restrictions. There are currently no plans to replace the bridge.
• The Board also formally referred zoning for the cannabis market and the establishment of a
commercial zoning district and associated regulations to the Planning Commission.
5. Upcoming Public Hearings & Activities
None
52 / 67
Data Center Workshop
Summary of Presentations and Discussions
Charlotte County, Virginia | October 27, 2026, | Southside Virginia Community College
Hosted by the Commonwealth Regional Council
Purpose and Background
On October 27, 2026, representatives of Charlotte County attended a regional Data Center Workshop
hosted by the Commonwealth Regional Council. County representatives included the County Administrator,
Deputy County Administrator, Administrative Planner, and members of the Board of Supervisors and Planning
Commission.
The event was intended to educate local government leaders about the data center industry, including
infrastructure requirements, potential economic benefits, land-use considerations, and community impacts.
No data center developer has approached Charlotte County regarding a proposed development. County
representatives attended to gather information and resources that may assist officials and the public if the
subject arises in the future.
Attendance did not represent an endorsement of data center development, a County initiative to
attract such facilities, or consideration of any specific development proposal. The presentations included both
potential benefits and concerns. This report summarizes what was discussed; it does not establish a County
policy position.
Session 1: Data Center 101 – Understanding the Industry
Tim Reynolds, PE, V.P., Southside Business Development, Hurt & Proffitt
The introductory session explained what data centers are, why they are needed, what they do, and
their role in supporting digital services. Topics included terminology, facility types, development and operating
expenses, infrastructure, regulatory responsibilities, and frequently asked questions.
Data Centers as the “Next Utility”
A presenter described data centers as the “next utility,” comparing their emergence to the printing press,
steam engine, railroad, and automobile. The speaker outlined three general phases through which society may
respond to transformative technology:
Phase 1 – Rejection and Panic: Initial skepticism, uncertainty, public opposition, and resistance to change.
Phase 2 – Regulation and Adaptation: Governments and communities develop rules and operating
frameworks to address concerns and establish expectations.
Phase 3 – Ubiquitous Infrastructure: Technology becomes a routine part of everyday life, as with
electricity, automobiles, and the internet.
This was presented as a framework for understanding technological change, not as a finding that public
concerns are unfounded or that every community should accommodate data centers.
53 / 67
Session 2: Siting and Construction
Moderator- Larry Jackson, PE, Energy Business Development, Hurt & Proffitt
Panel- Matt Rowe, Pittsylvania County (EDA), Matt Conrad, V.P., Business Development and External Affairs (Tract), Greg
Vlassopolos, Act. Manager/Data Centers (Schneider Electric)
The second session addressed site selection, construction, recommended practices, and common
challenges for local governments evaluating potential projects.
Site Selection and Infrastructure
Power: Adequate electrical capacity and reliable service commitments.
Water: Supply needs dependent on facility design and cooling technology.
Land: Sufficient acreage for buildings, supporting infrastructure, setbacks, and buffering.
Fiber: Reliable, high-capacity telecommunications connectivity.
Community willingness: Awareness of local land-use expectations and community concerns.
For very large, gigawatt-scale campuses, presenters discussed approximately 300 acres as a minimum site
size, while noting that project requirements vary. Substantial buffering from residences and other sensitive
54 / 67
uses was encouraged. Speakers also discussed confirming utility capacity, clarifying electrical rates and longterm arrangements, and distinguishing conventional data centers from cryptocurrency mining operations,
which may have different impacts.
Developer and Community Relationships
Panelists encouraged local governments to evaluate developers’ capabilities and long-term
commitments. They discussed negotiating meaningful community benefits arrangements, potentially
supporting education, workforce development, housing, infrastructure, and other identified priorities. The
discussion framed data center operators as potential long-term community partners rather than solely sources
of investment and tax revenue.
55 / 67
Workforce Needs
Presenters discussed the workforce requirements associated with data center development, noting the
distinction between temporary construction employment and permanent operational positions. Large-scale
projects can require substantial numbers of construction workers, including electricians, contractors,
engineers, and other skilled tradespeople. Once operational, data centers generally require a smaller, more
specialized permanent workforce.
The panel also discussed the broader economic impact of data center employment, indicating that for
every one direct job created by a data center, approximately four additional indirect jobs are generated within
the surrounding community. These additional employment opportunities may arise through supporting
businesses, contractors, suppliers, and other local services.
The discussion highlighted the importance of workforce development partnerships, technical
education, and training programs to help communities prepare for potential employment opportunities.
Construction Impacts
The panel discussed the potential impacts associated with constructing large-scale data center
facilities. Depending on the size and scope of a project, construction may involve significant truck traffic, heavy
equipment, increased activity on local roadways, noise, and extended construction schedules.
Presenters emphasized the importance of understanding a project's anticipated construction timeline,
transportation needs, and potential impacts on surrounding properties and infrastructure. These
considerations were discussed as factors local governments may evaluate when reviewing development
proposals.
Session 3: Community Benefits and Potential Pitfalls
Moderator- Jess Littlejohn, PE VP Blacksburg Business Development Hurt & Proffitt
Panel- David Manley- Executive Director (Tobacco Region Revitalization Commission), Anthony Romanello- Managing Partner, SIR
(Former Henrico Co. EDA), Jeremy Satterfield- TechSpark (Microsoft), Alex Gottschalk- Mecklenburg County Administrator
The third session considered experiences from communities with existing data centers, including
benefits, challenges, and lessons learned. Panelists stressed the importance of establishing local land-use
expectations before a project is proposed.
Planning and Zoning
Presenters discussed reviewing zoning ordinances, setting development standards for location,
setbacks, screening, buffering and noise, and considering potential infrastructure needs in comprehensive
plans and Capital Improvement Plans. They emphasized that approaches should be scaled to each locality’s
circumstances; not every community has the infrastructure or land to support the same type or size of facility.
Electrical service and fiber connectivity were identified as essential considerations.
Housing Pressures
Presenters discussed the potential effects of large construction projects on local housing availability. A
significant temporary construction workforce may increase demand for rental housing, hotels, and other
accommodations, particularly in rural communities with limited existing housing inventories.
56 / 67
Panelists noted that these pressures can extend beyond the immediate project location and affect
neighboring communities. The discussion highlighted the importance of considering workforce housing
availability and potential housing-related impacts when evaluating large-scale economic development
projects.
Mecklenburg, Loudoun, Pittsylvania, and Henrico Counties – Data Center Development Experiences
The panel highlighted experiences from several Virginia localities, including Mecklenburg, Loudoun,
Pittsylvania, and Henrico Counties, to illustrate the economic opportunities, planning considerations, and
challenges associated with data center development.
Mecklenburg County was presented as an example of data center development in a rural community.
Panelists discussed how the County considered lessons learned from Northern Virginia, particularly Loudoun
County, where rapid industry growth has generated public discussion regarding land-use compatibility,
infrastructure demands, and community impacts. Mecklenburg representatives described the industry's
significant contributions to the local tax base and how associated revenues have supported major public
investments, including school construction.
The experiences of Pittsylvania and Henrico Counties were also referenced as part of the broader
discussion of data center development across Virginia. Henrico County was highlighted for its approach to
community benefits, including initiatives supporting affordable housing and other community priorities.
Panelists discussed the importance of appropriate zoning regulations, infrastructure planning, and
understanding the long-term financial implications of development, including equipment depreciation and
potential fluctuations in tax revenue. Additional topics included temporary construction impacts, housing
pressures, public opposition, and the relatively limited number of permanent operational jobs at some
facilities compared with their construction workforce.
Examples of community benefits included workforce education, infrastructure improvements, housing
initiatives, and partnerships between data center operators and local organizations.
The discussion provided attendees with examples of how different Virginia localities have approached
data center development based on their individual circumstances, infrastructure capabilities, and community
priorities.
.
Session 4: Keynote – Economic Development and Infrastructure
Preston Bryant- Sr. V.P., Infrastructure and Economic Development- McGuireWoods
The keynote addressed the role of data centers in economic development, including capital
investment, construction activity, local tax revenue, and potential public infrastructure funding. Examples
from Virginia communities illustrated ways revenue has been used for public purposes.
Technology Overlay Districts
The speaker suggested that localities consider technology overlay zoning districts to identify suitable
locations and apply tailored standards for setbacks, screening, landscaping, noise, and infrastructure. This was
a presenter recommendation, not a policy adopted or proposed by Charlotte County.
57 / 67
Water Use and Cooling Systems
The keynote discussed how water requirements differ by cooling technology, including open, closedloop, and evaporative systems. Closed-loop systems recirculate cooling fluid and may use substantially less
replacement water than evaporative arrangements. The presenter stated that many newer facilities use
closed-loop technology. Water demand, however, depends on the specific facility and its design.
A presentation graphic compared water consumption in data centers with other activities and
industries, including beef production, soda production, and golf courses. The comparison was presented as
context for discussing water demand; the figures were not independently evaluated by Charlotte County.
Overall Workshop Observations
The workshop provided an educational overview rather than a presentation exclusively in favor of data
center development. Across the four sessions, speakers discussed economic opportunities alongside concerns
about zoning, electrical capacity, water use, traffic, noise, housing, public opposition, and long-term financial
planning.
Land-use regulations and site compatibility are important local considerations.
Power, fiber, land, and project-specific water needs influence feasibility.
Facility scale and impacts vary, and localities may take different approaches.
Tax revenue and capital investment should be considered alongside depreciation and ongoing community
impacts.
Experiences from Northern Virginia, Mecklenburg County, and other localities offer lessons for future
public discussion.
58 / 67
Relevance to Charlotte County
Charlotte County representatives attended to become better informed about a growing land-use and
economic development topic in Virginia. No developer had approached the County with a data center
proposal at the time of the workshop. The information gathered may help staff, elected officials, and residents
understand the industry and relevant questions if the topic arises. Participation did not initiate a development
project or establish a County position.
Conclusion
The October 27, 2026, regional workshop provided local government officials with information about
data center operations, siting and construction, community benefits and pitfalls, and economic development
considerations. Presenters addressed both potential advantages and concerns. Charlotte County’s
participation was educational and informational only, reflecting an effort to gather resources and remain
prepared to answer public questions should the need arise.
Report note: This summary reflects topics and statements presented at the workshop. Industry figures, comparisons, and
recommendations are attributed to presenters and should not be interpreted as independently verified County findings or official
County positions.
59 / 67
Dominion Energy
Charlotte County Board of Supervisors
Project Updates
November 12, 2026
Powering Your Every Day.
SM
60 / 67
1
Tall Pines Solar
•
•
•
188 MWAC
CUP approved August 2022
Area inside fence ~1400 acres
•
Local economic benefits
•
•
•
Construction Impact:
•
55 direct & 61
indirect/induced jobs
•
$4.9M in wages & benefits
•
$32.2M in economic output
•
$1.3M state & local tax
revenue
Operational Impact:
•
8 direct & 24
indirect/induced jobs
•
$1.6M in wages & benefits
•
$8.1M in economic output
Interconnection
•
•
Bethlehem Road
115 kV Dominion Transmission
Permitting & Construction
•
•
•
Permit approval Q2 2027
Mobilization Q2 2027
COD anticipated 2030
Powering Your Every Day.
SM
61 / 67
2
Quarter Horse Solar
•
•
•
125 MWAC
CUP approved September 2024
Area inside fence ~443 acres
•
Local economic benefits
•
•
•
•
36 direct & 47
indirect/induced jobs
•
$3.4M in wages & benefits
•
$20.6M in economic output
•
$0.9M in state & local tax
revenue
Operational Impact:
•
5 direct & 15
indirect/induced jobs
•
$1.0M in wages & benefits
•
$4.6M in economic output
Interconnection
•
•
Construction Impact:
115 kV Dominion Transmission
Permitting & Construction
•
•
•
Permit approval Q2 2027
Anticipated Mobilization Q2 2027
COD anticipated 2030
Powering Your Every Day.
SM
62 / 67
3
Randolph Solar
•
•
•
•
•
•
800 MWAC
CUP approved August 2022
~10,000 acres, ~100 landowners
Area inside fence < 4,950 acres
Local economic benefits
•
Construction Impact:
•
76 direct & 157 indirect/induced jobs
•
$10.1M in wages & benefits
•
$102.4M in economic output
•
$3.4M state & local tax revenue
•
Operational Impact:
•
34 direct & 99 indirect/induced jobs
•
$7.0M in wages & benefits
•
$31.2M in economic output
Phased permitting & Construction
•
•
•
Phase 1 – 160 MWAC
Phase 2 – 340 MWAC
Phase 3 – 300 MWAC
•
Phase I Permit Application Q2 2027
•
Phase I Mobilization Anticipated Q1 2028
•
COD (Phased) 2032/2033
Powering Your Every Day.
SM
Trailer Area
63 / 67
4
DEV CE-7 Solar – Charlotte County
Schedule
Project timeline
In-Service
Quarter Horse &
Tall Pines
6/1 Order
received/CPCNs
Issued
In-service
Randolph
12/1: File CE-7
Q4
2025
Q4
2026
EPC execution
for Quarter Horse &
Tall Pines Q4 2025
2028
2029
2030
2031
2032-33
Anticipated
Mobilization
Anticipated EPC execution for
Randolph
Contracting
Powering Your Every Day.
Q2
2027
SM
Regulatory / Permitting
64 / 67
Construction
5
Dominion Energy Contact Information
Justin Pope - External Affairs Manager
[email protected]
Powering Your Every Day.
SM
65 / 67
6
66 / 67
67 / 67
The government’s own published record — read it yourself, then decide what to do about it.
Showing up is how towns win. Put it on the calendar before it slips.
Public comment is where cancellations start. Three minutes, plain words, your own story.
The facilities, the coverage, and the local record for this community.
Provenance
Where this record came from. Every source is listed, permanently.
- Agenda Watch · Nov 13, 2026
Permanent ID DKT-2026-005216 — this record is never deleted.
Record history
Every change to this record, logged as it happened.
- Nov 13, 2026 Filed on the Docket
- Nov 13, 2026 Full document archived — public record
← The full Docket · every meeting, vote, and action on the permanent record · also in the National Record Index.