⚡︎ Independent, reader-supported & ad-free · Follow the megawatts in all 50 states ⚡︎ Support Us
The Docket · Government Meeting · DKT-2026-005296

On the agenda: Surry Planning Commission Meeting — Data Center (Nov 16)

Past  ⚠ Agenda Watch  Surry, Virginia · Monday, November 16, 2026 — 4 days ago

About this record

The published agenda for the November 16, 2026 meeting contains: "Data Center". The meeting has passed. The agenda stays here as a permanent public record.

WhenMonday, November 16, 2026
Check the agenda document for the meeting time.
WhereSurry, Virginia
BodyPlanning Commission Meeting
Money$3.0 million was at stake
On the record“Data Center”

The agenda, word for word

Government public record — the full text of the published document, archived November 14, 2026. Gold highlighting of key terms is ours, not the original’s. Read the original document ↗

43 pages · scroll to read
Page 1 of 43

Surry County
Department of Planning & Community Development
P.O. Box 357
45 School Street
Surry, Virginia 23883
757-294-5210

AGENDA
Planning Commission – November 16, 2026
CALL TO ORDER AT 6:00 P.M.
I.

PLEDGE OF ALLEGIANCE

II.

ROLL CALL / DETERMINATION OF QUORUM
Giron Wooden, Jr., Chair
Thomas Hardy, Vice Chair
Stephen Berryman
Eddie Brock
David Coggin
Thomas Hite

Carmen D. Judkins
Theodore Lunsford
Earl Newby, Sr
Breyon Pierce
William Seward, IV

III.

ADOPTION OF MEETING AGENDA

IV.

CONSENT ITEMS
a. October 26, 2026 Minutes

V.

OLD BUSINESS

VI.

NEW BUSINESS
a. Substantial Accord Determination 2026-01:
Surry County seeks determination that the proposed water infrastructure project located
along Commerce Drive and Colonial Trail West is substantially in accordance with the
Surry County Comprehensive Plan.

VII.

NEW BUSINESS – PUBLIC HEARINGS
a. Ordinance Amendment 2026-04:
Ordinance to amend Article III, Zoning Districts and Boundaries, Section 3-900 - M1,
Light Industrial District and Section 3-1000 – M2, General Industrial District, of the
Surry County Zoning Ordinance by amending Section 3-902, Permitted Uses, and
Section 3-1002, Permitted Uses, to shift certain industrial use types from by-right to
requiring a conditional use permit and adding new use types to each district.
1

Page 1 of 43

Page 2 of 43

VIII.

PUBLIC COMMENTS

IX.

COMMITTEE UPDATES

X.

PC SECRETARY COMMUNICATIONS

XI.

ADJOURNMENT

2

Page 2 of 43

Page 3 of 43

Item Template: Planning Commission Meeting
Item Title: October 26, 2026 Draft Minutes
Suggested Action:
Item Type:
Action Item

Item ID:
2026-271

Submitting Department:
Planning & Community Development

Drafter:

Meeting Body:
Planning Commission

Meeting Date:
November 16, 2026 6:00 PM

Agenda Section:
Consent Items

Is this a budgeted item?
If yes, include budgeted amount:
Total Project Cost:
Description of Presented Item:

Page 3 of 43

Page 4 of 43

County of Surry, Virginia
Planning Commission Meeting Minutes
October 26, 2026

MEETING CONVENED: The Surry County Planning Commission meeting was called to order at 6
PM on Monday, October 26, 2026, in the Surry County General District Court, 45 School Street, Surry,
VA, by Chair Dr. Giron Wooden.

ATTENDANCE: The following members responded present to Roll Call:
Dr. Giron Wooden, Jr., Chair
Mr. Thomas Hardy, Vice Chair
Mr. Theodore Lunsford
Mr. Earl Newby, Sr.
Mr. Breyon Pierce
Ms. Carmen D. Judkins
Mr. David Coggin
Mr. William Seward, IV
Ms. Dianne Cheek

Absent:

Mr. Stephen Berryman
Mr. Eddie Brock

Staff Present

Mr. Horace Wade, III, Director of Planning and Community Development
Ms. Regina Hilton, Administrative Assistant
Mr. Lorenzo Turner, Planner I
Ms. Lola Perkins, County Attorney

PLEDGE OF ALLEGIANCE:

All

ADOPTION OF AGENDA: Chair Wooden entertained a motion to adopt the meeting’s agenda
with an addition, per Mr. Wade, to add under New Business, Section Six, Item B, to bring forth an
amendment regarding food establishments. Mr. Newby moved, and Mr. Pierce seconded.

1
Page 4 of 43

Page 5 of 43

In favor: (9) Wooden, Newby, Hardy, Lunsford, Cheek, Judkins, Coggin, Seward, Pierce
Absent: (2) Berryman, Brock
Opposed: (0)
Abstain: (0)

APPROVAL OF CONSENT ITEMS: Chair Wooden asked the Commissioners for the disposition
of the minutes for July 26, 2026. Vice Chair Hardy moved to approve, and Ms. Judkins seconded.
In favor: (9) Wooden, Newby, Hardy, Lunsford, Cheek, Judkins, Coggin, Seward, Pierce
Absent: (2) Berryman, Brock
Opposed: (0)
Abstain: (0)

OLD BUSINESS: None

NEW BUSINESS:
a. Motion to bring forth a Zoning Ordinance Amendment to amend permitted uses
within the M-1 and M-2 Zoning Districts.
Mr. Wade said that before the Commission tonight is a motion to bring forth a Zoning Ordinance
Amendment to amend the permitted uses within the M-1 and M-2 Zoning Districts. A new
Comprehensive Plan was passed in the spring to ensure the Ordinance and the Surry County
Comprehensive Plan were consistent. Mr. Wade said Staff would like to bring Ordinance Amendments
to the Commission for consideration and, soon thereafter, to the Board of Supervisors.
Ms. Cheek asked Mr. Wade what the uses were. Mr. Wade said the current permitted uses within the
M-1 and M-2 Districts, or that should be in the districts, are Industrial types. Some uses could be
considered permitted, and others could be evaluated under the Conditional Use Permit uses.
Ms. Cheek asked if our Comprehensive Plan is currently in the Ordinance. Mr. Wade said the
Comprehensive Plan asks us to consider the surrounding environment and include the Communities. To
reconsider not-permitted uses, but maybe permit them as a conditional use, which has an adverse
impact on the environment. Mr. Wade said that when seeking a use, the use meets the considerations
for mitigation, whether it is buffering access or something like that.
Ms. Cheek asked Mr. Wade if the Commissioners would receive the Ordinance Amendment before the
Public Hearing. Mr. Wade said that it would be presented to the Commission at the Public Hearing. The
motion tonight is for Staff to draft an amendment so that it can be presented at the Public Hearing.
Chair Wooden asked Ms. Perkins and Mr. Wade whether, if the Commission approves bringing forth the
amendment, the Commission will receive a Comprehensive presentation for discussion.

2
Page 5 of 43

Page 6 of 43

Ms. Perkins said yes, and because of the timing of the November meeting and the holidays, the review
may coincide with the Public Hearing. Staff could send an advance copy as soon as it’s ready or
communicate with staff regarding any questions. Ms. Perkins said that the Draft is somewhat of
housekeeping and that she does not have a Comprehensive Legal Review because there isn’t a draft.
There could be some type of trading and moving things around. Also, uses that are currently in M-1
might be in M-2, or vice versa. The Emerging Technologies District was created within the last ten years,
and it overlaps with M-1 and M-2.
Chair Wooden entertained a motion for Item A. Vice Chair Hardy made the motion, “To approve the
permitted uses of the M-1 and M-2 districts. A motion to bring forward, in accordance with Virginia
Code section 15.2-2286(a)(7). A motion that public necessity, convenience, general welfare, and good
zoning practices require the amendment to the Surry County Zoning Ordinance related to the permitted
use within the M-1 and M-2 Zoning District to be brought forth to the Planning Commission for public
hearing, consideration, and action on such amendments following the public hearing.” Mr. Newby
seconded the motion.
In favor: (9) Wooden, Newby, Hardy, Lunsford, Cheek, Judkins, Coggin, Seward, Pierce
Absent: (2) Berryman, Brock
Opposed: (0)
Abstain: (0)

b. Motion to bring forth zoning amendments related to Commercial and Agricultural Uses
pertaining to food establishments.
Mr. Wade said that, when looking through our ordinance, we need to be consistent with food-related
uses, including restaurants and similar establishments. This will ensure commercial and agricultural use
categories are applied consistently in our Zoning Ordinance. Ms. Perkins said that the Economic
Development Authority recently had a grant application for what is considered a food establishment.
This word amendment will also increase the opportunities for restaurants and farm stands.
Ms. Perkins said that our ordinance is outdated. For example, we have “A Restaurant, General.” This
definition refers to sit-down, plated food, like non-disposable containers. Ms. Perkins said it should
apply to catering services, which she finds completely contradictory. Ms. Perkins said last year we

wanted to add event center to our ordinance because there wasn’t a use category to fit it.
Restaurants, drive-throughs, and farm stands may also need tweaking.
Chair Wooden entertained a motion for Item (b). Vice Chair Hardy made the motion for (b) Food
Establishments, “A motion to bring forth in accordance with Virginia Code Section 15.2-2286
(a) (7). A motion that the public necessity, convenience, general welfare, and good zoning
practice require the amendments to the Surry County Zoning Ordinance related to the
commercial and agricultural uses pertaining to food establishments be brought forth to the
Planning Commission for public hearing, consideration, and action on such amendments
following a public hearing.” Ms. Judkins seconded the motion.
In favor: (9) Wooden, Newby, Hardy, Lunsford, Cheek, Judkins, Coggin, Seward, Pierce
Absent: (2) Berryman, Brock

3
Page 6 of 43

Page 7 of 43

Opposed: (0)
Abstain: (0)

PUBLIC COMMENTS: None
COMMITTEE UPDATES:
Mr. Wade said the Subdivision Subcommittee is waiting for the Board of Supervisors' decision on the
Zoning Ordinance Amendment to the minimum lot size in the AR District and for Family Subdivision. Mr.
Coggin asked if it was on their agenda, and Mr. Pierce said that it had been tabled. Mr. Coggin said the
subcommittee could start tackling wells and septic systems and address the minimum lot size later. Mr.
Wade asked if the subcommittee would send items for him to review and set an agenda for a meeting.
Mr. Coggin asked how staff is currently reviewing subdivisions in a 10-acre field. Are they approving
them unilaterally, or are they on hold? Mr. Wade said Virginia Tech told him that no other state agency
will touch the code section or advise on a pending zoning decision. Also, USDA will not give Staff advice.
Mr. Coggin said that lots less than 10 acres in an open field are being approved, which is not currently in
accordance. Mr. Wade said that he thought that the ordinance wasn’t enforceable.
Mr. Coggin said there may be a need to make a change or not allow additional lots to be developed. Mr.
Coggin said that Staff is approving things that are not approvable or are not in accordance with our A-R
district. Ms. Perkins said, “We have to abide by what is in our ordinance to the extent that our
Ordinance hasn’t been trumped by Virginia Code.” Mr. Coggin said he understood and asked whether
the Virginia Code delineates or states whether the land is agricultural and profitable for farming. He felt
there is a need for a moratorium on creating more lots in an open field.
Chair Wooden said, “Respectfully, Mr. Coggin, the Planning Commission has no authority.” Mr. Coggin
said, “Mr. Wade does.” Chair Wooden said he did not think Mr. Wade had the authority to impose a
moratorium when an ordinance is already in place. Chair Wooden said, as Ms. Perkins spoke, that the
Virginia Code doesn’t trump. Mr. Wade must follow the ordinances that are already in place. Chair
Wooden said, “We cannot deny an applicant who is bringing a subdivision before the Commission and
say it is on hold until the Board of Supervisors makes their decision. We must abide by what is in place
by either our State Ordinance or if State law trumps that.”
Ms. Cheek asked what our codes say. Mr. Coggin said our current code says, “That you must prove that
the land is not profitable.” Mr. Wade said that in the past, farmers would go to the FSA office to get
their crops insured, and they would know whether the land was making money. Mr. Coggin said it is not
the County, Staff, or the Commissions’ responsibility to prove whether the land is profitable. Mr.
Coggin said he thinks Staff has taken on a responsibility that is not theirs. The land seller must prove
that the land is not profitable and that it is documented.
Ms. Perkins said, addressing Mr. Coggin’s concerns about Staff, that our Ordinance requirements and
past norm procedure were no longer available options for the owner to get a letter from USDA or
Virginia Tech. Ms. Perkins said Staff was more involved in the past and tried to find a way to make that
piece of our ordinance enforceable. She was to bring up Spratley Mills; Staff had documentation

4
Page 7 of 43

Page 8 of 43

showing they felt satisfied with that requirement. Ms. Perkins said she felt some level of responsibility
to help achieve that objective in our Ordinance because the mechanism by which it could be achieved in
the past was no longer available.
Chair Wooden told Mr. Coggin that the Board of Supervisors tabled the 10-acre amendment vote. Mr.
Wade said he is willing to facilitate another subdivision subcommittee to discuss the concerns the
subdivision subcommittee continues to have. Mr. Coggin said his recourse would be to ask Ms. Perkins
to get a lawyer, have a judge issue an injunction, and not allow any more lots to be developed until the
decision complies with zoning.
Ms. Perkins said that she is not comfortable answering Mr. Coggin question about filing a lawsuit against
her clients. She could commit to discussing this with Mr. Wade offline. She could determine how many
subdivisions have been approved and follow up with the Board of Supervisors to see their timeline for
bringing the decision back. Ms. Perkins said, “The terms of what a Judge could answer or not depends
on what kind of lawsuit is brought.”
Mr. Coggin asked about the solar project across from VDOT and the latest on the Data Center. Is there a
way to have a chart showing when the applicant project is approved and how much time remains before
the conditional use permit expires? Mr. Coggin asked about a list of current projects the Commission
has approved. Mr. Wade said there would be a project update request, or a monthly or quarterly
update, on where the project stands. Citizens would know the expected completion date or how much
of a project is complete. Mr. Wade also added that GIS could show where a project is located.

COMMENTS BY COMMISSIONER:
Mr. Coggin said he received a 45-minute phone call as the Planning Commission liaison about historical
preservation concerning the Enos Farmhouse. The roof and windows are leaking, and it’s damaging the
floor. Mr. Coggin asked whether they should file a formal request with Historical Preservation or
contact their Board of Supervisors’ representative. Mr. Pierce said that information could be shared with
the respective Board member of that District. That way, the Board member can directly contact staff for
directions.
Mr. Perkins said that, to follow up on other jurisdictions that the Planning Commission has with
subdivision approval, she would have an update tonight, but unfortunately, she will need more time.
Most localities have not yet had an opportunity to update their ordinances. Muni code was not a good
reference point. Ms. Perkins said she is reaching out to her colleagues throughout the State and
gathering information, but it is coming in very slowly.
Ms. Cheek asked Ms. Perkins about short-term rentals. Ms. Perkins said that the ordinance was
outsourced and is still on her plate. She and Mr. Wade need to meet with the Commissioner of
Revenue, since he will be impacted by whatever ordinance is enacted.

5
Page 8 of 43

Page 9 of 43

ADJOURNMENT:
Chair Wooden entertained a motion to adjourn at 6:47 PM until the November 16th meeting. Mr.
Newby moved, and Mr. Pierce seconded. The motion was made and properly seconded that the
meeting be adjourned. All those in favor signify by saying, Aye.
Commissioners: Aye

6
Page 9 of 43

Page 10 of 43

Item Template: Planning Commission Meeting
Item Title: Substantial Accord Determination 2026-01:
Surry County seeks determination that the proposed water infrastructure project located along Commerce Drive and
Colonial Trail West is substantially in accordance with the Surry County Comprehensive Plan.
Suggested Action:
Item Type:
Action Item

Item ID:
2026-272

Submitting Department:
Planning & Community Development

Drafter:

Meeting Body:
Planning Commission

Meeting Date:
November 16, 2026 6:00 PM

Agenda Section:
New Business

Is this a budgeted item?
If yes, include budgeted amount:
Total Project Cost:
Description of Presented Item:

Page 10 of 43

Page 11 of 43

SURRY COUNTY PLANNING COMMISSION STAFF REPORT
New Business November 16, 2026
Applicant: Hampton Roads Sanitation District
Staff: Horace H. Wade III, AICP, CZA
Staff Contact: (757) 294-5212 or [email protected]
Request
Surry County requests a determination that the proposed Industrial Park Water System
improvements, located at Commerce Drive and Colonial Trail, including a new groundwater
production well, well house, and associated water distribution infrastructure, are substantially in
accord with the Surry County Comprehensive Plan pursuant to Code of Virginia §15.2-2232.
Property
Mailing Address: PO Box 65
Surry, VA 23883

Tax Maps: 40-1, 40-7-25 & Right-of-Way

Legal Owner: Surry County

Site Size: 6,722 (well site)

Zoning District: M-2 & A-R

Comp Plan Land Use:
Employment, Commercial, and Public
(Future Land Use)

Project Overview
The County proposes improvements to its Industrial Park Water System to serve an initial
customer (the proposed YMCA) and support anticipated Industrial Park growth. The
improvements include a new groundwater production well and precast concrete well house,
approximately 6,000 linear feet of 12-inch water line, sodium hypochlorite disinfection feed
equipment, an emergency generator, electrical and control equipment, security fencing, and
related site improvements. The well is preliminarily sized at 200 gallons per minute (GPM),
subject to final design, testing, and permitting.
Public Hearing (N/A)
Planning Commission – Public hearing is discretionary under Virginia Code § 15.2-2232(A), unless
directed by the Board of Supervisors. The Board of Supervisors has not directed the Planning
Commission to hold public hearings when considering substantial accord determinations.

1
Page 11 of 43

Page 12 of 43

Background Information
The existing County-owned Industrial Park Water System operates under a Virginia Department
of Health (VDH) permit as a non-transient noncommunity waterworks serving three existing
customers. Existing infrastructure consists of one groundwater well withdrawing from the
Potomac Aquifer, a 150,000-gallon elevated storage tank, chlorination facilities, and
approximately 4,800 feet of 8-inch distribution piping. The permitted design capacity is 100,000
gallons per day (GPD). The approved Preliminary Engineering Report (PER) reports an average
existing demand of approximately 1,363 GPD.
The PER projects the YMCA average daily demand of approximately 4,800 GPD, with
combined existing and YMCA average demand of approximately 6,163 GPD. Hydraulic
modeling indicates that the proposed water main would support the required 1,200 GPM fire
flow at a residual pressure of 36 psi. The existing 150,000-gallon elevated tank is expected to
provide sufficient storage for the YMCA; no new storage tank is currently proposed. The PER
indicates that under existing conditions, approximately 72,000 gallons is required to satisfy
system fire flow demand, leaving an estimated 78,000 gallons available as operational storage
prior to the YMCA connection. Additional system upgrades may be needed as future
development increases demand.
The proposed well would be operated in alternating mode with the existing well through an
expanded telemetry system. The County is pursuing a combined groundwater withdrawal permit
for the Middle School and Industrial Park systems. The PER references a future interconnection
between those systems in the draft Surry Water System Master Plan; that interconnection is a
long-range objective and is not identified as part of this immediate construction scope.
Vicinity Map

Figure 1: Proposed water line alignment and YMCA connection.

2
Page 12 of 43

Page 13 of 43

Figure 2: Depiction of the location of the well house and well pad.

Pertinent Code Sections

Surry County Subdivision Ordinance
Sec. 8.1.4. - Conformance.
In addition to the regulations found in this appendix, all land development activity within the county shall
comply with the County's Comprehensive Plan
Surry County Zoning Ordinance
Sec. 1-107. - Relationship to comprehensive plan.
It is the intention of the Board of Supervisors that this ordinance implements the planning policies and
objectives for the County as reflected in the Comprehensive Plan.
Section 3-302 (A-R) Agricultural Rural Use Types allowed by-right:
Civic Use - Utility Service/Minor
Section 3-1002 (M-2) General Industrial Use Types allowed by-right:
Civic Use - Utility Service/Minor

3
Page 13 of 43

Page 14 of 43

Code of Virginia
§ 15.2-2232. Legal Status of Plan.
Virginia Code § 15.2-2232(A) generally requires Planning Commission review of the general or
approximate location, character, and extent of public utility facilities not already shown on the adopted
comprehensive plan. Subsection (B) establishes the Commission’s findings and governing-body review
procedures. Subsection (C) exempts normal service extensions of public utilities or public service
corporations, subject to the statutory qualifications. The applicability of that exemption to the water line
component should be documented separately from the new well and well house.

Staff Analysis and Recommendation

The purpose of substantial accord review is to evaluate the proposed public utility facilities against
the adopted Comprehensive Plan in terms of location, character, and extent. The proposed facilities
would expand an existing County waterworks rather than establish an unrelated utility system. The
well and well house would be located within the Industrial Park, and the new distribution line would
serve the proposed new customer (YMCA) and anticipated growth. These characteristics support a
finding of consistency with the County’s utility-service and economic-development objectives, as
the Industrial Park is intended to be served by public utilities, as noted and mapped in the adopted
2040 Comprehensive Plan.
The County describes the water line as being within the existing public right-of-way. To the extent
it constitutes a normal utility service extension, §15.2-2232(C) exempts that component. However,
the new production well and well house warrant independent review unless they are already
sufficiently depicted in the adopted Comprehensive Plan or another exception applies.
The PER supports a planning-level conclusion that the project improves water reliability and service
capacity. Final engineering, well yield, groundwater withdrawal authorization, VDH approvals, and
construction permits remain separate regulatory matters; substantial accord approval does not
substitute for them.
Staff recommends that the Planning Commission find the general or approximate location,
character, and extent of the proposed Industrial Park Water System improvements substantially in
accord with the adopted Comprehensive Plan.

Attachments:
1. Code of Virginia §15.2-2232
2. Approved Preliminary Engineering Report
.

4
Page 14 of 43

Page 15 of 43

Code of Virginia
Title 15.2. Counties, Cities and Towns
Subtitle II. Powers of Local Government
Chapter 22. Planning, Subdivision of Land and Zoning
Article 3. The Comprehensive Plan

§ 15.2-2232. Legal status of plan
A. Whenever a local planning commission recommends a comprehensive plan or part thereof for
the locality and such plan has been approved and adopted by the governing body, it shall control
the general or approximate location, character and extent of each feature shown on the plan.
Thereafter, unless a feature is already shown on the adopted master plan or part thereof or is
deemed so under subsection D, no street or connection to an existing street, park or other public
area, public building or public structure, public utility facility or public service corporation
facility other than a railroad facility or an underground natural gas or underground electric
distribution facility of a public utility as defined in subdivision (b) of § 56-265.1 within its
certificated service territory, whether publicly or privately owned, shall be constructed,
established or authorized, unless and until the general location or approximate location,
character, and extent thereof has been submitted to and approved by the commission as being
substantially in accord with the adopted comprehensive plan or part thereof. In connection with
any such determination, the commission may, and at the direction of the governing body shall,
hold a public hearing, after notice as required by § 15.2-2204. Following the adoption of the
Statewide Transportation Plan by the Commonwealth Transportation Board pursuant to § 33.2353 and written notification to the affected local governments, each local government through
which one or more of the designated corridors of statewide significance traverses, shall, at a
minimum, note such corridor or corridors on the transportation plan map included in its
comprehensive plan for information purposes at the next regular update of the transportation
plan map. Prior to the next regular update of the transportation plan map, the local government
shall acknowledge the existence of corridors of statewide significance within its boundaries.
B. The commission shall communicate its findings to the governing body, indicating its approval
or disapproval with written reasons therefor. The governing body may overrule the action of the
commission by a vote of a majority of its membership. Failure of the commission to act within 60
days of a submission, unless the time is extended by the governing body, shall be deemed
approval. The owner or owners or their agents may appeal the decision of the commission to the
governing body within 10 days after the decision of the commission. The appeal shall be by
written petition to the governing body setting forth the reasons for the appeal. The appeal shall
be heard and determined within 60 days from its filing. A majority vote of the governing body
shall overrule the commission.
C. Widening, narrowing, extension, enlargement, vacation or change of use of streets or public
areas shall likewise be submitted for approval, but paving, repair, reconstruction, improvement,
drainage or similar work and normal service extensions of public utilities or public service
corporations shall not require approval unless such work involves a change in location or extent
of a street or public area.
D. Any public area, facility, park or use as set forth in subsection A which is identified within, but
not the entire subject of, a submission under either § 15.2-2258 for subdivision or subdivision A 8
of § 15.2-2286 for development or both may be deemed a feature already shown on the adopted
1

11/12/2026 12:00:0

Page 15 of 43

Page 16 of 43

master plan, and, therefore, excepted from the requirement for submittal to and approval by the
commission or the governing body, provided that the governing body has by ordinance or
resolution defined standards governing the construction, establishment or authorization of such
public area, facility, park or use or has approved it through acceptance of a proffer made pursuant
to § 15.2-2303.
E. Approval and funding of a public telecommunications facility on or before July 1, 2012, by the
Virginia Public Broadcasting Board pursuant to Article 12 (§ 2.2-2426 et seq.) of Chapter 24 of
Title 2.2 or after July 1, 2012, by the Board of Education pursuant to § 22.1-20.1 shall be deemed
to satisfy the requirements of this section and local zoning ordinances with respect to such
facility with the exception of television and radio towers and structures not necessary to house
electronic apparatus. The exemption provided for in this subsection shall not apply to facilities
existing or approved by the Virginia Public Telecommunications Board prior to July 1, 1990. The
Board of Education shall notify the governing body of the locality in advance of any meeting
where approval of any such facility shall be acted upon.
F. On any application for a telecommunications facility, the commission's decision shall comply
with the requirements of the Federal Telecommunications Act of 1996. Failure of the commission
to act on any such application for a telecommunications facility under subsection A submitted on
or after July 1, 1998, within 90 days of such submission shall be deemed approval of the
application by the commission unless the governing body has authorized an extension of time for
consideration or the applicant has agreed to an extension of time. The governing body may
extend the time required for action by the local commission by no more than 60 additional days.
If the commission has not acted on the application by the end of the extension, or by the end of
such longer period as may be agreed to by the applicant, the application is deemed approved by
the commission.
G. A proposed telecommunications tower or a facility constructed by an entity organized
pursuant to Chapter 9.1 (§ 56-231.15 et seq.) of Title 56 shall be deemed to be substantially in
accord with the comprehensive plan and commission approval shall not be required if the
proposed telecommunications tower or facility is located in a zoning district that allows such
telecommunications towers or facilities by right.
H. A solar facility subject to subsection A shall be deemed to be substantially in accord with the
comprehensive plan if (i) such proposed solar facility is located in a zoning district that allows
such solar facilities by right; (ii) such proposed solar facility is designed to serve the electricity or
thermal needs of the property upon which such facility is located, or will be owned or operated by
an eligible customer-generator or eligible agricultural customer-generator under § 56-594 or 56594.01 or by a small agricultural generator under § 56-594.2;or (iii) the locality waives the
requirement that solar facilities be reviewed for substantial accord with the comprehensive plan.
All other solar facilities shall be reviewed for substantial accord with the comprehensive plan in
accordance with this section. However, a locality may allow for a substantial accord review for
such solar facilities to be advertised and approved concurrently in a public hearing process with a
rezoning, special exception, or other approval process.
Code 1950, §§ 15-909, 15-923, 15-964.10; 1958, c. 389; 1960, c. 567; 1962, c. 407, § 15.1-456;
1964, c. 528; 1966, c. 596; 1968, c. 290; 1975, c. 641; 1976, c. 291; 1978, c. 584; 1982, c. 39; 1987,
c. 312; 1989, c. 532; 1990, c. 633; 1997, cc. 587, 858;1998, c. 683;2007, c. 801;2009, cc. 670, 690;
2012, cc. 803, 835;2016, c. 613;2018, cc. 175, 318;2020, c. 665;2022, c. 181.
2

11/12/2026 12:00:0

Page 16 of 43

Page 17 of 43

The chapters of the acts of assembly referenced in the historical citation at the end of this
section(s) may not constitute a comprehensive list of such chapters and may exclude chapters
whose provisions have expired.

3

11/12/2026 12:00:0

Page 17 of 43

Page 18 of 43

SURRY COUNTY-INDUSTRIAL PARK WATER SYSTEM
SURRY COUNTY, VIRGINIA

PRELIMINARY ENGINEERING REPORT
MAY 2026
REVISED OCTOBER 2026

10/08/2026

Project No. 008127-04-001
OWNER:
SURRY COUNTY
45 SCHOOL STREET,
SURRY, VA 23883
PREPARED BY:
BOWMAN CONSULTING GROUP, LTD.
263 MCLAWS CIRCLE
SUITE 205
WILLIAMSBURG, VIRGINIA 23185
PHONE: 757-229-1776
WWW.BOWMAN.COM

Page 18 of 43

Page 19 of 43

INDUSTRIAL PARK WATER SYSTEM – UPGRADES
SURRY COUNTY, VIRGINIA
PRELIMINARY ENGINEERING REPORT

BOWMAN CONSULTING GROUP, LTD.
PROJECT NO. 008127-04-001
MAY 2026
REVISED OCTOBER 2026

TABLE OF CONTENTS

I.

INTRODUCTION .....................................................................................................................2

II.

BACKGROUND INFORMATION ................................................................................................3

A.
B.

EXISTING SYSTEM GENERAL DESCRIPTION ............................................................................................... 3
EXISTING SYSTEM CAPACITY.................................................................................................................. 3

III.

PROJECTED DEMANDS ...........................................................................................................4

A.
B.

DEMAND AND FIRE FLOW .................................................................................................................... 4
STORAGE ........................................................................................................................................... 5

IV.

PROPOSED UPGRADES ...........................................................................................................5

A.
B.
C.
D.

GENERAL ........................................................................................................................................... 5
NEW GROUNDWATER WELL ................................................................................................................. 6
WELL HOUSE ..................................................................................................................................... 7
CONTROL SUMMARY ........................................................................................................................... 7

V.

ENGINEERS OPINION OF PROBABLE COST ...............................................................................7

A.
B.

COST ESTIMATE .................................................................................................................................. 7
PROJECT FUNDING .............................................................................................................................. 7

APPENDICIES .....................................................................................................................................8
APPENDIX A – VDH ENGINEERING DATA SHEETS .......................................................................................... 9
APPENDIX B – EXISTING DEMAND DATA ..................................................................................................... 10
APPENDIX C – HYDRAULIC MODELING MAP ............................................................................................... 11

i

Page 19 of 43

Page 20 of 43

INDUSTRIAL PARK WATER SYSTEM – UPGRADES
SURRY COUNTY, VIRGINIA
PRELIMINARY ENGINEERING REPORT

I.

BOWMAN CONSULTING GROUP, LTD.
PROJECT NO. 008127-04-001
MAY 2026
REVISED OCTOBER 2026

INTRODUCTION
The purpose of this Preliminary Engineering Report (PER) is to document the water system
improvements to the Surry County, VA Industrial Park Water System to support the proposed
YMCA facility located near the Industrial Park (TM-27-32). This report describes existing system
conditions, projected water demands, and proposed infrastructure improvements required to
support the proposed development and maintain compliance with applicable Virginia
Department of Health (VDH) Waterworks Regulations.
The proposed project consists of a new groundwater well and well house within the Industrial
Park, approximately 6,000 linear feet of 12-inch water line, a chemical feed system, an emergency
generator, associated electrical and controls, and site improvements. The preliminary project area
is shown in Figure 1.

SURRY COUNTY YMCA
VICINITY MAP
PRELIMIARY ENGINEERING REPORT
SURRY, VIRGINIA

BOWMAN CONSULTING GROUP, LTD.
263 MCLAWS CIRCLE, SUITE 205
WILLIAMSBURG, VIRGINIA 23185
(757) 229-1776

FIGURE 1: Project Area

Page 20 of 43

Page 21 of 43

INDUSTRIAL PARK WATER SYSTEM – UPGRADES
SURRY COUNTY, VIRGINIA
PRELIMINARY ENGINEERING REPORT

II.

BOWMAN CONSULTING GROUP, LTD.
PROJECT NO. 008127-04-001
MAY 2026
REVISED OCTOBER 2026

BACKGROUND INFORMATION
A.

Existing System General Description
The Surry County Industrial Park Water System currently operates under the VDH permit
No. 318782 NonTransient NonCommunity (NTNC) waterworks that provides potable
water to three existing customers located within the Industrial Park in Surry County, VA
(Appendix A).
The existing system consists of a one groundwater supply well, a 150,000-gallon elevated
storage tank, chlorination disinfection, and 4,800 feet of 8-inch diameter distribution
piping. Groundwater is withdrawn from the Potomac Aquifer and disinfected prior to
distribution in accordance with VDH waterworks regulations. The system was last
updated in 2019. Currently the permit designation is not anticipated to change and stay
as a NonTransient NonCommunity.

B.

Existing System Capacity
The existing waterworks has a permitted design capacity of 100,000 GPD. Existing system
storage is provided by a 150,000 gallon elevated storage tank. The tank operates between
defined control elevations that regulate system pressure and available storage:



High-Water Alarm: Elev. 161.75 ft (150,000 gal)
Well Pump OFF: Elev. 147.5 ft (85,000 gal)
Well Pump ON: Elev. 145.5 ft (72,000 gal)
Low-Water Alarm: Elev. 138.0 ft (25,000 gal)

Based on supplied monthly operating reports, the existing system’s average flow is
approximately 1,363 GPD, with an average maximum flow of approximately 5,475 GPD,
as shown in Table 1. The full data set for the existing demand is provided in Appendix B.
Table 1 – Industrial Park Water System – YMCA Upgrades – Existing Demand
Jan-2025 through Apr-2026
Average Flow (GPD)

Average Maximum Flow (GPD)

1,363

5,475

Page 21 of 43

Page 22 of 43

INDUSTRIAL PARK WATER SYSTEM – UPGRADES
SURRY COUNTY, VIRGINIA
PRELIMINARY ENGINEERING REPORT

III.

BOWMAN CONSULTING GROUP, LTD.
PROJECT NO. 008127-04-001
MAY 2026
REVISED OCTOBER 2026

PROJECTED DEMANDS
A.

Demand and Fire Flow
Projected YMCA demand was estimated using operational data from a similar YMCA
facility (Luter Family YMCA, Smithfield, VA) with comparable size and amenities. Flow
projections reflect an estimated daily demand of approximately 5,000 GPD for the
proposed YMCA based on planning level design units (approximately 1,700 gpd) derived
from the reference facility and scaled to represent the anticipated demand. Flow
projections also consider existing demand as well as anticipated future growth within the
Industrial Park area.
Table 2 - Industrial Park Water System – YMCA Upgrades – Projected Demand
Surry Industrial Park Location
Descriptions

Total
Avg. Daily
Max Day Max Daily
Contributing
Avg. Daily
Number of Flow Per
Peak
Demand
Design Units
Flow (gpd)
Units
Unit (gpd)
Factor
(gpd)

1

Future use

2

Flow
Peak Hour
Duration Demand
(hours)
(gpm)

1,363

2.0

5,475

4.0

8

11

Per person

300

16

4,800

2.0

9,600

4.0

8

40

ERC

250

200

50,000

2.0

100,000

4.0

8

417

Totals:

56,201

Exi sting Demand
YMCA

Peak
Factor

115,075

457

NOTES:
1) YMCA demand is based on Luter YMCA planning-level design unit values (approximately 1,700 gpd) and scaled for the proposed use
2) Anticipated Growth in and around Industiral Park area

As shown above in Table 2, the projected average daily demand for the YMCA is
approximately 4,800 GPD. When accounting for existing demand, the average flow is
approximately 6,163 gallons per day, 15,075 gpd max, or 51 gpm for peak hour demand.
Including future use drastically increases the demand on the system to approximately
56,201 gpd average, 115.075 gpd max, and 457 gpm for peak hour. Future use will require
additional upgrades to the system as demands reach the existing design capacity of the
system.
Hydraulic modeling (Appendix C) indicates that the proposed water main will allow the
Industrial Park Water System to provide the required 1,200 gpm fire flow while
maintaining a residual pressure of 36 psi. The required fire flow volume of 72,000 gallons,
based on 1,200 gpm for 60 minutes, is supplied through a combination of available
storage and well production. The analysis demonstrates that the existing system, together
with the proposed improvements, has sufficient capacity to meet both projected
domestic demands and required fire flow demands.

Page 22 of 43

Page 23 of 43

INDUSTRIAL PARK WATER SYSTEM – UPGRADES
SURRY COUNTY, VIRGINIA
PRELIMINARY ENGINEERING REPORT

B.

BOWMAN CONSULTING GROUP, LTD.
PROJECT NO. 008127-04-001
MAY 2026
REVISED OCTOBER 2026

Storage
Based on the projected demands of the existing system and proposed YMCA facility, the
existing 150,000-gallon elevated storage tank will provide sufficient storage capacity to
support the addition of the YMCA demands. Under existing conditions, approximately
72,000 gallons is required to satisfy the system fire flow demand of 1,200 GPM for 60
minutes, leaving an estimated 78,000 gallons available as operational storage, as shown
below in Table 3.
The more substantial storage requirements identified in the projected demands are
primarily associated with anticipated future development within the Industrial Park, as
reflected in the “Future use” component of Table 2, rather than the YMCA facility itself.
Table 3 - Industrial Park Water System – YMCA Upgrades – Existing Storage
Total Existing Exisiting Allocated
Storage (Gal)
FF (GPD)
150,000
72,000

IV.

Operational Storage
Available (Gal)
78,000

PROPOSED UPGRADES
A.

General
The proposed upgrades include development of a new groundwater production well and
associated well building within the Industrial Park, approximately 6,000 linear feet of 12inch waterline, a chemical feed system, an emergency generator, and associated
electrical, controls, and site improvements. The preliminary well service area layout is
shown on the following page in Figure 2.
Subject to regulatory approval and completion of the bid and construction phases, the
proposed water system improvements are anticipated to reach substantial completion in
November 2027.
The YMCA (new connection) is anticipated to connect to the Industrial Park Water System
in December 2027, upon completion of this water system expansion project.

Page 23 of 43

Page 24 of 43

INDUSTRIAL PARK WATER SYSTEM – UPGRADES
SURRY COUNTY, VIRGINIA
PRELIMINARY ENGINEERING REPORT

SURRY COUNTY YMCA
VICINITY MAP
PRELIMIARY ENGINEERING REPORT
SURRY, VIRGINIA

BOWMAN CONSULTING GROUP, LTD.
PROJECT NO. 008127-04-001
MAY 2026
REVISED OCTOBER 2026

BOWMAN CONSULTING GROUP, LTD.
263 MCLAWS CIRCLE, SUITE 205
WILLIAMSBURG, VIRGINIA 23185
(757) 229-1776

FIGURE 2: Well Service Area

B.

New Groundwater Well
A new groundwater produc on well will be developed and constructed within the
Industrial Park to provide addi onal potable water supply capacity for the proposed YMCA
facility and future Industrial Park growth. The well will withdraw groundwater from the
Potomac Aquifer and will be designed in accordance with applicable Virginia Department
of Health (VDH) Waterworks Regula ons. Due to project phasing and grant funding
requirements, the development of the new well will be completed along with the rest of
the project. Based on similar well projects in the vicinity, it is an cipated that the proposed
well will be equipped with a submersible well pump preliminary sized at 200 gpm. Final
well yield, pump capacity, and water quality tes ng requirements will be confirmed during
detailed design and permi ng.
Although current and ini al demand projec ons are well below 200 gpm, the well is being
sized to support long term system needs and an cipated Industrial Park growth. The
County is also pursuing a combined Groundwater Withdrawal Permit (GWWP) for the
Middle School and Industrial Park systems. In addi on, the Surry Water System Master
Plan iden fies a future interconnec on between the industrial park and Schools systems
to improve reliability, redundancy, and opera onal flexibility. The proposed well capacity
aligns with these long-range planning objec ves.

Page 24 of 43

Page 25 of 43

INDUSTRIAL PARK WATER SYSTEM – UPGRADES
SURRY COUNTY, VIRGINIA
PRELIMINARY ENGINEERING REPORT

C.

BOWMAN CONSULTING GROUP, LTD.
PROJECT NO. 008127-04-001
MAY 2026
REVISED OCTOBER 2026

Well House
A new precast concrete well building will be constructed within the Industrial Park near
the current voter registration building. The new building will house the proposed
disinfection feed system and all associated electrical equipment. A 6-feet tall chain link
fence with access gate will be provided around the well building, and well for security.
Sodium hypochlorite will be u lized for system disinfec on. The chemical feed system will
be located within the well house and designed to maintain required chlorine residuals
throughout the distribu on system in accordance with VDH Waterworks Regula ons.
Final chemical feed equipment sizing and dosing calcula ons will be completed during
detailed design based on confirmed well yield and system opera ng condi ons.

D.

Control Summary
Currently the elevated storage tank operates with a pressure transducer on a combined
inlet/outlet line via a wireless telemetry system by Ranger. The wireless telemetry system
will be expanded to the proposed well. The pressure transducer and telemetry system
will operate the two wells in alternating mode. Manual valves will be included to isolate
either well without taking the system offline.

V.

ENGINEERS OPINION OF PROBABLE COST
A.

Cost Estimate
The estimated total project cost is approximately $3.0 million. This reflects all construction,
contingency, engineering, and administration associated with the proposed Industrial Park
Water System improvements.

B.

Project Funding
The County has secured funding for the project. The funding will be administered through
EPA.

Page 25 of 43

Page 26 of 43

INDUSTRIAL PARK WATER SYSTEM – UPGRADES
SURRY COUNTY, VIRGINIA
PRELIMINARY ENGINEERING REPORT

BOWMAN CONSULTING GROUP, LTD.
PROJECT NO. 008127-04-001
MAY 2026
REVISED OCTOBER 2026

APPENDICIES

Page 26 of 43

Page 27 of 43

INDUSTRIAL PARK WATER SYSTEM – UPGRADES
SURRY COUNTY, VIRGINIA
PRELIMINARY ENGINEERING REPORT

BOWMAN CONSULTING GROUP, LTD.
PROJECT NO. 008127-04-001
MAY 2026
REVISED OCTOBER 2026

APPENDIX A – VDH ENGINEERING DATA SHEETS

Page 27 of 43

Page 28 of 43

Page 28 of 43

Page 29 of 43

Page 29 of 43

Page 30 of 43

INDUSTRIAL PARK WATER SYSTEM – UPGRADES
SURRY COUNTY, VIRGINIA
PRELIMINARY ENGINEERING REPORT

BOWMAN CONSULTING GROUP, LTD.
PROJECT NO. 008127-04-001
MAY 2026
REVISED OCTOBER 2026

APPENDIX B – EXISTING DEMAND DATA

Page 30 of 43

Page 31 of 43

INDUSTRIAL PARK WATER SYSTEM - EXISITING
DEMAND DATA
SURRY, VIRGINIA
INDUSTRIAL
PARK WATER SYSTEM - EXISITING
Jan-2025 through Apr-2026
Month
Jan-25
Feb-25
Mar-25
Apr-25
May-25
Jun-25
Jul-25
Aug-25
Sep-25
Oct-25
Nov-25
Dec-25
Jan-26
Feb-26
Mar-26
Apr-26

Monthly
Minimun
(GPD)
MonthJan-25
Feb-25
Mar-25
Apr-25
May-25
Jun-25
Jul-25Aug-25

Sep-25
Oct-25
Nov-25
Dec-25
Jan-26
Feb-26
Mar-26
Apr-26

DEMAND
Monthly DATA
Monthly Avg
Maximum
(GPD)SURRY, VIRGINIA
(GPD)
Jan-2025
through
1,013
5,000 Apr-2026
1,182
3,000
Monthly
Monthly
Monthly Avg
1,287
2,800
Minimun
Maximum
1,660
5,800
(GPD)
1,517
(GPD) 4,300
(GPD)
1,547
3,900
- 7,000 1,013
5,000
1,797
1,182
3,000
2,032 - 17,900
1,393 5,200
1,287
2,800
1,452
5,000
1,660
5,800
1,137 3,900
963 3,300
1,517
4,300
1,461
6,100
1,547
3,900
1,307
7,600
1,797
7,000
1,055 4,200
1,010 2,600
2,032
17,900
-

1,393
1,452
1,137
963
1,461
1,307
1,055
1,010

5,200
5,000
3,900
3,300
6,100
7,600
4,200
2,600

Page 31 of 43

Page 32 of 43

INDUSTRIAL PARK WATER SYSTEM – UPGRADES
SURRY COUNTY, VIRGINIA
PRELIMINARY ENGINEERING REPORT

BOWMAN CONSULTING GROUP, LTD.
PROJECT NO. 008127-04-001
MAY 2026
REVISED OCTOBER 2026

APPENDIX C – HYDRAULIC MODELING MAP

Page 32 of 43

Page 33 of 43

Active Scenario: Fire Flow

J-2
Fire Flow Available: 1,567 gpm
53 psi
J-3
Fire Flow Available: 1,567 gpm
53 psi

elev tank

J-4

J-34
J-1
Fire Flow Available: 1,567 gpm

Fire Flow Available: 1,567 gpm

Fire Flow Available: 1,567 gpm

48 psi

58 psi

64 psi
J-5
Fire Flow Available: 1,567 gpm
48 psi
J-6
Fire Flow Available: 1,567 gpm
J-41

J-40
Fire Flow Available: 1,530 gpm
36 psi

49 psi

Fire Flow Available: 1,567 gpm
45 psi
J-11
Fire Flow Available: 1,567 gpm
55 psi

J-7
Fire Flow Available: 1,567 gpm
J-8

50 psi

J-38
Fire Flow Available: 1,567 gpm
41 psi

J-39
Fire Flow Available: 1,527 gpm
36 psi

Fire Flow Available: 1,567 gpm
51 psi

J-23
Fire Flow Available: 1,567 gpm
38 psi

J-16
Fire Flow Available: 1,370 gpm
36 psi

2026-03-06 - Industrial Park WaterCAD.wtg
5/19/2026

Bentley Systems, Inc. Haestad Methods Solution Center
76 Watertown Road, Suite 2D Thomaston, CT 06787 USA +1-203-755-1666

WaterCAD
[24.00.00.26]
Page 1 of 1

Page 33 of 43

Page 34 of 43

PREPARED BY:
BOWMAN CONSULTING GROUP, LTD.
263 MCLAWS CIRCLE
SUITE 205
WILLIAMSBURG, VIRGINIA 23185
PHONE: 757-229-1776
WWW.BOWMAN.COM

Page 34 of 43

Page 35 of 43

NOTICE IS HEREBY GIVEN THAT
THE SURRY COUNTY PLANNING COMMISSION
WILL HOLD PUBLIC HEARINGS ON
MONDAY, NOVEMBER 16, 2026 AT 6:00 P.M.
IN THE GENERAL DISTRICT COURTROOM LOCATED AT
THE SURRY COUNTY GOVERNMENT CENTER
45 SCHOOL STREET, SURRY, VIRGINIA
TO CONSIDER AND INTENDS TO TAKE ACTION ON THE FOLLOWING:
Ordinance Amendment 2026-04: Ordinance to amend Article III, Zoning Districts and Boundaries,
Section 3-900 - M1, Light Industrial District and Section 3-1000 – M2, General Industrial District, of the
Surry County Zoning Ordinance by amending Section 3-902, Permitted Uses, and Section 3-1002,
Permitted Uses, to shift certain industrial use types from by-right to requiring a conditional use permit and
adding new use types to each district.
The public hearings will be held pursuant to § 15.2-2204, and § 15.2-2285 of The Code of Virginia (1950,
as amended). A copy of the proposed ordinance amendments may be reviewed or obtained on the
County’s website at https://www.surrycountyva.gov/413/Public-Notices, or a copy of the proposed
ordinances and related material may be examined at the Department of Planning and Community
Development, Surry County Government Center, 45 School Street, Surry, Virginia. Office hours are
Monday through Friday from 9:00 am to 5:00 pm.
All interested persons are invited to participate in the public hearing. If assistance or special
accommodations are needed to participate in the hearing, please contact the Department of Planning &
Community Development Monday – Friday from 9:00 a.m. to 5:00 p.m. at least 72 hours prior to the
hearing.
Horace H. Wade III, AICP, CZA
Director of Planning & Community Development
(757) 294-5210

Page 35 of 43

Page 36 of 43

3-900. M-1 General Industrial District
Sec. 3-901. Purpose of the district.
This district is intended to provide an environment suitable for industrial activities that do not create
appreciable nuisances, hazards or threats to the natural environment or surrounding development. Uses that
would typically be found in this district include a wide variety of light manufacturing, fabricating, processing,
wholesale distributing and warehousing uses appropriately located for access to highways and providing a
controlled environment within which uses are to be conducted in completely enclosed buildings. In order to
preserve the land for industry, to reduce extraneous traffic, and avoid future conflicts between industry and other
uses, business and service uses are limited primarily to those which will be useful to employees in the district and
future residential uses are restricted.
(Ord. No. 2025-01, § 1, 2-13-2025; Ord. No. 2025-02, 4-3-2025)

Sec. 3-902. Permitted uses.
A.

The following uses are permitted by right subject to all other applicable requirements contained in this
ordinance. An asterisk (*) indicates additional, modified or more stringent standards are listed in article IV,
Use and design standards, for those specific uses.
AGRICULTURAL USES
Agriculture
Silvicultural activities
CIVIC USE TYPES
Park and ride facility
Parks and recreation
Post office
Public maintenance facility
Utility service/minor
Water or sewer pumping station
COMMERCIAL USE TYPES
Auction establishment
Bank
Business support service
Business or trade school
Construction office, temporary
Equipment sales and rental
General service and repair
Mini warehouse
Created: 2026-09-24 15:27:11 [EST]

(Supp. No. 13)
Page 1 of 8

Page 36 of 43

Page 37 of 43

Motor vehicle/outdoor storage
Motor vehicle repair service/major
Office, general
Taxidermy
Truck stop
INDUSTRIAL USE TYPES
Contractor's yard
Convenience center
Custom manufacturing
Industry, Type I
Laboratory
Warehousing and distribution
MISCELLANEOUS USE TYPES
Parking facility
Reconstructed wetland
Windmill*
B.

The following uses are allowed only by special exception from the board of zoning appeals pursuant to
section 1-304. An asterisk (*) indicates additional, modified or more stringent standards are listed in article
IV, Use and design standards, for those specific uses.
RESIDENTIAL USES
Accessory apartment
CIVIC USE TYPES
Day care center
MISCELLANEOUS USE TYPES
Communication tower

C.

The following uses are allowed only by conditional use permit from the board of supervisors pursuant to
section 1-501. An asterisk (*) indicates additional, modified or more stringent standards are listed in article
IV, Use and design standards, for those specific uses.
CIVIC USE TYPES
Battery energy storage system*
Community-scale solar energy facility*
Utility-scale solar energy facility*
Utility service/major
COMMERCIAL USE TYPES
Convenience store

Created: 2026-09-24 15:27:12 [EST]

(Supp. No. 13)
Page 2 of 8

Page 37 of 43

Page 38 of 43

Lumber yard
INDUSTRIAL USE TYPES
Industry, Type I
Industry, Type II
Laboratory
Mining*
Recycling center
Transfer station
MISCELLANEOUS USE TYPES
Alternate discharge sewage system
(Ord. No. 2025-01, § 1, 2-13-2025; Ord. No. 2025-02, 4-3-2025; Ord. No. 2025-03, 7-2-2025)

Sec. 3-903. Lot requirements.
The following standards shall apply to the creation of new lots under this ordinance:
A.

Minimum lot area: 30,000 square feet.
The required minimum area for lots served by private water or private sewer facilities may be
increased when the health department requires a larger parcel to satisfy an on-site sewage disposal
system.

B.

Minimum lot width:
1.

On existing public roads: 150 feet.

2.

On new subdivision roads: 100 feet.

C.

Minimum lot depth: 200 feet.

D.

Minimum lot frontage:

E.

1.

On existing public roads: 150 feet.

2.

On new subdivision roads: 100 feet.

3.

On a cul-de-sac: 75 feet.

The minimum lot size (area, width, depth, and frontage) requirements for water or sewer pumping
stations may be reduced provided the general standards outlined in section 4-610 of this Zoning
Ordinance are met.

(Ord. No. 2025-03, 7-2-2025)

Sec. 3-904. Height, bulk, and yard requirements.
The following standards shall apply to the building of any structure on lots within this district:
A.

Maximum building height:
1.

All structures: 75 [feet].

Created: 2026-09-24 15:27:12 [EST]

(Supp. No. 13)
Page 3 of 8

Page 38 of 43

Page 39 of 43

B.

C.

D.

a.

The height limit shall be 35 feet in height. The height limit for principal structures may be
increased to 70 feet or up to five stories, whichever is lesser; provided, that each required
yard is increased one foot for each additional foot of principal structure height over 35
feet. There are two side yards for each permitted principal structure, each of which is 15 or
more feet in width plus one foot or more of side yard for each additional foot of principal
structure height over 35 feet.

b.

Where structures exceed the 35-foot height requirement a building separation of 30 feet
shall be required.

c.

See section 4-102, for exceptions to height limits.

Minimum front yard setbacks:
1.

On primary highway: 75 feet.

2.

On secondary highway or other street: 50 feet.

3.

Accessory structures shall only be allowed in the side or rear yard (behind the front face of the
principal building).

Minimum side yard setback:
1.

None, but a buffer yard is required on lots adjacent to residential and agricultural zoning districts
(see section 5-400).

2.

Accessory structures shall only be allowed in the side or rear yard (behind the front face of the
principal building).

Minimum rear yard setback:
1.

All structures: 25 feet, but a buffer yard is required on lots adjacent to residential and agricultural
zoning districts (See section 5-400).

(Ord. No. 2025-03, 7-2-2025)

3-1000. M-2 General Industrial District
Sec. 3-1001. Purpose of the district.
The purpose of this district is to provide for a wide variety of industrial operations, but to restrict or prohibit
those industries which have characteristics likely to produce serious adverse effects within or beyond the limits of
the district. Certain potentially hazardous industries are permitted only after public hearings and review to assure
protection of the public interest and surrounding property and persons. It is the intention of the district to
preserve the land in the district for industrial use and to exclude new residential or commercial development
except for certain uses determined to be supportive of industrial operations.
(Ord. No. 2025-01, § 1, 2-13-2025; Ord. No. 2025-02, 4-3-2025)

Sec. 3-1002. Permitted uses.
A.

The following uses are permitted by right subject to all other applicable requirements contained in this
ordinance. An asterisk (*) indicates additional, modified or more stringent standards are listed in article IV,
Use and design standards, for those specific uses.
AGRICULTURAL USES
Created: 2026-09-24 15:27:12 [EST]

(Supp. No. 13)
Page 4 of 8

Page 39 of 43

Page 40 of 43

Agriculture
Silvicultural activities
RESIDENTIAL USES
Accessory apartment
CIVIC USE TYPES
Day care center
Park and ride facility
Post office
Public maintenance facility
Public facility
Public park and recreational area
Utility service/minor
Water or sewer pumping station
COMMERCIAL USE TYPES
Adult entertainment establishment
Agricultural service
Auction establishment
Bank
Business support service
Business or trade school
Construction office, temporary
Crematorium
General service and repair
Laundry
Livestock auction market
Office, general
Truck stop
INDUSTRIAL USE TYPES
Convenience center
Industry, Type I
Industry, Type II
Laboratory
Recycling center
Scrap and salvage service

Created: 2026-09-24 15:27:12 [EST]

(Supp. No. 13)
Page 5 of 8

Page 40 of 43

Page 41 of 43

Transfer station
Warehousing and distribution
MISCELLANEOUS USE TYPES
Parking facility
Reconstructed wetland
Windmill*
B.

The following uses are allowed only by special exception from the board of zoning appeals pursuant to
section 1-304. An asterisk (*) indicates additional, modified or more stringent standards are listed in article
IV, Use and design standards, for those specific uses.
CIVIC USE TYPES
Day care center
MISCELLANEOUS USE TYPES
Communication tower

C.

The following uses are allowed only by conditional use permit from the board of supervisors pursuant to
section 1-501. An asterisk (*) indicates additional, modified or more stringent standards are listed in article
IV, Use and design standards, for those specific uses.
CIVIC USE TYPES
Battery energy storage system*
Community-scale solar energy facility*
Utility-scale solar energy facility*
Utility service/major
COMMERCIAL USE TYPES
Convenience store
INDUSTRIAL USE TYPES
Asphalt plant
Industry, Type I
Industry, Type II
Industry, Type III
Landfill
Laboratory
Meat packing
Mining*
Power plant
Scrap and salvage service *
Transfer station

Created: 2026-09-24 15:27:12 [EST]

(Supp. No. 13)
Page 6 of 8

Page 41 of 43

Page 42 of 43

MISCELLANEOUS USE TYPES
Alternate discharge sewage system
(Ord. No. 2016-02, 8-4-2016; Ord. No. 2025-01, § 1, 2-13-2025; Ord. No. 2025-02, 4-3-2025; Ord. No. 2025-03, 7-22025)

Sec. 3-1003. Lot requirements.
The following standards shall apply to the creation of new lots under this ordinance:
A.

Minimum lot area: 40,000 square feet.
The required minimum area for lots served by private water or private sewer facilities may be
increased when the health department requires a larger parcel to satisfy an on-site sewage disposal
system.

B.

Minimum lot width:
1.

On existing public roads: 150 feet.

2.

On new subdivision roads: 100 feet.

C.

Minimum lot depth: 200 feet.

D.

Minimum lot frontage:

E.

1.

On existing public roads: 150 feet.

2.

On new subdivision roads: 100 feet.

3.

On a cul-de-sac: 75 feet.

The minimum lot size (area, width, depth, and frontage) requirements for water or sewer pumping
stations may be reduced provided the general standards outlined in section 4-610 of this Zoning
Ordinance are met.

(Ord. No. 2025-03, 7-2-2025)

Sec. 3-1004. Height, bulk, and yard requirements.
The following standards shall apply to the building of any structure on lots within this district:
A.

Maximum building height:
1.

All structures: 75 [feet].
a.

The height limit shall be 35 feet in height. The height limit for principal structures may be
increased to 70 feet or up to five stories, whichever is lesser; provided, that each required
yard is increased one foot for each additional foot of principal structure height over 35
feet. There are two side yards for each permitted principal structure, each of which is 15 or
more feet in width plus one foot or more of side yard for each additional foot of principal
structure height over 35 feet.

b.

Where structures exceed the 35-foot height requirement a building separation of 30 feet
shall be required.

c.

See section 4-102 for exceptions to height limits.

Created: 2026-09-24 15:27:12 [EST]

(Supp. No. 13)
Page 7 of 8

Page 42 of 43

Page 43 of 43

B.

C.

D.

Minimum front yard setbacks:
1.

On primary highway: 75 feet.

2.

On secondary highway or other street: 50 feet.

3.

Accessory structures shall only be allowed in the side or rear yard (behind the front face of the
principal building).

Minimum side yard setback:
1.

None, but a buffer yard is required on lots adjacent to residential and agricultural zoning districts
(see section 5-400).

2.

Accessory structures shall only be allowed in the side or rear yard (behind the front face of the
principal building)

Minimum rear yard setback:
1.

All structures: 25 feet, but a buffer yard is required on lots adjacent to residential and agricultural
zoning districts (see section 5-400).

(Ord. No. 2025-03, 7-2-2025)

Created: 2026-09-24 15:27:12 [EST]

(Supp. No. 13)
Page 8 of 8

Page 43 of 43

Outcome

Not yet recorded. The record stays open — outcomes are added as minutes and vote results are published.

Provenance

Where this record came from. Every source is listed, permanently.

  • Agenda Watch · Nov 14, 2026
  • DeFlock research desk · Nov 14, 2026

Permanent ID DKT-2026-005296 — this record is never deleted.

Record history

Every change to this record, logged as it happened.

  • Nov 14, 2026 Filed on the Docket
  • Nov 14, 2026 Full document archived — public record
  • Nov 14, 2026 Corroborated by another source DeFlock research desk
  • Nov 17, 2026 Record updated

← The full Docket · every meeting, vote, and action on the permanent record · also in the National Record Index.