⚡︎ Independent, reader-supported & ad-free · Follow the megawatts in all 50 states ⚡︎ Support Us
The Docket · Government Meeting · DKT-2026-005403

On the agenda: Daleville Agenda Packet for November 19 Work Session — data center (Nov 19)

⚠ Agenda Watch  Daleville, Virginia · Thursday, November 19, 2026 — today

About this record

The published agenda for this November 19 meeting contains: "data center", "Data Center". This is the public record BEFORE the vote — read the document, then show up. Public comment is where cancellations start.

WhenThursday, November 19, 2026
Check the agenda document for the meeting time.
WhereDaleville, Virginia
BodyAgenda Packet for November 19 Work Session
Money$30 on the table
On the record“data center”“Data Center”

The agenda, word for word

Government public record — the full text of the published document, archived November 18, 2026. Gold highlighting of key terms is ours, not the original’s. Read the original document ↗

84 pages · scroll to read
Page 1 of 84

Botetourt County
Planning Commission Agenda for
Work Session
57 S. Center Drive, Daleville, Virginia
November 19, 2026, 6:15 PM

1.
2.
3.
4.
5.
6.

Call to Order and Introduction
Review and approval of October 13 Planning Commission meeting minutes
Community Solar Survey Results
Discussion of Solar Comprehensive Plan Addendum Revisions
Discussion of Solar Ordinance Revisions
Adjournment

This is a Work Session only and there will be no opportunity for public comment. The public are welcome
to attend.

It is the intention of Botetourt County to comply with the Americans with Disabilities Act (ADA) in all respects. If, as an attendee
or participant at this meeting, you need special assistance beyond what is normally provided, Botetourt County will
attempt to accommodate you in a reasonable manner. Please contact us at (540.928.2080 or [email protected]) at least
72 hours prior to the meeting to inform us of your particular needs and advise us at that time if you will need accommodations to attend or
participate in meetings on a regular basis.

Page 2 of 84

Dr. Leffel called the October 13, 2026 Botetourt County Planning Commission meeting to
order at 6:01pm, in the Botetourt County Administration Center Auditorium Room 212 in
Daleville, Virginia.
Present:
•
•
•
•
•
•
•
•
•
•

Dr. Elizabeth Leffel, Chair,
Mr. Tim Lucas, Vice-Chair
Mr. Shannon Turner
Mr. Steve Hartman
Mr. Mark Tyson
Mr. Jonathan McCoy, Interim Director of Community Development
Mr. Matthew Lindsay, Planner II
Mr. Jude Wilson, Planner I
Ms. Jill Caldwell, Administrative Assistant
Mr. Mike Lockaby, County Attorney

Also Present:
•
•
•
•
•
•
•
•
•

Mr. Tim Snyder, Board Representative of Amsterdam Magisterial District
Mr. Walter Michael, Board Representative of Blue Ridge Magisterial District
Ms. Linda Rottman, Board Representative of Buchanan Magisterial District
Mr. Brandon Nicely, Board Representative of Fincastle Magisterial District
Mr. Donald “Mac” Scothorn, Board Representative of Valley Magisterial District
Mr. Brent Watts, Director of Communications
Mr. Matthew Hinckle, Director of Emergency Communications
Mr. Gary Larrowe, County Administrator
Mrs. Celeste Parker, Executive Assistant.

Dr. Leffel opened the meeting, then Dr. Scothorn opened the Board meeting. Dr. Scothorn
led the Pledge of Allegiance, then the Board recessed. Dr. Leffel welcomed the audience,
introduced Staff and Planning Commission members, and then read the procedures for the
public hearing. She noted that anyone wishing to speak should complete a “Request to
Speak” form and give it to a staff member.
Dr. Leffel announced that the Planning Commission would meet at the Botetourt County
Administration Center on Monday, November 9th, 2026, at 5 p.m.
She then asked Mr. Jon McCoy to present the first three agenda items. Mr. Tyson interrupted
to discuss the previous work session, noting his concerns over the notice given for that

Page 3 of 84

public meeting. Following this, Dr. Leffel asked Mr. McCoy to begin the presentation for the
Telecommunications Tower items.
Public Hearing Item: The Botetourt County Board of Supervisors, at their July 28, 2026,
meeting, authorized a text amendment to revise Ch. 25 Art. II Div. 7 Sec.s 25-171 –
Building requirements; minimum yards to consider an update that would reduce the
minimum required number of attached dwelling units per grouping from six (6) to three
(3) in the High Density Residential (R-4) Use District.
Mr. McCoy began by welcoming Mr. Shannon Turner to the Planning Commission, noting
that this was his first public hearing as a Commissioner. Mr. McCoy noted that the text
amendment was somewhat complex and explained how this zoning text amendment and
the subsequent hearing item on the telecommunications tower are necessary for the
county’s 911 communication program. Mr. McCoy then read the legal advertisement aloud
and began the presentation.
Mr. McCoy described how the need for the text amendment was twofold – that not securing
a fall zone easement would set the tower project in Blue Ridge behind, resulting in costly
delays, and that the recently changed County Code on telecommunications conflicted with
state code, by treating towers for public use and private use differently. Mr. McCoy then
described the proposed changes, including an increase in height by SEP up to a maximum
250 feet tall, removing redundant language on certified mail notices, clarifying the general
and property line setbacks, and language providing an alternative to the certified fall zone
easement requirement.
Planning Commissioners began to ask questions of the zoning changes, including why the
maximum height was proposed to be increased to 250’, expressing some concerns over the
engineering fall zone analysis, and discussing the philosophy of making a zoning ordinance
text change to benefit a single project.
Dr. Leffel asked the Commission if they would like to hear each item individually and make
a vote, or to hear all four items related to the tower, and then hold a public hearing and
vote. The Commission indicated the desire to hear all items prior to making a vote.
Mr. McCoy moved to present the item for the Comprehensive Plan amendment, but was
then asked by Mr. Tyson to replace the word “or” with the word “and” in the clause,
“…structure is outside the certified fall zone and otherwise does not create an unsafe
condition.”
Public Hearing Item: Botetourt County requests a Comprehensive Plan Amendment to
update map 9.6 – “Telecommunication Towers in Botetourt County” to show the

Page 4 of 84

proposed location of a new 911 Telecommunication Tower located at 40 East Park
Circle, Roanoke, VA and shown on tax maps as parcel 108(13)9B.
Mr. McCoy presented Map 9.6 in the comprehensive plan, which portrays the existing and
proposed telecommunications towers in the county. He explained that its more an
administrative in nature, and indicated he would be happy to answer any questions. Mr.
Tyson suggested moving to hear the item regarding the telecommunications tower itself
and then consider this item. Dr. Leffel indicated consent, and asked Mr. McCoy to move
forward to present the tower project request.
Public Hearing Item: Blue Ridge District: Diamond Communications requests a
Special Exception Permit, with possible conditions, in the Industrial (M-2) Use District
in accordance with Sec. 25-323 Special Exceptions and a commission permit to
construct a Freestanding Telecommunications Tower as part of the County’s 911
System. This project is located at the corner of Cloverdale Road (Alt. 220) and East
Park Drive (VA 1499), 40 East Park Circle in Roanoke, VA. This parcel covers 6.835 acres
and is identified on tax maps as 108(13)9B.
Mr. McCoy read the legal advertisement aloud and began to present information on the
item. He displayed a map showing the location of the proposed tower, and described the
zoning of the parcel and surrounding parcels. He then presented an aerial map, showing
the Dynax building and an erosion and sediment control pond. Mr. Tyson then asked how
many towers existed to support the County’s emergency communications program. Mr.
McCoy indicated that he was not sure, but that Mr. Hinckle was in the audience and could
answer the question. He then went on to ask why that tower was needed in that location.
Dr. Leffel asked Mr. McCoy to continue, but indicated that the Commission would like to
hear from Mr. Hinckle as well.
Mr. McCoy discussed the proposed development, including the site plan and the tower
design which showed the dishes for private carriers and the county’s own emergency
communications dishes. Dr. Leffel asked how the private carriers work for the tower. Mr.
McCoy indicated that these towers usually function by leasing space to private carriers.
Mr. McCoy then displayed renderings of the tower, including how it will look along nearby
properties and roadways. Mr. McCoy then discussed staff-recommended conditions,
which included: The development of the property, including the height of the tower, shall be
undertaken in substantial conformance with the conceptual site plan submitted with the
application entitled “Glade Creek” and dated July 15, 2026. Noise generated by the
development shall not violate provisions of the Botetourt County noise ordinance. All other
specifications and general provisions shall be met as required by the Botetourt County

Page 5 of 84

Zoning Ordinance and in no instance shall the zoning conditions exempt a project from any
local, state, or federal development requirement, except where allowed by the Zoning
Administrator.
Mr. McCoy then indicated that Mr. Hinckle was in attendance as well as a representative of
Diamond Communications and that technical questions may be better suited for them. Mr.
Tyson asked how the county’s relationship with Diamond Communications worked, and if
there were any financial connection. Mr. McCoy stepped aside to allow Mr. Hinckle to
answer some questions.
Mr. Hinckle introduced himself, then stated that there were 8 towers in the county, and that
this tower was a connection point from 7 towers and that this one is the aggregation point,
connecting all the towers to the E911 center. He then described the arrangement with
Diamond Communications, indicating that the County issued an RFP to partner with a third
party to build the tower.
Mr. Tim Lucas asked where the nearest residential property to the tower, Mr. Hinckle
indicated he did not have the exact distance, but everything on that side of Eastpark is
industrial. Mr. Tim Lucas then asked to clarify the distance to the road. Mr. Hinckle stated
that the distance to 220 is 207’ to the 50’ feet easement for the Eastpark sign.
Mr. Steve Hartman asked if fiber needed to be run from the E911 dispatch center to the
tower. Mr. Hinckle indicated that fiber would be run to the tower, and that the fiber is very
expensive to run, revealing the necessity for the tower to be relatively close to the E911
dispatch center.
The site Acquisition Manager, Cameron, with Diamond Communications came up to
answer some questions. He indicated that major targets are the major communications
carriers. At this height, only three carriers can be fit on the tower. He then discussed some
more technical information related to the tower structure, the tower inspections, and the
reasons for the lattice-style tower. The monopole-style tower is $30-50,000 more in cost
compared to the lattice-tower. Mr. Tyson asked questions about the structurally integrity of
the tower, to which Cameron responded that the tower was designed to risk category 2, or
109 mile-per-hour winds. He then discussed that decommissioning usually occurs as a
result of the end of a lease, more than a structural factor.
Dr. Leffel then opened the public hearing for all items related to the telecommunications
tower. Mr. Danny Goad, Valley District resident, spoke about concerns over the tower, or
pieces of the tower, falling outside of the engineered fall zone area. Another citizen asked a
clarifying question about the text amendment, and had concerns about the removal of the
adjacent property owner notification.

Page 6 of 84

There.being.no.one.else.to.speak?.Dr¡.Leffel.closed.the.public.hearing¡
Mr. McCoy answered the question about adjacent property owner notification rules, which
is contained in the adopted fee schedule. He also then answered that the nearest
residence is roughly 600’ from the proposed tower.
Planning Commissioners discussed among themselves, including the concerns over
changing the zoning ordinance text to benefit a single project. Mr. Turner then made a
motion to recommend denial for the zoning text amendment, which was seconded by Mr.
Hartman. This was approved unanimously by the Commission.
Dr. Leffel then moved to recommend approval to the Board of Supervisors of the proposed
Comprehensive Plan Map amendment. This was seconded by Mr. Lucas. This was passed
unanimously by the Commission
Dr. Leffel then moved onto the SEP for the telecommunications tower. She moved to
recommend approval of the SEP, with the conditions included in staff’s background report
and an additional condition to reduce the 24-month cessation of function before triggering
decommissioning down to 12 months. This was seconded by Mr. Lucas. This was passed
unanimously by the Commission.
Dr. Leffel then moved onto the Commission Permit for the telecommunications tower. Dr.
Leffel moved to recommend approval of the commission permit. This was seconded by Mr.
Lucas. This was passed unanimously by the Commission.
Dr. Leffel then moved to bring the Commission into a recess for the Board of Supervisors to
consider the items related to the telecommunications tower.
Chair Scothorn brought the Board of Supervisors out of recess to consider the items
related to the telecommunications tower. Supervisor Rottman asked a clarifying about
the reason for the zoning ordinance change. She then asked if the easement
requirement could be waived for the purposes of this project. Mr. Lockaby responded
that it could not be. Supervisor Rottman then asked if the telecommunications tower
text amendment could be changed, and then changed back following this project.
Chair Scothorn then opened the public hearing. Mr. Danny Goad, resident of the Valley
District, cautioned the Board to only make the changes completely necessary to make
the project work.
There.being.no.one.else.to.speak?.Chair.Scothorn.closed.the.public.hearing¡.
Dr. Scothorn asked Mr. Hinckle to discuss the timelines for the tower and the reason
for it to be considered during the October hearing.

Page 7 of 84

Dr. Scothorn asked for a motion to approve the telecommunications tower text
amendment. Supervisor Michael moved to approve. This was seconded by Supervisor
Nicely. The motion was passed unanimously by the Board.
Dr. Scothorn asked for a motion to approve the comprehensive plan map amendment.
Supervisor Michael moved to approve. This was seconded by Supervisor Rottman. The
motion was passed unanimously by the Board.
Dr. Scothorn asked for a motion to approve the SEP for the telecommunications tower.
Supervisor Michael moved to approve. This was seconded by Supervisor Nicely. The
motion was passed unanimously by the Board.
Supervisor Rottman then asked if Mr. McCoy could take a zoning text amendment for
telecommunications towers to the Board for authorization in November.
Dr. Scothorn asked for a motion to adjourn. This was made by Supervisor Rottman and
seconded by Mr. Nicely. This was passed unanimously by the Board of Supervisors.
This.ends.the.Board.of.Supervisors.meeting¡.
Dr. Leffel then brought the Planning Commission out of recess and asked Mr. Jude Wilson
to come forward to present the Summers Properties items.
Mr. Wilson read the legal advertisement for the zoning text amendment and the rezoning
and special exception permit for Summers Property, LLC.
The Botetourt County Board of Supervisors, at their July 28, 2026, meeting, authorized
a text amendment to revise Ch. 25 Art. II Div. 7 Sec.s 25-171 – Building requirements;
minimum yards to consider an update that would reduce the minimum required
number of attached dwelling units per grouping from six (6) to three (3) in the High
Density Residential (R-4) Use District.
Valley District: Summers Property LLC requests a Rezoning from the Medium Density
Residential (R-3) Use District to the High Density Residential (R-4) Use District, with
possible conditions, and a Special Exception Permit (SEP) for “Dwellings, single-family
attached, up to twelve (12) dwelling units per net acre” on a parcel located 168 Bonny
View Lane and is identified on tax maps as parcel 107-200.
Mr. Wilson began to present on the items, showing the existing zoning of the properties, and
then was interrupted by Mr. Tyson. Mr. Tyson asked questions about the parcels included in
the zoning changes. Mr. Wilson and Mr. Lindsay explained the reason for the land card not
matching the zoning.

Page 8 of 84

Mr. Wilson briefed the Commission on the comprehensive plan as it relates to this project
and discussed the surrounding land uses. Mr. Tyson then stated its somewhat of a doublespeak, stating that the project would increase density, but not more than what was
originally approved. He then asked about how the comprehensive plan factored into this.
Mr. Wilson indicated that the property was already approved for an SEP for the 74-unit
apartment building originally approved in 2016. Mr. Turner asked questions about whether
the approval of the rezoning to R-4 would allow someone else to put more units. Mr. McCoy
approached and explained that the SEP would travel with the land, regardless of the owner.
Mr. Lockaby verified this is the case. Mr. Lucas asked why the property needed to be
rezoned to get a higher density in R-3. Mr. McCoy explained that the R-3 use district does
not permit a higher density by SEP, but does in R-4, thus necessitating the rezoning.
Mr. Tyson asked how many units they could do under R-3. Mr. McCoy responded that they
were currently approved for 74-units under the R-3 zoning. Mr. Tyson asked how many
attached units could be built in the R-3 zoning. Mr. McCoy stated that the maximum under
the ordinance is 6 units per net acre.
Mr. Wilson explained the need for the substantial conformance to the site plan condition,
limiting the density of the project. Mr. McCoy then broached the topic of the associated text
amendment, which proposes to change the minimum attached single-family units from six
in a single row down to three. Mr. Turner brought up another townhome development and
inquired about the minimum units.
Mr. McCoy then circled back to the comprehensive plan, explaining that staff
acknowledged that the project was somewhat different than what the comprehensive plan
suggested, but that the current proposed development is less dense than what was
approved in 2016.
The Planning Commission then discussed the differences between the permitted units for
attached units and apartments. Mr. Turner asked about how height restrictions apply to the
project. Mr. McCoy then stated the maximum height for the R-4 district was 45’ which can
be increased by SEP.
Mr. Lucas asked how long an SEP will last, under the code. It was confirmed that an issued
SEP is valid for five years.
Dr. Leffel then asked Mr. Bobby Wampler, representative of the applicant, to come forward
to speak and answer questions. He explained that the goal of this request is to put a less
dense development that will blend well with the existing community. He also explained that
the project will involve a boundary line adjustment to take some of the existing property on

Page 9 of 84

Parcel 107-200A. Mr. Wampler also indicated that this project will connect to the other
planned townhome community, formerly owned by Journey Church.
Mr. Hartman asked Mr. Wampler if there was a proposed connection to Bonny View Lane.
Mr. Wampler confirmed that there is no intent or desire to be connected to Bonny View
Lane. Mr. Lucas asked if the road would connect through Summers Properties, to which Mr.
Wampler confirmed. Mr. Hartman asked if the apartments had been planned for 3-stories,
and if the townhomes were also intended to be. Mr. Wampler stated that they would be
similar product as the October rezoning for the adjacent property.
Dr. Leffel then discussed the original conditions placed for the 2016 rezoning and asked Mr.
Wampler his thoughts on some of those conditions. Mr. McCoy then reinforced that the
project contained an SEP, allowing the Planning Commission to recommend conditions, as
opposed to a rezoning, which requires the applicant to submit notarized proffers.
Dr¡.Leffel.then.opened.the.public.hearing.for.the.text.amendment¡.
Kathryn Hattam, resident of Botetourt, spoke of her concern over the original rezoning of
the project, urged the Planning Commission to carefully consider the application. She
stated that this was the last, or one of the last, undeveloped fields in Botetourt. She then
complimented the Planning Commission. She asked if this conserves the rural character of
the County. She also asked to revisit the water study and removing data centers from RAM
zoning as a by-right use.
Juanita Cooper, resident of Botetourt and neighbor to this project, stated that Bonny View is
special to the residents. She stated that not all property owners had received a notice, and
asked why that occurred. She also asked why a public notice sign was not placed near the
intersection at Read Mountain.
Steve Cooper, Resident of Bonny View Lane, commended the Planning Commission for
their work and stressed the need for transparency. He expressed the need to keep the
conditions protecting the adjacent property owners and to protect Bonny View Lane.
Danny Goad, resident of Botetourt, stated that the developers were not transparent and
gave little consideration to the neighbors.
Another citizen spoke, expressing a need to ensure Bonny View lane would be blocked off
to traffic and requesting a private road sign.
There.being.no.one.else.to.speak?.Dr¡.Leffel.closed.the.public.hearing¡.
Dr¡.Leffel.opened.the.public.hearing.for.the.Summers.Properties.SEP.and.Rezoning¡.

Page 10 of 84

Juanita Cooper, resident of Botetourt and neighbor to this project, discussed her four-page
letter. She mentioned inconsistencies with the application. She mentioned she preferred
townhomes to the apartments, and identified concerns over townhomes being too close to
the property line to allow for proffered buffers.
Steve Cooper, resident of Botetourt and neighbor to this project, expressed his biggest
issue is privacy and discussed his frustration over the length of time and confusion over the
property change.
There.being.no.else.to.speak?.Dr¡.Leffel.closed.the.public.hearing¡
Mr. Turner mentioned about the traffic accidents mentioned in the agenda packet, and
expressed his concerns about the neighbors and notices. Mr. Hartman mentioned that the
apartments were already approved and cannot be unapproved.
Mr. McCoy and Mr. Lockaby advised that the text amendment should be decided on
tonight, otherwise it would automatically go to the Board of Supervisors with a
recommendation of approval. The Planning Commission then ran through the original
proffered conditions and recommended some changes to those conditions. Mr. Wampler
came back up to the podium to discuss potential changes. Mr. Tyson then asked if the
townhomes could be broken into three groups of three along the border adjacent to Bonny
View Lane.
Dr. Leffel then requested a motion on the zoning text amendments. Mr. Lucas made a
motion to recommend approval to the Board of Supervisors of the zoning text
amendment. Mr. Tyson seconded that motion. The motion passed unanimously.
The Commissioners deliberate on the timeline for the SEP extension from 2025, including
the density that was included with that.
Mr. Tyson then made a motion to approve the rezoning, with a condition that the total
number of townhomes be reduced from 53 to 51 and that the westernmost string of
townhomes be stage to a lower density of three townhomes in a grouping of three. Mr.
Lucas seconded the motion. Dr. Leffel requested clarity and then called for the vote. The
motion to rezone the property from R-3 to R-4 passed on a 4-1 vote, with Mr. Turner
dissenting.
Dr. Leffel then moved to the SEP request. Mr. Lucas made a motion for approval of the SEP,
with the following conditions:

Page 11 of 84

This development shall be constructed in substantial conformance with the
concept plan entitled "03-Concept Plan" submitted by Engineering Concepts Inc on
May 04, 2026
• The proposed development shall under no circumstances connect streets or
roadways to Bonny View Lane for traffic circulation
• Restricting building heights to two stories plus a basement.
• Mandating dark sky-compliant exterior illumination.
• The property will developed to the exclusion of all other uses other than those
indicated in this application for rezoning.
• Requiring the installation of evergreen vegetative buffering and a physical privacy
barrier between the perimeter and Bonny View Lane properties prior to
commencement of construction.
• Enforcing a total prohibition against construction-related vehicular or equipment
traffic utilizing Bonny View Lane.
• Require the developer to reduce the number of units in the proposed development
from 53 to 51 units and break out the townhomes into smaller groupings along the
western boundary of the site.
Dr. Leffel seconded the motion. Further discussion included the addition of the privacy
fence being installed prior to construction by Mr. Hartman. Mr. Lucas seconded that
amendment. The motion to approve the SEP with the amended conditions passed
unanimously.
•

The Commission then moved to the Timberbook Associates request. Mr. Lindsay read the
legal advertisement into the record.
Amsterdam.District¿.Timberbrook Associates, LLC requests a Special Exception
Permit, with possible conditions, in the Shopping Center (SC) Use District in
accordance with Sec. 25-583 Special Exceptions and Sec. 25-462(e)(3) Electronic
message board/L.E.D. of the Botetourt County Code to construct and maintain an LED
Sign located at the corner of Commons Parkway and Kingston Drive. The parcel totals
0.723 acres, located at 101 Kingstone Drive, and is identified as tax parcel 101(13)4B.
Mr. Lindsay presented information on the item, including the location and proposed sign
design. He displayed the proposed LED sign and indicated that there were no public
comments on the item. Mr. Turner asked if the current sign was backlit, to which Mr.
Lindsay responded yes. Dr. Leffel then opened the public hearing. There were no speakers,
so she closed the public hearing.

Page 12 of 84

Mr. Hartman made a motion to approve the SEP with the conditions included in the staff
background report. This was seconded by Mr. Turner. The motion to approve the SEP with
the conditions included in the background report was approved unanimously.
Dr. Leffel then mentioned the draft solar survey and indicated the next commission
meeting would be on November 9th at 5pm. She then requested a motion to adjourn. Mr.
Lucas made a motion to adjourn, seconded by Mr. Tyson. This passed unanimously, ending
the Planning Commission meeting at 10:03pm.

Page 13 of 84

Community Solar Survey Results

TO:

Dr. Beth Leffel, Chair, Planning Commission
Members, Planning Commission

C:

Gary Larrowe, County Administrator
David Moorman, Deputy County Administrator
Jonathan McCoy, AICP, Interim Director of Community Development

FROM:

Matthew Lindsay, AICP, CZO, Planner II

DATE:

November 17, 2026

SUBJECT:

Community Solar Survey Results

November 2026

Purpose & Overview
This memo provides a summary of public input gathered from the Botetourt County Community Solar
Survey. The survey was conducted to gauge resident sentiment regarding small-scale and large-scale
solar energy facilities, appropriate siting locations, potential land-use concerns, and overall policy
direction for solar development within the County. This survey was active from October 31, 2026, to
November 13, 2026, and offered respondents the ability to respond online or in person at the County’s
libraries. In total the survey received 234 responses, 230 online and 10 in person.
Overall, respondents expressed strong opposition to utility-scale solar development - particularly on
timber, and rural lands - while demonstrating considerably higher tolerance for small-scale installations
and projects located on existing built infrastructure such as commercial rooftops and parking lots.

Key Takeaways:
1.
2.
3.
4.
5.

Most respondents to our survey were from the more rural portions of the County (Buchanan
& Fincastle) rather than the more suburban areas (Valley, Amsterdam, Blue Ridge).
Nearly all respondents to the survey live and own property here in Botetourt.
Respondents were largely positive towards small scale solar – such as individual rooftop,
ground mounted, or portable.
Respondents were largely against large scale solar – those in support were mixed on how it
should be handled.
Respondents do not want to see solar on agricultural lands.

Page 14 of 84

Community Solar Survey Results

November 2026

Demographics
A total of 234 responses were recorded across the County's magisterial districts. Participation heavily
weighted toward local property owners, with 94.8% of respondents indicating they own property in
Botetourt County, 2.6% renting property in the County, and 3.5% residing outside the County.
Magisterial District

Share of Respondents

Respondent Count

38%
24%
21%
9%
5%
4%

92
59
51
20
12
8

Fincastle District
Buchanan District
Amsterdam District
Valley District
Blue Ridge District
Not Applicable / Unspecified

Attitudes Towards Small vs Large Scale Solar
Survey results reveal a sharp distinction in public perception depending on project scale:
Small-Scale Solar (63.5% Supportive vs. 30.4% Opposed):
•

A clear majority of respondents view small-scale solar favorably or without objection.
Specifically, 36.1% support small-scale solar without currently using it, 20.0% are not
opposed to its use, and 7.4% currently utilize small-scale solar and support others doing so.
Roughly three in ten (30.4%) oppose small-scale solar, while 6.1% selected 'Other.'

Large-Scale Solar (68.3% Opposed vs. 24.4% Conditional or By-Right Support):
•

Opposition to utility-scale facilities is widespread, with 68.3% stating they do not support any
large-scale solar facility in Botetourt County. Among the minority open to large-scale
projects, respondents favored strict guardrails: 10.9% support limited allowance provided
facilities are excluded from residential, agricultural, or conservation lands; 10.9% support
limited allowance subject to a public hearing; 4.4% support by-right allowance; and 2.6%
support limited allowance without a public hearing. An additional 3.5% indicated they do not
fully understand the local impacts, and 4.8% selected 'Other.'

Preferred Siting Location & Areas For Restriction
When asked to identify the most appropriate locations for solar facilities in Botetourt County,
respondents strongly favored previously developed or impervious surfaces over greenfield sites:
Proposed Location Category
Commercial Building Rooftops
Parking Lots
Industrial Areas
Nowhere
Civic Buildings & Properties
Vacant Commercial Lots
Agricultural Lands

Respondents Selecting
62.2%
44.8%
34.4%
33.5%
26.1%
13.5%
6.5%
2|Page

Page 15 of 84

Community Solar Survey Results

November 2026

In an accompanying open-ended question asking where solar development should be most restricted
or prohibited, the most frequently occurring terms were 'agricultural,' 'farmland,' 'residential,' and 'rural'
- reinforcing strong public resistance to converting working farms, forests, and rural residential areas.

Citizen Concerns Regarding Large Scale Solar
Respondents were asked to select their top three concerns if a large-scale solar facility were proposed
near their property. Land preservation, rural aesthetics, and environmental runoff emerged as the
dominant issues:
•
•
•
•
•
•
•
•
•
•

Loss of Agricultural Land or Timberland: 74.5%
Visual Impacts and Changes to Rural Character: 54.6%
Stormwater Runoff, Soil Erosion, or Environmental Impacts: 51.2%
Impact on Property Values: 44.6%
Safety Related to Battery Storage: 33.3%
Inadequate Long-Term Maintenance: 25.1%
Decommissioning: 24.7%
Glare or Reflection from Panels: 17.3%
Noise During Construction or Operation: 10.8%
No Major Concerns: 3.5%

Policy Direction & Qualitative Feedback
A series of Likert-scale policy statements further clarified how residents want the County to approach
solar regulation:
•

•

•
•

Discouraging Large-Scale Solar: 70.6% agreed or strongly agreed (58.0% strongly agree) that
the County should actively discourage large-scale solar projects, compared to 20.4% who
disagreed.
Prohibiting Large-Scale Solar Even in Appropriate Locations: 65.8% disagreed or strongly
disagreed (55.0% strongly disagree) that large-scale solar should be allowed even in appropriate
locations, while 23.4% agreed.
General Support for Solar Projects: 63.2% disagreed or strongly disagreed with the general
statement that solar projects should be supported (vs. 19.0% agreeing).
Prioritizing Small-Scale Solar: Despite general acceptance of individual small-scale
installations noted earlier in the survey, 51.9% disagreed that small-scale solar should be
prioritized as a County policy initiative (vs. 29.0% agreeing and 18.2% neutral).

Open-ended comments echoed these quantitative findings. Key recurring themes included calls to
protect prime farmland and Botetourt County's rural landscape, encouragement to utilize
commercial/municipal rooftops and parking lot canopies before clearing open land, interest in
homeowner incentives or education for rooftop solar, and requests for transparent public review
processes rather than administrative approvals.

3|Page

Page 16 of 84

Community Solar Survey: Response Report

Page 17 of 84

Folks were given 2 options for taking
the survey – online or in person at
one of three library branches
The survey was distributed at the
County’s libraries and through the
County’s social media channels.
In total the survey received 240
responses – 230 online and 10 paper
surveys.

Survey Overview

The Community Survey was open
from October 31st to November 13th,
for citizen to provide their feedback

Page 18 of 84

Valley
8.7%

Amsterdam
21.3%

Buchanan
23.9%

Fincastle
37.8%
Blue Ridge
4.8%

The largest group of respondents were those from Fincastle District (87
respondents) followed by Buchanan District (55 respondents).

Demographics

N/A
3.5%

Page 19 of 84

I Own Property in
Botetourt County
94.8%

The vast majority of respondents to the survey both live in Botetourt County
and own property here

Demographics

I Rent Property in
Botetourt County
2.6%

I Do Not Live in
Botetourt County
3.5%

Page 20 of 84

#2

Nearly all respondents to the survey
live and own property here in
Botetourt.

Key Take Aways

#1

Most respondents to our survey
were from the more rural portions of
the County (Buchanan & Fincastle)
rather than the more suburban areas
(Valley, Amsterdam, Blue Ridge).

Page 21 of 84

I currently use small
scale solar, and I
support others who
want to do so
7.4%

I am not opposed to
the use of small scale
solar, but I don’t
currently use it and
don’t’ plan to
20%

I support the use of
small scale solar, but
do not currently use
it myself
36.1%

I am opposed to
small scale solar
30.4%

Responses to this question were mixed but more respondents answered
positively to this question than negatively – 63.5% vs. 30.4%

Q1. What are your
thoughts on Small
Scale Solar projects?

Other
6.1%

Page 22 of 84

I support the limited allowance of
large-scale facilities in Botetourt,
subject to no public hearing
2.6%
I support the limited allowance of
large-scale facilities in Botetourt,
subject to public hearing
10.9%
I support the limited allowance of
large-scale solar facilities in
Botetourt, but not on residential,
agricultural, or conservation lands
10.9%
I support by-right allowance of largescale solar facilities in Botetourt
4.4%

I do not
support any
large-scale
solar facility
in Botetourt
68.3%

The majority of respondents do not support large scale solar development
in the County – those in support are split on how to handle this type of solar

Q2. What are your
thoughts on Large
Scale Solar projects?

I do not fully understand the effects
of large-scale solar facilities on
Botetourt
3.5%

Other
4.8%

Page 23 of 84

Civic Buildings &
Properties
26.1%

Commercial Building
Rooftops
62.2%

Agricultural Lands
6.5%
Vacant
Commercial Lots
13.5%
Industrial Areas
34.4%

Parking Lots
44.8%

In large part respondents prefer to see solar facilities sited on already
developed sites

Q3. What is the most
appropriate location for
solar projects in BOCO?

Nowhere
33.5%

Page 24 of 84

Q4. Where do you feel solar
development should be most
restricted / not allowed?
The most prevalent words that showed in this free response were –
agricultural, farmland, rural – meaning respondents who answered this
question would not like to see solar development on agricultural lands

Page 25 of 84

Decommissioning
24.7%

I Have No Major Concerns
3.5%
Loss of Agricultural
Land of Timberland
74.5%

Safety Related to
Battery Storage
33.3%
Glare or Reflection
from the Panels
17.3%
Noise During
Construction or
Operation
10.8%
Stormwater Runoff, Soil
Erosion, or
Environmental Impacts
51.2%

Visual Impacts and
Changes to Rural
Character
54.6%

Impact on Property
Values
44.6%

The largest concerns among most respondents were loss of agricultural
lands (74.5%), Visual Impacts on Rural Character (54.6%), and Impacts to
Property Value (44.6%)

Q4. If a large-scale solar
facility was proposed near
you, what would your top 3
concerns be?

Inadequate Long-Term Maintenance
25.1%

Page 26 of 84

Agree
18.2%

Neutral
18.2%

Strongly Disagree
41.1%

Disagree
10.8%

Among respondents most disagreed with the notion that small scale solar
should be prioritized – 51.9% vs. 29%

Q5. To what degree do you agree
of disagree with the following
statement? – Small scale solar
should be prioritized

Strongly Agree
10.8%

Page 27 of 84

Agree
13.9%

Strongly Disagree
55%

Neutral
10%

Disagree
10.8%
Among respondents most disagreed with the notion that large scale solar
should be allowed, even in appropriate locations – 65.8% vs. 23.4%

Q5. To what degree do you agree
of disagree with the following
statement? – Large scale solar
should be allowed in appropriate
locations

Strongly Agree
9.5%

Page 28 of 84

Agree
9.5%

Strongly Disagree
47.2%

Neutral
17.3%

Disagree
16%
Among respondents most disagreed with the notion solar projects should
be supported – 63.2 % vs. 19%

Q5. To what degree do you
agree of disagree with the
following statement? – Solar
projects should be supported

Strongly Agree
9.5%

Page 29 of 84

Strongly Agree
58%

Disagree
10.4%

Neutral
7.4%

Agree
12.6%

Among respondents, most want the County to discourage large scale solar
development – 70.6 % vs. 20.4%

Q5. To what degree do you
agree of disagree with the
following statement? –
Large scale solar projects
should be discouraged

Strongly Disagree
10%

Page 30 of 84

Stop ruining our county!
Keep all this garbage in
cities. It is no longer
beautiful Botetourt.

No industrial solar Botetourt has
already fucked the tax payers and
residents by selling us out and having
closed door meetings and selling land
to google. Residents should vote on
these topics and no more closed door
meetings

Prioritize solar installations on
commercial and governmental
rooftops and make use of
parking lot areas first (imagine
being able to park in the shade
in August!)

Y’all quit trying to fuck up Botetourt and lower our property taxes already
you stupid fuckbags

Q6. Open Ended
Response

“Teach homeowners and businesses
how to utilize solar to cut down on our
carbon footprint along with tax breaks
for affordable solar. Do no harm to our
Agriculture. We want modern energy
along with a healthy community. Find
balance.”

Page 31 of 84

#4

#5

Respondents were largely against
large scale solar – those in support
were mixed on how it should be
handled.
Respondents do not want to see
solar on agricultural lands.

Key Take Aways

#3

Respondents were largely positive
towards small scale solar – such as
individual rooftop, ground mounted,
or portable.

Page 32 of 84

Respondents do not want the County
to prioritize small or large scale
solar.

#7

Respondents want the County to
actively discourage large scale
solar facilities.

Key Take Aways

#6

Page 33 of 84

Questions,
Comments,
Concerns?

Page 34 of 84

2026 Community Solar Survey
1. Which of the following most closely describes you?

250

200

150

100

50

0
I own property...

I rent propert...

I do not live ...

Answers

Count

Percentage

I own property in Botetourt County

219

94.81%

I rent property in Botetourt County

6

2.6%

I do not live in Botetourt County

8

3.46%

Answered: 230 Skipped: 1

Page 35 of 84

2. In which Voting District do you live?

100
80
60
40
20

l..
n't
do
N/

A

(I

Di
Va
l

le

y

tle
as
nc
Fi

.

...
ric
st

Di

st
Bu

ch

an
an

Di

Di
e
dg
Ri
ue
Bl

st

r..
.

..
s.

...
st
Di
er
da
m
st
Am

...

0

Answers

Count

Percentage

Amsterdam District

49

21.21%

Blue Ridge District

12

5.19%

Buchanan District

55

23.81%

Fincastle District

87

37.66%

Valley District

20

8.66%

N/A (I don't live in Botetourt)

8

3.46%

Answered: 231 Skipped: 0

Page 36 of 84

3. What are your thoughts on Small Scale Solar projects?

100

80

60

40

20

0
I support the ...

I am opposed t...

I am not oppos...

I currently us...

Other

Answers

Count

Percentage

I support the use of small scale solar, but do not currently use it

83

35.93%

I am opposed to small scale solar

70

30.3%

I am not opposed to the use of small scale solar, but I don’t

46

19.91%

18

7.79%

14

6.06%

myself

currently use it and don’t plan to
I currently use small scale solar, and I support others who want to
do so
Other

Page 37 of 84

Answered: 229 Skipped: 2

4. What are your thoughts on Large Scale Solar projects?

200
150
100
50

er
th
O

lly
...
fu
no
t
o
Id

Is

up
Is

up

po
rt

po
rt

lim

th
e

i..

.

...

.
i..
lim
po
rt
up
Is

po
rt
up
Is

Id

o

no
t

su

pp

by
-

o.

..

r..
.

0

Answers

Count

Percentage

I do not support any large scale solar facilites in Botetourt

157

67.97%

I support by-right allowance of large solar facilites in Botetourt

10

4.33%

I support limited allowance of large scale solar facilities in

26

11.26%

26

11.26%

Botetourt County, but not on residential, agricultural, or
conservation lands
I support the limited allowance of large scale solar facilities in
Botetourt County, subject to public hearing

Page 38 of 84

I support limited allowance of large scale solar facilities in

6

2.6%

8

3.46%

11

4.76%

Botetourt County, requiring no public hearing
I do not fully understand the effects of large scale solar facilities
on Botetourt County
Other

Answered: 228 Skipped: 3

5. In your opinion, what are the MOST appropriate locations for solar projects in Botetourt…

150

100

50

e
wh
No

ild
Bu
vic
Ci

ul
ric
Ag

er

..
in
g.

lL
ra
tu

m
Va
c

an

tC

om

ria
du
st
In

...

...
er
c

re
...
lA

g
in
rk
Pa

Co

m

m

er

cia

lB

ui

...

Lo
ts

0

Answers

Count

Percentage

Commercial Building Rooftops

144

62.34%

Page 39 of 84

Parking Lots

104

45.02%

Industrial Areas

79

34.2%

Vacant Commercial Lots

31

13.42%

Agricultural Lands

15

6.49%

Civic Buildings & Properties

60

25.97%

Nowhere

77

33.33%

Answered: 228 Skipped: 3

6. Where do you feel solar development should be most restricted / not allowed?

Usable

exception

leave

addition
cost.

valuable
result

roads

building

rights

adjacent

clean

spaces

Google
“small”
make

food.
compliance
lower

space.

woodland

places
gas

entire

landscape

Turning

properties

natural

great.

piece

water
beauty
allowed.

tops

panels.

Restrict

soil
Absolutely
us. occur
force

Erosion

forest

lots.

solar.

solar
place

limits

waterways

only.

power

large

residential.

farms

land
roof

national

and/or
toxic
son

sources.

lands

it.
roofs
.

fields

properties.

rooftop
cost?

restricted

current

vacant

rooftops.

tie
220

eyesore.
support

moved

project
WASTE

feel

residential
preserve

green

Anywhere.
well.

people

houses

public

covered
site.
smallest

beautiful
mountain
generate

energy.
neighborhoods
protected
left
protected.
farms.
(or
parks fine ground
personal
projects
effects
future
school
possibly
proposals
productive
lost
Clear
folk's
installed

protect

forested

erodible

etc.

open
farmland industrial
forests
small

Undeveloped.

farm / Agriculture conservation
botetourt.
energy
land.
property
use.
panels
Rural
area
views

Agricultural parking
runoff

scale

detrimental

plans

undeveloped

commercial

Botetourt
7

put

areas

food

visible
prime

buildings.

Don’t

fields/

erode

eyesore

allowed areas.

rooftops

Not.

county.

risk

county

lots

listen

real

wildlife
encouraged

development

cost

farmland.

run

ones.
setback

timberland
Dual

once.

agrivoltaics

Answered: 189 Skipped: 42

Page 40 of 84

7. If a large scale project was proposed near you, what would your top three concerns be?

200
150
100
50

aj
o.
..
e

av
Ih

ad
eq

ua

no

te

m

lo
n.
..

ni
In

m
De

co

fe
Sa

m

ty

iss

re

io

la

re
or
re
la
G

n.
..

..
te
d.

...
fle

c.
g
du

ise
No

wa
te
m
or
St

rin

rr

op
.
pr
on
ct

pa
Im

..

un
...

..

..
s.
ct
pa
im
al

Vi
su

Lo

ss

of

ag
ric

u.
..

0

Answers

Count

Percentage

Loss of agricultural land or timberland

172

74.46%

Visual impacts and changes to rural character

126

54.55%

Impact on property values

103

44.59%

Stormwater runoff, soil erosion, or environmental impact

119

51.52%

Noise during construction or operation

25

10.82%

Glare or reflections from the panels

40

17.32%

Safety related to battery storage systems

77

33.33%

Page 41 of 84

Decommissioning

57

24.68%

Inadequate long term maintenance

58

25.11%

I have no major concerns

8

3.46%

Answered: 230 Skipped: 1

8. To what degree do you agree or disagree with the following statements?
Small scale solar should be prioritized

Strongly Disagree
Disagree
Neutral
Agree
Strongly Agree

Answers

Count

Percentage

Strongly Disagree

95

41.13%

Page 42 of 84

Disagree

25

10.82%

Neutral

42

18.18%

Agree

42

18.18%

Strongly Agree

25

10.82%

Answered: 229 Skipped: 2

Large scale solar projects should be allowed in appropriate locations

140
120
100
80
60
40
20
0
Strongly Disag...

Disagree

Neutral

Agree

Strongly Agree

Answers

Count

Percentage

Strongly Disagree

127

54.98%

Page 43 of 84

Disagree

25

10.82%

Neutral

23

9.96%

Agree

32

13.85%

Strongly Agree

22

9.52%

Answered: 229 Skipped: 2

Solar projects should be supported

120
100
80
60
40
20
0
Strongly Disag...

Disagree

Neutral

Agree

Strongly Agree

Answers

Count

Percentage

Strongly Disagree

109

47.19%

Page 44 of 84

Disagree

37

16.02%

Neutral

40

17.32%

Agree

22

9.52%

Strongly Agree

22

9.52%

Answered: 230 Skipped: 1

Large scale solar projects should be discouraged

140
120
100
80
60
40
20
0
Strongly Disag...

Disagree

Neutral

Agree

Strongly Agree

Answers

Count

Percentage

Strongly Disagree

23

9.96%

Page 45 of 84

Disagree

24

10.39%

Neutral

17

7.36%

Agree

29

12.55%

Strongly Agree

134

58.01%

Answered: 227 Skipped: 4

9. What thoughts, questions, or concerns do you have about solar energy? Do you have…

now.
owner
age
sun
part
care
makes
thoughts
preserving
matter
county’s
supported
of.
leaders
stupid provide
turn
homes values
is.
open time

present

runoff ways make fit put
inefficient
parking 2
etc.
generation
water

rest
encourage
made NOT.
do.
ugly
paid

rights

residential

move
grid
produce
him.
existing
cost
businesses
destroying
birds

beauty

don’t

allowed

small

past

LOWER

top

door
allowed.

Wind

it’s

projects.

Solar

green

beautiful

state

listen

Botetourt.

including

told

unreliable

battery
Risk

term

property

energy

Va

future -- tax
county. roof

farm
BOS

public

scale areas

utilize

false

higher

can’t

carbon
all.

panel

dispose

Meetings
breaks

live
buy

buildings
great life.
thing

stay

money

tops

owners

Google.

due

no.

selling

ruining

on.

bad

impact

data

technology
install
work
I’m
people
fossil
special
electricity
come.

undeveloped

erosion
allowing

moved

issues

coming

vote

only.

community

government

lands

support

job

surveys.
massive

energy.
county center
environmental

60

industrial
land.

fine.

Year
views

Botetourt

#5. &
land it. panels rooftop personal
farms

commercial

buying

benefit
ground
Cover

development
savings
residents
left
ruin back
drop
longer
daily
rural
solar.
big
locations

power
fact

lot

Centers

rate

good

citizens large
lots
rooftops life
STOP time. fires

business
here.
survey
farmland
long use.
family clean
taxes input. Build BS
subsidy
nuclear projects
installations.
Planning
impacts
toxic

environment

belong

home harm
installations

Board
buildings.

Response

Count

No solar in botetourt

2

costs
sell

rejected
reflect

multiple

Page 46 of 84

no

2

You cant eat solar! It doesnt belong on farmland/woodland areas. There are a multitude of large buildings in

1

Botetouet that would be great locations for rooftop solar. Parking lots would be great for solar, it would also
provide cover from the weather for cars
You are destroying property values and landscaping especially near greenfield. Homes values will drop after

1

we paid higher prices for theses homes and supported Ashley Plantation and surrounding subdivisions.
Daleville is now a very commercial area and is beautiful has been destroyed! I am a life long resident of the
area!
Y’all quit trying to fuck up Botetourt and lower our property taxes already you stupid fuckbags

1

Worry about the water and pipes at Eagle Rock elementary before this bullshit

1

Why not allow only on already established areas such as parking lots or large commercial roof top

1

installations?
When is the break even for these solar panels to be viable. By time this happens you'll need buy new ones.

1

They are not repairable. An at best they produce 75%.
What bothers me the most is pro forma surveys like this and the fact that the citizens will not be listened to

1

at all about solar or data centers for that matter as long as the BOS can make money off the projects.
We have to get power somewhere Might as well let land owners make some money on their own land if it

1

does not harm their neighbors
We have panels on our roof. Took a long time to get and still have issues but see the potential. If you can

1

get more buildings to install, example all the new multifamily housing, all new commercial buildings to install
roof top solar that would be a good start.
We don’t need to depreciate our property & farmlands

1

Page 47 of 84

We don’t need more eyesores in Botetourt County, we already have too many junky yards and derelict

1

buildings.
We cannot build data centers, each using ~100MW without being willing to approve massive amounts of

1

solar, wind, and/or nuclear projects. The recently rejected 2 (just two!) MW solar farm rejected by the county
would have been just a drop in the bucket. VA imports roughly 30% of our power already and our utility
costs will continue to go up at least 8%/yr like they have been if our "plan" is just buying power from our
PJM neighbors.
Unreliable, expensive requires large government subsidy, gives a false sense of sufficient electricity

1

generation.
Too much is at risk by destroying our views and having runoff and erosion into our rivers. Think of what

1

makes this social. Keep it that way.
Thoughtful planning and compliance with community (not political or capitalistic) priorities the results of

1

which reflect the input at public hearings and surveys.
This survey was worded to try to confuse people. Typical Botetourt

1

This is frustrating because we all already told you our thoughts before

1

This is a very poor survey. There are no definitions explaining the difference between large and small scale

1

and thus the data gathered has no relevance.
This county does not need solar. Just another money making scheme to put money in someone's pocket.

1

They should only be allowed along I81

1

They cause fires, we have had multiple homes catch on fire do to solar energy.

1

They are ugly and should not ruin our beautiful countryside. Roof tops and parking areas are the only

1

acceptable placement.

Page 48 of 84

The rate and scale of our county’s development is concerning and alarming. The leaders seem to have lost

1

their way with regard to preserving the rural, peaceful lifestyle of our county. There needs to be more
opportunities for residents to provide input. Even by having this survey, in this format, is telling.
The disposable when they do not work in years to come. How will you dispose of them?

1

The amendment the BOS just passed was fine. If anything, make it go on new commercial rooftops going

1

forward, but don’t destroy the beauty of what we have.
Teach home owners and businesses how to utilize solar to cut down on our carbon footprint along with tax

1

breaks for affordable solar. Do no harm to our Agriculture. We want modern energy along with a healthy
community. Find balance.
Stop selling our county out, if I wanted to live in a fucked up place I woul move to Roanoke

1

Stop ruining our county! Keep all this garbage in cities. It is no longer beautiful Botetourt.

1

Stop issuing special exception permits for large developers, solar and wind.

1

Stay away from Botetourt county

1

Someday we will have the technology to build effective solar power projects. We do not have it at this time.

1

Yet "green energy" politics is driving this effort to build large, inefficient solar farms that are costly and
perform poorly.
Solar should utilize existing buildings…rooftops, parking garages, etc. Stop messing with our green space

1

and beauty of the area.
Solar should be utilized on all public buildings. It should be used on those big sound barriers along the
interstate like in European countries. It should be allowed on farmland that is basically unable to be
developed; not every pasture needs to stay a pasture, especially if that's all it's good for.

1

Page 49 of 84

Solar should be prioritized on developed lands, primarily over parking lots and building rooftops. Until most

1

of those are covered, open lands should not be considered for solar installations.
Solar should be offered to eligible homeowners at no cost. The county should not spend tax dollars to buy

1

land and build solar farms when there are plenty of people willing to have it on their homes.
Solar projects are based on the false (debunked, disproven) premise that carbon emissions cause global

1

warming. The process to mine, transport and refine the materials used to make solar panels is highly
impactful to the environment. The publicized cost and impact of soar panels should reflect the fully
burdened figures (manufacture, installation, disposal). And the impact to the power grid of unreliable energy
should also be publicized. Solar destabilizes the power grid and increases costs for consumers. Stop it.
Solar power absolutely needs to be supported and expanded since Botetourt is allowing data centers to

1

exploit our water and energy resources
Solar panels being put on land that should be kept clear for agricultural use.

1

Solar is inefficient, ugly and bad for the environment. Do some frigging research. Nuclear is the answer.

1

Solar is inefficient, damaging to the environment and not worth losing our farmland or the county’s rural

1

character. I’m already considering leaving the county due to the wind turbines and the data center, large
scale solar might just push me over the edge.
Solar is great but needs to be on existing facilities, rooftops, etc. it should NOT be using undeveloped land

1

or green space.
Solar is clean energy, and the county should give citizens an incentive to use solar for their personal
consumption.

1

Page 50 of 84

Solar has environmental impacts, but it is necessary for us to transition to cleaner energy and grow

1

technology that gets us off of fossil fuels. I think the strategic use of these technologies is a good thing. Use
of solar on roof tops, parking areas, and other already developed commercial or industrial land is best use
and lowers its environmental footprint. It should be encouraged for homeowners to add solar to their home
or property where conditions are favorable.
Solar farms do not produce anything for the citizens of Botetourt County. Botetourt County is also in to much

1

debt as is. If the people in charge really care about the citizens in Botetourt County you would bring back
traditional farming. Owning livestock and crops. Botetourt should go back to the values it once held by
supporting farmers and those that have land looking to farm it. Those in charge need to stop trying to turn
all of botetourt into a technology wasteland.
Solar energy should be for small scale only. It should not be installed on large lots of land

1

Solar energy isn’t as efficient as the small scale nuclear power plants. Look for alternative options. Use

1

solar fencing around business and industry.
Solar energy is unreliable and the vast majority of the components are made in China. It also ruins farm

1

land and the natural beauty of rural landscapes. If solar is used anywhere, it should be on parking rooftops
or other ways that do not use valuable rural land! Stop ruining BOCO with wind, solar and data centers!!!!!!
Solar energy is NOT green energy. The panels are not earth friendly and can not be recycled or disposed
of. The cost to install out weighs the benefits. Perform investigations and research on how bad solar is on
the land under the panels, the birds, the honey bees, wildlife, etc. Thousands of birds die from diving into
panels thinking that it is the sky. There is a massive solar facility in Virginia that has an employee that their
job is to retrieve and dispose of all the dead birds within this facility on a daily basis. Think about it. We can't
control how many carcasses that VDOT has to pick up daily along the road ways but we can do better and
not condone this type of large scale facilities. It is one thing for a homeowner to install panels on their
rooftops but keep it at that level for Botetourt County.

1

Page 51 of 84

Solar energy is not efficient enough yet to be pursued as a cost-effective energy source. People should be

1

able to put small scale solar on their personal property. Large scale projects should take into account long
term projections of cost vs energy production/cost savings, including maintenance and life span of panels.
Large scale projects should be allowed in industrial areas and other areas with significant public input.
Solar can be wonderful when done correctly. Roof tops, canopy’s over parking lots etc.

1

Small scale solar installations are fine for individual/ private /domestic use. They should be limited to urban

1

areas on rooftops and industrial areas that can be reclaimed. WE have no business allowing them in the
rural areas of the county.
Should only be on rooftops

1

Should be one-on-one choices, part of individual homes or businesses at owners choice. No more areas

1

should be destroyed for fields of panels & related equipment.
Rooftops are the only appropriate location for solar.

1

Rooftop residential or commercial rooftop is okay. But avoid placing them where runoff could cause erosion

1

or get into waterways.
Residential rooftop use or parking lot/commercial roof only. Don’t ruin our county further.

1

Residential rooftop only or are commercial rooftop. Thanks for caring about your citizens. Please maybe

1

listen to us.
Protect our farm industry and wild life. Put solar panels only on roofs of buildings not land.

1

Prioritize solar installations on commercial and governmental rooftops and make use of parking lot areas

1

first (imagine being able to park in the shade in August!)
Pretty sure the public was already vocal about their opinions. Not sure why you didn’t listen.

1

Page 52 of 84

Please don’t ruin our beautiful land and land that is used for farming. We will lose our value and the reason

1

we moved here. Please, please do not do this. I want a good life for my family now that we’ve moved here.
We moved here because we love the views and driving through looking at farms and the field views. You
will kill the very reason that makes Botetourt special if you allow these large solar facilities. Do not poison
our water with damaged panel runoff or risk horrible fires from battery fires. You are charged with planning
for your citizens, so please respect your citizens. Please keep my family respected and safe.
Please do not let these industrial solar arrays ruin our life and beauty.

1

Personal use only. Nothing else. However, I don't believe Botetourt County will listen to anything its citizens

1

want.
Other than the fact that they ruin our God given nature and rural character of our county, there currently is

1

no way of disposing of them after their life span. Maintenance would require trucks traveling to and from etc.
It is not a good fit for Botetourt.
Only roof top residential should be allowed.

1

Only on commercial rooftops

1

Only allow rooftop residential or commercial rooftop. Do not allow on farmland or undeveloped land

1

Nothing to add other than before stated if this is something that is going. To be done I would like to see

1

them on rooftops and not on the ground
Not sure why this survey is even happening since this was already voted on, but keep this solar off

1

undeveloped land. Period.
Not on open land

1

Not on land with erosion risk

1

Not on land that could cause erosion concerns. Keep it in rooftops

1

Page 53 of 84

Not interested in hekping to greenwash an at least 1GW power consuming multiphase data center

1

development by additionally sacrificing our community to make it look like a solar panel spread. The AI/tech
oligarchs should move on. Botetourt doesn't want or need any of these development plans that are to profit
big tech and thise who want to sell the rest of us out.
None

1

No solar. Be serious.

1

No solar in Botetourt.

1

No solar in Botetourt other than rooftop residential

1

No solar in Botetourt County. Too dangerous for our health, battery fires, beautiful views, water quality. So

1

much.
No large solar installations. For gods sake. Listen to your people

1

NO LARGE SCALE SOLAR IN BOTETOURT. PERIOD

1

No industrial solar botetourt has already fucked the tax payers and residents by selling us out and having

1

closed door meetings and selling land to google. Residents should vote on these topics and no more closed
door meetings
No county money or tax breaks should go to any of these solar companies. The county shouldn't put any on

1

government buildings which it already fails to maintain.
No Botetourt doesn’t care what citizens think anyhow

1

Need to be able to Look at Each project and vote though a public Hearing.

1

N/A

1

Page 54 of 84

Moving towards modern energy production is a good thing, without adoption there will be no technological

1

advancement. That said, the public conversation needs to be had and it must be had with those who will live
with its consequences. Folks over retirement age should have no input.
Long term impacts to environment once decommissioned and loss of agricultural land

1

Keep this county worthy of moving to and living in. Everyone I grew up with here moved away to raise their

1

families elsewhere because of the development. There is still beauty left here if we choose to protect it.
Keep all of these OUT of Botetourt! These are being pushed by Google. (We know they are NOT for the

1

benefit of citizens.) Solar poisons all future use of land after initial developers drop out and let them rot. You
cannot farm an asbestos field. Do not turn us into a company town that is exploited by a huge company.
Just stop destroying our home with this garbage.

1

Its not the only answer but if used properly can be added to supplement power usage

1

It is not the role of government to encourage solar development on any scale. If residents want small scale

1

solar on their own property, they should be allowed to have it. However, large scale solar affects more
people than just the property owner AND often receives government subsidy, which is not a fair or
responsible use of tax revenue. Large scale solar, where allowed, should be paid for exclusively by the
property owner developing the solar, not at all by taxpayers. Botetourt County admin/government should
NOT be encouraging large scale solar, it does not fit the character of the county.
Industrial rooftops are ideal, other locations need a case by case review.

1

In past Planning Commission Meetings the citizens let it be known they don't want any solar farms and it

1

ended. The BOS members should not be asking that the Planning Commission look at changing the rules n
regulations now. Thank you!
If a solar company pays you off, I guess this survey response won’t matter.

1

Page 55 of 84

I'd prefer a solar project to a data center! But if we have to have a data center, the first consideration should

1

be how we power it. Solar and wind should be appropriate options that wouldn't cost local taxpayers -- could
actually benefit local taxpayers. Solar projects don't have the same negative environmental impacts that
data centers do. But no one sent me a survey about data centers.
I’m from part of the country that has sunshine about 300 days a year, we do not. Solar panels do not

1

generate enough power for anything unless the sun is shining 24/7. The panels are toxic and how will they
be disposed of when they no longer work? and that getting into our ground water. I’ve seen this nightmare
and am not going to say they are good because they are not. Stop buying into the green BS it’s does not
work all you have to do is look at CA how’s that working for them with rolling black outs and power outages
all the time. Why be cause they d re and the kool aid on the green energy lie!!!’ This county is so stupid
when it comes to all of this mess. Educate yourself and stop chasing the dollar that will come back to bite
you in the ass.
I’m confused because I feel like we’ve already gave our opinion on this months ago at hearings. Not sure

1

why it’s coming up yet again
I would like to think my opinions or thoughts actually matter, but they can't be bought so I know they don't

1

really matter. Thank you for keeping the optics up.
I work in Botetourt. I do not live there due to the expense.

1

I think you are looking to ease the impacts of the Data Center coming in. You thought that the community

1

would be for these installations. You have found that is is NOT. We have energy vampires coming into our
communities targeing land owners for land lease solutions as well as other organizations canvassing
residentual customers for solar leasing, where they sell a percentage of the stored energy back to the
Power Company. You need to be very careful and do actual due dilligence this time before approving an
projects. There are solar famrs going belly up all accross the midwest because its a money grab and not a
long term energy solution. Dont ruin our lands for short term gains. The burden of risk 100% falls on the
land owners and residents of the county, as these installations consistnely fail. There are misleading
statistics. Solar is growing at a rate of 61% Year of Year, but bankrupting at the same if not higher rate.

Page 56 of 84

I think small scale solar privately owned should be encouraged. This allows a factor of self reliance that the

1

rural residents of our county were raised on. When power was out after Helene we burned almost 60
gallons of diesel powering our house. If we had a solar generator and battery system we would have only
had to run the generator to top off the system once a day. Large scale solar is tough because no one wants
to see it and have it near them. Maby consider installing large scale solar in areas of mines/quarry that have
been mined out and are no longer in production. Va does not reclamation laws so we should encourage
putting the land back for a good reason.
I think public buildings and property should be utilized for solar as much as possible to offset their carrying

1

costs. Power companies and other public utilities using rights of ways should be more responsible for
including solar power generation on their already existing lines and equipment.
I think it's the worst thing that has happened to our county.

1

I think it is hideous. If someone wants it on their house then that is fine. I don't want it on mine and I don't

1

want to look out and see solar panels taking up our beautiful farm land
I support residential/ personal solar use. If someone wants to power their home/ property using small scale

1

solar that should be allowed. If businesses want to use solar on roof tops & parking lots that should also be
allowed. Any large scale/ commercial solor projects should NOT be allowed. The Board has severely
neglected the citizens of this county with over spending, tax breaks/ favorable treatment of big business &
changing the landacape and population with mass apartment construction. Given the boards track record
I'm sure this survey will yield no favorable outcome to what the citizens of this county want but hopefully I
am wrong. STOP with all the pet projects, STOP letting the county administrator cater to his personal gain
and the gain of big business and STOP the overspending. The majority of the citizens in this county are
struggling to get by while Botetourt continues to take and spend like it's a unlimited amount of money. STOP
WASTING OUR MOMEY AND LOWER TAXES.
I support any sustainable energy development. We need to move away from fossil fuels.

1

Page 57 of 84

I realize the state is pushing solar and the county must comply. However, the state statutes are minimums.

1

The county has the right to ask for stronger rules about set backs, size, safe battery storage, locations, total
number of solar farms allowed in the county, decommissioning rules. We all know solar is inefficient and
toxic so I would limit how much comes to the county if it comes at all. In no way should it be allowed on
farmland.
I only support commercial or industrial scale solar if it was on rooftops/parking lots. Botetourt needs to focus

1

on preserving rural character.
I hope the Board if Supervisors don’t screw this up, like they did the Data Centers (for which they should be

1

ashamed!)
I have no issues with private residences installing solar for their energy needs. I am, however, conflicted

1

with large scale projects. I do not fully understand the environmental impact of large scale solar fields. I do
not have an issue with panels on commercial roof tops, although, I do not think that commercial rooftops
have enough square footage to produce a significant amount of energy. I am very disappointed in the way
the data center was slipped in without public input. I strongly recommend full transparency and would like to
see the county hold public forums where the public has an opportunity to ask questions and be educated on
the environmental impact and benefits of large scale solar.
I can’t answer these as they are too limiting. See question #5. I would only like to see a solar farm in the

1

place of Google. No water needed, no light or noise pollution, no toxic air pollution.
I believe in balancing personal property rights with the common good, which means creating spaces for the

1

residents of the future, our children, and our children's children. I am appalled at the behavior of "so-called"
conservatives and independent thinkers who fight against personal property rights with no offer or ear to
solutions. I am appalled at the selfishness of Mark Tyson, Steve Hartman, and Linda Rottman and the
apathy or inaction of the rest of the county leadership to allow it to erode the county's past and future
success. They are CANCER to the future of Botetourt.
I am opposed to solar or windfarms. If anything we should be supporting nuclear.

1

Page 58 of 84

I am not against solar but believe it belongs on existing structures or shaded parking areas, it does not

1

belong on any open land as it could leech chemicals into the ground that would prevent any future farming
on that land.
Haven’t you already done enough with the wind farm ruining the mountains and the data center? I hear

1

noise non-stop all day and into the evening from the Google construction site. I can’t enjoy my backyard
anymore. So so angry that I ever purchased property in a county where the elected leaders hide things from
their constituents and don’t listen to them at all. Larrowe and most of the Board of Supervisors need to be
fired with their serious mismanagement of the county and funds.
Green energy, including solar generation, has not yet reached a point where it is economically viable as a

1

stand alone energy source. Focusing on solar or wind just takes funding away from other sources of power
generation such as nuclear, gas and clean coal.
For those adamantly opposed to solar, it is far cheaper, far less damaging, provides faster turn on/build out

1

than any other mode of electrical power production.
Enough is enough. We are destroying the beauty of the county at an alarming rate. Natural habitats are

1

being destroyed, the dash for cash in this green energy industry is reckless and does too much damage for
too little true return
Door to door solar salesman should have to present a net present value of the solar array and not a straight

1

cost vs savings valuing future savings equally to present value dollars. This is a predatory tactic that
disproportionately impacts the elderly and less educated and fleeces them of their money and future
property value.
Don't think they produce enough power for the destruction of environment

1

Don't ruin our farm lands and our forest our neighborhoods.

1

Do not site these projects where there is a Risk of erosion. Also concerned about battery fires

1

Page 59 of 84

Do not permit or encourage solar developments of any kind in Botetourt county. We cannot afford to clean

1

up any more messes made.
Do not cover farm or timber land.

1

Do not bring it here.

1

Did the citizens not already give their opinion on this before? No solar unless brownfields.

1

Cover our schools roofs and parking lots in solar. This is wasted real estate that can benefit the county

1

fiscally and environmentally for decades. Fund our schools better!
climate change is a scam. the u.n. admitted it. fossil fuels are reliable sources of energy. our taxes should

1

not go toward the climate change scam.
Citizens already spoke about this before. Put it on parking lots, but DO NOT touch farmland or undeveloped

1

land
Citizens already said their piece about solar. You should probably listen to them.

1

Build the solar!!!

1

Botetourt County used to be famous for its beauty

1

Botetourt county is does not need this. Its ruining the rual areas

1

Before we bite the apple and can’t go back, let’s do our due diligence and research the long term effects on

1

mirrored communities and reach out openly to our entire county’s citizens in multiple ways so all may have
the opportunity to respond to surveys. Perhaps a mailing or special vote? Besides the adverse effects to our
land and water, one concern is the salesmanship of solar. The aggressive, arrogant door-to-door salesman
on his hoverboard has made several pitches and that has affected my openness to solar panels on my
home. He has been told at least twice not to come back. And I reported him.

Page 60 of 84

As an employee of AEP who works with solar generation on a daily basis, you should walk away from the

1

idea of building or allowing solar. It is not profitable or a long term investment. It would be prudent to
independently study the cost and impact of a solar farm that has been in operation for more than 10-15
years. Avoid the fad and just say no. It is not “clean” energy.
Are there any tax advantages to doing solar?

1

Any large scale solar farm should be put up for vote before persued.

1

After the solar panels don't work. What then?

1

A mixed grid is best for the community Traditional electricity Solar electricity Wind driven electricity

1

Answered: 144 Skipped: 87

Page 61 of 84

#

Reviewer

Topic

Section

Planning Commission Comment

Responses (Red text indicates addition from previous worksession)

1

Leffel

a

insert "native plant" in front of "pollinator"

SB 347 provides "native and naturalized pollinator plant species" and requires wildlife passage.
Suggest mirroring the statute's "native and naturalized" wording so the ordinance isn't narrower
than state code.

2

Leffel

c7

I have a question about the 5' height requirement

For ground-mounted projects of 1 MW+ serving off-site load, SB 347 sets panel height at a max
of 25 ft at full tilt.

3

Leffel

d,e,f

Thank you for this table, as requested by PC, to explain items that are state-mandated

N/a

4

Leffel

g3

spell out "VPDES"

Done.

5

Leffel

g3

What is a General VPDES Permit and how is that new or different than other
construction projects?

Addressed by spelling out. See below.

6

Leffel

g3

Why are capital letters used in "Discharges of Stormwater from Construction Activites"?
Is this another document or a title for another reference?

The full name of the permit is "General VPDES Permit for Discharges of Stormwater from
Construction Activities" but is more commonly known as the Construction General Permit (GCP).

7

Leffel

g3

I would like an explanation for the requirement of "decompaction". (This could lead to
erosion opportunities instead of prepping soil for planting as is probably intended)

Intent behind this regulation: to decompact soil as necessary and feasible for re-vegetation after
construction.

8

Leffel

g5

substitute the word "permanent"

Permanent comes directly from VA Code Sec. 15.2-2288.8 Special exceptions for solar
photovoltaic projetcs, subsection 9. Advise keeping.

9

Leffel

g5

Remove sentence about mowing, this cannot be dictated as it will be dependent on
what is planted. And, who is going to review said schedule, approve it, monitor it?

State code requires mowing be "limited and performed on a schedule that promotes" native
plantings, controls invasive species, and minimizes wildlife impacts. This also provides access for
emergency services.

10

Leffel

g6

delete last sentence about vegetation

The "not trimmed to stunt growth" sentence is state-mandated. Proposed changes line up with
state code: screening may be "25 and 50 feet wide"; screening must be adequate "at the end of
five years" (A)(9), so 5 years is feasible. Max 3 ft planting height is also directly from state code.

11

Leffel

g9

I would like to understand intent. Is this in all of our construction ordinances? Why
explicitly needed here?

State code requires compliance with state/federal labor and employment laws.

12

Leffel

i(2)i(ii)

Recommend delete. I think we all know that individuals, licensed or not, can sway
reports. Let's stick to following national standards

A Virginia-licensed PE (hired by applicant, approved by the locality) is required for the
decommissioning estimate. Third-party review at applicant cost is common best practice for
technical reviews, analysis, and studies.

13

Leffel

stormwater i.7

I think topsoil should be "replaced". It should be allowed to be removed from site, but if
that is done, then there has to be new brought in at decommissioning. Storage onsite is
not an option

This language comes directly from VA Code Sec. 15.2-2288.8 Special exceptions for solar
photovoltaic projetcs, subsection 8. Advise keeping.

14

Leffel

decommis
?.?.l(1)
sion

change restoration to 6 months limit

This appears possible and other localities, such as Page County, have a 6 month restoration
period. Recommend including a clause allowing an extension by the Board of Supervisors.

15

Leffel

decommis l.2.d

I need to understand what is behind this. It does not make sense to me to have
language like this in a zoning ordinance

This is language added by the Board of Supervisors.

16

Leffel

Fire Safety n/a

For battery storage, new subsection B is permissive (locality may grant a special exception with
I want to discuss in which section it is appropriate to have the applicant/facility
"reasonable regulations"), so an Emergency Response Plan, NFPA 855 compliance and
owner/operator be required to pay for BoCo Fire/EMS trained for response to the
coordination with County Fire/EMS are well supported. Requiring the applicant to fund training is
facility AND be required to write a specific Emergency Response Plan, in collaboration
best framed as a condition - legal should confirm. Proof of liability insurance is standard best
with County Fire/EMS
practice.

17

Tyson

Categories d

Does state code mandate the names of each category, do we have latitude to change
the names?

Addressed through discussion - Consensus is to leave these use types as identified as they
match up well with state code.

wants to consider a mile buffer around neighborhoods, historical, cultural resources

Inadvisable.Do not recommend establishing a blanket one-mile buffer around neighborhoods or
historic and cultural resources. A uniform buffer would impose a significant development
restriction without accounting for differences in resource sensitivity, topography, existing
vegetation, or actual visual impacts. State law already establishes minimum setbacks and
screening standards for neighboring properties and specifically authorizes the County to request
viewshed analyses to evaluate impacts on historic resources and other designated scenic
resources. Staff recommends relying on these established standards and addressing
documented impacts through project-specific site design, setbacks, and screening rather than
imposing an arbitrary one-mile separation.

18

Hartman /
General
Turner

19

Turner

Categories d

are changes due to state code?

Yes.

20

Tyson

Categories D

Could they have small portables not allowed in all districts?

Ground-mounted solar on residential, ag, commercial, industrial, institutional and mixed-use land
is permitted. Additionally, the County cannot restrict rooftop solar serving the dwelling/property.
See comments on Canopy solar for more information on "portable" solar.

21

Tyson

Categoires D

Why are minor scale allowed in high density residential (R3,R4) but not in lower density
(R1)?

State code requires the consideration of an SEP for 1 MW+ ground-mounted facilities serving offsite load. For residential zones, ground-mounted facilities must be permitted the same way
unless the local ordinance permits these project by-right.

22

Leffel

General

Make state mandated (BLUE), recommended changes (RED)

Addressed.

23

Tyson

General

Wants to consider embodying a prohibition of utlility scale faclilites within a certain
distance of eachother - not just in the Comp Plan language (1.h) - seeking to reduce
proliferation of this type of use

SB 347 requires an SEP or siting agreement for 1 MW+ projects. A spacing prohibition operates
like a cap and is not among the enumerated criteria. Add cumulative-impact/proximity policy in
the Comp Plan and make it an SEP review criterion. The locality must report any Comp Plan
nonconformity finding to the SCC for each decision, so a Comp Plan policy is well supported.

24

Turner

Small Scal f(3)

Wants to make sure the height is capped at 25 feet or if we can make it lower

25 ft cap applies to 1 MW+ ground-mounted projects.

Page 1 of 3

Page 62 of 84

25

Tyson

Solar
Parking

Can you have solar panels in the parking lot? Possible new form of solar

SB 347 only addresses ground-mounted facilities, so a defined solar canopy/carport category is
a local decision. § 15.2-961.4. (Effective July 1, 2027) Solar canopies in surface parking areas. A.
For purposes of this section: "Qualified parking area" means all new, or additions to, public or
private surface parking lots containing 100 or more new off-street contiguous parking spaces
that serve a nonresidential building, facility, or development. "Solar canopy" means a singular
structure or multiple structures located above a qualified parking area that has a raised
horizontal, slanted, or movable surface that contains solar photovoltaic panels and that has no
sides. https://law.lis.virginia.gov/vacode/title15.2/chapter9/section15.2-961.4/
Addressed. See response to comment #36

Owner or Operator be changed to "Owner/Operator"

Recommend defining one term (e.g., "Owner/Operator" = owner, lessee, developer and operator,
and successors) so decommissioning and bonding obligations attach to every party the statute
names.

Concerned about the language on fencing placement

Fencing must comply with §55.1-2804, the NESC and the USBC, so fence height/type is set by
those codes. Fencing is limited to areas in reasonable proximity to arrays/interconnection
equipment, with open wildlife access to riparian areas, wetlands and streams.
https://dwr.virginia.gov/wp-content/uploads/media/Solar-Energy-Facility-Guidance.pdf

If part of the parcel is prime farm land can they put it on any part?

Yes. Subsection (g)(7) protects prime farmland, but would allow solar facilities on parcels that
contain, to some degree, prime farmland.

Potential Addition of motion sensing lighting addition to lighting ordinance - do we
need specific regulation for solar lighting

State code provides "light intensity dimming solution technology," so motion-sensing and a
lighting plan at SEP submittal are consistent and best practice.

26

Tyson

27

Leffel

28

Hartman

29

Nicley,
Turner

30

Turner

4

31

Tyson,
Turner,
Leffel,
Lucas

4(E)

Is one mile enough?

Requires visual impacts to parks, scenic rivers/byways and NRHP-listed or eligible (or countyregister) sites be minimized and lets the locality request a viewshed analysis, but sets no
distance, so the 1 mile figure may be shifted to meet the County's goals. "Known and discovered"
is fine.

32

Turner

6(d)

Turner - funds will be put under county board control prior to any construction, land
disturbance, etc. (Turner will send langauge) - wants the money up front

Timing (before land disturbance) is a local choice. Consult with attorney on consistency with
bonding policy.

Page 7

Item d (Decommissioning & Restoration Funds): Add language requiring funds to be
placed under county board control prior to the start of any land preparation or
construction.

Addressed. Our bonding policy requires bonds to be in place prior to issuance of site plan
approval.

Page 8

Item 12 (Prime Farmland): Add protection and preservation requirements for erodible
Erodible land protections are addressed in subsection (g)(7)
and highly erodible land alongside prime farmland.
New Item 15
(Decommissioning Cost & Review): Require decommissioning costs to be paid to the New Item 15 - current bonding policy requires bonds to be secured prior to issuance of site plan
approval. Va Code Se. 15.2-2241.2B. And C. requires a "professional engineer licensed in the
county so they can be secured in a bond under county control. Any cost increases from
Commonwealth, who is engaged by the applicant, with experience in preparing
the 5-year site evaluation—conducted by an independent 3rd party approved by the
decommissioning estimates and approved by the locality;" Advise keeping this language.
Board of Supervisors (BOS) and paid for by the solar site owner-operator—must be paid
to the county on or before the 30th day after the report's release.
Item (j): Believe this references "notice of change in ownership, ground-mounted minor and
Item (j): Add a requirement that notification of any change must be brought to the
utility-scale solar facilities"
county's attention within 30 days.

33

General

g(4)

Prime Ag

Wants to add trails and migratory route (B), after habirate he wants migratory routes (C), Trails are not named (only public parks, scenic rivers/byways, NRHP/county-register sites), so
wants to add an additional segent that adds a report that makes it clear that wildlife are keep trails as a review consideration, not a regulation. A requirement to certify wildlife are "safe"
around panels is not in the code and is not a recognized standard.
safe if they come in contact with pannels. (D) we need to define the lowest achievable
State code has no numeric "lowest achievable level" for lighting.
levels (maybe in state code - will investigate)

Item B: VA Code Section 15.2-2241.2(A) refers to reasonable restoration. Recommend keeping
"reasonable" to not conflict with state code.

34

Turner

Page 9

Item b: Change the word "reasonable" to "Full restoration," and add property
delineation matching pre-construction baseline conditions or better. Require
restoration to begin within 6 months of decommissioning and be completed within 1
year.
Item 3: Change "one (1)
year" to "6 months" and remove the phrase "without the written consent of the zoning
administrator".
Item 4: At the end of the item, add that if
costs are greater, the operator must pay funds to the county within 30 days of the
report, subject to county approval.
Item 6: Remove the phrase "the applicant will ensure".

Item 3: No issues with changing one year to six months. Advise keeping the zoning administrator
written consent clause to account for uncontrollable situations - such as natural disaster.
Item 4 - No issue, but suggest language, "If an updated and approved decommissioning cost
estimate establishes that the existing financial assurance is insufficient to cover the projected
cost of decommissioning, the owner, lessee, or operator shall increase the financial assurance to
the amount approved by the County within thirty (30) days of written notification of the required
adjustment. Any increase in financial assurance shall be provided in a form authorized by Virginia
Code § 15.2-2241.2."
item 6 - Revised, see text.

Surety & Ownership Changes: Add a statement specifying that surety will not change
hands based on ownership or operator changes. The surety stays in place until
Surety and ownership changes: addressed by revising "owner" to "owner/operator" which
approved decommissioning and full site restoration are complete, and security will be
includes owner and successors.
released to the owner of record 6 months after full restoration and county approval.
Non-Compliance: Establish that failing to meet or maintain Special Exemption Permit
Non-Compliance: Do not recommend a forced decommissioning clause. Suggest following the
(SEP) provisions triggers forced decommissioning unless a remedy is presented and
Additional
usual zoning violation process and to not introduce additional procedures for staff to work
started within 30 days of nonconformance, and the site is brought back into
through.
compliance within 90 days of written county notification.
Duration of Solar SEP: Set the duration of a solar SEP to 25 years, allowing the ownerDuration of Solar SEP: Possible through VA Code Sec. 15.2-2286 A.3. May be better suited as a
operator to apply for a 5-year extension up to two (2) times. Extension applications must
condition upon approval, rather than explicity stated in the code.
include county-approved independent 3rd-party site and production reviews, and
requests will weigh both initial and recent SEP requirements.

Page 2 of 3

Page 63 of 84

1. Every 3 Years, Re-evaluate the Clean-up Bonds: Require an independent engineer to
re-verify site clean-up costs every three years at the developer's expense to account
for inflation over the twenty-year lifespan. If costs increase, the developer must submit
the additional funds within thirty days or face operational suspension.
2. Mandatory Protections for Karst, Sinkholes, and Steep Slopes: Require developers to
fund an independent hydrogeological study for any projects proposed on limestone,
karst formations, or slopes exceeding 10 degrees. This ensures construction will not
impact the limestone, cause sinkholes, or send runoff into local streams and wells
1. Addressed through the 5-year requirement. This matches state code Sec. 15.2-2241.2C
connected to the James River watershed.
2. Possible, see new items under (i)(4) f. and g.
3. Pre-Construction Safety Traps for Battery Fires: Require sites to be evaluated for
3. Possible, see new items under (m) (1), (2), and (3)
potential battery storage development upfront. If battery storage is added later, the
4. Confirmed, utility-scale solar is either an SEP or a by-right by State Code requirements
space must include dedicated chemical containment basins and self-contained water
5. Existing fees required as part of the development approval cover the cost of staff to review
and inspect the site during construction. Weekly inspections exceed the State Code 9VAC25-875loops to prevent toxic runoff from entering soil or groundwater.
140 requiring inspections ever two weeks and within 48-hours of a a runoff producing storm
4. Special Exception Discretion to Protect Our Neighborhoods: Confirm that
event. County also has a voluntary third-party inspection program. Advise not including.
transitioning utility-scale solar into the Special Exception Permit framework provides
6. This is addressed through changing definition of "owner" to "owner/operator"
the appropriate review authority for projects regarding residential buffers, property
7. This does not appear to be possible through state code prohibition. See Va Code 3.2-3907,
setbacks, scenic viewsheds, topography, and underground power line requirements
which establishes pesticide control under the authority of the State Board of Agriculture and
along corridors like Route 220 and Catawba Road.
Consumer Services.
5. Mandatory Third-Party Independent Inspections: Require developers to fund a
countyapproved independent inspector to be on-site weekly during construction and
annually during operations. This inspector will monitor compliance with stormwater
management and vegetative buffers, with any violations prompting an immediate stopwork order.
6. The "Chain of Title" Liability: Ensure that all Special Exception Permit conditions, noise
limits, and decommissioning bond liabilities automatically transfer to any future owner
or parent corporation. If a subsidiary or shell company dissolves, the primary energy
entity remains legally and financially responsible to Botetourt County.
7. Forbidding the use of Chemical and Herbicides: Restrict the use of chemical
defoliants for site maintenance to protect karst groundwater and local wells from
runoff. Maintenance for required pollinator habitats and panel rows must be conducted

35

Hartman

36

Lucas,
Tyson,
Leffel,
Hartman

37

Leffel

view shed

38

Tyson

Permitted
use chart

39

Tyson,
Turner,
Lucas

A

Leffel

B

Tyson

C
D
E

Turner
Tyson
Leffel

F

Lucas,
Leffel,
Tyson

G

Leffel,
Tyson

H

Tyson

I

Lucas,
Tyson

J

Turner

K

Leffel

L

Tyson

4.E.

Lucas - strongly prefered for parking lot solar with over 100 spots, but not required.
McCoy - suggest not requiing them but borrowing the languge from state code for
solar canopies in all zoning districts. ALL - agree with McCoy's recommendation

Addressed. Added "Solar Canopy" as a use permitted by-right in all districts. Suggested definition
is, "A singular structure or multiple structures located above a parking area that has a raized
horiszontal, slanted, or movable surface that contains solar photovoltaic panels and that has no
sides"

not less than one mile for view shed analysis

Addressed. Added "within at least one (1) mile"

Include full name of zoning categories

Addressed.

address density - current shows 1 miles, up to 5 miles from the property line. Add
language for an SEP for utility scale solar wihtin a 5 miles radius

Best practice: adopt density/proximity as Comp Plan policy and an SEP review factor, and
document the Comp Plan nonconformity reason for any denial to the SCC.

Comprehensive Plan Addendum
Do we still use "renewable" as opposed to "alternative energy" as the nomenclature?
Advise "renewable" energy to more closely align with VA Code language. See more specifically
What's the industry standard? Match throughout to the Code of Virginia
VA Code Sec. 56-576 for definition of "renewable" energy
What is a "brown field"? We need to define what that is since the layperosn may not
Defined. Used VA Code ec. 10.1-1230
1.A.ii
know what that is. Add defintion in brackets
Addressed.
1.A.iii
adjacent land might be Ag - make it clear that there will be none on AG zoned lands
Addressed.
1.B.i
include "including parcels with highly erodible soil"
Done.
Thoughou
put PC changes in RED
Can we recommnd the pollinator friendly design be higher than 10%? Look to see if
there's language that speaks to thistle or other plants that wouldn't be condusive to
Addressed.
1.f
adjacent agriculutral production. Tyson - would like to see 20% at least. Leffel - wants
to know what the reasoning behing the 10% before upping it.
look to see what the impact would be based on what is actually allowed - what
percentage would be covered on the areas where solar can actually go. Tyson wants
A Pollinator Smart Program manual suggests 10%. VA Code regulation does not specify a minumum
1.H
to change "should" to "are to be no more" in the last sentence. Leffel - have BG change
to difference between policy and regulations.
Tyson - has an issue with the word "encourage" wants it change to just "should be
Addressed.
1.I
allowed".
Lucas - can you include "while not preffered by Botetourt County, but if it's built"? Is
Suggest, "While minor- and utility-scale solar facilities are not the preference of the County, if
1.B
that too strong language? Leffel - Ask BG where the line is. Tyson - wants to get rid of
these facilities are approved, they should be sited on:
"prefered"
Turner - "should not overide the aetheics / character of BOCO" , shouldn't be all about Suggest, Utility-scale solar energy facilities should maximize economic benefits to the County,
1.J
the Money, Money, Money. Leffel - could Turner's statement be in this bullet or an
as demonstrated through thorough economic analysis, while ensuring that such benefits do not
additional bullet?
come at the expense of Botetourt County’s aesthetic qualities and natural character."
Leffel - wants to know who will be moniotiring this review? McCoy - PZ Staff will
Addressed. County staff (Community Development and County Attorney) will review.
1.L
review this.
Preamble

2

M

Lucas

2.e

N

Tyson

3

O

Tyson,
Leffel,
Turner

4.a

P

Tyson

4.b

Q
R

Leffel
Leffel

4.b.xiii
4.b.xi

Tyson - opening does not include utility scale solar applications that do include battery Addressed in Item 2: "When considering utility-scale solar applications, regardless of whether
storage. McCoy - "application that do or do not include battery storage". Turner - we the original application considers battery energy storage, the Planning Commission and Board of
will require a plan shown the proposed location of battery storage equipment whether
Supervisors should evaluate whether the solar project site can safely accommodate a future
you intend to install now or in the future. Turner - remove "evaluate" and change to
onsite battery energy storage system, including the availability of adequate:"
Addressed. Added additional item requiring training.
Lucas - include training in the language (might need an additional bullet)
Tyson - why aren't we pushing to have solar panels on the roof of the Google Data
Section 1.a. includes language indicating a preference for rooftops.
Center development? Leffel - can we include a note that encourages solar panel
instilllation on the rooftops of new large industrial or commerical buildings
Tyson - Is this a bribe? "The County is already pregnant". All - Agree to take the
language out.

Addressed and removed.

Tyson - wants to add "BOS and Planning Commission". Leffel - add to preamble "we
will not have solar development on prime farmland and highly erodiable soils", check
with BG to see if that's took strong
All - Get rid of this bullet point here and throughout
Leffel - Make BOS and PC capialized.

Tyson - Addressed. Leffel., suggest, "In order to preserve prime agricultural land and to prevent
soil erosion, solar facilities should not be placed on prime farmland or on areas with highly
erodible or potential highly erodible soils.
Addressed and removed.
Addressed and corrected.

Page 3 of 3

Page 64 of 84

Addendum to Envision 2045
Solar Energy Systems and Battery Energy Storage
Facilities Policies Utility-Scale Solar Energy and Battery
Energy Storage Facility Policies
Careful consideration of the location and potential impacts of an alternative energy facility is
an essential component of the development process. The design and siting of these facilities
should consider the preservation of forested areas, steep slopes, movement of wildlife, and
the potential density or concentration of these facilities in one area of a locality, which may
impact on the character of an area or limit future growth and development options for
available land. These renewable energy uses should continue to be regulated consistently
with the County’s values and rural character, along with best practices.
1.

When considering applications for minor- and utility-scale solar energy facilities
pursuant to Code of Virginia § 15.2-2241.2, 15.2-2288.7, and 15.2-2288.8, the County
should consider the following factors, considerations, and potential impacts
associated with the proposed facility and its compatibility with the Comprehensive
Plan, surrounding development, and public health, safety, and welfare.
a. Minor- and Uutility-scale solar facilities, if built, are preferred to be located on:
i.

Rooftops and/or over parking lots, particularly when sited on or and adjacent
to industrial, commercial, and civic buildings;

i.ii. Brownfields and previously developed sites;
ii.iii. Land adjacent to industrial zones;
iii.iv.
Areas with minimal environmental sensitivity, with terrain that is either
flat or gently sloped; and
iv.v.

Land that is adequately distanced from residential areas (at least 1 mile).

b. Minor- and Uutility-scale solar facilities, if built, are preferred not to be located on:
i.

Parcels with significant topographical challenges;

ii.

Areas with sensitive wildlife habitats;

iii. Locations near existing solar facilities;
iv. High traffic corridors and scenic areas; and
v. Prime agricultural farmland.

Addendum | Utility-Scale Solar Energy and Battery Energy Storage Facility Policies

A-1

Page 65 of 84

1.

"Prime farmland" shall have the meaning assigned to it by the Natural
Resource Conservation Service of the United States Department of
Agriculture, except that lands established in silviculture shall not be
considered prime farmland;

2. If no more than 10% of the site is prime farmland, this consideration will be
waived;
3. If more than 10% of the site is prime farmland that is not contiguous, this
consideration may be waived;
4. If more than 10% of the site is prime farmland that is contiguous,
consideration should be given to excluding those areas from the project
footprint to the extent practicablethe prime farmland can be removed from
the project area; and
5. The Board of Supervisors may waive any or all of the foregoing.
c. Active components (i.e., solar panels, substations, inverters, etc.) or developed
features (i.e., fences, gates, maintenance and operations buildings, etc.) of utilityscaled solar facilities should not be located in close proximity to residences or
historic, cultural, recreational, and environmentally sensitive areas and resources
to result in negative impacts to their use, value, or importance individually or to the
County. Appropriate buffers and screening should be incorporated to address
project proximity to residences, historic and cultural resources.
d. Utility-scale solar energy facilities, including fencing and support equipment,
should be significantly and sufficiently screened from the view of adjacent
properties and rights-of-way by a buffer that consists of natural vegetation and
landforms and/or be landscaped with plant materials consisting of an evergreen
and deciduous mix. Landscaping materials should be native to the region and
exclude the use of invasive species.
e. Utility-scale solar energy facilities should incorporate wildlife corridors and
wildlife-friendly design measures, where practicable, in accordance with guidance
from the Virginia Department of Wildlife Resources (DWR), the Virginia
Department of Conservation and Recreation (DCR), and other applicable agencies
or recognized standards. Such measures may include, but are not limited to,
wildlife passages, modified fencing design, habitat connectivity, and protection of
sensitive environmental features, consistent with the DWR’s Solar Energy Facility
Guidance and similar guidance documents.
f.

Utility-scale solar energy facilities should include pollinator-smart designated
areas to support native species, enhance biodiversity, reduce erosion, and help
maintain the County's rural and agricultural character. At least 10% of the project
area should be dedicated to pollinator-friendly habitats established and managed
using native vegetation and recognized best practices.

g. Utility-scale solar energy facilities should generally be in close proximity to
transmission line corridors (2 1 miles or less, measured from the farthest parcel
boundary) to reduce the need for significant new infrastructure. Any generation

Addendum | Utility-Scale Solar Energy and Battery Energy Storage Facility Policies

A-2

Page 66 of 84

lead lines should be located underground or buffered to block visibility from
roadways.
h. To ensure the protection of agricultural and forested lands and the rural character
of the County, utility-scale solar facilities should be no closer than 1 mile to another
facility; individual utility-scale solar facilities should have a total active developed
area, including fenced area and area comprising buffers, of less than 500 acres
(/0.78 square miles); and the total acreage of land in the County utilized for utilityscale solar facilities should be no more than 5,000 acres. (7.8 square miles or 1.4%
of the total County’s area).
i.

Utility-scale solar energy facilities should be encouraged to allow for the
concurrent use of compatible agricultural, commercial, industrial, or passive
recreational uses within project sites. Project developers are also encouraged to
preserve undeveloped portions of project properties through conservation
easements or similar land conservation mechanisms that limit future development
of the property.

j.

Utility-scale solar energy facilities should provide maximum economic benefits to
the County as demonstrated by thorough economic analysis.

k. The County should annually review related policies and ordinance regulations for
consistency with current best practices and state requirements.
2.

When considering utility-scale solar applications that do not include battery energy
storage systems as part of the original application, the Planning Commission and
Board of Supervisors should evaluate whether the solar project site has adequatecan
safely accommodate a future onsite battery energy storage system, including the
availability of adequate:
a.

aArea;,

b. pPrimary access;,
c.

eEmergency access;,

d.

iInfrastructure capacity;,

e.

pProximity to water supply and fire suppression/detection equipment;, and

f.

pPhysical separation from surrounding properties (particularly residential uses,
historic properties, and scenic byways). to safely accommodate a future onsite
battery energy storage system.

Staff reports prepared during the solar application review process and any conditions
attached to the special exception permit for the utility-scale solar application should
adequately address the potential for battery energy storage on the project site in the
future to best protect sensitive surrounding uses.
2.3. There is a preference for locally generated power to be utilized locally to benefit
industrial and other development. Applications for solar facilities and battery energy

Addendum | Utility-Scale Solar Energy and Battery Energy Storage Facility Policies

A-3

Page 67 of 84

storage facilities should demonstrate through information and materials how
generated electricity will be utilized locally.
3.4. There is a preference for projects that significantly mitigate or preserve portions of the
County in order to protect soils and other natural resources. The following may be
considered:
a. Either (i) dedication of real property of substantial value to the county or one of its
instrumentalities, or (ii) substantial cash payments for or construction of substantial
public improvements, the need for which is not generated solely by the granting
of the special exception, so long as such improvements are reasonably related to
the project.
b. In considering any application for a special exception for a utility-scale solar
energy facility, the Board of Supervisors should review the following factors:
i.

The topography of the site and the surrounding area.

ii.

The proximity of the site to, observability from, and impact on agricultural and
residential areas.

iii. The proximity of the site to, observability from, and impact on areas of
historical, cultural, and archaeological significance.
iv. The proximity of the site to, observability from, and impact on areas of scenic
significance, such as scenic byways, vistas, and blue ways.
v. The proximity of the site to, observability from, and impact on public rights-ofway, including, but not limited to, highways, secondary roads, and streets.
vi. The proximity of the site to, observability from, and impact on recreational
areas, such as parks, battlefields, trails, lakes, rivers, and creeks.
vii. The preservation and protection of wildlife and pollinator habitats and
corridors.
viii. The proximity of the site to any urban planning area, community planning area,
or environmentally or culturally sensitive area identified in the comprehensive
plan.
ix. The size of the site.
x. The proposed use of available technology, anti-reflective coatings, and other
measures for mitigating adverse impacts of the facility.
xi. Such other matters as the planning commission or board of supervisors may
deem reasonably related to the application or its impacts.
xii. Whether audible sound from a solar facility will exceed sixty (60) decibels, as
measured from any adjacent non-participating landowners' property line. This
level may be exceeded during short-term exceptional circumstances, such as
severe weather. The owner or operator of a solar facility is encouraged to

Addendum | Utility-Scale Solar Energy and Battery Energy Storage Facility Policies

A-4

Page 68 of 84

measure and document, on a continuing basis, not less frequent than annually,
or upon request by the County, that noise levels comply with the decibel limit
established herein; any violation will constitute a zoning violation.
xiii. With regard to any cash payments or in-kind contributions, the impact of the
project on probable future uses of the land if not developed with a solar farm,
including any changes in future tax revenues; investments in infrastructure for
other types of development that may have occurred in the area, and would be
of lesser utility; and the provisions of a siting agreement under Code of Virginia
§ 15.2-2316.6 et seq.

Addendum | Utility-Scale Solar Energy and Battery Energy Storage Facility Policies

A-5

Page 69 of 84

Utility-Scale Solar Energy and Battery Energy Storage
Facility Policy Implementation
#

Implementation Strategy

Cost to Pursue

Timeframe

1

When considering applications for minor- and
utility-scale solar energy facilities pursuant to
Code of Virginia Code of Virginia §§ 15.2-2241.2,
15.2-2288.7, and 15.2-2288.8, the County should
consider the following factors, considerations, and
potential impacts associated with the proposed
facility and its compatibility with the
Comprehensive Plan, surrounding development,
and public health, safety, and welfare. (See 1.a
through 1.j)

$

Ongoing

$

Ongoing

$

Ongoing

$

Ongoing

Minor- and Uutility-Scale Solar, if built, is preferred
to located on:
i.

1.a

Rooftops and/or over parking lots, particularly
when sited on or and adjacent to industrial,
commercial, and civic buildings;

i.ii. Brownfields and previously developed sites;
ii.iii. Land adjacent to industrial zones;
iii.iv.Areas with minimal environmental sensitivity,
with terrain that is either flat or gently sloped;
iv.v. Distanced from residential areas.
Minor- and Uutility Scale Solar, if build is preferred
not be located on:

1.b

i.

Parcels with significant topographical
challenges;

ii.

Areas with sensitive wildlife habitats;

iii. Locations near existing solar facilities;
iv. High traffic corridors and scenic areas;
v.

1.c

Prime agricultural farmland.

Active components (i.e., solar panels, substations,
inverters, etc.) or developed features (i.e., fences,
gates, maintenance and operations buildings, etc.)
of utility-scaled solar facilities should not be
located in close proximity to residences or historic,
cultural, recreational, and environmentally
sensitive areas and resources to result in negative
impacts to their use, value, or importance
individually or to the County. Appropriate buffers
and screening should be incorporated to address
project proximity to residences, historic and
cultural resources.

Addendum | Utility-Scale Solar Energy and Battery Energy Storage Facility Policies

A-6

Page 70 of 84

#

Implementation Strategy

Cost to Pursue

Timeframe

1.d

Utility-scale solar energy facilities, including
fencing and support equipment, should be
significantly and sufficiently screened from the
view of adjacent properties and rights-of-way by a
buffer that consists of natural vegetation and
landforms and/or be landscaped with plant
materials consisting of an evergreen and
deciduous mix. Landscaping materials should be
native to the region and exclude the use of
invasive species.

$

Ongoing

1.e

Utility-scale solar energy facilities should
incorporate wildlife corridors and wildlife-friendly
design measures, where practicable, in
accordance with guidance from the Virginia
Department of Wildlife Resources (DWR), the
Virginia Department of Conservation and
Recreation (DCR), and other applicable agencies or
recognized standards. Such measures may
include, but are not limited to, wildlife passages,
modified fencing design, habitat connectivity, and
protection of sensitive environmental features,
consistent with the DWR’s Solar Energy Facility
Guidance and similar guidance documents.

$

Ongoing

1.f

Utility-scale solar energy facilities should include
pollinator-smart designated areas to support
native species, enhance biodiversity, reduce
erosion, and help maintain the County's rural and
agricultural character. At least 10% of the project
area should be dedicated to pollinator-friendly
habitats established and managed using native
vegetation and recognized best practices.

$

Ongoing

$

Ongoing

$

Ongoing

1.g

1.h

Utility-scale solar energy facilities should
generally be located in close proximity to
transmission line corridors (12 miles or less) to
reduce the need for significant new infrastructure.
Any generation lead lines should be located
underground or buffered to block visibility from
roadways.
To ensure the protection of agricultural and
forested lands and the rural character of the
County, utility-scale solar facilities should be no
closer than one f (1) miles to another facility;
individual utility-scale solar facilities should have a
total active developed area, including fenced area
and area comprising buffers, of less than 500
acres/0.78 square miles; and the total acreage of
land in the County utilized for utility-scale solar
facilities should be no more than 5,000 acres/7.8
square miles. (7.8 square miles or 1.4% of the total
County’s area).

Addendum | Utility-Scale Solar Energy and Battery Energy Storage Facility Policies

A-7

Page 71 of 84

#

1.i

1.j
1.k

Implementation Strategy
Utility-scale solar energy facilities should be
encouraged to allow for the concurrent use of
compatible agricultural, commercial, industrial, or
passive recreational uses within project sites.
Project developers are also encouraged to
preserve undeveloped portions of project
properties through conservation easements or
similar land conservation mechanisms that limit
future development of the property.
Utility-scale solar energy facilities should provide
maximum economic benefits to the County as
demonstrated by thorough economic analysis.
The County should annually review related
policies and ordinance regulations for consistency
with current best practices and state requirements.
When considering utility-scale solar applications
that do not include battery energy storage
systems as part of the original application, the
Planning Commission and Board of Supervisors
should evaluate whether the solar project site can
safely accommodate a future onsite battery
energy storage system, including the availability of
adequate:
a.

Area;

b.

Primary access;

c.

Emergency access;

Cost to Pursue

Timeframe

$

Ongoing

$

Ongoing

$

Ongoing

$

Ongoing

d. Infrastructure capacity;

2

e.

Proximity to water supply and fire
suppression/detection equipment; and

f.

Physical separation from surrounding
properties (particularly residential uses, historic
properties, and scenic byways).

Staff reports prepared during the solar application
review process and any conditions attached to the
special exception permit for the utility-scale solar
application should adequately address the
potential for battery energy storage on the project
site in the future to best protect sensitive
surrounding uses.When considering utility-scale
solar applications that do not include battery
energy storage systems as part of the original
application, the Planning Commission and Board of
Supervisors should evaluate whether the solar
project site has adequate area, primary access,
emergency access, infrastructure capacity,
proximity to water supply and fire suppression
equipment, and physical separation from
surrounding properties (particularly residential

Addendum | Utility-Scale Solar Energy and Battery Energy Storage Facility Policies

A-8

Page 72 of 84

#

Implementation Strategy

Cost to Pursue

Timeframe

$

Ongoing

$

Ongoing

$

Ongoing

$

Ongoing

uses, historic properties, and scenic byways) to
safely accommodate a future onsite battery
energy storage system. Staff reports prepared
during the solar application review process and
any conditions attached to the special exception
permit for the utility-scale solar application should
adequately address the potential for battery
energy storage on the project site in the future to
best protect sensitive surrounding uses.

3

4

4.a

There is a preference for locally generated power
to be utilized locally to benefit industrial and other
development. Applications for solar facilities and
battery energy storage facilities shall demonstrate
through information and materials how generated
electricity will be utilized locally.
There is a preference for projects that significantly
mitigate or preserve portions of the County in
order to protect soils and other natural resources.
The following may be considered:

Either (i) dedication of real property of
substantial value to the county or one of
its instrumentalities, or (ii) substantial cash
payments for or construction of
substantial public improvements, the
need for which is not generated solely by
the granting of the special exception, so
long as such improvements are
reasonably related to the project.
In considering any application for a special
exception for a utility-scale solar energy
facility, the Board of Supervisors should
review the following factors:
i.

The topography of the site and the
surrounding area.

ii.

The proximity of the site to,
observability from, and impact on
agricultural and residential areas.

4.b
iii.

The proximity of the site to,
observability from, and impact on
areas of historical, cultural, and
archaeological significance.

iv.

The proximity of the site to,
observability from, and impact on

Addendum | Utility-Scale Solar Energy and Battery Energy Storage Facility Policies

A-9

Page 73 of 84

#

Implementation Strategy

Cost to Pursue

Timeframe

areas of scenic significance, such as
scenic byways, vistas, and blue ways.
v.

The proximity of the site to,
observability from, and impact on
public rights-of-way, including, but not
limited to, highways, secondary roads,
and streets.

vi.

The proximity of the site to,
observability from, and impact on
recreational areas, such as parks,
battlefields, trails, lakes, rivers, and
creeks.

vii. The preservation and protection of

wildlife and pollinator habitats and
corridors.
viii. The proximity of the site to any urban

planning area, community planning
area, or environmentally or culturally
sensitive area identified in the
comprehensive plan.
ix.

The size of the site.

x.

The proposed use of available
technology, anti-reflective coatings,
and other measures for mitigating
adverse impacts of the facility.

xi.

Such other matters as the planning
commission or board of supervisors
may deem reasonably related to the
application or its impacts.

xii. Whether audible sound from a solar facility will
exceed sixty (60) decibels, as measured from
any adjacent non-participating landowners'
property line. This level may be exceeded
during short-term exceptional circumstances,
such as severe weather. The owner or
operator of a solar facility is encouraged to
measure and document, on a continuing basis,
not less frequent than annually, or upon
request by the County, that noise levels
comply with the decibel limit established
herein; any violation will constitute a zoning
violation.

Addendum | Utility-Scale Solar Energy and Battery Energy Storage Facility Policies

A-10

Page 74 of 84

#

Implementation Strategy

Cost to Pursue

Timeframe

xiii. With regard to any cash payments or

in-kind contributions, the impact of the
project on probable future uses of the
land if not developed with a solar farm,
including any changes in future tax
revenues; investments in infrastructure
for other types of development that
may have occurred in the area, and
would be of lesser utility; and the
provisions of a siting agreement under
Code of Virginia § 15.2-2316.6 et seq.

Addendum | Utility-Scale Solar Energy and Battery Energy Storage Facility Policies

A-11

Page 75 of 84

Revision for 11.19.26 PC Work Session
- CODE OF THE COUNTY Chapter 25 - ZONING
ARTICLE IV. SUPPLEMENTAL REGULATIONS

Planning Commission Suggestions – TEXT

State Required – TEXT

DIVISION 1. USE REGULATIONS
Sec. 25-447. Solar energy facilities.
(a)

Purpose and intent. The purpose of this section is provide for and regulate the siting, development,
construction, installation, operation, maintenance, modification, and decommissioning of solar energy
facilities in a manner that promotes development of renewable energy sources and economic development of
the community, while preserving natural resources including native plant pollinator and wildlife habitats and
agricultural, forestall, residential, commercial, industrial, historical, cultural, and recreational resources and
uses, and promoting the public health, safety, general welfare, and good zoning practice.

(b)

Applicability. This section shall apply to all solar energy facilities constructed after the effective date of this
section, including any physical modifications to any existing solar energy facilities that materially alter the type,
configuration, generation capacity, or physical size, in accordance with Code of Virginia §§ 15.2-2241.2, 15.22288.7, and 15.2-2288.8.

(c)

General requirements. Unless otherwise specified, the following standards apply to all solar energy facilities:.
(1)

Building and zoning permits are required prior to the initiation of construction of each component of
any solar energy facility.

(2)

Solar energy facilities shall comply with generally accepted national environmental protection and
product safety standards for the use of solar panels and battery technologies for solar photovoltaic
(electric energy) projects, such as those developed for existing product certifications and standards
including the National Sanitation Foundation/American National Standards Institute No. 457,
International Electrotechnical Commission No. 61215-2, Institute of Electrical and Electronics Engineers
Standard 1547, and Underwriters Laboratories No. 61730-2. Site plan and building permit applications
shall refer to the specific safety and environmental standards to be complied with.

(3)

Solar energy facilities shall comply with all provisions of the Virginia Uniform Statewide Building Code.

(4)

Solar energy facilities shall use panels that employ anti-glare technology and anti-reflective coatings that
meet or exceed industry standards, to reduce glint and glare.

(5)

Roof-mounted solar panels may be attached to non-conforming structures. A roof-mounted solar panel
shall not result in an increase in nonconformity.

(6)

Roof-mounted solar energy facilities shall not be subject to buffering regulations.

(7)

Roof-mounted solar energy facilities shall not extend more than five (5) feet above the highest point of
the roof nor exceed the maximum permitted height in each use district.

Botetourt County, Virginia, Code of Ordinances

(Supp. No. 76, Update 1)
Page 1 of 10

Page 76 of 84

(d)

Districts permitted. Solar energy facilities shall be permitted in the following districts:

Zoning District

Agricultural (A-1)
Forest
Conservation (FC)
Rural residential
(RR)
Residential (R-1)
Residential (R-2)
Residential (R-3)
Residential (R-4)
Planned Unit
Development
(PUD)
Traditional
Neighborhood
District (TND)
Business (B-1)
Business (B-2)
Business (B-3)
Shopping Center
(SC)
Planned Office
Park (POP)
Industrial (M-1)
Industrial (M-2)
Industrial (M-3)
Planned Industrial
Park (PIP)
Research and
Advanced
Manufacturing
(RAM)

P

P

P

Minorscale,
groundmounted
facilities
S

P

P

P

P

P

P
P
P
P

Small
portable solar
generation
device

Small-scale

Minor-scale,
roofmounted
facilities

Utility-scale

Solar Canopy

S

P

—

—

P

P

—

—

P

P
P
P
P

P
P
P
P

—
—
S
S

—
—
—
—

P
P
P
P

P

P

P

—

—

P

P

P

P

S

—

P

P
P
P

P
P
P

—P
SP
SP

—S
—S
—S

P
P
P

P

P

SP

—S

P

P

P

SP

—S

P

P
P
P

P
P
P

SP
SP
SP

—S
S
S

P
P
P

P

P

SP

—S

P

P

P

SP

—S

P

P = Permitted by-right, S = By SEP only, — = Not permitted
(e) Development standards for small portable solar generation devices. The following provisions apply to all small
portable solar generation devices:
(1) Small portable solar generation devices shall adhere to all height and setback requirements of the
underlying zoning district.
(2) Small portable solar generation devices shall be in compliance with any provisions pertaining to local
historic districts, architectural preservation districts, or corridor protection districts adopted pursuant
to Code of Virginia § 15.2-2306.
(3) Small portable solar generation devices shall be in compliance with the requirements of this section and
Code of Virginia § 56-596.8.
(f) Development standards for small-scale solar energy facilities. The following provisions apply to all small-scale
solar energy facilities:
Page 2 of 10

Page 77 of 84

(1)

Small-scale solar energy facilities shall comply with the provisions of section 25-431.

(2)

Small-scale solar energy facilities shall comply with the accessory structure setback and lot coverage
requirements in the zoning districts where small solar energy facilities are permitted as an accessory use.
Ground-mounted panels and equipment shall not exceed a height of twenty-five (25) feet when at full
tilt. This limit does not apply to utility poles and the interconnection to the overhead electric utility grid
that meets State Corporation Commission requirements. As part of a special exception approval, the
board of supervisors may, but is not required to, approve higher height limits in order to accommodate
requirements for agrivoltaic uses that are imposed as a condition of a special exception permit.

(3)

(4)

Power and communication lines running between ground-mounted solar panels, connection points at
buildings, and other related equipment shall be buried underground.

(g) Development standards for ground-mounted minor and utility-scale solar energy facilities. The following
development standards apply to minor and utility-scale solar energy facilities:
(1)

Setbacks.
a.

Setbacks shall not be less than seventy-five (75) feet from the property line of any property that
is not part of the special exception or site plan, as applicable, and two hundred (200) feet from
any community center or public structure or structure that is inhabited or is actively being
market for habitation.

b. All ground-mounted minor and utility-scale solar energy facilities shall be set back at least one
hundred (100) feet from the edge of the pavement of all abutting public rights-of-way and from
adjacent property lines.
c.

Projects of not greater than 25 megawatts shall be set back not less than fifty (50) feet from the
edge of any wetland or perennial stream, and projects of greater than 25 megawatts shall be set
back not less than 100 feet from the edge of any wetland or perennial stream.

d.

Setbacks shall be measured from the nearest edge of any solar energy equipment notwithstanding
any provision of this Chapter to the contrary.

e.

Access, erosion and stormwater structures, and interconnection to the electrical grid may be made
through setback areas.

(2)

Anti-glare and anti-reflective coating required. The applicant shall provide written certification from a
qualified expert acceptable to the county that the facility's panels incorporate and utilize anti-glare
technology and anti-reflective coatings and reduce glint and glare to levels that meet or exceed industry
standards. The board of supervisors may impose conditions requiring that through project siting and
proposed mitigation, the solar project minimizes impacts on viewsheds, including from residential areas
and areas of scenic, historical, cultural, archeological, and recreational significance.

(3)

Erosion and sediment control. Site clearing shall not exceed one hundred (100) acres for each phase of
development. Sediment control features shall receive county approval on each phase before beginning
any land disturbance or construction activities. Site stabilization shall occur as the site is developed, as
set forth in stabilization timelines identified in the General Virginia Pollutant Discharge Elimination
System (VPDES) Permit for Discharges of Stormwater from Construction Activities discharge of
stormwater from construction activities for each phase. The developer of the facility shall decompact
soil as necessary and feasible for re-vegetation after construction has concluded on each phase.
Applicants shall obtain a written report from an independent engineer determining the stabilization of
each phase of construction. Once this determination is made another phase of land disturbance activities
can begin.

(4)

Security fencing; wildlife corridors. Solar panels, racking equipment or inverters must be enclosed by
security fencing meeting the requirements of Code of Virginia § 55.1-2804, the National Electric Safety
Code or successor standard, and the Uniform Statewide Building Code. Fencing must be installed on
the interior of the vegetative buffer required so that it is screened from the ground level view of adjacent
property owners. The fencing must always be maintained until abandonment. Fenced areas shall be
minimized so as to prioritize open wildlife access to riparian areas, wetlands, streams and other areas
Page 3 of 10

Page 78 of 84

not in proximity to the solar panels, racking equipment, and inverters.
(5)

Planting. When all land-disturbing activities for a project have been completed, the facility shall
initiate permanent stabilization to provide vegetative cover that is mature enough to survive and will
inhibit soil erosion, with no significant bare areas. For areas of a project that are not used for agrivoltaic
purposes, non-invasive plant species and pollinator-friendly and wildlife-friendly native plants, shrubs,
trees, grasses, forbs, or wildflowers must be used in the planting. Mowing shall be limited and
performed on a schedule that promotes the establishment of native plantings, controls, invasive
species, and minimizes impacts to wildlife.

(6) Vegetative buffer. A vegetative buffer sufficient to mitigate the visual impact of the facility is required.
The buffer must consist of a landscaping strip at least fifty (50) feet wide, located within the required
setbacks and shall run around the entire perimeter of the project area. Vegetative buffers shall not
contain stormwater holding ponds. Within the buffer area there shall be sufficient existing vegetation
and trees to create an opaque visual barrier to screen the project area from view. If no such barrier exists,
the applicant shall establish a landscaped strip consisting of two (2) rows of staggered evergreens ten
(10) feet apart and on fifteen (15) foot centers. Such trees shall be at least three (3) feet tall at the time
of planting and expected to grow to a minimum height of twenty (20) feet within ten (10) years. Noninvasive plant species and pollinator-friendly and wildlife-friendly native plants, shrubs, trees, grasses,
forbs, or wildflowers must be used in the vegetative buffer. Invasive plant species, as defined by the
Virginia Department of Conservation and Recreation, are prohibited. Vegetation shall not be trimmed
to stunt upward and outward growth or to otherwise limit the effectiveness of the visual screen.
a. Existing trees and vegetation in the buffer shall be maintained for the life of the facility. Trees
removed from the buffer shall be replaced by planting similar, like-for-like vegetation in the buffer.
Newly planted trees must be at least three (3) feet in height at the time of planting.
(7) Prime Farmland Protection. No ground-mounted minor and utility-scale solar energy facilities shall be in
any part located on “Prime Farmland” as determined under the criteria set forth by the United States
Department of Agriculture under 7 C.F.R. § 657.5.
(8) Erodible Land Protection. No solar energy equipment or fencing shall be located on “Highly Erodible Land”
or “Potentially Highly Erodible Land” as determined under the criteria set forth by the United States
Department of Agriculture under 7 C.F.R. §§ 12.21-22.
(9)

Labor Laws. Work on any facility must comply with all applicable state and federal labor and employment
laws, including providing for apprenticeships and labor standards necessary to achieve any available tax
credit bonuses found in 26 U.S.C. §§ 45Y and 48E.

(10) The planning commission may recommend, and the board of supervisors impose alternative conditions
having the effect of waiving or altering the vegetative screening and/or buffer requirements when the
applicant proposes to preserve existing wetlands or woodlands to serve as a buffer.
(11) Lighting must comply with division 5, outdoor lighting of this chapter.
(12) The applicant shall illustrate compliance with all Federal Aviation Administration regulations concerning
solar energy facilities.
(h) Community meeting prior to application for minor or utility-scale solar energy generating facility. A community
meeting shall be held prior to the submittal of an application for a special exception permit to give the
community an opportunity to hear from the applicant and ask questions regarding the proposed facility. The
community meeting shall be held under the following guidelines:
(1)

The applicant shall inform the zoning administrator and adjacent property owners in writing of the date,
time, and location of the meeting, at least seven (7) but no more than fourteen (14) days in advance of
the meeting.

Page 4 of 10

Page 79 of 84

(2)

The date, time, and location of the meeting shall be advertised in a newspaper of general circulation in
the county by the applicant, at least seven (7) but no more than fourteen (14) days in advance of the
meeting date.

(3)

The community meeting shall be held within the magisterial district in which the proposed site is located,
at a location open to the general public with adequate parking and seating facilities that will
accommodate persons with disabilities.

(4)

The community meeting shall give members of the public the opportunity to review application
materials, ask questions of the applicant, and provide feedback.

(5)

The applicant shall provide a summary of any input received from the community meeting to the zoning
administrator at least one (1) week prior to the first public hearing on the application before the planning
commission.

(i) Application requirements for ground-mounted minor- or utility-scale solar facility. A ground-mounted minor solar
facility located in the A-1, R-3, or R-4 districts, and all utility-scale solar facilities must obtain special exception
permit approval in accordance with section 25-583 of this chapter. An application for a special exception
permit for a ground-mounted minor or utility-scale solar energy facility shall contain:
(1)

A project narrative identifying the applicant, facility owner, site owner, and operator, and describing the
proposed solar project, including an overview of the project and its location; the size of the site and the
project area; the current use of the site; the estimated time for construction and proposed date for
commencement of operations; the planned maximum rated generating capacity, in plate AC megawatts
or kilowatts, of the facility; the approximate number, representative types and expected footprint of
solar equipment to be constructed, including, without limitation, photovoltaic panels; if applicable; and
how and where the electricity generated at the facility will be transmitted, including the location of the
proposed electric grid interconnection.

(2)

Concept plan. Each applicant requesting a special exception permit for a ground-mounted or utility-scale
solar energy facility shall submit a scaled concept plan, prepared by an engineer with a professional
engineering license in the Commonwealth of Virginia. The concept plan shall include the following
information:
a.

Property lines and setback lines.

b.

An area map showing the one (1) mile radius surrounding the site, together with prominent
landmarks and physical features.

c.

Existing and proposed buildings and structures, including preliminary location(s) of the proposed
solar equipment.

d.

Existing and proposed access roads, permanent entrances, temporary construction entrances,
drives, turnout locations, and parking.

e.

Proposed locations and maximum heights of substations, electrical cabling from the solar systems
to the substations, panels, ancillary equipment and facilities, buildings, and structures (including
those within any applicable setbacks).

f.

Fencing or other methods of ensuring public safety.

g.

Areas where the vegetative buffering will be installed and maintained and areas where pollinatorfriendly and wildlife-friendly native plants, shrubs, trees, grasses, forbs, and wildflowers will be
installed and maintained.

h.

Existing wetlands, woodlands, and areas containing substantial woods or vegetation.

i.

Identification of recently cultivated lands and predominant soil types (based on publicly available
data) of those lands, including delineation of any Prime Farmland as defined by 7 C.F.R. § 657.5
and Highly Erodible Land or Potentially Highly Erodible Land as defined in 7 C.F.R. §§ 12.21-22. The
determination shall consist of one of the following:
(i)

A current final technical determination issued by the United States Natural Resources
Page 10 of 10

Page 80 of 84

Conservation Service, including the applicable Form NRCS-CPA-026 and accompanying
determination map, or
(ii)

j.

A site-specific soil evaluation and determination prepared by a Virginia licensed professional
soil scientist. The report shall be signed and dated by the soil scientist and include the soil
scientist’s Virginia license number.
Pollinator-smart designated areas of the project shall be identified on the concept plan filed with
the special exception permit application. At least ten (10) percent of the total acreage of the facility
shall be cultivated in such a manner to encourage pollinator habitats in order to help maintain the
rural, agricultural nature of the county. Pollinator-smart designated areas shall be identified on the
concept plan in accordance with the following standards:
(i)

Pollinator-smart designated areas of the site shall receive prompt seeding with appropriate
pollinator-friendly native plants, shrubs, trees, grasses, forbs, and wildflowers and in such a
manner as to reduce invasive weed growth and trap sediment within the project area.

(ii)

At the beginning of the next planting season the owner shall over-seed the project area,
setbacks, and buffers with appropriate pollinator-friendly native plants, shrubs, trees,
grasses, forbs, and wildflowers, following Virginia Pollinator-Smart Program best practices or
any such other program as approved by county staff in consultation with the Virginia
Department of Environmental Quality or the local Agricultural Extension office.

(iii)

Once established, mowing of the pollinator habitats shall occur between the first and last
day of winter in order to reseed these areas.

(3)

Landscape and screening plan. A landscaping and screening plan that addresses the required vegetative
buffering and screening, including the use of existing and newly installed vegetation to screen the facility.
The plan also must address the use of pollinator-friendly and wildlife-friendly native plants, shrubs, trees,
grasses, forbs, and wildflowers in the project area and in the setbacks and vegetative buffering. The
planning commission or board of supervisors may require increased setbacks and additional or taller
vegetative buffering in situations where the height of structures or topography affects the visual impact
of the facility.

(4)

The following materials relating to environmental and cultural resources shall also be submitted:
a.

A report by the Virginia Department of Historic Resources Virginia Cultural Resource Information
System must be submitted to identify historical, architectural, archeological, or other cultural
resources on or near the proposed facility.

b.

A report on the potential impacts on wildlife and wildlife habitats at the site and within a two (2)
mile radius of the proposed facility using information provided by the department of game and
inland fisheries or a report prepared by a qualified third party.

c.

A report on potential impacts on pollinators and pollinator habitats at the site, including but not
necessarily limited to the submission of a completed solar site pollinator habitat assessment form
as required by the zoning administrator.

d.

A glint and glare study that demonstrates that the panels will be sited, designed, and installed to
eliminate glint and glare effects on roadway users, nearby residences, commercial areas, and other
sensitive viewing locations, or that the applicant will use all reasonably available mitigation
techniques to reduce glint and glare to the lowest achievable levels. The study will assess and
quantify potential glint and glare effects and address the potential health, safety, and visual
impacts associated with glint and glare. Any such assessment must be conducted by qualified
individuals using appropriate and commonly accepted practices and procedures.

e.

The applicant shall present an environmental inventory and impact statement containing
information regarding any site and viewshed impacts, including direct and indirect impacts to
national and state forests, national or state parks, wildlife management areas, conservation
easements, the Appalachian Trail, the Blue Ridge Parkway, designated scenic byways and any
historic or cultural resources within at least one (1) mile of the proposed project. The applicant shall
provide evidence of written notification to the National Park Service, the U.S. Forest Service, the
Appalachian Trail Conservancy, the Virginia Department of Conservation and Recreation, the
Page 10 of 10

Page 81 of 84

Department of Historic Resources and the custodians or other agencies responsible known historic
or cultural resource sites, if a proposed solar energy facility is within one (1) mile of the boundary
of said entity.
f.

For any proposed solar energy facility located in an area identified as having potential karst geology, or where
preliminary site investigations identify sinkholes, caves, springs, sinking or losing streams, or other indicators
of karst conditions, the applicant shall provide a site-specific karst assessment prepared by a qualified
professional. The assessment shall identify known and potential karst features, evaluate potential impacts
associated with grading, excavation, stormwater management, and other proposed site improvements, and
recommend measures necessary to protect groundwater resources, prevent sinkhole formation, and
minimize adverse impacts to surrounding properties and water resources. Additional geotechnical or
hydrogeological investigations may be required where warranted by the findings of the assessment.

g.

Where proposed land disturbance, grading, or construction activities would occur on slopes exceeding ten
(10) degrees (approximately 17.6 percent), the applicant shall provide a geotechnical assessment prepared
by a qualified professional evaluating the potential for soil erosion, slope instability, and adverse stormwater
impacts. The assessment shall identify appropriate design, construction, and stabilization measures to
minimize these impacts. The County may require additional investigation where the extent or nature of
proposed disturbance warrants such review.

(5)

Commission permit. A commission permit in accord with Code of Virginia, § 15.2-2232 is required prior
to or in conjunction with any special exception approvals that may be required by the district regulations
of this chapter.

(6)

Decommissioning plan. As part of the project application, the applicant shall submit a decommissioning
plan, certified by an engineer with a professional engineering license in the Commonwealth of Virginia,
which shall include the following:
a.

The anticipated life of the project;

b.

The estimated decommissioning cost in current dollars;

c.

How the estimate was determined;

d.

The method of ensuring that funds will be available for decommissioning and restoration;

e.

The method that the decommissioning cost will be kept current; and

f.

The manner in which the project will be decommissioned, and the site restored.

(7)

Stormwater. All solar facilities shall comply with the Department of Environmental Quality regulations
and minimize new impervious surface on the site. Land disturbance shall in all respects comply with the
provisions of an approved stormwater pollution prevention plan. Topsoil shall not be removed from the
site, and shall be returned to disturbed areas unless returning soil would cause adverse impacts to topsoil
integrity or is not practicable for construction activities.

(8)

Independent review. Upon submission for a special exception permit for a solar energy facility, the county
may hire an independent consultant to review the application and all associated documents for
compliance with this section and any other state and federal codes. Any costs associated with the review
shall be paid by the applicant. Any payment of such fees would in no way be a substitute of payment for
any other application review fees otherwise required by this chapter.

(9) Additional information may be required, as determined by the zoning administrator or by the request of the
Planning Commission or Board of Supervisors, such as a scaled elevation view and other supporting
drawings, photographs of the proposed site, photo or other realistic simulations or modeling of the
proposed solar energy project from potentially sensitive locations as deemed necessary by the zoning
administrator to assess the visual impact of the project, aerial image or map of the site, and additional
information that may be necessary for a technical review of the proposal. The planning commission or
board of supervisors may also require other relevant information deemed to be necessary to evaluate
the application.
(i)

Considerations on issuing special exception permit. The board of supervisors may impose reasonable conditions
designed to mitigate the impacts of a solar energy facility where permitted only by special exception.
Conditions on such a special exception may include requirements for: (i) dedication of real property of
substantial value to the county or one (1) of its instrumentalities, or (ii) substantial cash payments for or
Page 10 of 10

Page 82 of 84

construction of substantial public improvements, the need for which is not generated solely by the granting of
the special exception, so long as such conditions are reasonably related to the project. In considering any
application for a special exception for a minor or utility-scale solar energy facility, the board of supervisors
shall give reasonable considerations to the following factors, in addition to those provided in County Code §
25-583.2:
(1)

The topography of the site and the surrounding area.

(2)

The proximity of the site to, observability from, and impact on agricultural and residential areas.

(3)

The proximity of the site to, observability from, and impact on areas of historical, cultural, and
archaeological significance.

(4)

The proximity of the site to other large scale solar energy facilities, other energy generating facilities,
and utility transmission lines.

(5)

The proximity of the site to, observability from, and impact on areas of scenic significance, such as scenic
byways, vistas, and blue ways. In general, ground-mounted minor and utility-scale solar facilities located
where the installation would create a substantial adverse visual impact on designated scenic corridors,
including scenic byways, the Blue Ridge Parkway, the Appalachian Trail or other nationally or regionally
recognized cultural, historic or recreational resources are strongly disfavored.

(6)

The proximity of the site to, observability from, and impact on public rights-of-way, including, but not
limited to, highways, secondary roads, and streets.

(7)

The proximity of the site to, observability from, and impact on recreational areas, such as parks,
battlefields, trails, lakes, rivers, and creeks.

(8)

The preservation and protection of wildlife and pollinator habitats and corridors.

(9)

The proximity of the site to any urban planning area, community planning area, or environmentally or
culturally sensitive area identified in the comprehensive plan.

(10) The size of the site.
(11) The proposed use of available technology, coatings, and other measures for mitigating adverse impacts
of the facility.
(12) The preservation and protection of prime farmland in the county.
(13) Such other matters as the planning commission or board of supervisors may deem reasonably related to
the application or its impacts.
(14) With regard to any cash payments or in-kind contributions, the impact of the project on probable future
uses of the land if not developed with a solar farm, including any changes in future tax revenues;
investments in infrastructure for other types of development that may have occurred in the area, and
would be of lesser utility; and the provisions of a siting agreement under Code of Virginia, § 15.2-2316.6
et seq., as amended.
(j)

Annual report, ground-mounted minor and utility-scale solar facilities. The facility owner and operator shall
submit a report to the zoning administrator once a year, no later than July 1. The report shall state the current
owner and operator of the facility as well as the percentage of panels that are in operation or planned to be
operational in the next twelve (12) months, in relation to the current number of permitted panels. The yearly
report shall include a phone number and identify a responsible person for Botetourt County staff to contact
with inquiries and complaints.

(k)

Notice of change in ownership, ground-mounted minor and utility-scale solar facilities. Notice shall be provided
to the county within thirty (30) working days prior to any change in ownership of the facility.

(l)

Decommissioning of a utility-scale solar energy facility. As a condition of the approval of a site plan for a utilityscale solar energy facility, the owner, lessee, or developer of the project (the "responsible party") shall enter
into a written project development agreement with the county, setting forth, at a minimum, that:
(1)

At such time that a utility-scale solar energy facility is known to be abandoned or discontinued, the owner
shall notify the zoning administrator within ten (10) days of such knowledge of the proposed date of
Page 10 of 10

Page 83 of 84

discontinued operations and plans for removal. The owner or operator shall physically remove the
system and restore the site no more than twelve (12) six (6) months after the date of discontinued
operations. This time limitation may be extended at the request of the owner/operator, upon approval
by the Board of Supervisors.
(2)

Decommissioning of discontinued or abandoned system shall include the following:
a.

Physical removal of all solar panels and above-ground appurtenant structures from the subject
property including, but not limited to, buildings, machinery, equipment, cabling and connections
to transmission lines, equipment shelters, security barriers, electrical components, roads, unless
such roads need to remain to access buildings retrofitted for another purpose, or if a written
request is submitted by the landowner and approved by the zoning administrator that such roads
remain;

b.

Reasonable restoration of the real property, including soil stabilization and revegetation of the
ground cover of the real property disturbed by the installation of such equipment, facilities, or
devices;

c.

Proper disposal of all solid and hazardous waste in accordance with local and state waste disposal
regulations.

d.

In an A-1 zone, the decommissioning plan shall include a pre-construction baseline soil condition
report that satisfies the following conditions. The report shall establish the relevant characteristics
of the topsoil. The baseline data shall be derived from field and laboratory testing of soil condition,
including depth, density and quality from representative locations utilizing grid sampling
techniques. There shall be a minimum of eight (8) boreholes performed per 5 megawatts of the
general area of a proposed facility. Laboratory testing shall be conducted by an accredited
laboratory. Parameters for assessing soil quality shall include the following: infiltration rate, bulk
density, water holding capacity, pH, percent organic matter, cation exchange capacity,
Phosphorus/Phosphate (P), Nitrogen (N), and Potassium/Potash (K), respiration, wet aggregate
stability, and active/permanganate-oxidizable carbon. Every 5 years following the start of
commercial operation, soil conditions shall be determined for the same sampling locations using
the same parameters and the results used to plan soil restoration activities. After equipment is
removed as part of decommissioning, soil conditions shall be determined for the same sampling
locations using the same parameters. Soil restoration activities shall be performed as necessary
during operations or decommissioning to return soil conditions to at least baseline conditions. The
County shall be provided with data of soil conditions within thirty (30) days after receipt of results.

(3)

Abandonment: Absent notice of a proposed date of decommissioning, the system shall be considered
abandoned when the system fails to operate for more than one (1) year six months without the written
consent of the zoning administrator. The county shall determine at its discretion what proportion of the
system is inoperable for the system to be considered abandoned. If the applicant fails to remove the solar
energy facility in accordance with the requirements of this section within one (1) year of abandonment
or the proposed date of decommissioning, the county or its agents shall have the authority to enter the
property without further need of consent of the owner and physically remove the system and the costs
of such removal shall be at the owner's expense;

(4)

Prior to obtaining a building and zoning permit, and on every fifth anniversary of the commencement of
the operation of the project, the owner or operator shall provide the county an estimate of the projected
cost of decommissioning, as stated in the required decommissioning plan;

(5)

The responsible party provides financial assurance of such performance to the county in the form of
certified funds, cash escrow, bond, irrevocable letter of credit, or parent guarantee in a form approved
by the county administrator or the county attorney. The amount of the financial assurance shall be based
upon an estimate by a professional engineer licensed in the Commonwealth, who is engaged by the
responsible party, who has experience in preparing decommissioning estimates and is approved by the
county. The surety shall be an amount approved by the zoning administrator, that is no less than the
total estimated costs for decommissioning, removing and restoring the site as stated above, plus ten (10)
percent of said estimated costs as a reasonable allowance for administrative costs, inflation, and
potential damage to existing roads and utilities., and
Page 10 of 10

Page 84 of 84

(6)

The applicant will ensure the surety The financial surety shall remain in full force and effect until the
county has inspected the site and verified the system has been decommissioned as stated above, at
which time the county shall release the surety. Each time the facility is transferred, the new owner must
provide substitute surety to the county on or before the closing of the sale of the facility. If the property
owner or responsible party fails to decommission the project or to decommission a discontinued or
derelict solar panel in accordance with this section, Botetourt County may access such surety for the
completion of decommissioning and site restoration. Any excess funds that accrue after consideration
of salvage value may be returned to the responsible party.

(7)

A building and zoning permit is required prior to the decommissioning of a solar energy facility.

(m) Accessory battery energy storage facilities. Battery energy storage facilities are a by-right accessory use to
an existing ground-mounted minor-scale solar energy facility or utility-scale solar energy facility. An
accessory battery energy storage facility must otherwise meet all requirements of this section. In order to be
considered an accessory use under this subsection, a battery energy storage facility may not have a rated
storage capacity that exceeds the nameplate generation capacity of the solar energy facility to which it is an
accessory use.
(1)

Where an applicant proposes to include battery energy storage systems (BESS) as part of a solar energy
facility, or identifies BESS as a potential future component of the facility, the applicant shall identify the
proposed or potential location of such systems on the conceptual site plan and evaluate site suitability
with respect to emergency access, fire protection, separation from sensitive uses, and potential impacts
to groundwater and surface water resources.

(2)

Any BESS proposed for installation shall be subject to all applicable zoning, site plan, building, electrical,
and fire prevention requirements. Prior to installation, the applicant shall submit plans and
documentation demonstrating compliance with applicable fire and life safety standards and addressing
the containment, collection, and appropriate management of potentially contaminated runoff resulting
from fire suppression or other emergency response activities.

(3)

Any required containment or runoff management system shall be designed by a qualified professional
and shall be appropriate to the battery technology, facility configuration, anticipated fire protection
methods, and site-specific environmental conditions. The County may require additional safeguards
where necessary to protect groundwater, surface waters, and surrounding properties.

(n) Provision of record to the State Corporation Commission. The zoning administrator shall furnish to the State
Corporate Commission a record of all special exception decisions reached pursuant to this section not later
than 60 days after the decision is made. The record shall include (i) the reason for any adverse decision, (ii)
any finding of nonconformity with the local comprehensive plan, and (iii) the date of the last revision to the
comprehensive plan.

Created: 2025-03-19 14:45:04 [EST]

(Supp. No. 76, Update 1)
Page 10 of 10

Provenance

Where this record came from. Every source is listed, permanently.

  • Agenda Watch · Nov 18, 2026

Permanent ID DKT-2026-005403 — this record is never deleted.

Record history

Every change to this record, logged as it happened.

  • Nov 18, 2026 Filed on the Docket
  • Nov 18, 2026 Full document archived — public record

← The full Docket · every meeting, vote, and action on the permanent record · also in the National Record Index.